Loading...
HomeMy WebLinkAboutApplication-PermitGarfield County Building & Sanitation Department 108 8th Street, Suite #201 Glenwood Springs, Co. 81601 Office- 945-8212 Inspection Line- 384-5003 NO. 9`r 17 Job Address q I a k L- LJ� Itis Nature of Work Building Permit CR 13— ©-1 1 - O©— Cf3 Use of Buildin OwnerCLXJ` es. (411 fib 0 Amount of Permit $ Contractor Permit No: GARFIELD COUNTY BUILDING PERMIT APPLICATION 108 8`s Street, Suite 201, Glenwood Springs, CO 81601 Phone: 970-9454212 / Fax: 970-384-3470 / Inspection Line: 970-384-5003 9-t 17 Parcel/Schedule No: ca) 7/J 0 7/ 00 0 /,1. AGREEMENT PERMISSION 15 HEREBY GRANTED TO THE APPLICANT AS OWNER, CONTRACTOR AND/OR THE AGENT OF THE CONTRACTOR OR OWNER TO CONSTRUCT THE STRUCTURE AS DETAILED ON PLANS AND SPECIFICATIONS SUBMITTED TO AND REVIEWED BY THE BUILDING DEPARTMENT. IN CONSIDERATION OF THE ISSSUANCE OF THIS PERMIT, THE SIGNER. HEREBY AGREES TO COMPLY WITH ALL BUILDING CODES AND LAND USE REGULATIONS ADOPTED BY GARFIELD COUNTY PURSUANT TO AUTHORITY GIVEN IN 3028.201 CRS AS AMENDED. THE SIGNER FURTHER AGREES THAT IF TUE ABOVE SAID ORDINANCES ARE NOT FULLY COMPILED WITH IN THE LCOATION, ERECTION, CONSTRUCTION, AND USE OF THE ABOVE DESCRIBED STRUCTURE, THE PERMIT MAY BE REVOKED BY NOTICE FROM THE COUNTY AND THAT THEN AND THERE 11 SHALL BECOME NULL AND VOID. THE ISSUANCE OF A PERMT BASED UPON PLANS, SPECIFICATIONS AND OTHER DATA SHALL NOT PREVENT THE BUILDING OFFICIAL FROM THEREAFTER REQUIRING THE CORRECTION OF ERRORS IN SAID PLANS, SPECIFICATIONS AND OTHER DATA OR FROM PREVENTING BUILDING OPERATION BEING CARRIED ON THEREUNDER WHEN IN VIOLATION OF THS CODE OR ANY OTHER ORDINANCE OR REGULATION OF THIS JURISDICTION. TRE REVIEW OF SUBMITTED PLANS AND SPECIFICATIONS AND INSPECTIONS CONDUCTED THEREAFTER DOES NOT CONSTITUTE AN ACCEPTANCE OF ANY RESPONSIBILITIES OR LIABLTITES BY GARFIEID COUNTY FOR ERRORS, OMISSIONS OR DISCREPENCIES. THE RESPONSIBILITY FOR THESE ITEMS AND IMPLEMENTATION DURING CONSTRUCTION RESTS SPECIFICIALLY WITH THE ARTICTECT, DESIGNER, BUILDER, AND OWNER. COMMENTS ARE INTENDED TO BE CONSERVATIVE AND IN SUPPORT OF THE OWNERS INTEREST. c..rae ooJ /AY' >1 2t, 1 HEREBY ACKNOWLEDGE THAT 1 HAVE READ AND UNDERSTAND THE ACREEMENTyYBoVE (INITIAL): � rtIt�1 l n w nl •iE.(/_ 1 /� 'JC` Job Address:9 9 Z , / t kr^ if al 0) pLI 'i _ ' `•L3 I ID1 Q(/ 30 L 1 Lot No: Block No: Subd. / Exem DP : 2 er• N1J's r M 11,—, �.�,G� iP-1-t-i kr)11r�. 141J Address /2 (9 LLJoy De d,7itt (0 Ph: 5>i .4.2 ye,l d Ph: Sall e 3 Contra( or. taa Address: Ph: Lic. No. 4 Architect/Engineer: Address: Ph: Lic. No. 5 Sq. Ft. of Building: / D ('� Q 7 Sq. Ft. of Lot i , C r4 j J Height: No. of Floors: 6 Use of Building: V s - LL\ 7 Describe Work: RI� 11 e Nta G/Xi"ts14ro IM 6`-- NI SAI 1✓er 0 v '12 A-/4 ilk...0 / ,/ �,/,�/ 8 Class of Work: o New C" Alteration o Remove o Addition ❑ Move 9 10 Garage: o Single o Double Carport: ❑ Single o Double o Driveway Permit e- On -Site Sewage Disposal a Site Plan (Septic) 11 Valuation of Work: SOO Adjusted Valuations: 5 12 Special Conditions: NOTICE A SEPARATE ELECTRICAL PERMIT IS REQUIRED AND MUST BE ISSUED BYTHE STATE OF COLORADO. THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT COMMENCED WITHIN 180 DAYS, OR, IF CONSTRUCTION OR WORK 1S SUSPENDED OR ABANDONED FOR A PERIOD OF 180 DAYS AT ANY TIME AFTER WORK IS COMMENCED. 1 HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS GOVERNING THIS TYPE OF WORK WILL BE COMPLETED WITHIN WHETHER SPECIFIED HEREIN OR NOT. THE GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING CONSTRUCTION OR THE PERFORMANCE OF CO STRU TION. ,' 24_ / - 71/ 2i /r_.�r ✓~ Plan Check Fee: di s ( /1 Permit Fee: 83.25 - Total Fee: Dated Permit Issued: /'>_7 _ - O C Group: Const. 1'ype: Zoning: Setbacks: Manu. Home: ISDS No. & Fee: 24:3 S lL rrOF s W NER '�^DDATEa >' r /0 2.0'S �ortl.lauG�O BLDG DE . PLNG. DEPT. APPR• /DATE APPROVAL/DATE AGREEMENT PERMISSION 15 HEREBY GRANTED TO THE APPLICANT AS OWNER, CONTRACTOR AND/OR THE AGENT OF THE CONTRACTOR OR OWNER TO CONSTRUCT THE STRUCTURE AS DETAILED ON PLANS AND SPECIFICATIONS SUBMITTED TO AND REVIEWED BY THE BUILDING DEPARTMENT. IN CONSIDERATION OF THE ISSSUANCE OF THIS PERMIT, THE SIGNER. HEREBY AGREES TO COMPLY WITH ALL BUILDING CODES AND LAND USE REGULATIONS ADOPTED BY GARFIELD COUNTY PURSUANT TO AUTHORITY GIVEN IN 3028.201 CRS AS AMENDED. THE SIGNER FURTHER AGREES THAT IF TUE ABOVE SAID ORDINANCES ARE NOT FULLY COMPILED WITH IN THE LCOATION, ERECTION, CONSTRUCTION, AND USE OF THE ABOVE DESCRIBED STRUCTURE, THE PERMIT MAY BE REVOKED BY NOTICE FROM THE COUNTY AND THAT THEN AND THERE 11 SHALL BECOME NULL AND VOID. THE ISSUANCE OF A PERMT BASED UPON PLANS, SPECIFICATIONS AND OTHER DATA SHALL NOT PREVENT THE BUILDING OFFICIAL FROM THEREAFTER REQUIRING THE CORRECTION OF ERRORS IN SAID PLANS, SPECIFICATIONS AND OTHER DATA OR FROM PREVENTING BUILDING OPERATION BEING CARRIED ON THEREUNDER WHEN IN VIOLATION OF THS CODE OR ANY OTHER ORDINANCE OR REGULATION OF THIS JURISDICTION. TRE REVIEW OF SUBMITTED PLANS AND SPECIFICATIONS AND INSPECTIONS CONDUCTED THEREAFTER DOES NOT CONSTITUTE AN ACCEPTANCE OF ANY RESPONSIBILITIES OR LIABLTITES BY GARFIEID COUNTY FOR ERRORS, OMISSIONS OR DISCREPENCIES. THE RESPONSIBILITY FOR THESE ITEMS AND IMPLEMENTATION DURING CONSTRUCTION RESTS SPECIFICIALLY WITH THE ARTICTECT, DESIGNER, BUILDER, AND OWNER. COMMENTS ARE INTENDED TO BE CONSERVATIVE AND IN SUPPORT OF THE OWNERS INTEREST. c..rae ooJ /AY' >1 2t, 1 HEREBY ACKNOWLEDGE THAT 1 HAVE READ AND UNDERSTAND THE ACREEMENTyYBoVE (INITIAL): � rtIt�1 l n w nl •iE.