Loading...
HomeMy WebLinkAboutApplication-PermitGARFIELD COUNTY BUILDING PERMIT APPLICATION 108 8-" Street, Suite 201, GIenwood Springs, CO 81601 Phone: 970-945-8212 / Fax: 970-384-3470 / Inspection Line: 970.384.6003 Permit No: q (l co Parcel/Schedule No: 2189-214-00026 AGREEMENT PERMISSION IS HEREBY GRANTED TO THE APPLICANT AS OWNER, CONTRACTOR AND/OR THE AGENT OF THE CONTRACTOR OR OWNER TO CONSTRUCT THE STRUCTURE AS DETAILED ON PLANS AND SPECIFICATIONS SUBMITTED TO AND REVIEWED BY THE BUILDING DEPARTMENT. IN CONSIDERATION OF THE ISSSUANCE OF THIS PERMIT, THE SIGNER. HEREBY AGREES TO COMPLY WITH ALL BUILDING CODES AND LAND USE REGULATIONS ADOPTED BY GARFIELD COUNTY PURSUANT TO AUTHORITY GIVEN LN 30.28.201 CRS AS AMENDED. THE SIGNER FURTHER AGREES THAT IF THE ABOVE SAID ORDINANCES ARE NOT FULLY COMPILED WITH IN 111E LCOATION, ERECTION, CONSTRUCTION, AND USE OF THE ABOVE DESCRIBED STRUCTURE, THE PERMIT MAY BE REVOKED BY NOTICE FROM TI IE COUNTY AND THAT THEN AND THERE IT SHALL BECOME NULL AND VOID. THE ISSUANCE OF A PERMT BASED UPON PLANS, SPECIFICATIONS AND OTHER DATA SHALL NOT PREVENT THE BUILDING OFFICIAL FROM THEREAFTER REQUIRING THE CORRECTION OF ERRORS IN SAID PLANS, SPECIFICATIONS AND OTHER DATA OR FROM PREVENTING BUILDING OPERATION BEING CARRIED ON THEREUNDER WHEN IN VIOLATION OF THS CODE OR ANY OTIIER ORDINANCE OR REGULATION OF THIS JURISDICTION. THE REVIEW OF SUBMITTED PLANS AND SPECIFICATIONS AND INSPECTIONS CONDUCTED THEREAFTER DOES NOT CONSTITUTE AN ACCEPTANCE OF ANY RESPONSIBILITIES OR LIABLITIES BY GARFIELD COUNTY FOR ERRORS, OMISSIONS OR DISCREPENCIES. THE RESPONSIBILITY FOR THESE ITEMS AND IMPLEMENTATION DURING CONSTRUCTION RESTS SPECIFICIALLY WITH THE ARTICTECT, DESIGNER, BUILDER, AND OWNER. COMMENTS ARE INTENDED TO BE CONSERVATIVE AND IN SUPPORT OF THE OWNERS LNTEREST. Garfom.003 44 A i / I HEREBY ACKNOWLEDGE THAT I HAVE READ AND UNDERSTAND THE AGREEMENT ABOVE (INITIAL): / 't 'i_,. 5%s 1c) c, 0? cm c' Job Address: 8 miles north, 7 miles east of BeBeque Colorado CACIV5 Cr I'' tet3 v -e. 1 Lot No: Block No: Subd. / Exemption: SW/4, SW/4, T7S, R97W, 0th PM 2 Owner: onIwwu, Address 807281/4 Road,Suite 109 Grand Junction, CO 81506 Ph: 87„68._om5,,,1 _ '-n" , Wk Ph: Same Lic. No. 2050337 3 Contractor: Ford Construction Address: 714 Amawest Road Grand Junction, CO 81505 Junction, Ph: 970.2459343 4 Architect/Engineer: Alliance Steel Buildings Address: 3333 9. Council Road Oldehome City, OK 73179 Ph: 4057467500 Lic. No. 38125 1 5 Sq. Ft. of Building: 900osaa Sq. Ft. of Lot: Height: 24, No. of Floors: 6 Use of Building: equiPa /-��,-li liter 7 Describe Work: New steal Belding 8 Class of Work: D New ❑ Alteration o Remove ❑ X Addition U Move 9 10 Garage: WA ❑ Single ❑ Double Carport: wA 0 Single ❑ Double o Driveway Permit 0 On -Site Sewage WA Disposal u Site Plan atlaaned 11 Valuation of Work: $ 213,307.00 Adjusted Valuations: S2/.' 12 Special Conditions: None NOTICE A SEPARATE ELECTRICAL PERMIT IS REQUIRED AND ISSUED BY THE STATE OF COLORADO. THIS PERMIT BECOMES NULL AND VOID IF WORK OR AUTHORIZED IS NOT COMMENCED WITHLN 180 DAYS, CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED PERIOD OF 180 DAYS AT ANY TIME AFTER WORK IS I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED APPLICATION AND KNOW THE SAME TO BE TRUE AND PROVISIONS OF LAWS GOVERNING THIS TYPE OF WORK COMPLETED WITHIN WHETHER SPECIFIED HEREIN GRANTING OF A PERMIT DOES NOT PRESUME TO TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER LOCAL LAW REGULATING CON RUCTION OR THE OF I 7 R CTIOI fi MUST BE CONSTRUCTION OR, IF FOR A COMMENCED. THIS CORRECT. ALL WILL BE OR NOT. THE GIVE AUTHORITY STATE OR PERFO MANCE y K.-_ ATI; /( DEFT. Plan Check Fee: i 19(e0 . G ly [ 1� Permit Fee: 3.Z . /5 13.&./5-` Total Fee: 21093 . c5 Dated PermiterlIssued: OCC Grouz // Const. ype: ( Zoning.: Setbacks: Manu. Home: ISDS No. & Fee: ii'''.i- A:. 1i 1l• WNER I� iilliF lk BLDG DE' . NG. APPR1 •/DATE APPROVAL/DATE AGREEMENT PERMISSION IS HEREBY GRANTED TO THE APPLICANT AS OWNER, CONTRACTOR AND/OR THE AGENT OF THE CONTRACTOR OR OWNER TO CONSTRUCT THE STRUCTURE AS DETAILED ON PLANS AND SPECIFICATIONS SUBMITTED TO AND REVIEWED BY THE BUILDING DEPARTMENT. IN CONSIDERATION OF THE ISSSUANCE OF THIS PERMIT, THE SIGNER. HEREBY AGREES TO COMPLY WITH ALL BUILDING CODES AND LAND USE REGULATIONS ADOPTED BY GARFIELD COUNTY PURSUANT TO AUTHORITY GIVEN LN 30.28.201 CRS AS AMENDED. THE SIGNER FURTHER AGREES THAT IF THE ABOVE SAID ORDINANCES ARE NOT FULLY COMPILED WITH IN 111E LCOATION, ERECTION, CONSTRUCTION, AND USE OF THE ABOVE DESCRIBED STRUCTURE, THE PERMIT MAY BE REVOKED BY NOTICE FROM TI IE COUNTY AND THAT THEN AND THERE IT SHALL BECOME NULL AND VOID. THE ISSUANCE OF A PERMT BASED UPON PLANS, SPECIFICATIONS AND OTHER DATA SHALL NOT PREVENT THE BUILDING OFFICIAL FROM THEREAFTER REQUIRING THE CORRECTION OF ERRORS IN SAID PLANS, SPECIFICATIONS AND OTHER DATA OR FROM PREVENTING BUILDING OPERATION BEING CARRIED ON THEREUNDER WHEN IN VIOLATION OF THS CODE OR ANY OTIIER ORDINANCE OR REGULATION OF THIS JURISDICTION. THE REVIEW OF SUBMITTED PLANS AND SPECIFICATIONS AND INSPECTIONS CONDUCTED THEREAFTER DOES NOT CONSTITUTE AN ACCEPTANCE OF ANY RESPONSIBILITIES OR LIABLITIES BY GARFIELD COUNTY FOR ERRORS, OMISSIONS OR DISCREPENCIES. THE RESPONSIBILITY FOR THESE ITEMS AND IMPLEMENTATION DURING CONSTRUCTION RESTS SPECIFICIALLY WITH THE ARTICTECT, DESIGNER, BUILDER, AND OWNER. COMMENTS ARE INTENDED TO BE CONSERVATIVE AND IN SUPPORT OF THE OWNERS LNTEREST. Garfom.003 44 A i / I HEREBY ACKNOWLEDGE THAT I HAVE READ AND UNDERSTAND THE AGREEMENT ABOVE (INITIAL): / 't 'i_,. 