HomeMy WebLinkAboutApplication-PermitGarfield County
Building & Sanitation Department
108 8th Street, Suite #201 Glenwood Springs, Co. 81601
Office- 945-8212 Inspection Line- 384-5003
NO. C toCA,
Job Address 03 ill C� . C� �t—f e_
Nature of Work
Use of Building
Building Permit f r+j� . 1 l'-tL6p L{�..�]
Owner f\/\c, E (roc,
Contractor (-- -(.
Amount of Permit $ , 4,0(4
Qt-tc)c/- (Dt )
Date CY 0<5
Clerk 4(
Permit No:
Job Address:
GARFIELD COUNTY BUILDING PERMIT APPLICATION
108 8'" Street, Suite 201, Glenwood Springs, CO 81801
Phone: 970-945-8212 / Pax: 970-384-3470 / Inspection Line: 970-38.4-5003
Parcel/Schedule No: Ail tack 110 D!1
(09
5eA cag.0 fi V E. f l Ccs urs s Qx3. sib
1 Lot No: Block No: ( Subd. / Exemption:
•#'40/7e ---,2-.S . ' • G
V Owner: _
r N e6i- '
y
A.+ress746-
.G 4` l
Ph � • c_,—
— / 6
Wk Ph:
Contract s,•..
• C - tei-ee
Address:
/ .�r� L g_s 9
Ph:
`76'7 -0!76
Lic. No.
i - /E •fir:
-LVIC.OW t (
Address:
Ph:
Lic, No.
Sq. Ft. o ,Building:
!Buil.
Sq Ft. �� 5Loz)06 Is
I�
Height: .2„,„(
CT
No. of Floors:
Use of ing:
Describe W l
Class of Work: .1 . New Q �"�Alteration 0 Remove
Addition :.J Move
9
10
Garage: L3 Single
0 Double
Carport: ❑ Single
❑ Double
a Driveway Permit 0 On -Site Sewage
At Disposal
- Site Plan
—7y
Valuation of Work: $
Adjusted Valuations: ' ,T 4 .� CO
12
Special Conditions:
NOTICE
A SEPARATE ELECTRICAL PERMIT IS REQUIRED AND MUST BE
BY THE STATE OF COLORADO.
THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION
AUTHORIZED IS NOT COMMENCED WITHLN 180 DAYS, OR, W
CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A
PERIOD OF 180 DAYS AT ANY TIME AFTER WORE IS COMMENCED.
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS
APPLICATION AND KNOW THE SAME TO BE TRUE AND CORRECT. ALL
PROVISIONS OF LAWS GOVERNING THIS TYPE OF WORK WILL BE
COMPLETED WITHIN WHETHER SPECIFIED HEREIN OR NOT. THE
GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY
TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR
LOCAL LAW REGULATING CONSTRUCTION OR THE PERFORMANCE
OF CONSTRUCTION.
Plan Check Fee:
� Z.
Permit Fee:
32.ISSUED
Total Fee:
q �y _ fGly.O
1( _!/
Dated Permit Issued:
OCC up:
0 t. Type:
Zoning:
Setbacks:
Manu : Home:
ISDS N
0(,,�
r-"
S 1/4414d41-5:
I 0 "-1
SI iiii RE OF O ER DATE
ate_ :4 AL >" , g d lief S
r .: 3 PLNO. DEFT.
.�tt rl. NI r APP' OVAL/DATE ,
to -1m cyC��-"�c�w�t, � ��r J, L `o y�so.
