HomeMy WebLinkAboutApplication-PermitGARFIELD COUNTY BUILDING PERMIT APPLICATION
108 8-" Street, Suite 201, GIenwood Springs, CO 81601
Phone: 970-945-8212 / Fax: 970-384-3470 / Inspection Line: 970.384.6003
Permit No: q (l co
Parcel/Schedule No: 2189-214-00026
AGREEMENT
PERMISSION IS HEREBY GRANTED TO THE APPLICANT AS OWNER, CONTRACTOR AND/OR THE AGENT OF THE CONTRACTOR OR OWNER TO CONSTRUCT THE
STRUCTURE AS DETAILED ON PLANS AND SPECIFICATIONS SUBMITTED TO AND REVIEWED BY THE BUILDING DEPARTMENT.
IN CONSIDERATION OF THE ISSSUANCE OF THIS PERMIT, THE SIGNER. HEREBY AGREES TO COMPLY WITH ALL BUILDING CODES AND LAND USE
REGULATIONS ADOPTED BY GARFIELD COUNTY PURSUANT TO AUTHORITY GIVEN LN 30.28.201 CRS AS AMENDED. THE SIGNER FURTHER AGREES THAT IF
THE ABOVE SAID ORDINANCES ARE NOT FULLY COMPILED WITH IN 111E LCOATION, ERECTION, CONSTRUCTION, AND USE OF THE ABOVE DESCRIBED
STRUCTURE, THE PERMIT MAY BE REVOKED BY NOTICE FROM TI IE COUNTY AND THAT THEN AND THERE IT SHALL BECOME NULL AND VOID.
THE ISSUANCE OF A PERMT BASED UPON PLANS, SPECIFICATIONS AND OTHER DATA SHALL NOT PREVENT THE BUILDING OFFICIAL FROM THEREAFTER
REQUIRING THE CORRECTION OF ERRORS IN SAID PLANS, SPECIFICATIONS AND OTHER DATA OR FROM PREVENTING BUILDING OPERATION BEING
CARRIED ON THEREUNDER WHEN IN VIOLATION OF THS CODE OR ANY OTIIER ORDINANCE OR REGULATION OF THIS JURISDICTION.
THE REVIEW OF SUBMITTED PLANS AND SPECIFICATIONS AND INSPECTIONS CONDUCTED THEREAFTER DOES NOT CONSTITUTE AN ACCEPTANCE OF ANY
RESPONSIBILITIES OR LIABLITIES BY GARFIELD COUNTY FOR ERRORS, OMISSIONS OR DISCREPENCIES. THE RESPONSIBILITY FOR THESE ITEMS AND
IMPLEMENTATION DURING CONSTRUCTION RESTS SPECIFICIALLY WITH THE ARTICTECT, DESIGNER, BUILDER, AND OWNER. COMMENTS ARE INTENDED
TO BE CONSERVATIVE AND IN SUPPORT OF THE OWNERS LNTEREST.
Garfom.003 44
A i /
I HEREBY ACKNOWLEDGE THAT I HAVE READ AND UNDERSTAND THE AGREEMENT ABOVE (INITIAL): / 't 'i_,.
5%s 1c) c, 0? cm c'
Job Address: 8 miles north, 7 miles east of BeBeque Colorado
CACIV5 Cr I'' tet3 v -e.
1 Lot No: Block No: Subd. / Exemption:
SW/4, SW/4, T7S, R97W, 0th PM
2
Owner: onIwwu,
Address 807281/4 Road,Suite 109
Grand Junction, CO 81506
Ph: 87„68._om5,,,1
_ '-n"
, Wk Ph: Same
Lic. No. 2050337
3
Contractor:
Ford Construction
Address: 714 Amawest Road
Grand Junction, CO 81505
Junction,
Ph: 970.2459343
4
Architect/Engineer:
Alliance Steel Buildings
Address: 3333 9. Council Road
Oldehome City, OK 73179
Ph: 4057467500
Lic. No. 38125
1
5
Sq. Ft. of Building: 900osaa
Sq. Ft. of Lot:
Height: 24,
No. of Floors:
6
Use of Building:
equiPa /-��,-li liter
7
Describe Work: New steal Belding
8
Class of Work: D New ❑ Alteration o Remove
❑ X Addition U Move
9
10
Garage: WA ❑ Single
❑ Double
Carport: wA 0 Single
❑ Double
o Driveway Permit 0 On -Site Sewage
WA Disposal
u Site Plan atlaaned
11
Valuation of Work: $ 213,307.00
Adjusted Valuations: S2/.'
12
Special Conditions:
None
NOTICE
A SEPARATE ELECTRICAL PERMIT IS REQUIRED AND
ISSUED BY THE STATE OF COLORADO.
THIS PERMIT BECOMES NULL AND VOID IF WORK OR
AUTHORIZED IS NOT COMMENCED WITHLN 180 DAYS,
CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED
PERIOD OF 180 DAYS AT ANY TIME AFTER WORK IS
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED
APPLICATION AND KNOW THE SAME TO BE TRUE AND
PROVISIONS OF LAWS GOVERNING THIS TYPE OF WORK
COMPLETED WITHIN WHETHER SPECIFIED HEREIN
GRANTING OF A PERMIT DOES NOT PRESUME TO
TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER
LOCAL LAW REGULATING CON RUCTION OR THE
OF I 7 R CTIOI
fi
MUST BE
CONSTRUCTION
OR, IF
FOR A
COMMENCED.
THIS
CORRECT. ALL
WILL BE
OR NOT. THE
GIVE AUTHORITY
STATE OR
PERFO MANCE
y K.-_
ATI; /(
DEFT.
Plan Check Fee:
i 19(e0 . G ly
[ 1�
Permit Fee:
3.Z . /5
13.&./5-`
Total Fee:
21093 . c5
Dated PermiterlIssued:
OCC Grouz
//
Const. ype:
(
Zoning.:
Setbacks:
Manu. Home:
ISDS No. & Fee:
ii'''.i- A:.