5%s 1c) c, 0? cm c' The following items are required by Garfield County for a final inspection: 1. A final Electrical Inspection from the Colorado State Electrical Inspector; 2. Permanent address assigned by Garfield County Building Department posted where readily visible from access road; 3. A finished roof, a lockable house, complete exterior siding, exterior doors and windows installed, a complete kitchen with cabinets, a sink with hot & cold running water, non-absorbent kitchen floor coverings, counter tops and finished walls, ready for stove and refrigerator, all necessary plumbing; 4. All bathrooms must be complete, with washbowl, tub or shower, toilet stool, hot and cold running water, non-absorbent floors and walls finished and a privacy door; 5. All steps outside or inside over three (3) steps must have handrails, guard rails on balconies or decks over 30" high constructed to all IBC and IRC requirements; 6. Outside grading done to where water will detour away from the building; 7. Exceptions to the outside steps, decks and grading may be made upon the demonstration of extenuating circumstances, i.e. weather, but a Certificate of Occupancy will not be issued until all the required items are completed and a final inspection made; 8. A final inspection sign off by the Garfield County Road & Bridge Department for driveway installation, where applicable; as well as any final sign off by the Fire District, anchor State Agencies where applicable. A CERTIFICATE OF OCCUPANCY WILL NOT BE ISSUED UNTIL ALL THE ABOVE ITEMS HAVE BEEN COMPLETED. ****CANNOT OCCUPY OR USE DWELLING UNTIL A CERTIFICATE OF OCCUPANCY (C.O.) IS ISSUED. OCCUPANCY OR USE OF DWELLING WITHOUT A C.O. WILL BE CONSIDERED AN ILLEGAL OCCUPANCY AND MAY BE GROUNDS FOR VACATING PREMISES UNTIL ABOVE CONDITIONS ARE MET. I understand and agree to abide by the above conditions for occupancy use and the issuance of a Certificate of Occupancy for the dwelling under building permit #(gl b diat4 e,/,/ Signature BpcontOct2004 Date GARFIELD COUNTY BUILDING AND PLANNING 970-945-8212 MINIMUM APPLICATION REQUIREMENTS FOR CONSTRUCTION OF COMMERCIAL OR MULTI -FAMILY RESIDENTIAL BUILDINGS Including NEW CONSTRUCTION ADDITIONS ALTERATIONS And MOVED BUILDINGS In order to understand the scope of the work intended under a permit application and expedite the issuance of a permit it is important that complete information be provided. When reviewing a plan and it's discovered that required information has not been provided by the applicant, this will result in the delay of the permit issuance and in proceeding with building construction. The owner or contractor shall be required to provide this information before the plan review can proceed. Other plans that are in line for review may be given attention before the new information may be reviewed after it has been provided to the Building Department. Please review this document to determine if you have enough information to design your project and provide adequate information to facilitate a plan review. Also, please consider using a design professional for assistance in your design and a construction professional for construction of your project. Any project with more than ten (10) occupants requires the plans to be sealed by a Colorado Registered Design Professional. To provide for a more understandable plan and in order to determine compliance with the building, plumbing and mechanical codes, applicants are requested to review the following checklist prior to and during design. Plans to be included for a Building Permit must be on draft paper at least 18"x 24"" and drawn to scale. 1 Plans must include a floor plan, a concrete footing and foundation plan, elevations all sides with decks, balcony steps, hand rails and guard rails, windows and doors, including the finish grade and original grade line. A section showing in detail, from the bottom of the footing to the top of the roof, including re -bar, anchor bolts, pressure treated plates, floor joists, wall studs and spacing, insulation, sheeting, house -rap, (which is required), siding or any approved building material. Engineered foundations may be required. Check with the Building Department. A window schedule. A door schedule. A floor framing plan, a roofing framing plan, roof must be designed to withstand a 40 pound per square foot up to 7,000 feet in elevation, a 90 M.P.H. windspeed, wind exposure B or C, and a 36 inch frost depth. All sheets need to be identified by number and indexed. All of the above requirements must be met or your plans will be returned. All plans submitted must be incompliance with the 2003 IBC, IPC, IMC and IFGC. Applicants are required to indicate appropriately and to submit completed checklist at time of application for a permit: 1. Is a site plan included that identifies the location of the proposed structure, additions or other buildings, setback easements, and utility easements showing distances to the property lines from each corner