HomeMy WebLinkAboutApplication-PermitGarfield County
Building & Sanitation Department
108 ?' Street, Suite #201 Glenwood Springs, Co. 81601
Office- 945-8212 Inspection Line- 384-5003
NO. 13_1
Job Address C' I lc \P rEP eta (-3: 01 G-(3.' S
Nature of Work Build
ing Permit l bek- 2
J 16 1Tc
rr-\brt `/
se of Building V / t- ()(1 Ci . o . l IM40--.4 n ade(((' Cc Y
Contractor Aocaner `��O1 rlc�J���vv�
i2_
Amount of Permit $ `,l'C� :37 16Date */ I / 6 Si
Clerk
t 04
Permit No:
GARFIELD COUNTY BUILDING PERMIT APPLICATION
108 8-" Street. Suite 201. Olenwood Springs. CO 81801
Phone: 970-995-8212 / Pax: 970-9843470 / inspection Line: 970-3845003
Parcel/Schedule No: 2,35 5- 121 - 18- (6 8
Job Address: 0103 RIVER BEND W4y 6), 4,0
1 Lot No:/ Block No: �j Sobel. / Exemption:
16 rronhar?djt✓ ?lag -she -4 (phi,V -bs
opMeynJ-,N
2
Owner:
rron 6ricL& 40rnes LLC
Address
Li 10 iron Lri c1 y CW
Ph.Wk
9LS 1 9sco
Ph:
3
Contractor.
1
-(tinsel LAMS+rvct-1'04
Address:
5ar>•te
ph:
'191- 9900
1.1c. No.
4
Archlte Engineer:Address:
WOOCI t y r4rtki4-ec-+vrG(
`1137 6. Ric15LKe BIHh '�
1,ti1:vuls Rime/,, co 303.683-7231
Lie. No.
5
Sq. Ft. of Building: 2, 5 r b
75
Sq. Ft. of Lot: ` q 6
Li
Height:
No. of Floors: I
6
Use of Building:
Sin lG Fc•w1'
b-lawfe_ w CO-& ;:.... ,E iv
Describe Work: wart 1`.r,Q YMe ! • �+
S.,� .L 1/l D/,. l
tf U yY��
7
1
/Remove
8
Class of Work: jNew 0 •. teratitlon�LAM� a
L1 Addition J Move
9
10
?page:.-.. ❑ Single
- 1r4 r Double
Carport: 0 Single
/ ❑ Double
o Driveway Permit ❑ On -Site Sewage
kKempt Disposal
�
II( Slte Plan /�/.11iQ4Sion p� 3/
�c1'0/FS/
11
Valuation of Work: S
1 /
Adjusted Valuations: S /g / 217 g412
I:1a1
Conditional
AA{� it l+ • 0 �.�Pt gl�J.i r•T —X
''
tri
�3'LIO l�t� (L
•
SEPARATE E
I SSUEDED BY THHE
THIS PERMIT BECOMES
AUTHORIZED
CONST
PERIOD OF 180
l HEREBY CERTIFY
APPLICATION AND
PROVISIONS OF
COMPLETED WITHIN
COMPLETED
GRANTING OF A
TD VIOLATE OR
LOCAL LAW '
OFCONSTRU JJs
TE
STA
STATE OF
O
NULL
OR WORK
DAYS AT
THAT
KNOW
LAWS GOVERNING
WHETHER
PERMIT
CANCEL
-TIN..
NOTICE _Plan
PERMIT IS REQUIRED AND MUST 86
COLORADO.
AND VOID LF WORK OR CONSTRUCTIONTgqot
IS SUSPENDED ORABANDONEDLFOR A
ANY TIME AFTER WORK IS COMMENCED.