1i 1l• WNER I�
iilliF
lk
BLDG DE' . NG.
APPR1 •/DATE APPROVAL/DATE
AGREEMENT
PERMISSION IS HEREBY GRANTED TO THE APPLICANT AS OWNER, CONTRACTOR AND/OR THE AGENT OF THE CONTRACTOR OR OWNER TO CONSTRUCT THE
STRUCTURE AS DETAILED ON PLANS AND SPECIFICATIONS SUBMITTED TO AND REVIEWED BY THE BUILDING DEPARTMENT.
IN CONSIDERATION OF THE ISSSUANCE OF THIS PERMIT, THE SIGNER. HEREBY AGREES TO COMPLY WITH ALL BUILDING CODES AND LAND USE
REGULATIONS ADOPTED BY GARFIELD COUNTY PURSUANT TO AUTHORITY GIVEN LN 30.28.201 CRS AS AMENDED. THE SIGNER FURTHER AGREES THAT IF
THE ABOVE SAID ORDINANCES ARE NOT FULLY COMPILED WITH IN 111E LCOATION, ERECTION, CONSTRUCTION, AND USE OF THE ABOVE DESCRIBED
STRUCTURE, THE PERMIT MAY BE REVOKED BY NOTICE FROM TI IE COUNTY AND THAT THEN AND THERE IT SHALL BECOME NULL AND VOID.
THE ISSUANCE OF A PERMT BASED UPON PLANS, SPECIFICATIONS AND OTHER DATA SHALL NOT PREVENT THE BUILDING OFFICIAL FROM THEREAFTER
REQUIRING THE CORRECTION OF ERRORS IN SAID PLANS, SPECIFICATIONS AND OTHER DATA OR FROM PREVENTING BUILDING OPERATION BEING
CARRIED ON THEREUNDER WHEN IN VIOLATION OF THS CODE OR ANY OTIIER ORDINANCE OR REGULATION OF THIS JURISDICTION.
THE REVIEW OF SUBMITTED PLANS AND SPECIFICATIONS AND INSPECTIONS CONDUCTED THEREAFTER DOES NOT CONSTITUTE AN ACCEPTANCE OF ANY
RESPONSIBILITIES OR LIABLITIES BY GARFIELD COUNTY FOR ERRORS, OMISSIONS OR DISCREPENCIES. THE RESPONSIBILITY FOR THESE ITEMS AND
IMPLEMENTATION DURING CONSTRUCTION RESTS SPECIFICIALLY WITH THE ARTICTECT, DESIGNER, BUILDER, AND OWNER. COMMENTS ARE INTENDED
TO BE CONSERVATIVE AND IN SUPPORT OF THE OWNERS LNTEREST.
Garfom.003 44
A i /
I HEREBY ACKNOWLEDGE THAT I HAVE READ AND UNDERSTAND THE AGREEMENT ABOVE (INITIAL): / 't 'i_,.
5%s 1c) c, 0? cm c'
The following items are required by Garfield County for a final inspection:
1. A final Electrical Inspection from the Colorado State Electrical Inspector;
2. Permanent address assigned by Garfield County Building Department posted where readily
visible from access road;
3. A finished roof, a lockable house, complete exterior siding, exterior doors and windows
installed, a complete kitchen with cabinets, a sink with hot & cold running water, non-absorbent
kitchen floor coverings, counter tops and finished walls, ready for stove and refrigerator, all
necessary plumbing;
4. All bathrooms must be complete, with washbowl, tub or shower, toilet stool, hot and cold
running water, non-absorbent floors and walls finished and a privacy door;
5. All steps outside or inside over three (3) steps must have handrails, guard rails on balconies or
decks over 30" high constructed to all IBC and IRC requirements;
6. Outside grading done to where water will detour away from the building;
7. Exceptions to the outside steps, decks and grading may be made upon the demonstration of
extenuating circumstances, i.e. weather, but a Certificate of Occupancy will not be issued until
all the required items are completed and a final inspection made;
8. A final inspection sign off by the Garfield County Road & Bridge Department for driveway
installation, where applicable; as well as any final sign off by the Fire District, anchor State
Agencies where applicable.
A CERTIFICATE OF OCCUPANCY WILL NOT BE ISSUED UNTIL ALL THE
ABOVE ITEMS HAVE BEEN COMPLETED.
****CANNOT OCCUPY OR USE DWELLING UNTIL A CERTIFICATE OF OCCUPANCY
(C.O.) IS ISSUED. OCCUPANCY OR USE OF DWELLING WITHOUT A C.O. WILL BE
CONSIDERED AN ILLEGAL OCCUPANCY AND MAY BE GROUNDS FOR VACATING
PREMISES UNTIL ABOVE CONDITIONS ARE MET.
I understand and agree to abide by the above conditions for occupancy use and the issuance of a
Certificate of Occupancy for the dwelling under building permit #(gl b
diat4 e,/,/
Signature
BpcontOct2004
Date
GARFIELD COUNTY BUILDING AND PLANNING
970-945-8212
MINIMUM APPLICATION REQUIREMENTS
FOR
CONSTRUCTION OF
COMMERCIAL OR MULTI -FAMILY RESIDENTIAL BUILDINGS
Including
NEW CONSTRUCTION
ADDITIONS
ALTERATIONS
And
MOVED BUILDINGS
In order to understand the scope of the work intended under a permit application and expedite
the issuance of a permit it is important that complete information be provided. When reviewing
a plan and it's discovered that required information has not been provided by the applicant, this
will result in the delay of the permit issuance and in proceeding with building construction. The
owner or contractor shall be required to provide this information before the plan review can
proceed. Other plans that are in line for review may be given attention before the new
information may be reviewed after it has been provided to the Building Department.
Please review this document to determine if you have enough information to design your
project and provide adequate information to facilitate a plan review. Also, please consider
using a design professional for assistance in your design and a construction professional for
construction of your project. Any project with more than ten (10) occupants requires the
plans to be sealed by a Colorado Registered Design Professional.