of the proposed structure prepared by a licensed surveyor and has the surveyors signature and professional stamp on the drawing? Slopes of 30% or more on properties must be show on site plan. (NOTE: Section 106.2) Any site plan for the placement of any portion of a structure within 50 ft. of a property line and not within a previously surveyed building envelope on a subdivision final plat shall be prepared by a licensed surveyor and have the surveyors signature and professional stamp on the drawing. Any structure to be built within a building envelope of a lot shown on a recorded subdivision plat, shall include a copy of the building envelope as it is shown on the final plat with the proposed structure located within the envelope. Yes X 2. Does the site plan when applicable include the location of the I.S.D.S. (Individual Sewage Disposal System) and distances to the property lines, wells (on subject property and adjacent properties), streams or water courses? This information must be certified by a licensed surveyor with their signature and professional stamp on the design. Yes No Not necessary for this project X There is no I.S.D.S associated with this building. 3. Are the plans submitted for application review construction drawings and not drawings that are stamped or marked identifying them as "Not for construction, for permit issuance only", "Approval drawings only", "For permit issuance only" or similar language? 2 Yes X No Not necessary for this project 4. Is the LS.D.S. (Individual Sewage Disposal System) designed, stamped and signed by a Colorado Registered Engineer? Yes No Not necessary for this project X There is no I.S D.S. associated with this building. 5. Does the site plan indicate the location and direction of the State, County or private road accessing the property? Yes X 6. Do the plans include a foundation plan indicating the size, location and spacing of all reinforcing steel in accordance with the uniform building code or per stamped engineered design? Yes X No Not necessary for this project 7. If the building is a pre-engineered structure, is there a stamped, signed engineered foundation plan for this building? Yes X No Not necessary for this project 8. Do the plans indicate the location and size of ventilation openings for under floor crawl spaces and the clearances required between wood and earth? Yes No Not necessary for project X There are no under floor crawl spaces associated with this building. 9. Do the plans indicate the size and location of the ventilation openings for the attic, roof joist spaces and soffits? Yes X No Not necessary for this project 10. Do the plans include design loads as required under the IBC or IRC for roof snowloads, (a minimum of 40 pounds per square foot in Garfield County)? Yes X No Not necessary for this project 11. Do the plans include design loads as required for floor loads under the IBC or IRC? Yes X No Not necessary for this project 12. Does the plan include a building section drawing indicating foundation, wall, floor, and roof construction? Yes X No Not necessary for this project 13. Is the wind speed and exposure design included in the plan? Yes X No Not necessary for this project 3 14. Does the building section drawing include size and spacing of floor joists, wall studs, ceiling joists, roof rafters or joists or trusses? Yes X No Not necessary for this project 15. Does the building section drawing or other detail include the method of positive connection of all columns and beams? Yes X No Not necessary for this project 16. Does the elevation plan indicate the height of the building or proposed addition from the undisturbed grade to the midpoint between the ridge and cave of a gable or shed roof or the top of a flat roof? (Check applicable zone district for building height maximum) Yes No Not necessary for this project X The building is located in a zone district exempt from building height requirements. 17. Does the plan include any stove or zero clearance fireplace planned for installation including make and model and Colorado Phase II certifications or Phase II EPA certification? Yes No Not necessary for this project X There is no fireplace associated with this building. 18. Does the plan include a masonry fireplace including a fireplace section indicating design to comply with the IBC or IRC? Yes No Not necessary for this project X There is no fireplace associated with this building. 19. Does the plan include a window schedule or other verification that egress/rescue windows from sleeping rooms and/or basements comply with the requirements of the IBC or IRC? Yes No Not necessary for this project X There are no sleeping rooms or basements associated with this building. 20. Does the plan include a window schedule or other verification that windows provide natural light and ventilation for all habitable rooms? Yes No Not necessary for this project X There are no windows associated with this building. 21. Do the plans indicate the location of glazing subject to human impact such as glass doors, glazing immediately adjacent to such doors; glazing adjacent to any surface normally used as a walking surface; sliding glass doors; fixed glass panels; shower doors and tub enclosures and specify safety glazing for these areas? Yes No Not necessary for this project X There is no glazing subject to human impact associated with this building. 