(/_ 1 /� 'JC` SSS ESTIMATE ✓6 Kpo-Alt FINISHED LIVING SPACE: X 74.68 = UNFINISHED BASEMENT: X 41.00 = CRAWL SPACE: X 9.00 = GARAGE: X18.00 = UNCOVERED PATIO/DECK: X 12.00 = COVERED PATIO/DECK: X 24.00 = MISC. a Lt+Q)..s.csk_J 3, CCLX3 . MISC. TOTAL VALUATION: 3� D O D PLAN REVIEW FEE: . at PERMIT FEE: qi . a5' TOTAL: I ( CD . `+6 MANUFACTURED HOME SET UP FEE: SEPTIC -- PERMIT: PERK: i GARFIELD COUNTY BUILDING AND PLANNING 970-945-8212 MINIMUM APPLICATION REQUIREMENTS FOR CONSTRUCTION OF COMMERCIAL OR MULTI -FAMILY RESIDENTIAL BUILDINGS including NEW CONSTRUCTION ADDITIONS ALTERATIONS and MOVED BUILDINGS In order to understand the scope of the work intended under a permit application and expedite the issuance of a permit it is important that complete information be provided. Adequate and complete information will prevent delays in the plan review process. Reviewing a plan and the discovery that required information has not been provided by the applicant may result in the delay of the permit issuance and in proceeding with building construction. The owner or contractor may be required to provide this information before the plan review may proceed. This causes delays because other plans that are in line for review may be given attention before the new information may be reviewed after it has been provided to the Building Department. Please review this document to determine if you have enough information to design your project and provide adequate information to facilitate a plan review. If you do not, it may be helpful to obtain a book titled "Dwelling Construction Under the Uniform Building Code". This book is available to you through this department at our cost. Also, please consider using a design professional for assistance in your design and a construction professional for construction of your project. To provide for a more understandable plan in order to determine compliance with the building, plumbing and mechanical codes, applicants are requested to review the following checklist prior to and during design. Plans to be included for a Building Permit must be on draft paper at least 18"x 24"" and drawn to scale. Plans must include a floor plan, a concrete footing and foundation plan, elevations all sides with decks, balcony steps, hand rails and guard rails, windows and doors, including the finish grade line. A section showing in detail, from the bottom of the footing to the top of the roof, including re -bar, anchor bolts, pressure treated plates, floor joists, wall studs and spacing, insulation, sheeting, house -rap, (which is required), siding or any approved building material. A window schedule. A door schedule. A floor framing plan, a roofing framing plan, roof must be designed to withstand a 40 pound per square foot. up to 7,000 feet in elevation, an 80 M.P.H. windshear, wind exposure B, windload of 15 pounds per square foot and a 36 inch frost depth. All sheets to be identified by number and indexed. All of the above requirements must be met or your plans will be returned. All plans submitted must be incompliance with the 1997 UBC, UMC and 1997 UPC. Applicants are required to indicate appropriately and to submit completed checklist at time of application for a permit: 1. Is a site plan included that identifies the location of the proposed structure, additions or other buildings, setback easements, and utility easements showing distances to the property lines from each corner of the proposed structure prepared by a licensed surveyor and has the surveyors signature and professional stamp on the drawing? Slopes of 30% or more on properties must be show on site plan. NOTE: 106.3.1 (7.) Any site plan for the placement of any portion of a structure within 50 ft. of a property line and not within a previously surveyed building envelope on a subdivision final plat shall be prepared by a licensed surveyor and have the surveyors signature and professional stamp on the drawing. Any structure to be built within a building envelope of a lot shown on a recorded subdivision plat, shall include a copy of the building envelope as it is shown on the final plat with the proposed structure located within the envelope. Yes 2. Does the site plan when applicable include the location of the I.S.D.S. (Individual Sewage Disposal System) and distances