To provide for a more understandable plan and in order to determine compliance with the
building, plumbing and mechanical codes, applicants are requested to review the following
checklist prior to and during design.
Plans to be included for a Building Permit must be on draft paper at least 18"x 24"" and
drawn to scale.
1
Plans must include a floor plan, a concrete footing and foundation plan, elevations all sides with
decks, balcony steps, hand rails and guard rails, windows and doors, including the finish grade
and original grade line. A section showing in detail, from the bottom of the footing to the top of
the roof, including re -bar, anchor bolts, pressure treated plates, floor joists, wall studs and
spacing, insulation, sheeting, house -rap, (which is required), siding or any approved building
material. Engineered foundations may be required. Check with the Building Department.
A window schedule. A door schedule. A floor framing plan, a roofing framing plan, roof must
be designed to withstand a 40 pound per square foot up to 7,000 feet in elevation, a 90 M.P.H.
windspeed, wind exposure B or C, and a 36 inch frost depth.
All sheets need to be identified by number and indexed. All of the above requirements must be
met or your plans will be returned.
All plans submitted must be incompliance with the 2003 IBC, IPC, IMC and IFGC.
Applicants are required to indicate appropriately and to submit completed checklist at
time of application for a permit:
1. Is a site plan included that identifies the location of the proposed structure, additions or
other buildings, setback easements, and utility easements showing distances to the
property lines from each corner of the proposed structure prepared by a licensed surveyor
and has the surveyors signature and professional stamp on the drawing? Slopes of 30%
or more on properties must be show on site plan. (NOTE: Section 106.2) Any site plan
for the placement of any portion of a structure within 50 ft. of a property line and not
within a previously surveyed building envelope on a subdivision final plat shall be
prepared by a licensed surveyor and have the surveyors signature and professional stamp
on the drawing. Any structure to be built within a building envelope of a lot shown on a
recorded subdivision plat, shall include a copy of the building envelope as it is shown on
the final plat with the proposed structure located within the envelope.
Yes X
2. Does the site plan when applicable include the location of the I.S.D.S. (Individual Sewage
Disposal System) and distances to the property lines, wells (on subject property and
adjacent properties), streams or water courses? This information must be certified by a
licensed surveyor with their signature and professional stamp on the design.
Yes No Not necessary for this project X There is no I.S.D.S
associated with this building.
3. Are the plans submitted for application review construction drawings and not drawings
that are stamped or marked identifying them as "Not for construction, for permit issuance
only", "Approval drawings only", "For permit issuance only" or similar language?
2
Yes X No Not necessary for this project
4. Is the LS.D.S. (Individual Sewage Disposal System) designed, stamped and signed by a
Colorado Registered Engineer?
Yes No Not necessary for this project X There is no I.S D.S.
associated with this building.
5. Does the site plan indicate the location and direction of the State, County or private road
accessing the property?
Yes X
6. Do the plans include a foundation plan indicating the size, location and spacing of all
reinforcing steel in accordance with the uniform building code or per stamped engineered
design?
Yes X No Not necessary for this project
7. If the building is a pre-engineered structure, is there a stamped, signed engineered
foundation plan for this building?
Yes X No Not necessary for this project
8. Do the plans indicate the location and size of ventilation openings for under floor crawl
spaces and the clearances required between wood and earth?
Yes No Not necessary for project X There are no under floor
crawl spaces associated with this building.
9. Do the plans indicate the size and location of the ventilation openings for the attic, roof
joist spaces and soffits?
Yes X No Not necessary for this project
10. Do the plans include design loads as required under the IBC or IRC for roof
snowloads, (a minimum of 40 pounds per square foot in Garfield County)?
Yes X No Not necessary for this project
11. Do the plans include design loads as required for floor loads under the IBC or IRC?
Yes X No Not necessary for this project
12. Does the plan include a building section drawing indicating foundation, wall, floor, and
roof construction?
Yes X No Not necessary for this project
13. Is the wind speed and exposure design included in the plan?
Yes X No Not necessary for this project
3
14. Does the building section drawing include size and spacing of floor joists, wall studs, ceiling
joists, roof rafters or joists or trusses?
Yes X No Not necessary for this project
15. Does the building section drawing or other detail include the method of positive connection
of all columns and beams?
Yes X No Not necessary for this project
16. Does the elevation plan indicate the height of the building or proposed addition from the
undisturbed grade to the midpoint between the ridge and cave of a gable or shed roof or the
top of a flat roof? (Check applicable zone district for building height maximum)
Yes No Not necessary for this project X The building is
located in a zone district exempt from building height requirements.
17. Does the plan include any stove or zero clearance fireplace planned for installation
including make and model and Colorado Phase II certifications or Phase II EPA
certification?
Yes No Not necessary for this project X There is no fireplace
associated with this building.
18. Does the plan include a masonry fireplace including a fireplace section indicating design
to comply with the IBC or IRC?
Yes No Not necessary for this project X There is no fireplace
associated with this building.
19. Does the plan include a window schedule or other verification that egress/rescue windows
from sleeping rooms and/or basements comply with the requirements of the IBC or IRC?
Yes No Not necessary for this project X There are no
sleeping rooms or basements associated with this building.
20. Does the plan include a window schedule or other verification that windows provide
natural light and ventilation for all habitable rooms?
Yes No Not necessary for this project X There are no
windows associated with this building.
21. Do the plans indicate the location of glazing subject to human impact such as glass doors,
glazing immediately adjacent to such doors; glazing adjacent to any surface normally used as
a walking surface; sliding glass doors; fixed glass panels; shower doors and tub enclosures
and specify safety glazing for these areas?
Yes No Not necessary for this project X There is no glazing
subject to human impact associated with this building.
4
22. Do the plans include a complete design for all mechanical systems planned for
installation in this building?
Yes No Not necessary for this project X There are no
mechanical systems associated with this building.
23. Have all areas in the building been accurately identified for the intended use?
(Occupancy as identified in the IBC Chapter 3)
Yes No Not necessary for this project X There are not
separate areas or intended uses within the planned building.
