Job Address a-, co fl i I I -r \/ f e uD C' re -
c
Nature of Work BuildingLN-1 Permit LI --Pil 1111(.1,9 e
C
Use of Building `)/-tdi" Ls)/ a' id-. 00A 3e + ()pin J pat?
Owner f a cQ._. AN/n.2 B
Contractor C t.f>r\ f2
Amount of Permit $ / 53G. y 7 Date a - / - o S
c9c/67_ al -cg 603
Clerk
r
f s
4
Permit No:
GARFIELD COUNTY BUILDING PERMIT APPLICATION
108 e'• Street, Salta 201, Glenwoed Syringe, CO 81601
Prone: 970.9454212 / Fax: 970-384-3470 / Inspect:os Lint: 970-3846003
Job Address: O27 Uew GI✓tit
Parcel/Schedule No: 2!t 0 lig (O1}c0
PQr0, Sib 3S
1 Lot No: Block No: pi sum. / � n , & l / / J _ 6 c
I-14 u 13 MVV/� UW
IPhh:: _7
2
�/7
Owner e I IJO,.. S
L G. -/
ti s i4t Ilett c4 . CS . J
ho
k
3
ConVactoOC.CQ HU..es
I l
Address: 7'J (Hliey ! 4
�+(' 1'
Ph: 5 13 S -S1 S
J C -
Lic.20 G 3�I
4
Architect/pi-Writer:
tliLgt Cow«F FK5.
/
Ad re1ss:
/t..I.4 i Sy,,..5s
Ph: r,
gg oc133
LIC. No.
5
Sq. Ft. of Badding: I ! `
V
Sq. Ftl orLot: 4C ,y.,
I t{ "I 7 t�"
Height:
No. of Floors:
6
Use of Building:
�e' Wry -,e �W War►i[�74 4- aile.441,40
rata,
7
Describe Work: Uu
A%„ Font
8
Class of Work: it,' New ❑ Alteration o Remove
0 Addition ❑ Move
9
10
Garage: ❑ Single
❑ `0 Double
Carport: ❑ Single
❑ Double
o Driveway Permit ❑ On -Site Sewage
Disposal
❑ Site Plan
II
Valuation of Work: $
Adjusted Valuations: S124, 364 343
12
Special Conditions: viejukttyptv 4 ) • _ -/J
taut?
iak.
NOT7 E
A SEPARATE ELECTRICAL PERMIT IS REQUIRED AND MUST BE
ISSUED BY THE STATE OF COLORADO.
ISSLO
THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCT/ON
AUTHORMED IS NOT COMMENCED WITH N 180 DAYS, OR, IF
CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A
PERIOD OF 180 DAYS AT ANY TIME AFTER WORK IS COMMENCED.
I HEREBY CERTIFY THAT I RAVE READ AND EXAMINED THIS
APPLICATION AND KNOW THE SAME TO BE TRUE AND CORRECT ALL
PROVISIONS OF LAWS GOVERNING THIS TYPE OF WORK WILL BE
COMPLETED WITHIN WHETHER SPECIFIED HEREIN OR NOT. THE
GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY
TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR
LOCAL LAW REGULATING CONSTRUCTION OR THE PERFORMANCE
QF_CONSTf , ON. ,s1
t'4 /[j o
It. -(1;„eIe„} 641/45
Plan Check Fee:
1�
7 A) I . 2Z
Permit Fee:
I ) 9
l / 44 ' /
Total Fee:
��
T L'j,.W
/ ]gyp/ /7 30 /-jv 47
Dated Permit Issued:
C " " •
OCC Group:n�
Const. Type:
--..1-:'NCI.._
Zoning:
Setbacks:
Manu Home:
(V��PgC•�^-
—002.44..
ISDSS No.& Fee:
L
..,r
I�.0, • •ER ^
ATE
/1']
�T'/
BLIGr PT. PING. DEPT /yri
• -,. AL/DATE APPROVAL/D W7
AGREEMENT
PERMISSION IS HEREBY GRANTED TO THE APPLICANT AS OWNER, CONTRACTOR AND/OR THE AGENT OF THE CONTRACTOR OR OWNER TO CONSTRUCT THE
STRUCTURE AS DETAILED ON PLANS AND SPECIFICATIONS SUBMITTED TO AND REVIEWED BY THE BUILDING DEPARTMENT.