to the property lines, wells (on subject property and adjacent properties), streams or water courses? This information must be certified by a licensed surveyor with their signature and professional stamp on the design. Yes No Not necessary for this project )( 3. Are the plans submitted for application review construction drawings and not drawings that are stamped or marked identifying them as "Not for construction, for permit issuance only",pproval drawings only", "For permit issuance only" or similar language? Yes No Not necessary for this project 4. Is the I.S.D.S. (Individual Sewage Disposal System) designed, stamped and signed by a Colorado Registered Engineer? Yes No Not necessary for this project X 5. Does the site plan indicate the location and direction of the State, County or private road accessing the property? Yes 6. Do the plans include a foundation plan indicating the size, location and spacing of all reinforcing steel in accordance with the uniform building code or per stamped engineered design? Yes No Not necessary for this project 7. If the building is a pre-engineered structure, is there a stamped, signed engineered foundation plan for this building? Yes No Not necessary for this project X 8. Do the plans indicate the location and size of ventilation openings for under floor crawl spaces and the clearances required between wood and earth? Yes No Not necessary for project X. 9. Do the plans indicate the size and location of the ventilation openings for the attic, roof joist spaces and soffits? Yes No Not necessary for this project K 10. Do the plans include design loads as required under the Uniform Building Code for roof snowloads, (a minimum of 40 pounds per square foot in Garfield County)? Yes No Not necessary for this project x 11. Do the plans include design loads as required for floor loads under the Uniform Building Code Chapter 16 and Tables 16A, 16B and 16C? Yes No Not necessary for this project 4 12. Does the plan include a building section drawing indicating foundation, wall, floor, and roof construction? Yes No Not necessary for this project X 13. Is the wind speed and exposure design included in the plan? Yes No Not necessary for this project 14. Does the building section drawing include size and spacing of floor joists, wall studs, ceiling joists, roof rafters or joists or trusses? Yes No Not necessary for this project X 15. Does the building section drawing or other detail include the method of positive connection of all columns and beams? Yes No Not necessary for this project I 16. Does the plan indicate the height of the building or proposed addition from the highest point of the building or addition measured at mid span between the ridge and the eave down to existing grade contours? Yes No Not necessary for this project X 17. Does the plan include any stove or zero clearance fireplace planned for installation including make and model and Colorado Phase II certifications or Phase II EPA certification? Yes No Not necessary for this project 18. Does the plan include a masonry fireplace including a fireplace section indicating design to comply with the Uniform Building Code Chapter 31? Yes No Not necessary for this project %\ 19. Does the plan include a window schedule or other verification that egress/rescue windows from sleeping rooms and/or basements comply with the requirements of the Uniform Building Code? Yes No Not necessary for this project X 20. Does the plan include a window schedule or other verification that windows provide natural light and ventilation for all habitable rooms? Yes No Not necessary for this project 21. Do the plans indicate the location of glazing subject to human impact such as glass doors, glazing immediately adjacent to such doors; glazing adjacent to any surface normally used as a walking surface; sliding glass doors; fixed glass panels; shower doors and tub enclosures and specify safety glazing for these areas? Yes No Not necessary for this project %( 22. Do the plans include a complete design for all mechanical systems planned for installation in this building? Yes No Not necessary for this project 23. Have all areas in the building been accurately identified for the intended use? (Occupancy as identified in the Uniform Building Code Table 5-A) Yes )( No Not necessary for this project 4 r 24. Does the plan indicate the quantity, form, use and storage of any hazardous materials that may be in use in this building? Yes No Not necessary for this project 25. Is the location of all natural and liquid petroleum gas furnaces, boilers and water heaters indicated on the plan? Yes No Not necessary for this project 26. Do the plans indicate the location and dimension of restroom facilities and if more than four employees and both sexes are employed, facilities for both sexes? Yes No Not necessary for this project 27. Do the plans indicate that restrooms and access to the building are handicapped