4 22. Do the plans include a complete design for all mechanical systems planned for installation in this building? Yes No Not necessary for this project X There are no mechanical systems associated with this building. 23. Have all areas in the building been accurately identified for the intended use? (Occupancy as identified in the IBC Chapter 3) Yes No Not necessary for this project X There are not separate areas or intended uses within the planned building. 24. Does the plan indicate the quantity, form, use and storage of any hazardous materials that may be in use in this building? Yes No Not necessary for this project X There will be no hazardous material storage or use associated with this building. 25. Is the location of all natural and liquid petroleum gas furnaces, boilers and water heaters indicated on the plan? Yes No Not necessary for this project X There are no liquid petroleum gas furnaces, boilers and hot water heaters associated with this building. 26. Do the plans indicate the location and dimension of restroom facilities and if more than four employees and both sexes are employed, facilities for both sexes? Yes No Not necessary for this project X There are no restroom facilities associated with this building. 27. Do the plans indicate that restrooms and access to the building are handicapped accessible? Yes No Not necessary for this project X There are no restroom facilities associated with this building. 28. Have two (2) complete sets of construction drawings been submitted with the application? Yes X No 29. Have you designed or had this plan designed while considering building and other construction code requirements? Yes X No Not necessary for this project 30. Does the plan accurately indicate what you intend to construct and what will receive a final inspection by the Garfield County Building Department? Yes X No 31. Do your plans comply with all zoning rules and regulations in the County related to your 5 zone district? For corner lots see supplemental section 5.05.03 in the Garfield County Zoning Resolution for setbacks. Yes X No 32. Do you understand that approval for design and/or construction changes are required prior to the implementation of these changes? Yes X No 33. Do you understand that the Building Department will collect a "Plan Review" fee from you at the time of application and that you will be required to pay the "Permit" fee as well as any "Septic System" or "Road Impact" fees required, at the time you pick up your building permit? Yes X No 34. Are you aware that you are required to call for all inspections required under the IBC including approval on a final inspection prior to receiving a Certificate of Occupancy and occupancy of the building? Yes X No 35. Are you aware that the Permit Application must be signed by the Owner or a written authority be given for an Agent and that the party responsible for the project must comply with the Uniform Codes? Yes X No 36. Are you aware that you must call in for an inspection by 3:30 the business day before the requested inspection in order to receive it the following business day? Inspections will be made between 7:30 a.m. and 3:30 p.m. Monday through Friday. Inspections are to be called in to 384-5003. Yes X No 37. Are you aware that requesting inspections on work that is not ready or not accessible will result in a $50.00 re -inspection fee? Yes X No 38. Are you aware that prior to issuance of a building permit you are required to show proof of a driveway access permit or obtain a statement from the Garfield County Road & Bridge Department stating one is not necessary? You can contact the Road & Bridge Department at 625-8601. Yes No X An exemption letter from the Garfield County Road & Bridge Department is pending as of 6/10/05 and will be submitted to the Building & Planning Department via fax. 6 39. Do you understand that you will be required to hire a State of Colorado Licensed Electrician and Plumber to perform installations and hookups? The license number will be required at time of inspection. Yes X No 40. Are you aware, that on the front of the building permit application you will need to fill in the Parcel/ Schedule Number for the lot you are applying for this permit on prior to submittal of the building permit application? Your attention in this is appreciated. Yes X No 41. Do you know that the local fire district may require you to submit plans for their review of fire safety issues? Yes X No (Please check with the building department about this requirement) 42. Do you understand that if you are planning on doing any excavating or grading to the property prior to issuance of a building permit that you will be required to obtain a grading permit? Yes X A grading permit exemption exists for agricultural zoned property. I hereby acknowledge that I have read, understand, and answered these questions to the best of y ability. Signature Date Phone:_970-683-5401 (days); 970-985-0190 (evenings) Project Name:_ Compressor Building Project Address:_ Smiles north, 7 miles east of DeBeque via County Rd 213. Note: If you answered "No" on any of these questions you may be required to provide this information at the request of the Building Official prior to beginning the plan review process. Delays in issuing the permit are to be expected. Work may not proceed without the issuance of the permit. 