IN CONSIDERATION OF THE ISSSUANCE OF THIS PERMIT, THE SIGNER HEREBY AGREES TO COMPLY WITH ALL BUILDING CODES AND LAND USE
REGULATIONS ADOPTED BY CANFIELD COUNTY PURSUANT TO AUTHORTIY GIVEN LN 30.28.201 CRS AS AMENDED. THE SIGNER FURTHER AGREES THAT IF
THE ABOVE SAID ORDINANCES ARE NOT FULLY COMPILED WITH IN THE LCOATION, ERECTION, CONSTRUCTION, AND USE OF THE ABOVE DESCRIBED
STRUCTURE, THE PERMIT MAY BE REVOKED BY NOTICE FROM THE COUNTY AND THAT THEN AND THERE IT SHALL BECOME NULL AND VOID.
THE ISSUANCE OF A PERMT BASED UPON PLANS, SPECIFICATIONS AND OTHER DATA SHALL NOT PREVENT THE BUILDING OFFICIAL FROM THEREAFTER
REQUIRING THE CORRECTION OF ERRORS IN SAID PLANS, SPECIFICATIONS AND OTHER DATA OR FROM PREVENTING BUILDING OPERATION BEING
CARRIED ON THEREUNDER WHEN IN VIOLATION OF THS CODE OR ANY OTHER ORDINANCE OR REGULATION OF THIS JURISDICTION.
THE REVIEW OF SUBMITTED PLANS AND SPECIFICATIONS AND INSPECTIONS CONDUCTED THEREAFTER DOES NOT CONSTITUTE AN ACCEPTANCE OF ANY
RESPONSIBILITIES OR UABUTIES BY GARFIELD COUNTY FOR ERRORS, OMISSIONS OR DISCREPENCIES. THE RESPONSIBILITY FOR THESE ITEMS AND
IMPLEMENTATION DURING CONSTRUCTION RESTS SPECIFICIALLY WITH THE ARTICTECT, DESIGNER. BUILDER. AND OWNER. COMMENTS ARE INTENDED
TO BE CONSERVATIVE AND IN SUPPORT OF THE OWNERS LNTEREST. I n
Garfom.003
I HEREBY ACKNOWLEDGE THAT I HAVE REAP AND UNDERSTAND THE AGREEMENT ABOVE (INITIAL):
rI I $IoS CO -I4 %a-8' fQ
f
C
t
The following items are required by Garfield County for a final inspection:
1. A final Electrical Inspection from the Colorado State Electrical Inspector;
2. Permanent address assigned by Garfield County Building Department posted where readily
visible from access road;
3. A finished roof, a lockable house, complete exterior siding, exterior doors and windows
installed, a complete kitchen with cabinets, a sink with hot & cold running water, non-absorbent
kitchen floor coverings, counter tops and finished walls, ready for stove and refrigerator, all
necessary plumbing;
4. All bathrooms must be complete, with washbowl, tub or shower, toilet stool, hot and cold
running water, non-absorbent floors and walls finished and a privacy door;
5. All steps outside or inside over three (3) steps must have handrails, guard rails on balconies or
decks over 30" high constructed to all IBC and IRC requirements;
6. Outside grading done to where water will detour away from the building;
7. Exceptions to the outside steps, decks and grading may be made upon the demonstration of
extenuating circumstances, i.e. weather, but a Certificate of Occupancy will not be issued until
all the required items are completed and a final inspection made;
8. A final inspection sign off by the Garfield County Road & Bridge Department for driveway
installation, where applicable; as well as any final sign off by the Fire District, anchor State
Agencies where applicable.
A CERTIFICATE OF OCCUPANCY WILL NOT BE ISSUED UNTIL ALL THE
ABOVE ITEMS HAVE BEEN COMPLETED.