I HAVE READ AND EXAMINED THIS
THE SAME TO BE TRUE AND CORRECT. ALL
THIS TYPE OF WORK WILL BE---/(C.--
SPECIFIED HEREIN OR NOT. THE
DOES NOT PRESUME TO GIVE AUTHORITY
1- s VISIONS OF ANY OTHER STATE OR
UCTION OR THE PERFORMANC
1
q Isijb
Check Fee:
9451. �Z
Permit Fee: /
452.95
1 Fe
F
7 ri
13
J
Dated Permit
C
Issued:
�
. J� * 750
--
OCC Group:
C
Const. Type:
Zoning:
1)
IA
0 ,J
Setbacks:
Manu. Home:
ye ATill
7 (41 -
1SDS No. &'t
Ir^' "�'
(p
V
ER DATE
/0-/1-01-
0-/f�i �� Yl�P_NG. J
BLDG.a
.s• . • Tti Pnovttwive'$rif-7A-6.
Se
AGREEMENT
PERMISSION 15 HEREBY GRANTED 1D THE APPLICANT AS OWNER CONTRACTOR AND/OR THE AGENT OF THE CONTRACTOR OR OWNER TO CONSTRUCT
THE STRUCTURE AS DETAILED ON PLANS AND SPECIFICATIONS SUBMITTED TO AND REVIEWED BY THE BUILDING DEPARTMENT
IN CONSIDERATION OF THE ISSSUANCE OF THIS PERMIT. THE SIGNER HEREBY AGREES TO COMPLY WTTII ALL BUILDING CODES AND IAND
1355 REGULATIONS ADOPTED BY GARFIELD COUNTY PURSUANT TO AUTHORITY GIVEN LN 30.26.201 CRS AS AMENDED. 7115 SIGNER FURTHER AGREES
THAT IF THE ABOVE SAID ORDINANCES ARE NOT FULLY COMPILED WITH IN THE LCOATION. ERECTION, CONSTRUCTION. AND USE OF THE
ABOVE DESCRIBED STRUCTURE. THE PERMIT MAY BE REVOKED BY NOTICE FROM THE COUNTY AND THAT THEN AND THERE IT SHALL BECOME
NULL AND VOID. THE ISSUANCE OF A PERMT BASED UPON PLANS. SPECIFICATIONS AND OTHER DATA SHALL NOT PREVENT THE BUILDING OFFICIAL
FROM THEREAFTER REQUIRING THE CORRECTION OF ERRORS IN SAID PLANS. SPECIFICATIONS AND OTHER DATA OR FROM PREVENTING
BUILDING OPERATION BEING CARRIED ON THEREUNDER WHEN IN VIOLATION OF THS CODE OR ANY OTHER ORDINANCE OR REGULATION OF
THIS JURISDICTION. THE REVIEW OF SUBMITTED PLANS AND SPECIFICATIONS AND INSPECTIONS CONDUCTED THEREAFTER DOES NOT CONSTITUTE
AN ACCEPTANCE OF ANY RESPONSIBILITIES OR LIABLII1ES BY GARFIELD COUNTY FOR ERRORS OMISSIONS OR DISCREPENCIES TT21jlIE RESPONSI
BILTTY FOR THESE MEMS AND IMPLEMENTATION DURING CONSTRUCTION RESTS SPECIFICIALLY W1TH THE ARIICfECT. DESIGN FWBU1 DER.
AND OWNER. COMMENTS ARE INTENDED TO BE CONSERVATIVE AND IN SUPPORT OF THE OWNERS LNIEREST.
Garfom.003
I HEREBY ACKNOWLEDGE THAT 1 HAVE READ AND UNDERSTAND THE AGREEMENT ABOVE (INITIAL)
/'it, 31 -7 ( 397a e. 4l
�" 8 g'F7So.(1u
The following items are required by Garfield County for a final inspection:
1. A final Electrical Inspection from the Colorado State Electrical Inspector
2. Permanent address assigned by Garfield County Building Department posted where
readily visible from access road;
3. A finished roof, a lockable house, complete exterior siding, exterior doors and windows
installed, a complete kitchen with cabinets, a sink with hot & cold running water, non-
absorbent kitchen floor coverings, counter tops and finished walls, ready for stove and
refrigerator, all necessary plumbing;
4. A complete bathroom, with washbowl, tub or shower, toilet stool, hot and cold running
water, non-absorbent floors and walls finished and a privacy door;
5. All steps outside or inside over three (3) steps must have handrails, guard rails on
balconies or decks over 30" high constructed to all 1997 UBC requirements;
6. Outside grading done to where water will detour away from the building;
7. Exceptions to the outside steps, decks and grading may be made upon the demonstration
of extenuating circumstances, i.e. weather, but a Certificate of Occupancy will not be issued until
all the required items are completed and a final inspection made.