24. Does the plan indicate the quantity, form, use and storage of any hazardous materials that
may be in use in this building?
Yes No Not necessary for this project X There will be no
hazardous material storage or use associated with this building.
25. Is the location of all natural and liquid petroleum gas furnaces, boilers and water heaters
indicated on the plan?
Yes No Not necessary for this project X There are no liquid
petroleum gas furnaces, boilers and hot water heaters associated with this building.
26. Do the plans indicate the location and dimension of restroom facilities and if more than
four employees and both sexes are employed, facilities for both sexes?
Yes No Not necessary for this project X There are no
restroom facilities associated with this building.
27. Do the plans indicate that restrooms and access to the building are handicapped
accessible?
Yes No Not necessary for this project X There are no
restroom facilities associated with this building.
28. Have two (2) complete sets of construction drawings been submitted with the
application?
Yes X No
29. Have you designed or had this plan designed while considering building and other
construction code requirements?
Yes X No Not necessary for this project
30. Does the plan accurately indicate what you intend to construct and what will receive a
final inspection by the Garfield County Building Department?
Yes X No
31. Do your plans comply with all zoning rules and regulations in the County related to your
5
zone district? For corner lots see supplemental section 5.05.03 in the Garfield County
Zoning Resolution for setbacks.
Yes X No
32. Do you understand that approval for design and/or construction changes are required
prior to the implementation of these changes?
Yes X No
33. Do you understand that the Building Department will collect a "Plan Review" fee from
you at the time of application and that you will be required to pay the "Permit" fee as well
as any "Septic System" or "Road Impact" fees required, at the time you pick up your
building permit?
Yes X No
34. Are you aware that you are required to call for all inspections required under the IBC
including approval on a final inspection prior to receiving a Certificate of Occupancy
and occupancy of the building?
Yes X No
35. Are you aware that the Permit Application must be signed by the Owner or a written
authority be given for an Agent and that the party responsible for the project must comply
with the Uniform Codes?
Yes X No
36. Are you aware that you must call in for an inspection by 3:30 the business day
before the requested inspection in order to receive it the following business day?
Inspections will be made between 7:30 a.m. and 3:30 p.m. Monday through Friday.
Inspections are to be called in to 384-5003.
Yes X No
37. Are you aware that requesting inspections on work that is not ready or not accessible
will result in a $50.00 re -inspection fee?
Yes X No
38. Are you aware that prior to issuance of a building permit you are required to show proof
of a driveway access permit or obtain a statement from the Garfield County Road &
Bridge Department stating one is not necessary? You can contact the Road & Bridge
Department at 625-8601.
Yes No X An exemption letter from the Garfield County Road &
Bridge Department is pending as of 6/10/05 and will be submitted to the Building &
Planning Department via fax.
6
39. Do you understand that you will be required to hire a State of Colorado Licensed
Electrician and Plumber to perform installations and hookups? The license number will
be required at time of inspection.
Yes X No
40. Are you aware, that on the front of the building permit application you will need to fill in
the Parcel/ Schedule Number for the lot you are applying for this permit on prior to
submittal of the building permit application? Your attention in this is appreciated.
Yes X No
41. Do you know that the local fire district may require you to submit plans for their review
of fire safety issues? Yes X No (Please check with the
building department about this requirement)
42. Do you understand that if you are planning on doing any excavating or grading to the
property prior to issuance of a building permit that you will be required to obtain a
grading permit?
Yes X A grading permit exemption exists for agricultural zoned property.
I hereby acknowledge that I have read, understand, and answered these questions to
the best of y ability.
Signature Date
Phone:_970-683-5401 (days); 970-985-0190 (evenings)
Project Name:_ Compressor Building
Project Address:_ Smiles north, 7 miles east of DeBeque via County Rd 213.
Note:
If you answered "No" on any of these questions you may be required to provide this information
at the request of the Building Official prior to beginning the plan review process. Delays in
issuing the permit are to be expected. Work may not proceed without the issuance of the permit.
7
*If you have answered "Not necessary for this project" on any of the questions and it is
determined by the Building Official that the information is necessary to review the application
and plans to determine minimum compliance with the adopted codes, please expect the
following:
A. The application may be placed behind more recent applications for building permits in the
review process and not reviewed until required information has been provided and the
application rotates again to first position for review.
B. Delay in issuance of the permit.
C. Delay in proceeding with construction.
*If you answered "No" to this question the circumstances described in the question could result
in a "Stop Work Order" being issued or a "Certificate of Occupancy" not being issued.
Bpcomm
Feb2005
8
Applicant
E)4,
Building
FLAN REVIEW CHECKLIST
( Engineered Foundation
,,4Driveway Permit
Seel Site Plan ' 51-6
A/if/septic Permit and Setbacks
Grade/Topography 30%
Attach Residential Plan Review List
(....„,-Minimum Application Questionnaire
*Subdivision Plat Notes
'ire Department Review
Valuation Determination/Fees
ed Line Plans/Stamps/Sticker
Attach Conditions
Ap ation Signed
PlaReviewer To Sign Application
Lzy-
Parcel/Schedule No.
40# Snowload Letter- Manf. Hms.
GENERAL NOTES:
fid
Date '7 -Z3 -O5
Planning/Zoning
perty Line Setbacks
7A0ft Stream Setbacks
Neff -Flood Plain
✓Building Height
-Zoning Sign -off
// `Road Impact Fees
KM'HOA/DRC Approval
-V rade/Topography 40%
Planning Issues
gr4Subdivision Plat Notes
re>. -4 Lk,: CM% Si -Li' 6, srre.' y24 AD
4.3
:To IvP
11
."' . ',;',,,,',,
r.i..7M1......k.%,-;:
,'.11,.,-... ..... ,....::•,.:,-!
iv ..;•,.:-.•,..,:.11.:..-__--- .