accessi le? Yes X No Not necessary for this project 28. Have two (2) complete sets of construction drawings been submitted with the application? Yes X No 29. Have you designed or had this plan designed while considering building and other construction code requirements? Yes X No Not necessary for this project 30. Does the plan accurately indicate what you intend to construct and what will receive a final inspection by the Garfield County Building Department? Yes X No 31. Do your plans comply with all zoning rules and regulations in the County related to your zone district? For comer lots see supplemental section 5.05.03 in the Garfield County Zoning Resolution for setbacks. Yes X No 32. Do you understand that approval for design and/or construction changes are required prior to the implementation of these changes? Yes x No 33. Do you understand that the Building Department will collect a "Plan Review" fee from you at the time of application and that you will be required to pay the "Permit" fee as well as any "Septic System" or "Road Impact" fees required, at the time you pick up your building permit? Yes No 34. Are you aware that you are required to call for all inspections required under the Uniform Building Code including approval on a final inspection prior to receiving a Certificate of Occupancy and occupancy of the building? Yes X No 35. Are you aware that the Permit Application must be signed by the Owner or a written authority be given for an Agent and that the party responsible for the project must comply with the Uniform Codes? Yes )< No 36. Are you aware that you must call in for an inspection by 3:30 the business day before the requested inspection in order to receive it the following business day? Inspections will be made between 7:30 a.m. and 3:30 p.m. Monday through Friday. Inspections are to be called in to 384-5003. 37. Are you aware that requesting inspections on work that is not ready or not accessible will result in a $47.00 re -inspection fee? Yes x No 38. Are you aware that prior to issuance of a building permit you are required to show proof of a driveway access permit or obtain a statement from the Garfield County Road & Bridge Department stating one is not necessary? You can contact the Road & Bridge Department at 625-8601. Yes X No 39. Do you understand that you will be required to hire a State of Colorado Licensed Electrician and Plumber to perform installations and hookups? The license number will be required at time of inspection. Yes 7( No 40. Are you aware, that on the front of the building permit application you will need to fill in the Parcell Schedule Number for the lot you are applying for this permit on prior to submittal of the building permit application? Your attention in this is appreciated. Yes X No 41. Do you know that the local fire district may require you to submit plans for their review of fire safety issues? Yes No (Please check with the building department about this requirement) 6 1 I hereby acknowledge that I have read, understand, and answered these questions to the best of my ability. ftat.?/?/ILtX--2>7G 9-lr or Signature Date Phone: ?2,0 J23 d (days); 92, 0\82-9,z/6 (evenings) l Project Name: COL / JL y C4,D? / o f �hK �/f.. (�ic1 "Dann) Project Address: L ). / l (Duni/ �. c B y pegp€24, co, e 1 6J o Note: If you answered "No" on any of these questions you may be required to provide this information at the request of the Building Official prior to beginning the plan review process. Delays in issuing the permit are to be expected. Work may not proceed without the issuance of the permit. *If you have answered "Not necessary for this project" on any of the questions and it is determined by the Building Official that the information is necessary to review the application and plans to determine minimum compliance with the adopted codes, please expect the following: A. The application may be placed behind more recent applications for building permits in the review process and not reviewed until required information has been provided and the application rotates again to first position for review. B. Delay in issuance of the permit. C. Delay in proceeding with construction. *If you answered "No" to this question the circumstances described in the question could result in a "Stop Work Order" being issued or a "Certificate of Occupancy" not being issued. Bpcomm 07/2004 GARFIELD COUNTY BUILDING REQUIREMENTS Codes: 97 UBC, 97IPC, and 97 UMC. 1995 CABO One and Two Family Dwelling Code Appendix A for Manufactured Housing Setbacks: 25 feet front and rear and 10 feet on the sides (check subdivisions). Snowload: 40PSF up to 7000ft. elevation. 50PSF 7001 to 8000ft. 75PSF 8001 to 9000ft. 100PSF 9001 to 10000ft. Seismic: Zone 1 Windshear: 80mph Wind Exposure: B Windload: 15PSF. Frost Depth: 36in. to S000ft. elevation. 