ON IS HEREBY GRANTED TO THE APPLICANT AS OWNER CONTRACTOR AND/OR THE AGENT OF THE CONTRACTOR 0
ER TO CONSTRUCT
TI -IE STRUCTURE AS DETAILED ON PLANS AND SPECIFICATIONS SUBMITTED TO AND REVIEWED BY THE BUILDING DEPARTMENT,
IN CONSIDERATION OF THE ISSSUANCE OF THIS PERMIT, THE SIGNER HEREBY AGREES TO COMPLY WITH ALL BUILDING CODES AND LAND
USE REGULATIONS ADOPTED BY GARFIELD COUNTY PURSUANT TO AUTHORITY GIVEN LN 30.28.201 CRS AS AMENDED. THE SIGNER FURTHER AGREES
THAT IF THE ABOVE SAID ORDINANCES ARE NOT FULLY COMPILED WIh IN THE LCOATION, ERECTION, CONSTRUCTION, AND USE OF THE
ABOVE DESCRIBED STRUCTURE. THE PERMIT MAY BE REVOKED BY NOTICE FROM THE COUNTY AND THAT THEN AND THERE IT SHALL BECOME
NULL AND VOID. THE ISSUANCE OF A PERMT BASED UPON PLANS, SPECIFICATIONS AND OTHER DATA SHALL NOT PREVENT THE BUILDING OFFICIAL
FROM THEREAFTER REQUIRING THE CORRECTION OF ERRORS IN SAID PLANS, SPECIFICATIONS AND OTHER DATA OR FROM PREVENTING
BUILDING OPERATION BEING CARRIED ON THEREUNDER WHEN IN VIOLATION OF THS CODE OR ANY OTHER ORDINANCE OR REGULATION OF
THIS JURISDICTION. THE REVIEW OF SUBMITTED PLANS AND SPECIFICATIONS AND INSPECTIONS CONDUCTED THEREAFTER DOES NOT CONSTITUTE
AN ACCEPTANCE OF ANY RESPONSIBILITIES OR LIABLITIES I3Y GARFIELD COUNTY FOR ERRORS. OMISSIONS OR DISCREPENCIES. THE RFSPONSI
BILITY FOR THESE ITEMS AND IMPLEMENTATION DURING CONSTRUCTION RESTS SPECIFICIALLY WITH THE ARTICTECT, DESIGNER, BUILDER,
AND OWNER. COMMENTS ARE INTENDED TO BE CONSERVATIVE AND IN SUPPORT OF THE OWNERS LNTEREST.
Garfom.O03
I HEREBY ACKNOWLEDGE THAT I HAVE READ AND UNDERSTAND THE AGREEMENT ABOVE (INITIAL):
1 aiii(oc-'
The following items are required by Garfield County for a final inspection:
1. A final Electrical Inspection from the Colorado State Electrical Inspector;
2. Permanent address assigned by Garfield County Building Department posted where readily
visible from access road;
3. A finished roof, a lockable house, complete exterior siding, exterior doors and windows
installed, a complete kitchen with cabinets, a sink with hot & cold running water, non-absorbent
kitchen floor coverings, counter tops and finished walls, ready for stove and refrigerator, all
necessary plumbing;
4. All bathrooms must be complete, with washbowl, tub or shower, toilet stool, hot and cold
running water, non-absorbent .floors and walls finished and a privacy door;
5. All steps outside or inside over three (3) steps must have handrails, guard rails on balconies or
decks over 30" high constructed to all IBC and IRC requirements;
6. Outside grading done to where water will detour away from the building;
7. Exceptions to the outside steps, decks and grading may be made upon the demonstration of
extenuating circumstances, i.e. weather, but a Certificate of Occupancy will not be issued until
all the required items are completed and a final inspection made;
8. A final inspection sign off by the Garfield County Road & Bridge Department for driveway
installation, where applicable; as well as any final sign off by the Fire District, anchor State
Agencies where applicable.
A CERTIFICATE OF OCCUPANCY WILL NOT BE ISSUED UNTIL ALL THE
ABOVE ITEMS HAVE BEEN COMPLETED.
****CANNOT OCCUPY OR USE DWELLING UNTIL A CERTIFICATE OF OCCUPANCY
(C.O.) IS ISSUED. OCCUPANCY OR USE OF DWELLING WITHOUT A C.O. WILL BE
CONSIDERED AN ILLEGAL OCCUPANCY AND MAY BE GROUNDS FOR VACATING
PREMISES UNTIL ABOVE CONDI'T`IONS ARE MET.
I understand and agree to abide by the above conditions for occupancy use and the issuance of a
Certificate of Occupancy for the dwelling under building permit # j o9 -4
Signature
BpcontOct2004
Date
9bA
7 06
FBF ESTIMA TE
FINISHED LIVING SPACE X 74.68
UNFINISHED BASEMENT: X 41.00
CRAWL SPACE: X 9.00
GARAGE: X111.00 =
UNCOVERED PATIO/DECK: • X 12.00 =
COVERED PA TIO/DECK: X 24.00
MISC.rzC j)G c :. -/9 ` c)
MISC.