,,.• i
•
-
.7--
' -.•.,,_.. .' .-
- ''N\ -
::. ,, 1V\ -e ,,,:"7:!-- --,A. -r -7(,'.--'•
• -.'--Nt,,,a,
i.„--_-____.
i
,..
•
,-c,',1-5.;11
)
•,,,,-` L
...E ,
•'.I .0—',4-6-
"
1 r .
1 . IF-
'Rri-.. - "'"'
. -t,,
N "
q.
e.)
—) /_-'•','!. -
.l.:,
- _
'• 1.4,.'3,1,70
vre
. ,
AN,::_, '
., y.1/. - /(•' I-r(O'„- .rf(. '''''&-r9e.'
. ,i.---
\lip
A
1 ....
:- p -"r . -3r '1J.;
-, 1
/1----__,V)/
f,'
"
_....
-. .
------
31'! I '
'1.k '
. '7('
...0,
T. _._
f!1(
., • jk•-•-•'".
'
'e --• , -
._.
..
•
--'..- '
. .
, ,
I
. ,,,,0,-'4..!.
- r
'''. .. .
.. .---- .,I
' \It! w-
r.:1
..o
...
• .;
•
14
', .•
'
‘"
1,,k1 L
,
:'.-
• ' d
• p- .44)1,,,:joe.",
, .•1'''
._„\ ' •
y -(r- -.-
+ %,..,f -•:t0
- V'Ar.
.''
,-,e,,
'-'..%---
.
_-)--;'....;;:r.
.
'''''.; ,
)
,-
- -.'-1, v, .
—:„,„-
i_::?- P.!
• 1
oc.A 4
))I
.• 1
!!'! .) ..
.' .....
.-0..)'- ..• --,
1
-i-,--.- I•.i.i, %V . -5i -e s'n,) i..
h,..
, -.; ,
,
\
1
dirr I
-.`:- —
-'
,
.i.' e:•.-',9 ., -
....... _.
•Nf -- fir a
•• . (?: '
11.."-....-----4,
., ,; :'',' ','
,
"
'. •."
li, .-
* '
, \J..
•:k1P• _(, ,A) ' i . '
g„.,.,...„..„.7e:„...„,....,..)
.,, A.jt"
. • —..,. ,,
,. 8 -
---1,
ii• p....
. ' '--''-.' ..-- (• #1„-,-
g, • ,------,-
' • '.. - • ‘
• L, ::.
--_/'
' r• .( . „-...„. ,
•,,- -(
• ..,., -.I
- - f C '.
t.1 . '..'- -1'. '.: '. —..',-_' —',... 1. k'. ..'- .; 'r',.''''''' -.-..',
A
-
IV ' "Ili '-j`v r V • (.--.1
, . ( Ap, :•:•
,... _.. ,,
.... • . r 4
e- .. -.,.. Th- ,e -o.09
! I,
14 - .. i
....... .... ...
-. .. I, / \-
I
-'• - '440:14.4 I I
• ' c.--. 1
...„(
.
L,-
•-:,
t ,.
(
:
-. •
i
:::,-;,..--'-
4
, 4.,
.!'': '.
..•-•
1 .. ,° !
( lir
.1
..,..
• .1
. • - - :.4
j • ''....: .
) '' ''
.,.
AL,— ., -.• A , :
r(.., f ,,Vv--• .,;-'t)
..• -.. •
111' 4:
rc" , ,.., .,.1-, .. ,,....,-
Pikkj • .
..,.,
' '.• ''-'
L., '
. )\- -•
r ••
- '
,
\
f /
i e • ' .
•••• ....,-1 -
. ., I ',, . • a
) . 4.-- i'cr '
./.. !:'. I,' 1&,.•.f.-•'. .".
eir' -,. ' "-- L.0
• (:' -- ;';. • ,
- / s, , 1.•;1,0-22-•..s.,==?...
- _I
\ 9 ;;._4('
....... ,-,
i-6-,4 re - 7 : 7 , • :-_,
--..F-......L.,%,•-..:.-
,, ...,„....,
, -_...,....
,...,_
• -- \ -,--
'..'' k ' -
'.{!
, 1
'. ' '-.-----
4,
1'?, ' .„. -
•-'-N7.: -I
IP'
..?...•;;..
z..7
.,,N..i.-.,, ....
..._,
.. . . -
-._s.
" — —
'' : : )
s. . C.
.
.• ., i
$
.. i
. ...f.
./-,.
.
-! ";,,.'-'
Ro. ahnin , . ,,--
• •,,
.cr •._
.
•
' • • • ,,i I
'
. ...
Or' :'1-7- '
- , . . , • .( . ./
Cep.
1
,--,-.L,
.
,
1 I.
! '
i j
i
,ft
el
..: ‘; ._f ::...
: - •.•
..,..7.,:,._,_,.,......
_:..,—..,,..,:--• rcf..--e
i .,_,,0
I. - a “5.41.4-.4.R...:: .4!--,.
' •-;. i -P'''.-14:- • --::.°1
'ii - ..'" .--4.•'
. . • A • •24.44: (...-.1.-.2-..'...---'1._?..,----"--1H--5---c‹...-...--'r''t
'- L. sl..
10 ,1L , I
• , - ..-... , ,...,
. , _ _ .
7 1/ P - yt".,-.(c-'
if. , e , : ., .,!'). ] ,..L.,1..1_,__L
., i , \--- I (-, L., ./- • r). r,---
2
, :' r- ,,_ '' I°. .-,_
,
.t.. . •
V.,,,k ,
.,
2 ' . . . .1', tit. t_4y" '
1 ' I i -j11411( r.
-w--
;yr*
-.
' BLM
".. - -
i .
,0--
••
-
i
••••-
:,---,----,.,;
tic
.i.,....•_........„.
..,_..(6,
'143....... --:-
- -,. -
L__,,,,,,,.,.,
.A-'
',*r'' lliZ,.
- '
e'e'. 144
• . .41'
• S4
..?)'.‘::.`,1'4:4)
-e 7 -""- i
, •,-,)-(1
1,4 i_.-2
`(' ".."-'' i'.,54
-1';.,
7-' ..f.''