****CANNOT OCCUPY OR USE DWELLING UNTIL A CERTIFICATE OF OCCUPANCY
(C.O.) IS ISSUED. OCCUPANCY OR USE OF DWELLING WITHOUT A C.O. WILL BE
CONSIDERED AN ILLEGAL OCCUPANCY AND MAY BE GROUNDS FOR VACATING
PREMISES UNTIL ABOVE CONDITIONS ARE MET.
I understand and agree to abide by the above conditions for occupancy,ytse and the issuance of a
Certificate of Occupancy for the dwelling under building permit # % 5-
ic&
Signature
BpcontOct2004
«/15/05
Date
3
4
VALUATION/FEE DETERMINATION
Applicant
Address C2'7(p C � �Ff (kJ Circ(...
Date 7 -2A -06 -
Finished
-2A-o'
Finished (Livable Area):
Main
Upper
Lower
Other
Total Square Feet
Valuation
Subdivision (moi ' P'441R 6
Lot/Block 3
Contractor
/ SQ) sf 74) 18 = I I (p, sto 8o
Basement:
Unfinished
Conversion of Unfinished to Finished
Plan Check Fee for Conversion
Valuation
Garage:
Crawl Space:
Valuation 452f /
Valuation
Decks/Patios:
Covered
Valuation
Open
Valuation
/44 w la = 1723
Fri
Total Valuation 124,, 3‘4 go
GARFIELD COUNTY BUILDING AND PLANNING
970-945-8212
MINIMUM APPLICATION REQUIREMENTS
For
SINGLE FAMILY DWELLING CONSTRUCTION
Including
NEW CONSTRUCTION
ADDITIONS
ALTERATIONS
And
MOVED BUILDINGS
In order to understand the scope of the work intended under a permit application and expedite the
issuance of a permit it is important that complete information be provided. When reviewing a plan
and it's discovered that required information has not been provided by the applicant, this will result
in the delay of the permit issuance and in proceeding with building construction. The owner or
contractor shall be required to provide this information before the plan review can proceed. Other
plans that are in line for review may be given attention before the new information may be reviewed
after it has been provided to the Building Department.
Please review this document to determine if you have enough information to design your
project and provide adequate information to facilitate a plan review. Also, please consider
using a design professional for assistance in your design and a construction professional for
construction of your project. Any project with more than ten (10) occupants requires the plans
to be sealed by a Colorado Registered Design Professional.
To provide for a more understandable plan in order to determine compliance with the building,
plumbing and mechanical codes, applicants are requested to review the following checklist prior to
and during design. Applicants are required to indicate appropriately and to submit the
completed checklist at time of application for a permit.
Plans to be included for a Building Permit, must be on drafting paper at least 18"x24" and
drawn to scale.
I -
Plans must include a floor plan, a concrete footing and foundation plan, elevations all sides with
decks, balcony, steps, hand rails and guard rails, windows and doors, including the finish grade line
and original grade. A section showing in detail, from the bottom of the footing to the top of the roof,
including re -bar, anchor bolts, pressure treated plates, floor joists, wall studs and spacing, insulation,
sheeting, house -rap, (which is required), siding or any approved building material. Engineered
foundations may be required.
A window schedule. A door schedule. A floor framing plan, a roof framing plan, roof must be
designed to withstand a 40 pound per square foot up to 7,000 feet in elevation, a 90 M.P.H. wind
speed, wind exposure B or C, and a 36 inch frost depth.
All sheets to be identified by number and indexed. All of the above requirements must be met or
your plans will be returned.
All plans submitted must be incompliance with the 2003 IRC.
1. Is a site plan included that identifies the location of the proposed structure or addition and
distances to the property lines from each corner of the proposed structure(s) prepared by a
licensed surveyor and has the surveyors signature and professional stamp on the drawing?
Properties with slopes of 30% or greater must be shown on the site plan. (NOTE
Section: 106.2) Any site plan for the placement of any portion of a structure within 50 ft.
of a property line and not within a previously surveyed building envelope on a
subdivision final plat shall be prepared by a licensed surveyor and have the surveyor's
signature and professional stamp on the drawing. Any structure to be built within a
building envelope of a lot shown on a recorded subdivision plat shall include a copy of
the building envelope as it is shown on the final plat with the proposed structure located
within the envelope.