(Pd
TOTAL VALUATION: '7 �
J 5c?t-
5-z‘i LacT
PERMIT FEE: r
TOTAL: c37a.D.Lf
MANUFACTURED HOME SET UP FEE:
SEPTIC - PERMIT:
PERK:
GARFIELD COUNTY BUILDING AND PLANNING
970-945-8212
MINIMUM APPLICATION REQUIREMENTS
FOR
CONSTRUCTION OF
COMMERCIAL OR MULTI -FAMILY RESIDENTIAL BUILDINGS
Including
NEW CONSTRUCTION
ADDITIONS
ALTERATIONS
And
MOVED BUILDINGS
In order to understand the scope of the work intended under a permit application and expedite
the issuance of a permit it is important that complete information be provided. When reviewing
a plan and it's discovered that required information has not been provided by the applicant, this
will result in the delay of the permit issuance and in proceeding with building construction. The
owner or contractor shall be required to provide this information before the plan review can
proceed. Other plans that are in line for review may be given attention before the new
information may be reviewed after it has been provided to the Building Department.
Please review this document to determine if you have enough information to design your
project and provide adequate information to facilitate a plan review. Also, please consider
using a design professional for assistance in your design and a construction professional for
construction of your project. Any project with more than ten (10) occupants requires the
plans to be sealed by a Colorado. Registered Design Professional.
To provide for a more understandable plan and in order to determine compliance with the
building, plumbing and mechanical codes, applicants are requested to review the following
checklist prior to and during design.
Plans to be included for a Building Permit must be on draft paper at least 18"x 24"" and
drawn to scale.
Plans must include a floor plan, a concrete footing and foundation plan, elevations all sides with
decks, balcony steps, hand rails and guard rails, windows and doors, including the finish grade
and original grade line. A section showing in detail, from the bottom of the footing to the top of
the roof, including re -bar, anchor bolts, pressure treated plates, floor joists, wall studs and
spacing, insulation, sheeting, house -rap, (which is required), siding or any approved building
material. Engineered foundations may be required. Check with the Building Department.
A window schedule. A door schedule. A floor framing plan, a roofing framing plan, roof must
be designed to withstand a 40 pound per square foot up to 7,000 feet in elevation, a 90 M.P.H.
windspeed, wind exposure 13 or C, and a 36 inch frost depth.
All sheets need to be identified by number and indexed. All of the above requirements must be
met or your plans will be returned.
All plans submitted must be incompliance with the 2003 IBC, IPC, IMC and IFGC.
Applicants are required to indicate appropriately and to submit completed checklist at
time of application for a permit:
l . Is a site plan included that identifies the location of the proposed structure, additions or
other buildings, setback easements, and utility easements showing distances to the
property lines from each corner of the proposed structure prepared by a licensed surveyor
and has the surveyors signature and professional stamp on the drawing? Slopes of 30%
or more on properties must be show on site plan. (NOTE: Section 106.2) Any site plan
for the placement of any portion of a structure within 50 ft. of a property line and not
within a previously surveyed building envelope on a subdivision final plat shall be
prepared by a licensed surveyor and have the surveyors signature and professional stamp
on the drawing. Any structure to be built within a building envelope of a lot shown on a
recorded subdivision plat, shall include a copy of the building envelope as it is shown on
the final pilat with the proposed structure located within the envelope.
Yes �/
2. Does the site plan when applicable include the location of the I.S.D.S. (Individual
Sewage Disposal System) and distances to the property lines, wells (on subject property
and adjacent properties), streams or water courses? This information must be certified by
a licensed surveyor with their signature and professional stamp/n the design.
Yes No Not necessary for this project f
3. Are the plans submitted for application review construction drawings and not drawings
that are st ped or marked identifying them as "Not for construction, for permit issuance
only", " pproval drawings only", "For permit issuance only" or similar language?
Yes No Not necessary for this project
2
4. Is the I.S.D.S, (Individual Sewage Disposal System) designed, stamped and signed by a
Colorado Registered Engineer?
Yes No Not necessary for this project t/
5. Does the site plan indicate the location and direction of the State, County or private road
accessi g the property?
Yes
6. Do the plans include a foundation plan indicating the size, location and spacing of all
reinforci g steel in accordance with the uniform building code or per stamped engineered
design?
Yes No Not necessary for this project
7. If the buil 'ng is a pre-engineered structure, is there a stamped, signed engineered
foundati plan for this building?