' AN° '')
Ir r...
• 4 , . ‘.4
)•
l, --,i)
5 L_..?•Li
•
,
L.,•:,
--
LI
.
s ..i/11'`
' '' i
.A.,'"A \ .
1 .251
\ . ) '‘.
7 )1. . 'i , -,
,
:', ' .11
'' ) •
30
. -
• •
,
'.- 81) '4"°
! ,
,
' . J
! •
I
!.. ,
, r
- '
. ,Lt,6, : ...7-
• ,.."
•`,-
,
'
V
g', 1.4.7 —
.1 .!. ,•s..,---, '--
, s
Al ,..„. , ,
l''T
. ,..11.': \
,----1 --L... =4-4Em.4.,
V . ./ 9,-/
1. . ,
..„, ,..--,
...11 -\•1:-.5V•e.,
fi .''' ---. ,
_....-
. P
.34,
`., •1/4.
? in 1•>•!!.
\ 4.2 ';'
' ./
i
f •:'
' ./ t.
_ •C!! LM./ -,,...y
.1i I, • . rf.,.
I , • 34 ,/ ,,,e,-,-;- .-/,-
• . laY. i' , !
SDC
JOE G. BAUMBERGER
August 1, 2007
ONSTRUCTION
MANAG EMENT, INC.
GAS GATHERING AND PROCESSING
Mr. John Ocana
OXY USA WTP LP
2754 Compass Driver Suite 170
Grand Junction, CO 81506
Re: Conn Creek Gas Treating Facility
Control Building Foundation
Garfield County, Colorado
Dear Mr. Ocana:
Confirming recent telephone conversations with Teri Polley, SDC Construction Management, Inc.
was responsible for supervision of rebar placement for the subject building to insure the foundation
was installed in accordance with the design drawings provided by Odo Engineering, Inc. Inspection
was made as part of SDC's project construction services for installation of the Conn Creek Gas
Treating Facility. SDC inspected all of the equipment foundations, not just the subject building
foundation, at the facility prior to pouring concrete, but does not retain individual foundation
documentation. SDC certifies that the rebar was installed correctly.
Yeh & Associates provided on-site compaction tests for the structural fill below the foundations and
concrete testing to insure the concrete met the requirements specified by Odo Engineering. Copies
of the test results have been provided in the past or may be obtained from Yeh & Associates.
If you have any questions, please give me a call.
Sincerely,
Joe G. Baumberger
President
/ipb
SDC CONSTRUCTION MANAGEMENT, INC.
P.O. Box 1 339 - 21484 COUNTY ROAD T.5
FT. MORGAN, CO 80701
(970) 542-0423 OFFICE (970) 542-0425 FAx
ODDO ENGINEERING, INC.
MEMORANDUM
To: Bill Heller - OXY USA WTP LP
From: Landon Anderson P.E., Oddo Engineering, Inc.
Job: Oxy Conn Creek
Project No.: 2424-01
Date: July 25, 2007
oddo
engineering
Regarding design and construction of foundations for the Oxy Conn Creek Project Oddo
Engineering was involved through our contract with OXY USA. Oddo Engineering produced
construction documents including foundation details and material specifications. Oddo
Engineering certifies that all designs were in accordance with Garfield County Building
Department requirements including all applicable codes. Due to the remote location of the site
Oddo Engineering worked in conjunction with Yeh & Associates and SDC Construction to
provide oversight of the construction. I met with Yeh & Associates personnel on April 5, 2005
to review inspection requirements, material and construction specifications, ACI general
practice, and our expectations for subcontractor performance. Compressor foundations were
inspected at the time of the meeting. Subsequent inspections were performed by Yeh &
Associates personnel and SDC Construction which to our understanding performed the
observation per our Apri 5, 2005 requirements.
For additional information regarding our involvement with the project feel free to contact
myself or Bob Oddo.
COLORADO STATE ELECTRICAL BOARD
1560 Broadway, Suite 1350
Denver, CO. 80202
Inspection Report
Permit #: 569307
Date Inspected: 10 -APR -06
Permit Holder: WILLBROS MT. WEST, INC.
1115 16 RD FRUITA CO 815210000
Phone: 970-683-5100 Fax: 970-683-5159
Email:
Site: CONN CREEK ROAD Debeque Garfield
Owner: OCCIDENTAL OIL & GAS CORP.
Status:
Inspector:
ACCEPTED
Inspection Type:
New
Final
Commercial
Partial: N Trim Permit: N
Cliff Owens (970) 248-7044
Corrections:
Comments:
This job apparently had been finalled by Mr. Robert Fuller but the paper work/computer work has not been
recorded,
quo w- y;;-41 7
THUNDER MOUNTAIN TESTING
♦♦♦
2973 F. Road • Grand Junction, CO 81504
(970) 256-9965 / Cell (970) 210-7008 / FAX (970) 314-7067
Occidental Oil and Gas Corporation
2754 Compass Drive, Suite 170
Grand Junction, CO 81506
ATTN: Ms. Teri Polley
RE: Conn Compressor Station
TGS R97W Sec 32
De Beque, Colorado
Dear Ms. Polley,
August 29, 2007
As requested, structural steel special inspection was conducted per the IBC 2003 Edition - Chapter
17: Structural Tests and Special Inspection and Garfield County requirements. I arrived on site at 11:00
AM. I met with Mr. John Ocana with Occidental Oil and Gas Corp. and Mr. Richard Haugen with Ford
Construction Inc. to review project requirements and specifications. The steel building fabricator for this
project is Alliance Steel, Inc. in Oklahoma City, OK.
Visual inspection was conducted at the Roof Framing Plan levels on the 5/8", 3/4", and 1" ASTM
A325 High Strength beam to beam, beam to column, and crane rail to column saddle bolted connections.