Yes 2
2. Does the site plan also include any other buildings on the property, setback easements and
utility easements? Please refer to Section 5.05.03 in the Garfield County Zoning Resolution
if the property you are applying for a building permit on is located on a corner lot. Special
setbac do apply.
Yes
3. Does the site plan include when applicable the location of the I.S.D.S. (Individual Sewage
Disposal System) and the distances to the property lines, wells (on subject property and
adjacent properties), streams or water courses?
Yes_
2
4. Does the site plan indicate the location and direction of the County or private road accessing
the prop'?
Yes J�
5. Do the plans include a foundation plan indicating the size, location and spacing of all
reinforcing steel in accordance with the IRC or per stamped engineered design?
Yes
6. Do the plans indicate the location and size of ventilation openings for under floor crawl
spaces aqd the clearances required between wood and earth?
Yes
7. Do the plans indicate the size and location of ventilation openings for the attic, roof joist
spaces 'soffits?
Yes p
8. Do the plans include design loads as required by Garfield County for roof snow loads, (a
minimum of 40 pounds per square foot up to & including 7,000 feet above sea level), floor
loads and)wind loads?
Yes r
9. Does the plan include a building section drawing indicating foundation, wall, floor, and roof
construction?
10. Does the building section drawing include size and spacing of floor joists, wall studs, ceiling
joists, roof rafters or joists or trusses?
Yes
11. Does the building section drawing or other detail include the method of positive connection of
all columns and beams?
Yes \O
12. Does the elevation plan indicate the height of the building or proposed addition from the
undisturbed grade to the midpoint between the ridge and cave of a gable or shed roof or the
top of a flat roof? (Building height measurement usually not to exceed 25 feet)
Yes
13. Does the plan include any stove or zero clearance fireplace planned for installation including
make andel and Colorado Phase II certifications or phase II EPA certification?
Yes No
3
14. Does the plan include a masonry fireplace including a fireplace section indicating design to
comply with the IRC?
Yes No
15. Does the plan include a window schedule or other verification that egress/rescue windows
from sl g rooms and/or basements comply with the requirements of the IRC?
Yes_ No
16. Does the plan include a window schedule or other verification that windows provide natural
light and ventilation for all habitable rooms?
Yes No
17. Do the plans indicate the location of glazing subject to human impact such as glass doors,
glazing immediately adjacent to such doors; glazing adjacent to any surface normally used as
a walking surface; sliding glass doors; fixed glass panels; shower doors and tub enclosures
and spe ' safety glazing for these areas?
Yes No
18. Is the location of all natural and liquid petroleum gas furnaces, boilers and water heaters
indicated on the plan?
Yes No
19. Do you understand that if you are building on a parcel of land created by the exemption
process or the subdivision process, are building plans in compliance with all plat notes and/or
covenants?
Yes %0 No
20. Do you understand that if you belong to a homeowners association, it is your responsibility
to obtain written permission from the association, if required by that association, prior to
submitting an application for a building permit? The building permit application will not
be accept thout it.
Yes No
21. Will this e the only residential structure on the parcel?
Yes No If no -Explain:
22. Have two,Q) complete sets of construction drawings been submitted with the application?
Yes
23. Do you understand that the minimum dimension a home can be on a lot is 20ft.wide and 20ft.
long?
Yes No
4
24. Have you designed or had this plan designed while considering building and other
construe ion code requirements?
Yes_ No
25. Do your plans comply with all zoning rules and regulations in the County related to your
properties z n_e district?
Yes l" No
26. Does the plan accurately indicate what you intend to construct and what will receive a final
inspectioT�b_y the Garfield County Building Department?
Yes iCJ No
27. Do you understand that approval for design and/or construction changes are required prior to
the applioat'on of these changes?
Yes No
28. Do you understand that the Building Department will collect a "Plan Review" fee from you
at the time of application submittal and that you will be required to pay the "Permit Fee" as
well as any "Road Impact" or "Septic System" fees required, at the time you pick up your
buildin permit?