Yes No Not necessary for this project
8. Do the plans indicate the location and size of ventilation open' gs for under floor crawl
spaces and the clearances required between wood and earth?
Yes No Not necessary for project
9. Do the pi ns indicate the size and location of the ventilation openings for the attic, roof
joist spa es and soffits?
Yes No Not necessary for this project
10. Do the Tans include design loads as required under the IBC or IRC for roof
snowlo ds, (a minimum of 40 pounds per square foot in Garfield County)?
Yes No Not necessary for this project
11. Do the fans include design loads as required for floor loads under the IBC or IRC?
Yes No Not necessary for this project
12. Does the Ian include a building section drawing indicating foundation, wall, floor, and
roof co struction?
Yes No Not necessary for this project
13. Is the wjAd speed and exposure design included in the plan?
Yes Y/ No Not necessary for this project
14. Does the b ilding section drawing include size and spacing of floor joists, wall studs,
ceiling j 'sts, roof rafters or joists or trusses?
Yes No Not necessary for this project
3
15. Does the building section drawing or other detail include the m od of positive
connection of all columns and beams?
Yes No Not necessary for this project
16. Does the elevation plan indicate the height of the building or proposed addition from the
undist rbed grade to the midpoint between the ridge and eave of a gable or shed roof or
the to of a flat roof? (Check applicable zone district for building height maximum)
Yes No Not necessary for this project
17. Does the plan include any stove or zero clearance fireplace planned for installation
including make and model and Colorado Phase II certifications r Phase 11 EPA
certification?
Yes No Not necessary for this project
18. Does the plan include a masonry fireplace including a fireplace s ction indicating design to
comply with the IBC or IRC?
Yes No Not necessary for this project
19. Does the plan include a window schedule or other verification th t egress/rescue windows
from sleeping rooms and/or basements comply with the require ents of the IBC or IRC?
Yes No Not necessary for this project
20. Does the plan include a window schedule or other verification that windows provide
natural ght and ventilation for all habitable rooms?
Yes t/ No Not necessary for this project
21. Do the plans indicate the location of glazing subject to human impact such as glass doors,
glazing immediately adjacent to such doors; glazing adjacent to any surface normally used
as a walking surface; sliding glass doors; fixed glass panels; show r doors and tub
enclosures and specify safety glazing for these areas?
Yes No Not necessary for this project
22. Do the plans include a complete design for all mechanical systems planned for installation
in this building?
Yes No Not necessary for this project
23. Have areas in the building been accurately identified for the intended use? (Occupancy
as idea ed in the IBC Chapter 3)
Yes No Not necessary for this project
24. Does the plan indicate the quantity, form, use and storage of any does materials that
may be in use in this building?
Yes No Not necessary for this project
4
25. Is the location of all natural and liquid petroleum gas furnaces, bo'lers and water heaters
indicated on the plan?
Yes No Not necessary for this project •
26. Do the plans indicate the location and dimension of restroom faci 'ties and if more than
four employees and both sexes are employed, facilities for both exes?
Yes No Not necessary for this project
27. Do the plans indicate that restrooms and access to the building a handicapped
accessible?
Yes No Not necessary for this project
28. Have two (2) complete sets of construction drawings been submitted with the
applica 'on?
Yes i No
29. Have you esigned or had this plan designed while considering building and other
constru ion code requirements?
Yes No Not necessary for this project
30. Does th plan accurately indicate what you intend to construct and what will receive a
final in ection by the Garfield County Building Department?
Yes No
31. Do your ans comply with all zoning rules and regulations in the County related to your
zone dis 'et? For comer lots see supplemental section 5.05.03 in the Garfield County
Zonin esolution for setbacks.
Yes No
32. Do you a derstand that approval for design and/or construction changes are required
prior to e implementation of these changes?
Yes No
33. Do you understand that the Building Department will collect a "Plan Review" fee from
you at t time of application and that you will be required to pay the "Periiiit" fee as well
as any` Septic System" or "Road Impact" fees required, at the time you pick up your
buildi g permit?
Yes No
34. Are yo aware that you are required to call for all inspections required under the IBC
inclu ng approval on a final inspection prior to receiving a Certificate of Occupancy
and o cupancy of the building?
Yes No
5
35. Are you a are that the Permit Application must be signed by the Owner or a written
authority e given for an Agent and that the party responsible for the project must comply
with the niform Codes?