A CERTIFICATE OF OCCUPANCY WILL NOT BE ISSUED UNTIL ALL THE ABOVE
ITEMS HAVE BEEN COMPLETED.
•"'CANNOTOCCUPY OR USE DWELLING UNTIL A CERTIFICATE OF OCCUPANCY
(C.O.) IS ISSUED. OCCUPANCY OR USE OF DWELLING WITHOUT A C.O. WILL BE
CONSIDERED AN ILLEGAL OCCUPANCY AND MAY BE GROUNDS FOR VACATING
PREMISE UNTIL ABOVE CONDITIONS ARE MET.
1 understan and agree to abide by the above conditions for occupancy, use and the issuance of a
Certificat Oc ' y for the dwelling under buildingrmit#
g r
Signature Date
BpcontO82002
VALUATION/FEE DETERMINATION
Applicant iia
Address 0( 031,1ver
Date 11-rj.e
Finished (Livable Area):
Main
Upper
Lower
Other
Subdivision 3-o^isri ajefuD - Pkkse
Lot/Block !(a$
Contractor I
rukekSerl CAIAS4-
Total Square Feet 2013 V !�i — /5O 3
70
Valuation
Basement:
Unfinished
Conversion of Unfinished to Finished
Plan Check Fee for Conversion
Valuation
Garage:
Crawl Space:
Valuation
570
Valuation 2013 4 9
Decks/Patios:
Covered //� `)
Valuation qa Y2�=
Open
Valuation
Total Valuation
2keo
/61 22-1
alop
S aco-E_ 11 olo (,
VALUATION/FEE DETERMINATION
Applicant7aola L:'J .kipc4 ll, Subdivision J-o^L ri t je eUD -- itkise C
Address 0 ( 03?4,1vet Lot/Block 1678
Date �E F(0 Contractor FtclikSen c
Finished (Livable Area):
Main
Upper
Lower
Other
Total Square Feet .20 13 't 7-i — /5-0 3
Valuation
/5t, 33o ssi
Basement:
Unfinished
Conversion of Unfinished to Finished
Plan Check Fee for Conversion
Valuation
S Ott 227 f o oG
Garage: /0100 /,D, 4a2 0
Valuation 510 f
Crawl Space:
Valuation 2013 4 q z /8 117 "� //7
Decks/Patios:
Covered //�� -11
Valuation `73 12`� -
Open
Valuation
ZkQO
216
Total Valuation /Q / 221 t9 /05 3/3. SI
7 r FuiSvrq-*,o/ Z397, 37
2z) 3' . 33
M;
3(0• cup
Saco ) 1114
GARFIELD COUNTY BUILDING AND PLANNING
970-945-8212
MINIMUM APPLICATION REQUIREMENTS
For
SINGLE FAMILY DWELLING CONSTRUCTION
Including
NEW CONSTRUCTION
ADDITIONS
ALTERATIONS
And
MOVED BUILDINGS
In order to understand the scope of the work intended under a permit application and expedite the
issuance of a permit it is important that complete information be provided. When reviewing a plan
and it's discovered that required information has not been provided by the applicant, this will result
in the delay of the permit issuance and in proceeding with building construction. The owner or
contractor shall be required to provide this information before the plan review can proceed. Other
plans that are in line for review may be given attention before the new information may be reviewed
after it has been provided to the Building Department.
Please review this document to determine if you have enough information to design your
project and provide adequate information to facilitate a plan review. Also, please consider
using a design professional for assistance in your design and a construction professional for
construction of your project. Any project with more than ten (10) occupants requires the plans
to be sealed by a Colorado Registered Design Professional.