7 *If you have answered "Not necessary for this project" on any of the questions and it is determined by the Building Official that the information is necessary to review the application and plans to determine minimum compliance with the adopted codes, please expect the following: A. The application may be placed behind more recent applications for building permits in the review process and not reviewed until required information has been provided and the application rotates again to first position for review. B. Delay in issuance of the permit. C. Delay in proceeding with construction. *If you answered "No" to this question the circumstances described in the question could result in a "Stop Work Order" being issued or a "Certificate of Occupancy" not being issued. Bpcomm Feb2005 8 Applicant E)4, Building FLAN REVIEW CHECKLIST ( Engineered Foundation ,,4Driveway Permit Seel Site Plan ' 51-6 A/if/septic Permit and Setbacks Grade/Topography 30% Attach Residential Plan Review List (....„,-Minimum Application Questionnaire *Subdivision Plat Notes 'ire Department Review Valuation Determination/Fees ed Line Plans/Stamps/Sticker Attach Conditions Ap ation Signed PlaReviewer To Sign Application Lzy- Parcel/Schedule No. 40# Snowload Letter- Manf. Hms. GENERAL NOTES: fid Date '7 -Z3 -O5 Planning/Zoning perty Line Setbacks 7A0ft Stream Setbacks Neff -Flood Plain ✓Building Height -Zoning Sign -off // `Road Impact Fees KM'HOA/DRC Approval -V rade/Topography 40% Planning Issues gr4Subdivision Plat Notes re>. -4 Lk,: CM% Si -Li' 6, srre.' y24 AD 4.3 :To IvP 11 ."' . ',;',,,,',, r.i..7M1......k.%,-;: ,'.11,.,-... ..... ,....::•,.:,-! iv ..;•,.:-.•,..,:.11.:..-__--- . ,,.• i • - .7-- ' -.•.,,_.. .' .- - ''N\ - ::. ,, 1V\ -e ,,,:"7:!-- --,A. -r -7(,'.--'• • -.'--Nt,,,a, i.„--_-____. i ,.. • ,-c,',1-5.;11 ) •,,,,-` L ...E , •'.I .0—',4-6- " 1 r . 1 . IF- 'Rri-.. - "'"' . -t,, N " q. e.) —) /_-'•','!. - .l.:, - _ '• 1.4,.'3,1,70 vre . , AN,::_, ' ., y.1/. - /(•' I-r(O'„- .rf(. '''''&-r9e.' . ,i.--- \lip A 1 .... :- p -"r . -3r '1J.; -, 1 /1----__,V)/ f,' " _.... -. . ------ 31'! I ' '1.k ' . '7(' ...0, T. _._ f!1( ., • jk•-•-•'". ' 'e --• , - ._. .. • --'..- ' . . , , I . ,,,,0,-'4..!. - r '''. .. . .. .---- .,I ' \It! w- r.:1 ..o ... • .; • 14 ', .• ' ‘" 1,,k1 L , :'.- • ' d • p- .44)1,,,:joe.", , .•1''' ._„\ ' • y -(r- -.- + %,..,f -•:t0 - V'Ar. .'' ,-,e,, '-'..%--- . _-)--;'....;;:r. . '''''.; , ) ,- - -.'-1, v, . —:„,„- i_::?- P.! • 1 oc.A 4 ))I .• 1 !!'! .) .. .' ..... .-0..)'- ..• --, 1 -i-,--.- I•.i.i, %V . -5i -e s'n,) i.. h,.. , -.; , , \ 1 dirr I -.`:- — -' , .i.' e:•.-',9 ., - ....... _. •Nf -- fir a •• . (?: ' 11.."-....-----4, ., ,; :'',' ',' , " '. •." li, .- * ' , \J.. •:k1P• _(, ,A) ' i . ' g„.,.,...„..„.7e:„...„,....,..) .,, A.jt" . • —..,. ,, ,. 8 - ---1, ii• p.... . ' '--''-.' ..-- (• #1„-,- g, • ,------,- ' • '.. - • ‘ • L, ::. --_/' ' r• .( . „-...„. , •,,- -( • ..,., -.I - - f C '. t.1 . '..'- -1'. '.: '. —..',-_' —',... 1. k'. ..'- .; 'r',.''''''' -.-..', A - IV ' "Ili '-j`v r V • (.--.1 , . ( Ap, :•:• ,... _.. ,, .... • . r 4 e- .. -.,.. Th- ,e -o.09 ! I, 14 - .. i ....... .... ... -. .. I, / \- I -'• - '440:14.4 I I • ' c.--. 1 ...„( . L,- •-:, t ,. ( : -. • i :::,-;,..--'- 4 , 4., .!'': '. ..•-• 1 .. ,° ! ( lir .1 ..,.. • .1 . • - - :.4 j • ''....: . ) '' '' .,. AL,— ., -.• A , : r(.., f ,,Vv--• .,;-'t) ..• -.. • 111' 4: rc" , ,.., .,.1-, .. ,,....,- Pikkj • . ..,., ' '.• ''-' L., ' . )\- -• r •• - ' , \ f / i e • ' . •••• ....,-1 - . ., I ',, . • a ) . 4.-- i'cr ' ./.. !:'. I,' 1&,.•.f.-•'. .". eir' -,. ' "-- L.0 • (:' -- ;';. • , - / s, , 1.•;1,0-22-•..s.,==?... - _I \ 9 ;;._4(' ....... ,-, i-6-,4 re - 7 : 7 , • :-_, --..F-......L.,%,•-..:.- ,, ...,„...., , -_...,.... ,...,_ • -- \ -,-- '..'' k ' - '.{! , 1 '. ' '-.----- 4, 1'?, ' .„. - •-'-N7.: -I IP' ..?...•;;.. z..7 .,,N..i.-.,, .... ..._, .. . . - -._s. " — — '' : : ) s. . C. . .• ., i $ .. i . ...f. ./-,. . -! ";,,.'-' Ro. ahnin , . ,,-- • •,, .cr •._ . • ' • • • ,,i I ' . ... Or' :'1-7- ' - , . . , • .( . ./ Cep. 1 ,--,-.L, . , 1 I. ! ' i j i ,ft el ..: ‘; ._f ::... : - •.• ..,..7.,:,._,_,.,...... _:..,—..,,..,:--• rcf..--e i .,_,,0 I. - a “5.41.4-.4.R...:: .4!--,. ' •-;. i -P'''.-14:- • --::.°1 'ii - ..'" .--4.•' . . • A • •24.44: (...-.1.-.2-..'...---'1._?..,----"--1H--5---c‹...-...--'r''t '- L. sl.. 10 ,1L , I • , - ..-... , ,..., . , _ _ . 7 1/ P - yt".,-.(c-' if. , e , : ., .,!'). ] ,..L.,1..1_,__L ., i , \--- I (-, L., ./- • r). r,--- 2 , :' r- ,,_ '' I°. .-,_ , .t.. . • V.,,,k , ., 2 ' . . . .1', tit. t_4y" ' 1 ' I i -j11411( r. -w-- ;yr* -. ' BLM ".. - - i . ,0-- •• - i ••••- :,---,----,.,; tic .i.,....•_........„. ..,_..(6, '143....... --:- - -,. - L__,,,,,,,.,., .A-' ',*r'' lliZ,. - ' e'e'. 144 • . .41' • S4 ..?)'.‘::.`,1'4:4) -e 7 -""- i , •,-,)-(1 1,4 i_.-2 `(' ".."-'' i'.,54 -1';., 7-' ..f.'' ' AN° '') Ir r... • 4 , . ‘.4 )• l, --,i) 5 L_..?•Li • , L.,•:, -- LI . s ..i/11'` ' '' i .A.,'"A \ . 1 .251 \ . ) '‘. 7 )1. . 'i , -, , :', ' .11 '' ) • 30 . - • • , '.- 81) '4"° ! , , ' . J ! • I !.. , , r - ' . ,Lt,6, : ...7- • ,.." •`,- , ' V g', 1.4.7 — .1 .!. ,•s..,---, '-- , s Al ,..