Yes No
36. Are you aware that you must call in for an inspection by 3:30 the business day
before the requested inspection in order to receive it the following business day?
Inspections will be made between 7:30 a.m. and 3:30 p.m. Monday through Friday.
Inspections are to be called in to 384-5003.
37. Are you ware that requesting inspections on work that is not ready or not accessible
will re It in a $50.00 re -inspection fee?
Yes I No
38. Are you aware that prior to issuance of a building permit you are required to show proof
of a driveway access peruzit or obtain a statement from t e Garfield County Road &
Bridge Department stating one is not necessary? You an contact the Road & Bridge
Department at 625-8601.
Yes No
39. Do you understand that you will be required to hire a State of Colorado Licensed
Electric'an and Plumber to perform installations and hookups? The license number will
be req fired at time of inspection.
Yes No
40. Are you are, that on the front of the building permit application you will need to fill in
the Parc / Schedule Number for the lot you are applying for this permit on prior to
submitt of the building permit application? Your attention in this is appreciated.
Yes No
41. Do you know that the local fire dis ct may require you to submit plans for their review
of fire safety issues? Yes No (Please check with the
building department about this requirement)
6
42. Do you unde tannd that if you are planning on doing any excavating or grading to the
property pri to issuance of a building permit that you will be required to obtain a
grading pe t?
Yes
I hereby acknowledge that I have read, understand, and answered these questions to
the best of my ability.
7/(Ar---
Signature Date
Phone: G 577‘ (days); p J J (evenings)
Project Name: %C
Project Address: i,e0
Note:
If you answered "No" on any of these questions you may be required to provide this information
at the request of the Building Official prior to beginning the plan review process. Delays in
issuing the permit are to be expected. Work may not proceed without the issuance of the permit.
*If you have answered "Not necessary for this project" on any of the questions and it is
determined by the Building Official that the information is necessary to review the application
and plans to determine minimum compliance with the adopted codes, please expect the
following:
A. The application may be placed behind more recent applications for building permits in the
review process and not reviewed until required information has been provided and the
application rotates again to first position for review.
B. Delay in issuance of the permit.
C. Delay in proceeding with construction.
*If you answered "No" to this question the circumstances described in the question could result
in a "Stop Work Order" being issued or a "Certificate of Occupancy" not being issued.
Bpcomm
Feb2005
7
GARFIELD COUNTY
BUILDING REQUIREMENTS
Codes: 2003 IRC, IBC, IFGC, IMC, IPC,
Setbacks: Check subdivisions and zone district for setback requirements.
Snowload: 40PSF up to 7000ft. elevatio
50PSF 7001 to 8000ft.
75PSF 8001 to 9000ft.
100PSF 9001 to 10000ft.
Seismic design category: B
Weathering probability for concrete: Severe
Termite infestation probability: None to slight
Wind speed: 90mph
Decay probability: None to slight
Wind Exposure: B or C (see section 8301.2.1.4)
Frost Depth: 36in. to 8000ft. elevation. 42in. 8001 and above.
Winter Design Temperature: Minus 2 to 7000ft.; minus 16 over 7000ft.
elevation.
Air Freezing Index: 2500deg F -days to 7000ft.; over 7000ft. to be determined by
Building Official.
Ice shield under-layment required.
Mean Annual temp.: Variable
Insulation: Maximum glazing U factor: 0.50
Minimum R -Values:
= Ceilings/roofs R values are: R-30 stick built
structures. R-3 8 log construction and steel
rafter construction.
■ Walls R values are R-19 wood frame; R-19
cavity R-3 sheathing steel studs.
■ Floors R -values are R-19.
PLAN REVIEW CHECKLIST
Date f-..4
Building
Engineered Foundation
Re0 Driveway Permit
Surveyed Site Plan
kt4 eptic Pewit and Setbacks
Grade/Topography 30%
ttach Residential Plan Review List
/Minimum Application Questionnaire
Subdivision Plat Notes
„ Fi
V
Department Review
uation Determination/Fees
d Line Plans/Stamps/Sticker
ttach Conditions
JPIan
Application Signed
Reviewer To Sign SiApplication
L 4arcel/Schedule No.
40# Snowload Letter- Manf. Hms.