To provide for a more understandable plan in order to determine compliance with the building,
plumbing and mechanical codes, applicants are requested to review the following checklist prior to
and during design. Applicants are required to indicate appropriately and to submit the
completed checklist at time of application for a permit.
Plans to be included for a Building Permit, must be on drafting paper at least 18"x24" and
drawn to scale.
1
Plans must include a floor plan, a concrete footing and foundation plan, elevations all sides with
decks, balcony, steps, hand rails and guard rails, windows and doors, including the finish grade line
and original grade. A section showing in detail, from the bottom of the footing to the top of the roof,
including re -bar, anchor bolts, pressure treated plates, floor joists, wall studs and spacing, insulation,
sheeting, house -rap, (which is required), siding or any approved building material. Engineered
foundations may be required.
A window schedule. A door schedule. A floor framing plan, a roof framing plan, roof must be
designed to withstand a 40 pound per square foot up to 7,000 feet in elevation, a 90 M.P.H. wind
speed, wind exposure B or C, and a 36 inch frost depth.
All sheets to be identified by number and indexed. All of the above requirements must be met or
your plans will be returned.
All plans submitted must be incompliance with the 2003 IRC.
Is a site plan included that identifies the location of the proposed structure or addition and
distances to the property lines from each comer of the proposed structure(s) prepared by a
licensed surveyor and has the surveyors signature and professional stamp on the drawing?
Properties with slopes of 30% or greater must be shown on the site plan. (NOTE
Section: 106.2) Any site plan for the placement of any portion of a structure within 50 ft.
of a property line and not within a previously surveyed building envelope on a
subdivision final plat shall be prepared by a licensed surveyor and have the surveyor's
signature and professional stamp on the drawing. Any structure to be built within a
building envelope of a lot shown on a recorded subdivision plat shall include a copy of
the building envelope as it is shown on the final plat with the proposed structure located
withinvelope.
Yes
2. Does the site plan also include any other buildings on the property, setback easements and
utility easements? Please refer to Section 5.05.03 in the Garfield County Zoning Resolution
if the property you are applying for a building permit on is located on a corner lot. Special
setback5.4o pply.
Yes
3. Does the site plan include when applicable the location of the I.S.D.S. (Individual Sewage
Disposal System) and the distances to the property lines, wells (on subject property and
adjacent ogar)ies), streams or water courses?
Yes
2
4. Does the site plan indicate the location and direction of the County or private road accessing
the prope
Yes
5. Do the plans include a foundation plan indicating the size, location and spacing of all
reinforcing sjee1 in accordance with the IRC or per stamped engineered design?
Yes
6. Do the plans indicate the location and size of ventilation openings for under floor crawl
spaces and thyclearances required between wood and earth?
Yes
7. Do the plans indicate the size and location of ventilation openings for the attic, roof joist
spaces jpd soffits?
Yes
8. Do the plans include design loads as required by Garfield County for roof snow loads, (a
minimum of 40 pounds per square foot up to & including 7,000 feet above sea level), floor
loads and wind loads?
Yes
9. Does the plan include a building section drawing indicating foundation, wall, floor, and roof
constructio ?
Yes
10. Does the building section drawing include size and spacing of floor joists, wall studs, ceiling
joists, roof] fter or joists or trusses?
Yes
11. Does the building section drawing or other detail include the method ofpositive connection of
all columnsand_beams?
Yes
12. Does the elevation plan indicate the height of the building or proposed addition from the
undisturbed grade to the midpoint between the ridge and eave of a gable or shed roof or the
top of a flat roy? (Building height measurement usually not to exceed 25 feet)
Yes
13. Does the plan include any stove or zero clearance fireplace planned for installation including
make and I and Colorado Phase II certifications or phase II EPA certification?
Yes J///// No
3
14. Does the plan include a masonry fireplace including a fireplace section indicating design to
comply with the IRC?
Yes No
15. Does the plan include a window schedule or other verification that egress/rescue windows
from sle in ooms and/or basements comply with the requirements of the IRC?
Yes (/ No
16. Does the plan include a window schedule or other verification that windows provide natural
light and ventilati n for all habitable rooms?