„. , , l''T . ,..11.': \ ,----1 --L... =4-4Em.4., V . ./ 9,-/ 1. . , ..„, ,..--, ...11 -\•1:-.5V•e., fi .''' ---. , _....- . P .34, `., •1/4. ? in 1•>•!!. \ 4.2 ';' ' ./ i f •:' ' ./ t. _ •C!! LM./ -,,...y .1i I, • . rf.,. I , • 34 ,/ ,,,e,-,-;- .-/,- • . laY. i' , ! SDC JOE G. BAUMBERGER August 1, 2007 ONSTRUCTION MANAG EMENT, INC. GAS GATHERING AND PROCESSING Mr. John Ocana OXY USA WTP LP 2754 Compass Driver Suite 170 Grand Junction, CO 81506 Re: Conn Creek Gas Treating Facility Control Building Foundation Garfield County, Colorado Dear Mr. Ocana: Confirming recent telephone conversations with Teri Polley, SDC Construction Management, Inc. was responsible for supervision of rebar placement for the subject building to insure the foundation was installed in accordance with the design drawings provided by Odo Engineering, Inc. Inspection was made as part of SDC's project construction services for installation of the Conn Creek Gas Treating Facility. SDC inspected all of the equipment foundations, not just the subject building foundation, at the facility prior to pouring concrete, but does not retain individual foundation documentation. SDC certifies that the rebar was installed correctly. Yeh & Associates provided on-site compaction tests for the structural fill below the foundations and concrete testing to insure the concrete met the requirements specified by Odo Engineering. Copies of the test results have been provided in the past or may be obtained from Yeh & Associates. If you have any questions, please give me a call. Sincerely, Joe G. Baumberger President /ipb SDC CONSTRUCTION MANAGEMENT, INC. P.O. Box 1 339 - 21484 COUNTY ROAD T.5 FT. MORGAN, CO 80701 (970) 542-0423 OFFICE (970) 542-0425 FAx ODDO ENGINEERING, INC. MEMORANDUM To: Bill Heller - OXY USA WTP LP From: Landon Anderson P.E., Oddo Engineering, Inc. Job: Oxy Conn Creek Project No.: 2424-01 Date: July 25, 2007 oddo engineering Regarding design and construction of foundations for the Oxy Conn Creek Project Oddo Engineering was involved through our contract with OXY USA. Oddo Engineering produced construction documents including foundation details and material specifications. Oddo Engineering certifies that all designs were in accordance with Garfield County Building Department requirements including all applicable codes. Due to the remote location of the site Oddo Engineering worked in conjunction with Yeh & Associates and SDC Construction to provide oversight of the construction. I met with Yeh & Associates personnel on April 5, 2005 to review inspection requirements, material and construction specifications, ACI general practice, and our expectations for subcontractor performance. Compressor foundations were inspected at the time of the meeting. Subsequent inspections were performed by Yeh & Associates personnel and SDC Construction which to our understanding performed the observation per our Apri 5, 2005 requirements. For additional information regarding our involvement with the project feel free to contact myself or Bob Oddo. COLORADO STATE ELECTRICAL BOARD 1560 Broadway, Suite 1350 Denver, CO. 80202 Inspection Report Permit #: 569307 Date Inspected: 10 -APR -06 Permit Holder: WILLBROS MT. WEST, INC. 1115 16 RD FRUITA CO 815210000 Phone: 970-683-5100 Fax: 970-683-5159 Email: Site: CONN CREEK ROAD Debeque Garfield Owner: OCCIDENTAL OIL & GAS CORP. Status: Inspector: ACCEPTED Inspection Type: New Final Commercial Partial: N Trim Permit: N Cliff Owens (970) 248-7044 Corrections: Comments: This job apparently had been finalled by Mr. Robert Fuller but the paper work/computer work has not been recorded, quo w- y;;-41 7 THUNDER MOUNTAIN TESTING ♦♦♦ 2973 F. Road • Grand Junction, CO 81504 (970) 256-9965 / Cell (970) 210-7008 / FAX (970) 314-7067 Occidental Oil and Gas Corporation 2754 Compass Drive, Suite 170 Grand Junction, CO 81506 ATTN: Ms. Teri Polley RE: Conn Compressor Station TGS R97W Sec 32 De Beque, Colorado Dear Ms. Polley, August 29, 2007 As requested, structural steel special inspection was conducted per the IBC 2003 Edition - Chapter 17: Structural Tests and Special Inspection and Garfield County requirements. I arrived on site at 11:00 AM. I met with Mr. John Ocana with Occidental Oil and Gas Corp. and Mr. Richard Haugen with Ford Construction Inc. to review project requirements and specifications. The steel building fabricator for this project is Alliance Steel, Inc. in Oklahoma City, OK. Visual inspection was conducted at the Roof Framing Plan levels on the 5/8", 3/4", and 1" ASTM A325 High Strength beam to beam, beam to column, and crane rail to column saddle bolted connections. All bolted connections that appear to exist on this project require tensioning to a snug tight condition as referenced in approved jobsite drawings provided by Alliance Steel, Inc.: Job No. 305-201A (Revision 1 dated 6/9/05) — General Notes: Paragraph 1.6. Inspection was conducted on the Compressor Building, Generator Building, Reference Building, and Shop Building on site. As a minimum, 10% of all connections, but not less than 2 bolts per connection were inspected for proper bolt tension requirements. All buildings referenced were inspected and bolted connections were observed to be adequately tensioned to project requirements except for