GENERAL NOTES:
Planning/Zoning
Property Line Setbacks
4,"' ft Stream Setbacks
eaod Plain
wilding Height
Jing Sign -off
,ad Impact Fees
frHOADDRC Approval
Grade/Topography 40%
ng Issues
Subdivision Plat Notes
FSS ESTIMA TE
FINISHED LIVING SPACE: X 74.68
UNFINISHED BASEMENT:
X 41.00
CRAWL SPACE: X 9.00
GARAGE: X18.00 =
UNCOVERED PATIO/DECK: X 12.00 =
COVERED PATIO/DECK: X 24.00
misc.
misc.
ria q/qe>s'
,iitt) ca o19c2Z)�
TOTAL VALUATION: Cc, S
it )9 ( )5.0J00
0_cf
PERMIT FEE:
TOTAL:(37L-1.C>k4
MANUFACTURED HOME SET UP FEE:
SEPTIC — PERMIT:
PERK:
No
Job Ad•r:ss
Owner►� 1 141,
Contractor t2XY1
Assessor's Parcel Not`'D + t)0
tbfq' bowl
BUIL® rets� cAll� ��..�. ��.�.
v ;
s� . �
Addres -7� is TC't_. Phone 41,0=b
Address) Q t .Qgc Phone Iraq'"i'.7*
tbac : Front Rear RH l -H
�.-„ INSPECTIONS %-°�Q �'��
Weatherproofing
Mechanical
Electrical Rough (State)
Electric`al n State) a-6- 2VO5` CAil
Final!!-- /Checklis Cpm feted? i(
Certificate Occupancy # (l0 2
Date
Septic System # `P
Y E'
Date (91/7v /
Final 06-
Soils Test
Footing
Foundation
Grout
Underground Plum ing /J-7�/ -
Rough Plumbin ;7- 0
Framing k-4 -0(0
Insulation
Roofing
Drywall
Gas Piping
rj .
•
Other
NOTES
(continue on back)
Garfield County
Building and Planning
108 8th Street Suite 201
Glenwood Springs, CO 81601
970.945.8212
Plan analysis based on
the 2003 International Building Code
Project Number:
Project Name: McElroy Storage Building
Address: Lot 9 Travelers Highland
Contractor:
Occupancy: S-1 Architect:
Construction: V -B Engineer:
Report By:
Date: September 29, 2005
Kirk
Johnson
Kesler
Andy Schwaller
NOTE: The code items listed in this report are not intended to be a
complete listing of all possible code requirements in the 2003 IBC.
It is a guide to selected sections of the code.
FRONTAGE INCREASE:
Perimeter of the entire building = 188 feet.
Perimeter which fronts a public way or accessible open space = 25 feet.
Minimum width of public way or accessible open space = 20
Allowable area increased 0.0% for frontage increase.
-- Sec. 506.2
FL
NAME OCC MAX FLR AREA ALLOWED RATIO STATUS
1 Storage/Stock Room S-1 ok
TOTAL FOR FLOOR
BUILDING TOTAL
-- Sec. 503, 504, 506 and Table 503
1920
1920
1920
9000
9000
9000
The actual height of this building is 21.0 feet.
The maximum height of this building is 40.0 feet.
PROPERTY DESCRIPTION:
North Side has a property line.
East Side has a property line.
South Side has a property line.
West Side has a property line.
- Distance
- Distance
- Distance
- Distance
0.21
0.21
0.21
Table 503
to property
to property
to property
to property
line
line
line
line
ok
ok
ok
11.0
10.0
25.0
10.0
Page # 2
Code review for:
Project Id.: McElroy Storage Building
Address: Lot 9 Travelers Highland
EXTERIOR WALL FIRE RATINGS AND OPENING PROTECTION
Sec. 602, Tables 601 and 602, and Sec. 704
NORTH
OCC BRG NON OPNG%
WALL BRG UP/PR
S-1 0 -hr 0 -hr NL/NL
EAST
BRG NON OPNG%
WALL BRG UP/PR
0 -hr 0 -hr NL/NL
SOUTH
BRG NON OPNG%
WALL BRG UP/PR
0 -hr 0 -hr NL/NL
WEST
BRG NON OPNG%
WALL BRG UP/PR
0 -hr 0 -hr NL/NL
The exterior walls may be of COMBUSTIBLE material. -- Sec. 602.5
Exterior walls are required to be fire -rated for exposure to fire:
1. From Both sides when fire separation is 5 feet or less.
2. On the interior side only when separation is greater than 5 feet.
-- Sec. 704.5
up/pr = Maximum percent of openings in the exterior wall.