All bolted connections that appear to exist on this project require tensioning to a snug tight condition as
referenced in approved jobsite drawings provided by Alliance Steel, Inc.: Job No. 305-201A (Revision 1
dated 6/9/05) — General Notes: Paragraph 1.6. Inspection was conducted on the Compressor Building,
Generator Building, Reference Building, and Shop Building on site. As a minimum, 10% of all
connections, but not less than 2 bolts per connection were inspected for proper bolt tension requirements.
All buildings referenced were inspected and bolted connections were observed to be adequately tensioned
to project requirements except for the crane rail to column saddle connections and column to roof beam
connections in the Compressor Building. Inspected connections were observed to be loose and therefore
rejected. I informed Mr. Haugen and Mr. Ocana that all high strength bolted connections in the Compressor
Building shall be re -tensioned prior to acceptance by Thunder Mountain Testing.
Continued inspection shall be conducted on 9/4/07.
Respectfully Submitted,
S o " m axwell
IBC Certified - #0863569
Thunder Mountain Testing
Garfield County
Building and Planning
108 8th Street Suite 201
Glenwood Springs, CO 81601
970.945.8212
Plan analysis based on
the 2003 International Building Code
Project Number:
Project Name: Compressor Building
Address: Conn Creek
Occupancy: F-1
Construction: II -B
Date: September 23, 2005
Contractor: Oxy
Designer: Heidary
Engineer: Oddo
Report By: Andy Schwaller
NOTE: The code items listed in this report are not intended to be a
complete listing of all possible code requirements in the 2003 IBC.
It is a guide to selected sections of the code.
EXIT REQUIREMENTS:
FL NAME NUMB MIN MIN PANIC CORRIDOR DOOR NOTES
OCC EXITS WIDTH HDWR RATING SWING
1 Industrial Area
TOTAL FOR FLOOR
90 2 18.0 No N/A Out 1
90 2 18.0 No N/A Out
FOOTNOTES:
1. Two exits are required from this area since the occupant load exceeds
allowable in Table 1014.1
NOTES FOR EXIT TABLE
Door swing is based on Section 1008.1.2
Occupant load is based on Section 1004 and Table 1004.1.2
Exit width is in inches and based on Section 1005.1 & Table 1005.1
Width shown for all areas is based on other egress components.
Width shown for 1st floor is based on other egress components.
Width shown for other floors & basements is based on stairways.
For the minimum width of doors, see Section 1008.1.1.
For the minimum width of corridors, see Section 1016.2.
For the minimum width of stairways, see Section 1009.1.
Exits shall be continuous from the point of entry into the exit to
the exit discharge. -- Sec. 1003.6
Page # 2
Code review for:
Project Id.: Compressor Building
Address: Conn Creek
EXIT SEPARATION
In areas where 2 exits are required, the minimum separation is 1/2 of
the maximum diagonal of the area or floor measured in a straight line
between exits or exit access doorways.-- Sec. 1014.2.1
Multiple means of egress shall be sized such that the loss of any one
means of egress shall not reduce the available capacity by more than
50 percent. -- Sec. 1005.1
EXIT SIGNS
Exits and exit access doors shall be marked by an approved exit sign.
Signs shall be placed where the exit or the path of egress travel is not
immediately visible. No point to be more than 100 feet from an exit sign.
- - Sec. 1011.1
Exception 1: Exit signs are not required in rooms or areas which require
only one exit.
Exception 2: Main exterior exit doors which obviously and clearly are
identifiable as exits need not be signed when approved.
Exit signs shall be internally or externally illuminated.
- - Sec. 1011.2
Exit sign shall be illuminated at all times including during loss of
primary power. -- Sec. 1011.4 & Sec. 1011.5.3
BOLT LOCKS:
Manually operated flush bolts and surface bolts are not permitted.
-- Sec. 1008.1.8.4
Exception 2: Where a pair of doors serves a storage or equipment room,
manually operated edge- or surface -mounted bolts are
permitted on the inactive leaf.
LOCKS AND LATCHES:
Egress doors shall be readily openable from the egress side without the
use of a key or any special knowledge or effort. -- Sec. 1008.1.8
Locks and latches shall be permitted to prevent operation where any
of the following exists:
Exception 2: The main door or doors in Group B, F, M and S areas are
permitted to be equipped with key operating locking devices
from the egress side provided:
2.1 The locking device is readily distinguishable as locked.
2.2 A readily visible durable sign is posted on the egress
side stating: THIS DOOR TO REMAIN UNLOCKED WHEN BUILDING
IS OCCUPIED
Exception 3: Where egress doors are used in pairs, automatic flush bolts
shall be permitted to be used, provided the door leaf having
the automatic flush bolts has no doorknob or surface -mounted
hardware.
Page # 3
Code review for:
Project Id.: Compressor Building
Address: Conn Creek
ADDITIONAL DOORS:
Where additional doors are provided for egress purposes, they
shall conform to the requirements in Section 1008.1
LANDINGS AT DOORS:
1. There shall be a floor or landing on each side of a door.
-- Sec. 1008.1.4
2. Such floor or landing shall be at the same elevation on each
side of the door. -- Sec. 1008.1.4
3. The floor or landing shall not be more than 1/2 inch lower than the
threshold. -- Sec. 1008.1.6
4. Landings shall have a width not less than the width of the stairway
or width of the doorway, whichever is the greater. Where a landing
serves an occupant load of 50 or more, doors in any position shall
not reduce the landing dimension to less than one half it required
width. The minimum length in the direction of exit travel is 44
inches. -- Sec. 1008.1.5
5. The space between two doors in series shall be 48 inches plus the
width of door swinging into the space. -- Sec. 1008.1.7
EXIT ACCESS TRAVEL DISTANCE:
The maximum travel distance in Group Fl is 200 feet. -- Table 1015.1
Page # 4
Code review for:
Project Id.: Compressor Building
Address: Conn Creek
Areas containing high piled combustible stock or rack storage in
any occupancy group require smoke and heat vents. Design to comply
with the International Fire Code. -- Sec. 910.2.3
LIGHT AND VENTILATION
1. Every space intended for human occupancy shall be provided with
natural light. The minimum net glazed area shall not be less than
8% of the floor area. -- Sec. 1205.1 and 1205.2
Any room is permitted to be considered as a portion of an adjoining
room where one half of the area of the common wall is open and
unobstructed and provided not less than one tenth of the floor area
or 25 square feet, whichever is greater. -- Sec. 1205.2.1
Artificial light shall be provided that is adequate to provide an
average illumination of 10 foot candles over the area of the room
at a height of 30 inches above the floor. -- Sec. 1205.3
2. Natural ventilation of an occupied space shall be through windows,
doors, louvers or other openings to the outdoors. -- Sec. 1203.4
The minimum openable area to the outdoors shall be 4 percent of the
floor area. -- Sec. 1203.4.1
Any room is permitted to be considered as a portion of an adjoining
room where unobstructed openings are provided that have an area not
less than 8% of the floor area of the interior room but no less than.