Yes /7� No
17. Do the plans indicate the location of glazing subject to human impact such as glass doors,
glazing immediately adjacent to such doors; glazing adjacent to any surface normally used as
a walking surface; sliding glass doors; fixed glass panels; shower doors and tub enclosures
and speci sa glazing for these areas?
Yes / No
18. Is the location of all natural and liquid petroleum gas furnaces, boilers and water heaters
indicated . . t e plan?
Yes No
19. Do you understand that if you are building on a parcel of land created by the exemption
process or the subdivision process, are building plans in compliance with all plat notes and/or
covenants9
Yes / //r/ No
20. Do you understand that if you belong to a homeowners association, it is your responsibility
to obtain written permission from the association, if required by that association, prior to
submitting an application for a building permit? The building permit application will not
be accep d wout it.
Yes No
21.
22.
23.
Will this be only residential structure on the parcel?
Yes No If no -Explain:
Hay two (2) cgmplete sets of construction drawings been submitted with the application?
Yes
Do you understand that the minimum dimension a home can be on a lot is 20ft.wide and 20ft.
long?
Yes 7// No
4
24. Have you designed or had this plan designed while considering building and other
construction ode requirements?
Yes l%7 No
25. Do your plans comply with all zoning rules and regulations in the County related to your
propertie zo a district?
Yes / No
26. Does the plan accurately indicate what you intend to construct and what will receive a final
inspection e Garfield County Building Department?
Yes No
27. Do you understand that approval for design and/or construction changes are required prior to
the applif oo of these changes?
Yes `//i' No
28. Do you understand that the Building Department will collect a "Plan Review" fee from you
at the time of application submittal and that you will be required to pay the "Permit Fee" as
well as any "Road Impact" or "Septic System" fees required, at the time you pick up your
building perm't?
Yes No
29. Aryou aware that you must call in for an inspection by 3:30 the business day before
the requested inspection in order to receive it the following business day? Inspections
will be made from 7:30 a.m. to 3:30 p.m. Monday through Friday. Inspections are to be
called'' o 3-5003.
Yes ` /// No
30. Are you aware that requesting inspections on work that is not ready or not accessible will
result in a S50.00 re -inspection fee?
Yes No
31. Are you aware that you are required to call for all inspections required under the IRC
including approval on a final inspection prior to receiving a Certificate of Occupancy and
occupancy th building?
Yes No
32. Are you aware that the Permit Application must be signed by the Owner or a written
authority being given for an Agent and that the party responsible for the project must comply
with the
Yes / No
5
33. Are you aware that prior to submittal of a building permit application you are required to
show proof of a driveway access permit or obtain a statement from the Garfield County Road
& Bridge Department stating one is not necessary? You can contact the Road & Bridge
Departme at 5-8601.
Yes No
34. Do you understand that you will be required to hire a State of Colorado Licensed Electrician
and Plumber to perform installations and hookups, unless you as the homeowner are
performing the work? The license number of the person performing the work will be
required at C a applicable inspection.
Yes No
35. Are you aware, that on the front of the Building Permit Application you will need to fill in
the Parcel/Schedule Number for the lot you are applying for this permit on prior to submittal
of a building pe t application? Your attention in this is appreciated.
Yes �� No
36. Do you know that the local fire d' may require you to submit plans for their review of
fire safety issues? Yes No (please check with the
building department about this quirement)
37. Do you understand that if you are planning on doing any excavating or grading to the
property prior to issuance of a building permit that you will be required to obtain a grading
Yet,Yes
I hereby a
be of my
e that I have read, understand and answered these questions to the
Signature Owner
Phone: el 5-2044 (days);
Project Name:
/r-
9oq-io45
(evenings)
1 Con brto:5a 'P(ahne( O„;+--'be✓e(opmen
l -
Project Address: 910 =rcw,brid5e Dr; GWS. CO B(6of
Notes: If you have answered "No" on any of the questions, you may be required to provide this
information at the request of the Building Official prior to beginning the plan review process. Delays
in issuing the permit are to be expected. Work may not proceed without the issuance of a permit. If
it is determined by the Building Official that additional information is necessary to review the
application and plans to determine minimum compliance with the adopted codes, the application
6
may be placed behind more recent applications for building permits in the review process and not
reviewed until required information has been provided and the application rotates again to first
position for review, delay in issuance of the permit or delay in proceeding with construction.