42in. 8001 to 10000ft. Insulation: R-11 Floors over unheated areas R-19 Walls R-29 Ceilings If floors over Brawl spaces are not insulated, the crawl apace walls must be insulated. Basement walls must be insulated to frost depth. Common walls garage to house must have R-19 insulation. Common ceiling/floor garage to house must have R-11. Take precautions to protect plumbing in these garage areas from freezing. COWBOY CHAPEL OF PRAYER 9721 County Road #204 DeBeque, Colorado 81630 Pastor Marlion W. Holt 283-9216 September 15,2005 Dear Sirs, The congregation of The Cowboy Chapel of Prayer would like to request approval for a septic permit, and the permit allowing us to enclose a 6 ft.X 8 ft. area for a man / woman bathroom in our existing building. We will meet all your code requirements for septic, electrical plumbing, and structural. Our bathroom will be designed to accommodate the physically impaired. In the past and present we have allowed Garfield County to use our property for equipment parking and gravel stockpiling. We have also allowed the County Commissioner, the Game and Fish Department, Encanna Oil, and many others to use our facilities for Community meetings. An indoor bathroom would greatly enhance our facilities for such future use. Thank you for your consideration, Pastor Marlion W. Holt Cowboy Chapel of Prayer 4 J 1'; C'0 VL/ b JL.t� r �� — (ry /i J Ih �f✓ 4- C Cif3“ 1 Co PI alcorpows j ?F rag ►.iatm?:c tfrl . 2003 '213C, SRC, Arne =FC. SEL R.4.4 .41110. LYS Cs On- ? t -4i10 ,n-vwS J/ < : APPROVED SUBJECT TO NOTED LSOEPTIONS 8 INSPECTION!, GARFIELD COUNTY BUILDING DEPARTr`MEN'! 'ate /J• 12--16 By je FIELD COPY NO INSPECTION WITHOY? ?NESE MANS ON SITE .1Qr n. La Ij�/Q /14 i o b � X_6 r. i_nso /6 /eh_ 5.0 n boa, -J c4- 4" �yt,a� ... Poor)10 b_ 3' -m GARFIELD COUNTY BUILDING AND SANITATION DEPARTMENT 108 Eighth Street, Suite 201 Glenwood Springs, Coloradof 81601 Phone (970) 945-8212 INDIVIDUAL SEWAGE DISPOSAL PERMIT PROPERTY Owner's Name, P swot Address ( a System Location / 7, / (R )0 (� 7 � ���' � / J Q Legal Description of Assessor's Parcel No. SYSTEM DESIGN /(too Septic Tank Capacity (gallon) Other a'P/3-oqF/-oo-ooh Permit 4 1C 3 Assessor's Parcel No. This does not constitute a building or use permit. Phone lit — (11),1(o Tho Percolation Rate (minutes/inch) Number of Bedrooms— (or other) 4�G Required Absorption Area - See Attached Special Setback Requirements: equirementa: Date (712h _)r Inspector A �/rJ —v "e" FINAL SYSTEM INSPECTION AND APPROVAL (as installed) Call for Inspection (24 hours notice) Before Covering Installation f(I System Installer A.i Septic Tank Capacity 'OG• Septic Tank Manufacturer or Trade Name • / .' lt' f 6 K Septic Tank Access within S" of surface Absorption Area ^ Absorption Area Type and/or Manufacturer or Trade Name Adequate compliance with County and State regulations/requirements (I A A Other Date 1 RETAIN WITH RECEIPT RECORDS AT CONSTRUCTION SITE Inspector (h'( K 6 (f *CONDITIONS: 1. All installation must comply with all requirements of the Colorado State Board of Health Individual Sewage Disposal Systems Chapter 25, Article 10 C.R.S. 1973, Revised 1984. 2. This permit is valid only for connection to structures which have fully complied with County zoning and building requirements. Con- nection to or use with any dwelling or structures not approved by the Building and Zoning office shall automatically be a violation or a requirement of the permit and cause for both legal action and revocation of the permit. 3. Any person who constructs.alters, or installs an individual sewage disposal system in a manner which involves a knowing and material variation from the terms or speclflcations contained in the application of permit commits a Class 1, Petty Offense ($500.00 fine — 8 months in jail or both). Whits - APPL IrANT YMkw - r1FPAPTUPUT GEO-E? 1 'LES EROSION CONTROL ORArJBOARC 3':!ATERPRCOFING BRIDGE BEAR! EXPANSION JOINTS CULTEG HARG R CHAMBERS 2Z RAINA -E SYSTEMS CH17 CTERAL PRC/DUCTS OSOC ciRG>N PEP -FUZEE zalaSOUTH SYRACUSE vaAv DENVER OWM ANJ STRUCTION SUPPLY, INC 'COLORADO 80231 303606-2980 FAX 303 636 0620 www bowmanconstruLIIonsupply cc- Xcat- 3--941 9 //. / day as 2- X S = as?) reAs% 7-c. 38,eti '9 ` 6 : x acg T= ,721 4 = s' X —C - o n- 51,2511 f z_ Garfield County Building and Planning 108 8th Street Suite 201 Glenwood Springs, CO 81601 970.945.8212 Plan analysis based on the 2003 International Building Code Project Number: Project Name: Getty Oil- Cowboy Address: 9721 C.R. 204 Occupancy: A-3 Construction: V -B Date: October 12, 2005 Chapel Contractor: Architect: Engineer: Report By: Cowboy Chapel Andy Schwaller NOTE: The code items listed in this report are not complete listing of all possible code requirements It is a guide to selected sections of the code. FL intended to be a in the 2003 IBC. NAME OCC MAX FLR AREA ALLOWED RATIO STATUS 1 Church Worship Area A-3 ok 1800 Interior check only Total for Floor 1800 Interior check only DRAFTSTOPPING: If there is combustible construction in the