HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT
BLC0-10-14-3430
Williams/ American Soda/Solvay
Office Remodel
1821 {2717) CR 215
Parachute, CO
1} ALL WORK MUST COMPLY WITH THE 2009 IBC, IMC, IPC, IFGC, IFC, IECC AND
MANUFACTURERS INSTALLATION SPECIFICATIONS.
2) PRIOR TO CONSTRUCTION, CONTACT LOCAL FIRE DISTRICT FOR PERTINENT IFC
REQUIREMENTS. FIRE DISTRICT FINAL APPROVAL REPORT IS REQUIRED FOR
FINAL/COMPLETION INSPECTION .
3) ACCESSIBILTY REQUIREMENTS PER 2009 IBC, CHAPTER 11, AND ICC/ANSI A117.1-2003 .
SEE REDLINE NOTES AND PLAN ATTACHMENTS ON PAGES AG.01 AND A7.02 .
4) ROUGH IN PLUMBING INSPECTION REQUIRED PRIOR TO FRAMING INSPECTION .
5) ROUGH IN MECHANICAL INSPECTION REQUIRED PRIOR TO FRAMING INSPECTION.
6) VERIFY EXIT DIRECTIONAL SIGNS/EMERGENCY LIGHTING LOCATIONS PRIOR TO
ELECTRICAL ROUGH IN INSPECTION .
7) ELECTRICAL ROUGH IN APPROVAL IS REQUIRED PRIOR TO FRAME INSPECTION.
8) ELECTRICAL FINAL APPROVAL IS REQUIRED FOR FINAL/COMPLETION INSPECTION .
9) LOCKS, LATCHES AND LANDINGS PER 2009 IBC, SECTION 1008.
10) LIGHT AND VENTILATION PER 2009 IBC, CHAPTER 12.