-- Table 704.8
up - The maximum percent if all openings are unprotected.
pr - The maximum percent if all openings are protected.
If some are protected and some are not, then use formula
in Sec. 704.8
Openings in lhr walls are required to be protected with
3/4 hour assemblies. -- Sec. 704.12 and Sec. 715.4
Openings in walls required to be greater than lhr are required
protected with 1 1/2 hour assemblies. -- Sec. 715.4
NL = No fire protection requirements for openings.
NP = Openings are not permitted in this wall.
Note: Unlimited unprotected openings are allowed in walls not required
to fire-resistant. -- Table 704.8, Note: g.
* = These walls may be required to have a parapet wall 30 inches
above the roofing. The parapet wall is required to have the
same fire rating as the wall and shall have noncombustible faces
for the uppermost 18 inches. -- Sec. 704.11
Exception 1: A parapet wall is not required when the wall is not
required to be fire -resistive.
Page # 3
Code review for:
Project Id.: McElroy Storage Building
Address: Lot 9 Travelers Highland
FIRE RESISTANCE RATINGS FOR BUILDING ELEMENTS
ELEMENT MATERIAL RATING NOTES
Structural Frame Any 0 hour
Interior Bearing wall Any 0 hour
Interior nonbrg wall Any 0 hour
Floor/Ceiling Assembly Any 0 hour
Roof/Ceiling Assembly Any 0 hour
Stairs Any None
NOTES:
Table 601
EXIT REQUIREMENTS:
FL NAME NUMB MIN MIN PANIC CORRIDOR DOOR NOTES
OCC EXITS WIDTH HDWR RATING SWING
1 Storage/Stock Room 6 1 1.2 No N/A N/R
TOTAL FOR FLOOR 6 1 1.2 No N/A N/R
FOOTNOTES:
5. One exit is based on compliance with Section 1018.2, #3
6. One exit is based on compliance with Section 1018.2 and
Table 1018.2
NOTES FOR EXIT TABLE
Door swing is based on Section 1008.1.2
Occupant load is based on Section 1004 and Table 1004.1.2
Exit width is in inches and based on Section 1005.1 & Table 1005.1
Width shown for all areas is based on other egress components.
Width shown for 1st floor is based on other egress components.
Width shown for other floors & basements is based on stairways.
For the minimum width of doors, see Section 1008.1.1.
For the minimum width of corridors, see Section 1016.2.
For the minimum width of stairways, see Section 1009.1.
Exits shall be continuous from the point of entry into the exit to
the exit discharge. -- Sec. 1003.6
BOLT LOCKS:
Manually operated flush bolts and surface bolts are not permitted.
r_ Sec. 1008.1.8.4
Exception 2: Where a pair of doors serves a storage or equipment room,
manually operated edge- or surface -mounted bolts are
permitted on the inactive leaf.
LOCKS AND LATCHES:
Egress doors shall be readily openable from the egress side without the
use of a key or any special knowledge or effort. -- Sec. 1008.1.8
Page # 4
Code review for:
Project Id.: McElroy Storage Building
Address: Lot 9 Travelers Highland
Locks and latches shall be permitted to prevent operation where any
of the following exists:
Exception 2: The main door or doors in Group B, F, M and S areas are
permitted to be equipped with key operating locking devices
from the egress side provided:
2.1 The locking device is readily distinguishable as locked.
2.2 A readily visible durable sign is posted on the egress
side stating: THIS DOOR TO REMAIN UNLOCKED WHEN BUILDING
IS OCCUPIED
Exception 3: Where egress doors are used in pairs, automatic flush bolts
shall be permitted to be used, provided the door leaf having
the automatic flush bolts has no doorknob or surface -mounted
hardware.
ADDITIONAL DOORS:
Where additional doors are provided for egress purposes, they
shall conform to the requirements in Section 1008.1
LANDINGS AT DOORS:
1. There shall be a floor or landing on each side of a door.
-- Sec. 1008.1.4
2. Such floor or landing shall be at the same elevation on each
side of the door. -- Sec. 1008.1.4
3. The floor or landing shall not be more than 1/2 inch lower than the
threshold. -- Sec. 1008.1.6
4. Landings shall have a width not less than the width of the stairway
or width of the doorway, whichever is the greater. Where a landing
serves an occupant load of 50 or more, doors in any position shall
not reduce the landing dimension to less than one half it required
width. The minimum length in the direction of exit travel is 44
inches. -- Sec. 1008.1.5
5. The space between two doors in series shall be 48 inches plus the.
width of door swinging into the space. -- Sec. 1008.1.7
EXIT ACCESS TRAVEL DISTANCE:
The maximum travel distance in Group S1 is 200 feet. -- Table 1015.1
ROOFING REQUIREMENTS:
1. The roofing on this building is required to be Class C. -- Table 1505.1
Roofing may be of No. 1 cedar or redwood shakes and No. 1 shingles.