floor/ceiling assembly, draftstopping shall be installed so that the area of concealed space does not exceed 1,000 square feet. -- Sec. 717.3.3 If there is combustible construction in the roof/ceiling assembly, draftstopping shall be installed so that the area of concealed space does not exceed 3,000 square feet. -- Sec. 717.4.3 Opening in the partitions shall be protected by self-closing doors with automatic latches constructed as required for the partitions. -- Sec. 717.4.1.1 EXIT REQUIREMENTS: FL NAME NUMB MIN MIN PANIC CORRIDOR DOOR NOTES OCC EXITS WIDTH HDWR RATING SWING 1 Church Worship Area 257 2 51.4 Yes N/A Out 1 12 257 2 51.4 Yes N/A Out 12 TOTAL FOR FLOOR Page # 2 Code review for: Project Id.: Getty Oil- Cowboy Chapel Address: 9721 C.R. 204 FOOTNOTES: 1. Two exits are required from this area since the occupant load exceeds allowable in Table 1014.1 12. Panic hardware is required when the occupant load is 100 or more. -- Sec. 1008.1.9 NOTES FOR EXIT TABLE Door swing is based on Section 1008.1.2 Occupant load is based on Section 1004 and Table 1004.1.2 Exit width is in inches and based on Section 1005.1 & Table 1005.1 Width shown for all areas is based on other egress components. Width shown for 1st floor is based on other egress components. Width shown for other floors & basements is based on stairways. For the minimum width of doors, see Section 1008.1.1. For the minimum width of corridors, see Section 1016.2. For the minimum width of stairways, see Section 1009.1. Exits shall be continuous from the point of entry into the exit to the exit discharge. -- Sec. 1003.6 EXIT SEPARATION In areas where 2 exits are required, the minimum separation is 1/2 of the maximum diagonal of the area or floor measured in a straight line between exits or exit access doorways.-- Sec. 1014.2.1 Multiple means of egress shall be sized such that the loss of any one means of egress shall not reduce the available capacity by more than 50 percent. Sec. 1005.1 EXIT SIGNS Exits and exit access doors shall be marked by an approved exit sign. Signs shall be placed where the exit or the path of egress travel is not immediately visible. No point to be more than 100 feet from an exit sign. - - Sec. 1011.1 Exception 1: Exit signs are not required in rooms or areas which require only one exit. Exception 2: Main exterior exit doors which obviously and clearly are identifiable as exits need not be signed when approved. Exit signs shall be internally or externally illuminated. - - Sec. 1011.2 Exit sign shall be illuminated at all times including during loss of primary power. -- Sec. 1011.4 & Sec. 1011.5.3 • Page # 3 Code review for: Project Id.: Getty Oil- Cowboy Chapel Address: 9721 C.R. 204 BOLT LOCKS: Manually operated flush bolts and surface bolts are not permitted. -- Sec. 1008.1.8.4 Exception 2: Where a pair of doors serves a storage or equipment room, manually operated edge- or surface -mounted bolts are permitted on the inactive leaf. LOCKS AND LATCHES: Egress doors shall be readily openable from the egress side without the use of a key or any special knowledge or effort. -- Sec. 1008.1.8 Locks and latches shall be permitted to prevent operation where any of the following exists: Exception 2: The main door or doors in Group A areas with an occupant load of 300 or less are permitted to be equipped with key operating locking devices from the egress side provided: Exception 2: The main door or doors in churches are permitted to be equipped with key operating locking devices from the egress side provided: 2.1 The locking device is readily distinguishable as locked. 2.2 A readily visible durable sign is posted on the egress side stating: THIS DOOR TO REMAIN UNLOCKED WHEN BUILDING IS OCCUPIED Exception 3: Where egress doors are used in pairs, automatic flush bolts shall be permitted to be used, provided the door leaf having the automatic flush bolts has no doorknob or surface -mounted hardware. LANDINGS AT DOORS: 1. There shall be a floor or landing on each side of a door. -- Sec. 1008.1.4 2. Such floor or landing shall be at the same elevation on each side of the door. -- Sec. 1008.1.4 3. The floor or landing shall not be more than 1/2 inch lower than the threshold. -- Sec. 1008.1.6 4. Landings shall have a width not less than the width of the stairway or width of the doorway, whichever is the greater. Where a landing serves an occupant load of 50 or more, doors in any position shall not reduce the landing dimension to less than one half it required width. The minimum length in the direction of exit travel is 44 inches. -- Sec. 1008.1.5 5. The space between two doors in series shall be 48 inches plus the width of door swinging into the space. -- Sec. 1008.1.7 Page # 4 Code review for: Project Id.: Getty Oil- Cowboy Chapel Address: 9721 C.R. 204 BUILDING ACCESSIBILITY 1. In addition to accessible entrances required by Sections 1105.1.1 through 1105.1.6, at least 50 percent of all public entrances shall be accessible. -- Sec. 1105.1 2. At least one accessible entrance shall be provided to each tenant, dwelling unit and sleeping unit in a facility. -- Sec. 1105.1.6 3. Where parking is provided, accessible parking spaces hall be provided in compliance with Table 1106.1 -- Sec. 1106.1 4. At least one accessible route shall connect each accessible level. -- Sec. 1104.4 See exceptions. 