BpminreqFeb2005
7
s
IRON- `•,RIDGE
GOLF CLUB AND MOUNTAIN COMMUNITY
August 18, 2005
Garfield County Building Department
108 8th Street
Glenwood Springs, CO 81601
RE: Approved Plans at Ironbridge
Dear County Representative,
The following plans have been reviewed and approved by the Architectural Review
Board of the Ironbridge Property Owners Association for use on Lot 168:
Woodley Architectural Group
"Ironbridge — Plan 3101"
"Bid Set Redlines" dated September 15, 2004
If you have any questions, please call me at (970) 404-1045.
Sincerely,
Ironbridge Property Owners Association
Dirk Gosda
Representative
410 1RONBRIDGE DRIVE GLENWOOD SPRINGS COLORADO 81601
T. (970) 947-9800 F (970) 928-8865 www Ironbridgeclub com
PLAN REVIEW CHECKLIST
Applicant—Tit— i
4? -I8
Building
9 Engineered Foundation
)C /4Driveway Permit
J��JJSurveyed Site Plan
/1 ' flSeptic Permit and Setbacks
. rade/Topography 30%
�Attach Residential Plan Review List
Minimum Application Questionnaire
✓Subdivision Plat Notes
dol -Fire Department Review
V "Valuation Determination/Fees
(Aed Line Plans/Stamps/Sticker
C/Attach Conditions
✓Application Signed
`7 Plan Reviewer To Sign Application
arceUSchedule No.
40# Snowload Letter- Manf. Hms.
GENERAL NOTES:
Date /O - /9' OSS
Planning/Zoning
operty Line Setbacks
30ft Stream Setbacks
sirgod Plain
wilding Height
ming Sign -off
✓Read Impact Fees
LH'CA/DRC Approval
tMr de/Topography 40%
manning Issues
t'Suidi'vision Plat Notes
EXHIBIT LOT 168
V
L
1
169
593 SF±
�. `AC±
P"OPOSED
BOULDER WALL
5 NOTE 4
X
PROPOSED
HOUSE
FF=6033.69'
1T)
/
LOT-__ 16
15,208 SEt
0.349 AC±
WATR SE' VIC
CONNEC • CGVER Tn ,B
'TRAFFIC LO ED OR RELO-• TE
OUTSIDE OF IRIVEWAY. L:C • TI.
5
/
NOTE:
1. NORTH AMERICAN GREEN S150 EROSION CONTROL BLANKET (OR EQUIVALENT) IS TO BE PLACED ON ALL SLOPES
GREATER THAN 3:1
2. MAINTAIN POSITIVE DRAINAGE AWAY FROM STRUCTURES IN ALL DIRECTIONS AT ALL TIMES.
3. CHANGES TO THE GRADING PLAN AND DRAINAGE SHALL BE VERIFIED THROUGH THE ENGINEER OF RECORD PRIOR TO
BEING COMPLETED IN THE FIELD.
4. BOULDER RETAINING WALL TO BE LOCATED ENTIRELY ON LOT 168, AND THE TOE OF THE WALL 15 TO BE WITHIN ONE
(1) FOOT OF THE PROPERTY LINE BETWEEN LOTS 168/169
PROPERTY DESCRIBED AS: LOT 168, ACCORDING TO THE AMENDED & RESTATED FINAL PLAT OF IRONBRIDGE P.0 D.
PHASE 1, RECORDED AS RECEPTION NO. 654210, COUNTY OF GARFIELD, STATE OF COLORADO;
ALSO KNOWN AS: 0103 RIVER BEND WAY
ES
NDER DRIVE
6628.40'
AUT 6028.17'/
RIVE 6030.4p
F
kREVISED 9/26/05
HIGH COUNTRY ENGINEERING, INC.