25 square feet. -- Sec. 1202.3.1.1
When openings are below grade, clear space measured perpendicular to
the opening shall be one and one half times the depth of the opening.
-- Sec. 1203.4.1.2
3. Rooms containing bathtubs, showers, spas and similar bathing fixtures
shall be mechanically. ventilated. -- Sec. 1203.4.2.1
CEILING HEIGHTS:
Occupiable spaces, habitable spaces and corridors shall have a ceiling
height of not less than 7 feet 6 inches. Bathrooms, toilet rooms,
kitchens, storage rooms and laundry rooms shall be permitted to have a
ceiling height of not less than 7 feet. -- Sec. 1208.2
No. yLD—R.—
Job Address 01,C C 9--" BUI
Assessor's Parcel No
WINO PERMIT CARD
a,ict -flu - £X
Date
Owner (tMu-� LAS 1
Contractor C •
Setbacks: Front Rear
INSPECTIONS
AddressesII%! & Phone # nS3" ay'.
`..0�,
Address 4 -\n-touA€ C=;" -Phone Ct- 1-{3
RH LH Zoning
Soils Test
Footing JJ
Foundation
Grout
Underground Plumbing
Rough Plumbing
Framing Insulation fc_
Roofing
Drywall
Gas Piping
EXTERIOR
Address No.
Drainage
Decks -support & clearance to wood
Decks -stairs & rails _
Exterior locks
Flashing around doors & windows
Insect screens
INTERIOR
GARAGE
Fire wall separation
Service doors -11k" min.
Door (20 min.) w/auto closer -1N" min.
Mech. equip. 18" above floor
No opening into sleeping area_
BASEMENT -CRAWL AREA
Access
Insulation
Headroom/Stairs
Ventilation
Weatherproofing
Mechanical
Electrical Rough (State)
Electrical to%(State) �'^ r�I'
Final � /Checklist Co pieted?�
Certificate Occupancy # S3E
Date q--"2:5-17f1-
Septic System # f 4
Date
Final
Other
NOTES
FINAL CHECKLIST
MECHANICAL ROOM
Boiler
Hot water
F.A. gas/oil
Floor drain
Clearance
Air con, system_
Hot water heater
Combustion air_
Gas piping, valves
LPG Drain
FIREPLACE/STOVE
Clearance to combustibles_
Termination of chimney
Combustion air
Hearth (12" or 20" on sides) OTHER
Glass doors
Certified by:
(continue on back)
STAIRWAYS
Headroom (6'6")
Railing & guardrails _
Width
Rise & run
KITCHEN
Clearance above grill
Exhaust fan
Broiler exhaust (1 hr, chase) _
BEDROOMS
Egress
Smoke detector
BATHROOMS
Exhaust fan
Shatterproof glass
REMARKS
INSPECTION WILL NOT BE MADE UNLESS
THIS CARD IS POSTED ON THE JOB
24 HOURS NOTICE REQUIRED FOR INSPECTIONS
BUILDING PERMIT
GARFIELD COUNTY, COLORADO
Date IssueJa7 .A" Zoned Area Permit No 967
AGREEMENT
In consideration of the issuance of this permit, the applicant hereby agrees to comply with all
laws and regulations related to the zoning, location; construction and erection of the proposed
structure for which this permit is granted, and further agrees that if the above said regulations
are not fully complied with in the zoning, location, erection and construction of the above
described structure, the permit may then be revoked by notice from the County Building
Inspector and IMMEDIATELY BECOME NULL AND VOID.
Use
Address or Legal Description`
OwnerOX USN/ IploC
Setbacks Front
Kt4 P
Cgntractor�ra
Site Side
Rear
This Card Must Be Posted So It is Plainly Visible From The Street Until Final Inspection.
INSPECTION RECORD
Footing
Driveway
ct-'"
Foundation Gr
Underground Plumbing -h.,-
Insulation -pi-4-
Rough Plumbing --14-4--
Drywall -„,,,t_
Chimney & Vent -nom
Electric Final (by State Inspector) '-x,"
Gas Piping --74.-,c-
Final 9-s-d7—
Electric Rough (By State Inspector) b/-
Septic Final ---)A-4..-
Framing
(To include Roof in place and Windows
and Doors installed).
Notes:
ALL LISTED ITEMS MUST BE INSPECTED AND APPROVED BEFORE COVERING -
WHETHER INTERIOR OR EXTERIOR, UNDERGROUND OR ABOVE GROUND.
THIS PERMIT IS NOT TRANSFERABLE
For Inspections Call 384-5003 108 8th Street Glenwood Springs, Colorado
APPROVEDDO NOT DESTROY THIS CARD
Date
BYM
IF PLACED OUTSID - COVE,:. WITH CLEAR PLASTIC
Garfield County
Building & Sanitation Department
108 8th Street, Suite #201 Glenwood Springs, Co. 81601
Office- 945-8212 Inspection Line- 384-5003
Job Address Cri-
Nature of Work Building Permit . I(C)t" c `
Use of Building�-
- LLL
Contractor C_CN/\_
Owner
cDaL
Amount of Permit $ a bcf s D 3 Date
Clerk
/4670,