5. Accessible routes shall coincide with or be located in the same area as a general circulation path. Where the circulation path is interior, the accessible route shall also be interior. -- Sec. 1104.5 LIGHT AND VENTILATION 1. Every space intended for human occupancy shall be provided with natural light. The minimum net glazed area shall not be less than 8% of the floor area. -- Sec. 1205.1 and 1205.2 Any room is permitted to be considered as a portion of an adjoining room where one half of the area of the common wall is open and unobstructed and provided not less than one tenth of the floor area or 25 square feet, whichever is greater. -- Sec. 1205.2.1 Artificial light shall be provided that is adequate to provide an average illumination of 10 foot candles over the area of the room at a height of 30 inches above the floor. -- Sec. 1205.3 2. Natural ventilation of an occupied space shall be through windows, doors, louvers or other openings to the outdoors. -- Sec. 1203.4 The minimum openable area to the outdoors shall be 4 percent of the floor area. -- Sec. 1203.4.1 Any room is permitted to be considered as a portion of an adjoining room where unobstructed openings are provided that have an area not less than 6% of the floor area of the interior room but no less than 25 square feet. -- Sec. 1202.3.1.1 When openings are below grade, clear space measured perpendicular to the opening shall be one and one half times the depth of the opening. -- Sec. 1203.4.1.2 3. Rooms containing bathtubs, showers, spas and similar bathing fixtures shall be mechanically ventilated. -- Sec. 1203.4.2.1 Page # 5 Code review for: Project Id.: Getty Oil- Cowboy Chapel Address: 9721 C.R. 204 WALL AND CEILING FINISH: 1. Wall and ceiling finish materials are required to comply with Sec. 803.5 and Table 803.5. 2. Textile wall coverings shall have Class A flame spread index and shall be protected by automatic sprinklers or meet the criteria in Section 803.6.1.1 or 803.6.1.2. -- Sec. 803.6.1 3. Carpet and similar textile materials used as a ceiling shall have a Class A flame spread index and be protected by automatic sprinklers. - - Sec. 803.6.2 4. Expanded vinyl wall coverings shall comply with the requirements for textile wall and ceiling materials. -- Sec. 803.7 5. Toilet room floors shall have a smooth, hard nonabsorbent surface that extends upward onto the walls at least 6 inches. - - Sec. 1210.1 6. Walls within 2 feet of urinals and water closets shall have a smooth, hard nonabsorbent surface, to a height of 4 feet above the floor. - - Sec. 1210.2 ACCESSIBLE FACILITIES: NOTE: Except as noted, section numbers listed below are from ICC/ANSI A117.1-1998 TOILET FACILITIES: 1. A 60 inch diameter turning space or T-shaped space is required in the toilet room. -- Sec. 603.2.1 and 304.3 Doors shall not swing into the clear floor space for any fixture. 603.2.3 See exception for rooms used for individual use. 2. Water closet shall be mounted adjacent to a side wall or partition. The distance from the side wall or partition to the centerline of the water closet shall be 16 to 18 in. Sec. 604.2 3. When the accessible water closet is not in a compartment: Clearance around the water closet shall be 60 inches minimum, measured perpendicular to the side wall, and 56 inches minimum, measured perpendicular to the rear wall. -- Sec. 604.3.1 4. When the accessible water closet is in a compartment: Wheelchair accessible compartments shall be 60 inches wide minimum measured perpendicular to the side wall, and 56 inches deep minimum for wall hung water closets and 59 inches deep for floor mounted water closets, measured perpendicular to the rear wall. -- Sec. 604.8.1.1 Compartment doors shall not swing into the minimum required compartment area. -- Sec. 604.8.1.2 Page # 6 Code review for: Project Id.: Getty Oil- Cowboy Chapel Address: 9721 C.R. 204 5. Grab bars shall have a circular cross section with a diameter of 1 1/4 inch minimum and 2 inches maximum, or shall provide equivalent graspability. -- Sec. 609.2 The space between the wall and the grab bar shall be 1 1/2 inches. Sec. 609.3 Grab bars shall be mounted in a horizontal position 33 inches minimum and 36 inches maximum above the floor. -- Sec. 609.4 a. Side wall grab bars are required to start within 12 inches of the backwall and extend to 54 inches from the back wall. (The minimum length of the bar is 42 in) -- Sec. 604.5.1 b. The rear bar shall be 24 in long minimum, centered on the water closet. Where space permits, the bar shall be 