14 INVERNESS DRIVE EAST, STE F120, ENGLEWOOD. CO80112
PHONE 130319250844 FAX (3 031 8 28 0 5 47
1517 BLAKE AVENUE, STE 101, GLENWOOD SPRINGS. CO 81801
PHONE 19701 9454679 FAX 19701 943325S5
wlvwHma.aN
IRONBRIDGE CLUB
GLENWOOD SPRINGS. COLORADO
IRONBRIDGE
PLOT PLAN
LOT 168
DRAWN BY
SPG
KALE
1" 30'
C HECXED BY.
REW
PROJECT No:
2041020 00
DATE:
PAGE.
8/30/05 1
Bim' J'/SDSKPROJ/204/ 1 020/DWG/LOT 168
No 1 Assessor's Parcel No 02345- /62
Date Hitt OS
Job Addre
Owner - LL
Contractor LLLCPGL
Setbacks: Front Rear
IFO� �w(C
Soi s Test
nn BIUI_ LDIIiIO7RMITRD
01 v 3 t^C I vein Co X11001 Lehi 6$ �d`ohkx`,�
i)*C; Address YID ES Itch # .9f/7-9�up
Addresses- a4 Phone # 9V7-962
RH LH Zoning
INSPECTIONS
Footing // ?-€05 LS
fL
Foundation //- /0-05 J . r
Grout
Underground Plumbing
Rough Plumbing 3-30 Wail*
Framing
Y '-
Framing 3 93 -OflI
Insulation
Roofing
Drywall Hi/2- oGt
Gas Piping 3 -3a '007-0-
aerrE tpsoism + NOTES
C U
t p• °
Weatherproofing
Mechanical
Electrical Rough (State)
Electrical Final tate)
Fina heckIi m�l�gd� —
Certificate Occupan y # �jj��
Date (- 2 ^04.
Septic System # s- -r+- .
Date
Final
0
pGagd(� R0�
0/(ct:41P
tinte on back)
INSPECTION WILL NOT BE MADE UNLESS
THIS CARD IS POSTED ON THE JOB
24 HOURS NOTICE REQUIRED FOR INSPECTIONS
BUILDING PERMIT
yy
GARFIELD COUNTY, COLORADO
Date Issued.�.j.1./ QQ ..Zoned Area Permit No -1
AGREEMENT
In consideration of the issuance of this permit, the applicant hereby agrees to comply with all
laws and regulations related to the zoning, location; construction and erection of the proposed
structure for which this permit is granted, and further agrees that if the above said regulations
are not fully complied with in the zoning, location, erection and construction of the above
described structure, the permit may then be revoked by notice from the County Building
Inspector and IMMEDIATELY BECOME^NULL AND VOID. w -�-
Use 51 �' on l .Sp ES WR. �`og. is
Address or Legal DJesscriiptionJ1 7 t`Q_�_ T1�Lkr �;��u � /�
Owne=rt� doe F ip�V1� 5 Contractor 14o � `o act&
Setbacks Front Side Side Rear
This Card Must Be Posted So It is Plainly Visible From The Street Until Final Inspection.
INSPECTION
RECORD
Footing _ 3-,p —
Driveway
Foundation /•(p. ® /
Underground Plumbing
Insulation U_(p-O&
Rough Plumbing 3 _ 6 -dr.
Drywall - L—a4
Chimney & Vent 3_ 3s -ora S-
Electric Final (by jr o : a 2 re
Gas Piping 3- 30 _Os I.I
Final , -$ _O6
Septic Final
El' t , R 1 -LtuaLajaauleastatiniclii
Framing 3 -30 d br.$
(To include Roof in place and Windows
and Doors installed).
Notes:
ALL LISTED ITEMS MUST BE INSPECTED AND APPROVED BEFORE COVERING -
WHETHER INTERIOR OR EXTERIOR, UNDERGROUND OR ABOVE GROUND.
THIS PERMIT IS NOT TRANSFERABLE
For Inspections Call 384-5003 108 8th Street Glenwood Springs, Colorado
DO NOT DESTROY THIS CARD
APPROVED
LOT 16'
Date By
IF PLACED OUTSI - COVER WITH CLEAR PLASTIC