the crane rail to column saddle connections and column to roof beam connections in the Compressor Building. Inspected connections were observed to be loose and therefore rejected. I informed Mr. Haugen and Mr. Ocana that all high strength bolted connections in the Compressor Building shall be re -tensioned prior to acceptance by Thunder Mountain Testing. Continued inspection shall be conducted on 9/4/07. Respectfully Submitted, S o " m axwell IBC Certified - #0863569 Thunder Mountain Testing Garfield County Building and Planning 108 8th Street Suite 201 Glenwood Springs, CO 81601 970.945.8212 Plan analysis based on the 2003 International Building Code Project Number: Project Name: Compressor Building Address: Conn Creek Occupancy: F-1 Construction: II -B Date: September 23, 2005 Contractor: Oxy Designer: Heidary Engineer: Oddo Report By: Andy Schwaller NOTE: The code items listed in this report are not intended to be a complete listing of all possible code requirements in the 2003 IBC. It is a guide to selected sections of the code. EXIT REQUIREMENTS: FL NAME NUMB MIN MIN PANIC CORRIDOR DOOR NOTES OCC EXITS WIDTH HDWR RATING SWING 1 Industrial Area TOTAL FOR FLOOR 90 2 18.0 No N/A Out 1 90 2 18.0 No N/A Out FOOTNOTES: 1. Two exits are required from this area since the occupant load exceeds allowable in Table 1014.1 NOTES FOR EXIT TABLE Door swing is based on Section 1008.1.2 Occupant load is based on Section 1004 and Table 1004.1.2 Exit width is in inches and based on Section 1005.1 & Table 1005.1 Width shown for all areas is based on other egress components. Width shown for 1st floor is based on other egress components. Width shown for other floors & basements is based on stairways. For the minimum width of doors, see Section 1008.1.1. For the minimum width of corridors, see Section 1016.2. For the minimum width of stairways, see Section 1009.1. Exits shall be continuous from the point of entry into the exit to the exit discharge. -- Sec. 1003.6 Page # 2 Code review for: Project Id.: Compressor Building Address: Conn Creek EXIT SEPARATION In areas where 2 exits are required, the minimum separation is 1/2 of the maximum diagonal of the area or floor measured in a straight line between exits or exit access doorways.-- Sec. 1014.2.1 Multiple means of egress shall be sized such that the loss of any one means of egress shall not reduce the available capacity by more than 50 percent. -- Sec. 1005.1 EXIT SIGNS Exits and exit access doors shall be marked by an approved exit sign. Signs shall be placed where the exit or the path of egress travel is not immediately visible. No point to be more than 100 feet from an exit sign. - - Sec. 1011.1 Exception 1: Exit signs are not required in rooms or areas which require only one exit. Exception 2: Main exterior exit doors which obviously and clearly are identifiable as exits need not be signed when approved. Exit signs shall be internally or externally illuminated. - - Sec. 1011.2 Exit sign shall be illuminated at all times including during loss of primary power. -- Sec. 1011.4 & Sec. 1011.5.3 BOLT LOCKS: Manually operated flush bolts and surface bolts are not permitted. -- Sec. 1008.1.8.4 Exception 2: Where a pair of doors serves a storage or equipment room, manually operated edge- or surface -mounted bolts are permitted on the inactive leaf. LOCKS AND LATCHES: Egress doors shall be readily openable from the egress side without the use of a key or any special knowledge or effort. -- Sec. 1008.1.8 Locks and latches shall be permitted to prevent operation where any of the following exists: Exception 2: The main door or doors in Group B, F, M and S areas are permitted to be equipped with key operating locking devices from the egress side provided: 2.1 The locking device is readily distinguishable as locked. 2.2 A readily visible durable sign is posted on the egress side stating: THIS DOOR TO REMAIN UNLOCKED WHEN BUILDING IS OCCUPIED Exception 3: Where egress doors are used in pairs, automatic flush bolts shall be permitted to be used, provided the door leaf having the automatic flush bolts has no doorknob or surface -mounted hardware. Page # 3 Code review for: Project Id.: Compressor Building Address: Conn Creek ADDITIONAL DOORS: Where additional doors are provided for egress purposes, they shall conform to the requirements in Section 1008.1 LANDINGS AT DOORS: 1. There shall be a floor or landing on each side of a door. -- Sec. 1008.1.4 2. Such floor or landing shall be at the same elevation on each side of the door. -- Sec. 1008.1.4 3. The floor or landing shall not be more than 1/2 inch lower than the threshold. -- Sec. 1008.1.6 4. Landings shall have a width not less than the width of the stairway or width of the doorway, whichever is the greater. Where a landing serves an occupant load of 50 or more, doors in any position shall not reduce the landing dimension to less than one half it required width. The minimum length in the direction of exit travel is 44 inches. -- Sec. 1008.1.5 5. The space between two doors in series shall be 48 inches plus the width of door swinging into the space. -- Sec. 1008.1.7 EXIT ACCESS TRAVEL DISTANCE: The maximum travel distance in Group Fl is 200 feet. -- Table 1015.1 Page # 4 Code review for: Project Id.: Compressor Building Address: Conn