36 in long minimum, with the additional length provided on the transfer side. -- Sec. 604.5.2 6. The top of the water closet seats shall be 17 to 19 inches above the floor. -- Sec. 604.4 7. Accessible urinals shall be of the stall type or wall hung with the rim at 17 inches maximum above the floor. -- Sec. 605.2 8. Accessible lavatories shall be mounted with the rim 34 inches maximum above the floor. -- Sec. 606.3 9. Sinks shall be 6 1/2 inches deep maximum. -- Sec. 606.5 10. Water supply and drain pipes under lavatories shall be insulated or otherwise treated to protect against contact. -- Sec. 606.6 11. Mirrors shall be mounted with the bottom edge of the reflecting surface 40 inches maximum above the floor. -- Sec. 603.3 No 1 1 -7 Job Adp.pss Owner(> Contractor C;'*�-�L�01J1 l �i Addressc*3e Setbpcks: VntRearf RH LH S CIh.L�X(� ICnJ[�t3 VnUn� NSPECTIONS Assessor's Parcel No r'(-1-1- BUILDING (-1-i3 BUILDING PERMIT CAR A-7 a 1 C ao`i Tp •GU_ irmL.c) AddressHR 13 Soils Test Footing Foundation Grout Underground Plumbing Rough Plumbing L2- -(Q-(x Q- Framing 12 -la-OS OWL Insulation Roofing Drywall Gas Piping NOTES Date Ir ya R/eL 5- c D43 Phone #3-4 Y- fQ)(a Phone # Zoning Weatherproofing Mechanical Electrical Rough (State) Electri al Final (State) Final hecklist Completed9 Certificate Occupancy # Date Septic System # `I 10 3 Date °r- i S -us Final /01 3 i l o< P flvl eo-a Other (continue on back) 1 INSPECTION WILL NOT BE MADE UNLESS THIS CARD IS POSTED ON THE JOB 24 HOURS NOTICE REQUIRED FOR INSPECTIONS 1 BUILDING PERMIT GARFIELD COUNTY, COLORADO Date Issu--Zoned Area Permit No. tin AGREEMENT In consideration of the issuance of this permit, the applicant hereby agrees to comply with all laws and regulations related to the zoning, location; construction and erection of the proposed structure for which this permit is granand further agrees that if the above said regulations are not fully complied with in the zoning, location, erection and construction of the above described structure, the permit may then be revoked by notice from the County Building Inspector and IMMEDIATELY BECOME NULL AND VOID. Use QMlo&TAAssesudscsaaa►L Address , I, -.w ption • $cash r This Card Most Be Posted So It is Plainly Visible From The Street Until Final Inspection. INSPECTION RECORD Footing Driveway Foundation Underground Plumbing Insulation Rough Plumbing 12._/q .05- mit, Drywall Chimney & Vent /,. i q -OS 1gn, Electric Final (by State Inspector) , , , L ''' Gas Piping Final 9-10-06 Pm Electric Rough (By State InspectorY,fl `)U Septic Final /0/30r Framing / 2.-/ 1 -DS dekNotes: (To include Roof in place and and and Doors installed). ALL LISTED ITEMS MUST BE INSPECTED AND APPROVED BEFORE COVERING - WHETHER INTERIOR OR EXTERIOR, UNDERGROUND OR ABOVE GROUND. THIS PERMIT IS NOT TRANSFERABLE For Inspections Call 384-5003 108 8th Street Glenwood Springs, Colorado APPROVED DO NOT DESTROY THIS CARD Dats/6SBy IF PLACED OUTSIDE - COVER WITH CLEAR PLASTIC �. ( 4.-) The following items are required by Garfield County for a final inspection: 1. A final Electrical Inspection from the Colorado State Electrical Inspector; 2. Permanent address assigned by Garfield County Building Department posted where readily visible from access road; 3. A finished roof, a lockable house, complete exterior siding, exterior doors and windows installed, a complete kitchen with cabinets, a sink with hot & cold running water, non-absorbent kitchen floor coverings, counter tops and finished walls, ready for stove and refrigerator, all necessary plumbing; 4. A complete bathroom, with washbowl, tub or shower, toilet stool, hot and cold running water, non-absorbent floors and walls finished and a privacy door; 5. All steps outside or inside over three (3) steps must have handrails, guard rails on balconies or decks over 30" high constructed to all 1997 UBC requirements; 6. Outside grading done to where water will detour away from the building; 7. Exceptions to the outside steps, decks and grading may be made upon the demonstration of extenuating circumstances, i.e. weather, but a Certificate of Occupancy will not be issued until all the required items are completed and a final inspection made; 8. A final inspection sign off by the Garfield County Road & Bridge Department for driveway installation, where applicable; as well as any final sign off by the Fire District, where applicable. A CERTIFICATE OF OCCUPANCY WILL NOT BE ISSUED UNTIL ALL THE ABOVE ITEMS HAVE BEEN COMPLETED. ****CANNOT OCCUPY OR USE DWELLING UNTIL A CERTIFICATE OF OCCUPANCY (C.O.) IS ISSUED. OCCUPANCY OR USE OF DWELLING WITHOUT A C.O. WILL BE CONSIDERED AN ILLEGAL OCCUPANCY AND MAY BE GROUNDS FOR VACATING PREMISES UNTIL ABOVE CONDITIONS ARE MET. I understand and agree to abide by the above conditions for occupanc use and the issuance of a Certificate of Occupancy for the dwelling under building permit # l'( �I_ o r Signature Date Bpcont03/2004