-- Exception c
Note: The leading edge of the roof must have a least a 10 foot fire
separation distance.
Page # 5
Code review for:
Project Id.: McElroy Storage Building
Address: Lot 9 Travelers Highland
LIGHT AND VENTILATION
1. Every space intended for human occupancy shall be provided with
natural light. The minimum net glazed area shall not be less than
8% of the floor area. -- Sec. 1205.1 and 1205.2
Any room is permitted to be considered as a portion of an adjoining
room where one half of the area of the common wall is open and
unobstructed and provided not less than one tenth of the floor area
or 25 square feet, whichever is greater. -- Sec. 1205.2.1
Artificial light shall be provided that is adequate to provide an
average illumination of 10 foot candles over the area of the room
at a height of 30 inches above the floor. -- Sec. 1205.3
2. Natural ventilation of an occupied space shall be through windows,
doors, louvers or other openings to the outdoors. -- Sec. 1203.4
The minimum openable area to the outdoors shall be 4 percent of the
floor area. -- Sec. 1203.4.1
Any room is permitted to be considered as a portion of an adjoining
room where unobstructed openings are provided that have an area not
less than 8% of the floor area of the interior room but no less than
25 square feet. Sec. 1202.3.1.1
When openings are below grade, clear space measured perpendicular to
the opening shall be one and one half times the depth of the opening.
-- Sec. 1203.4.1.2
3. Rooms containing bathtubs, showers, spas and similar bathing fixtures
shall be mechanically ventilated. -- Sec. 1203.4.2.1
Page # 6
Code review for:
Project Id.: McElroy Storage Building
Address: Lot 9 Travelers Highland
GLAZING REQUIREMENTS
All glazing in hazardous locations is required to be of safety
glazing material. -- Sec. 2406.1
Locations: -- Sec. 2406.3
1. Glazing in swinging doors except jalousies.
2. Glazing in fixed and sliding panels of sliding patio door assemblies
and panels in sliding and bifold closet door assemblies.
3. Glazing in storm doors.
4. Glazing in all unframed swinging doors.
5. Glazing in doors and enclosures for hot tubs, whirlpools, saunas,
steam rooms, bathtubs and showers. Glazing in any portion of a
building wall enclosing these compartments where the bottom exposed
edge of the glazing is less than 60 inches above a standing surface.
6. Glazing in fixed or operable panels adjacent to a door where the
nearest exposed edge of the glazing is within a 24 -inch arc of
either vertical edge of the door in a closed position and where the
bottom exposed edge of the glazing is less than 60 inches above the
walking surface.
Exception: Panels where there is an intervening wall or other
permanent barrier between the door and glazing.
7. Glazing in an individual fixed or operable panel, other than those
locations described in items 5 and 6 above, than meets all of the
following conditions:
7.1 Exposed area of an individual pane greater than 9 square feet.
7.2 Exposed bottom edge less than 18 inches above the floor.
7.3 Exposed top edge greater than 36 inches above the floor.
7.4 One or more walking surfaces within 36 inches horizontally of
the plane of the glazing.
See Exceptions.
8. Glazing in guards and railings regardless of the area or height
above a walking surface.
9. Glazing in walls and fences enclosing indoor and outdoor swimming
pools, hot tubs and spas where all of the following are present:
9.1 The bottom edges of the glazing on the pool or spa side is
less than 60 inches above the walking surface.
9.2 The glazing is within 60 inches of the water's edge.
10. Glazing adjacent to stairways, landings and ramps within 36 inches
horizontally of a walking surface when the glass is less than 60
inches above the plane of the walking surface.
11. Glazing adjacent to stairways within 60 inches horizontally of the
bottom tread of a stairway in any direction when the exposed glass
is less than 60 inches above the nose of the tread.
See Exceptions.