Creek Areas containing high piled combustible stock or rack storage in any occupancy group require smoke and heat vents. Design to comply with the International Fire Code. -- Sec. 910.2.3 LIGHT AND VENTILATION 1. Every space intended for human occupancy shall be provided with natural light. The minimum net glazed area shall not be less than 8% of the floor area. -- Sec. 1205.1 and 1205.2 Any room is permitted to be considered as a portion of an adjoining room where one half of the area of the common wall is open and unobstructed and provided not less than one tenth of the floor area or 25 square feet, whichever is greater. -- Sec. 1205.2.1 Artificial light shall be provided that is adequate to provide an average illumination of 10 foot candles over the area of the room at a height of 30 inches above the floor. -- Sec. 1205.3 2. Natural ventilation of an occupied space shall be through windows, doors, louvers or other openings to the outdoors. -- Sec. 1203.4 The minimum openable area to the outdoors shall be 4 percent of the floor area. -- Sec. 1203.4.1 Any room is permitted to be considered as a portion of an adjoining room where unobstructed openings are provided that have an area not less than 8% of the floor area of the interior room but no less than. 25 square feet. -- Sec. 1202.3.1.1 When openings are below grade, clear space measured perpendicular to the opening shall be one and one half times the depth of the opening. -- Sec. 1203.4.1.2 3. Rooms containing bathtubs, showers, spas and similar bathing fixtures shall be mechanically. ventilated. -- Sec. 1203.4.2.1 CEILING HEIGHTS: Occupiable spaces, habitable spaces and corridors shall have a ceiling height of not less than 7 feet 6 inches. Bathrooms, toilet rooms, kitchens, storage rooms and laundry rooms shall be permitted to have a ceiling height of not less than 7 feet. -- Sec. 1208.2 No. yLD—R.— Job Address 01,C C 9--" BUI Assessor's Parcel No WINO PERMIT CARD a,ict -flu - £X Date Owner (tMu-� LAS 1 Contractor C • Setbacks: Front Rear INSPECTIONS AddressesII%! & Phone # nS3" ay'. `..0�, Address 4 -\n-touA€ C=;" -Phone Ct- 1-{3 RH LH Zoning Soils Test Footing JJ Foundation Grout Underground Plumbing Rough Plumbing Framing Insulation fc_ Roofing Drywall Gas Piping EXTERIOR Address No. Drainage Decks -support & clearance to wood Decks -stairs & rails _ Exterior locks Flashing around doors & windows Insect screens INTERIOR GARAGE Fire wall separation Service doors -11k" min. Door (20 min.) w/auto closer -1N" min. Mech. equip. 18" above floor No opening into sleeping area_ BASEMENT -CRAWL AREA Access Insulation Headroom/Stairs Ventilation Weatherproofing Mechanical Electrical Rough (State) Electrical to%(State) �'^ r�I' Final � /Checklist Co pieted?� Certificate Occupancy # S3E Date q--"2:5-17f1- Septic System # f 4 Date Final Other NOTES FINAL CHECKLIST MECHANICAL ROOM Boiler Hot water F.A. gas/oil Floor drain Clearance Air con, system_ Hot water heater Combustion air_ Gas piping, valves LPG Drain FIREPLACE/STOVE Clearance to combustibles_ Termination of chimney Combustion air Hearth (12" or 20" on sides) OTHER Glass doors Certified by: (continue on back) STAIRWAYS Headroom (6'6") Railing & guardrails _ Width Rise & run KITCHEN Clearance above grill Exhaust fan Broiler exhaust (1 hr, chase) _ BEDROOMS Egress Smoke detector BATHROOMS Exhaust fan Shatterproof glass REMARKS INSPECTION WILL NOT BE MADE UNLESS THIS CARD IS POSTED ON THE JOB 24 HOURS NOTICE REQUIRED FOR INSPECTIONS BUILDING PERMIT GARFIELD COUNTY, COLORADO Date IssueJa7 .A" Zoned Area Permit No 967 AGREEMENT In consideration of the issuance of this permit, the applicant hereby agrees to comply with all laws and regulations related to the zoning, location; construction and erection of the proposed structure for which this permit is granted, and further agrees that if the above said regulations are not fully complied with in the zoning, location, erection and construction of the above described structure, the permit may then be revoked by notice from the County Building Inspector and IMMEDIATELY BECOME NULL AND VOID. Use Address or Legal Description` OwnerOX USN/ IploC Setbacks Front Kt4 P Cgntractor�ra Site Side Rear This Card Must Be Posted So It is Plainly Visible From The Street Until Final Inspection. INSPECTION RECORD Footing Driveway ct-'" Foundation Gr Underground Plumbing -h.,- Insulation -pi-4- Rough Plumbing --14-4-- Drywall -„,,,t_ Chimney & Vent -nom Electric Final (by State Inspector) '-x," Gas Piping --74.-,c- Final 9-s-d7— Electric Rough (By State Inspector) b/- Septic Final ---)A-4..- Framing (To include Roof in place and Windows and Doors installed). Notes: ALL LISTED ITEMS MUST BE INSPECTED AND APPROVED BEFORE COVERING - WHETHER INTERIOR OR EXTERIOR, UNDERGROUND OR ABOVE GROUND. THIS PERMIT IS NOT TRANSFERABLE For Inspections Call 384-5003 108 8th Street Glenwood Springs, Colorado APPROVEDDO NOT DESTROY THIS CARD Date BYM IF PLACED OUTSID - COVE,:. WITH CLEAR PLASTIC Garfield County Building & Sanitation Department 108 8th Street, Suite #201 Glenwood Springs, Co. 81601 Office- 945-8212 Inspection Line- 384-5003 Job Address Cri- Nature of Work Building Permit . I(C)t" c ` Use of Building�- - LLL Contractor C_CN/\_ Owner cDaL Amount of Permit $ a bcf s D 3 Date Clerk /4670,