Yes No
29. Are you aware that you must call in for an inspection by 3:30 the business day before
the requested inspection in order to receive it the following business day? Inspections
will be made from 7:30 a.m. to 3:30 p.m. Monday through Friday. Inspections are to be
called in to 384-5003.
Yes 50 No
30. Are you aware that requesting inspections on work that is not ready or not accessible will
result in $ 0.00 re -inspection fee?
Yes No
31. Are you aware that you are required to call for all inspections required under the IRC
including approval on a final inspection prior to receiving a Certificate of Occupancy and
occupanof the building?
Yes No
32. Are you aware that the Permit Application must be signed by the Owner or a written
authority being given for an Agent and that the party responsible for the project must comply
with the IRC?
Yes No
5
33. Are you aware that prior to submittal of a building permit application you are required to
show proof of a driveway access permit or obtain a statement from the Garfield County Road
& Bridge Department stating one is not necessary? You can contact the Road & Bridge
Department at 625-8601.
Yes )2 No
34. Do you understand that you will be required to hire a State of Colorado Licensed Electrician
and Plumber to perform installations and hookups, unless you as the homeowner are
performing the work? The license number of the person performing the work will be
required at time of applicable inspection.
Yes 20 No
35. Are you aware, that on the front of the Building Permit Application you will need to fill in
the Parcel/Schedule Number for the lot you are applying for this permit on prior to submittal
of a building rmit application? Your attention in this is appreciated.
Yes No
36. Do you know that the local flt3listrict may require you to submit plans for their review of
fire safety issues? Yes No (please check with the
building department about this requirement)
37. Do you understand that if you are planning on doing any excavating or grading to the
property prior to issuance of a building permit that you will be required to obtain a grading
permit?‘
Yes
I hereby acknowledge that I have read, understand and answered these questions to the
best of my ability.
Signature of Ow
Phone:
S23 55)-c
Project Name:
/' / f / (days); �//�
VG��ty Vi[�„ HI N�4k.&
(245105
Date
(evenings)
Project Address:
Gz7 C ((4 U, C,44t
Notes: If you have answered "No" on any of the questions, you may be required to provide this
information at the request of the Building Official prior to beginning the plan review process. Delays
in issuing the permit are to be expected. Work may not proceed without the issuance of a permit. If
it is determined by the Building Official that additional information is necessary to review the
application and plans to determine minimum compliance with the adopted codes, the application
6
may be placed behind more recent applications for building permits in the review process and not
reviewed until required information has been provided and the application rotates again to first
position for review, delay in issuance of the permit or delay in proceeding with construction.
BpminreqFeb2005
7
Jun. 2. 2005— $:48PM—HIGH COUNTRY ENGINEERING
OTE:
J,.
ALL DRAINAGE SHALL FLOW AWAY FROM THE
'BUILDING WITH A GRADE DROP OF 1 VERTIC5F
IN 10 HORIZONTAL FEET.
-� DRAINAGE ARROW
No.0759 P. 4/4
T 2
12-1 s
a'$ GRAVEL
ROSEWOOD
1560 S.F.
0276 CUFF VIEW,.
CIRCLE -
FE ELEV:.5435.98
HIGH COUNTRY ENGINEERING, INC.
t4lHV iN®OWKLAn,ITIE P110. UNCL,{IYOG .Oo 10111
Puma9YEYSY MONO uaa n
1s1)BLMRPHONE 110508711101r6L ax S COMM
rwnmr—
DARTER. LI C
6ARFIELD COUNTY. COLORADO
VALLEY VIEW VILLAGE
PHASE D
LOT 3 SITE PLAN
Fly'/JD7/1Oram, in aria /ierr Mr!
•
hr
O L7 c cvc-
FAYeh and Associates, Inc.
Geotechnical Engineering Consultants
5700 E. Evans Avenue
Denver. CO 80222
Tel : (303) 781-9590
Fax • (303)781-9583
0170 Mel Ray Road
Glenwood Springs. CO 81601
Tel: (970) 3841500
Fax: (970) 3841501
June 1, 2005 Project No. 24-116
Mr. Dan Penny
Grace Homes, Inc.
786 Valley Court
Grand Junction, CO 81505
Subject: Test Pit Observations, Lots 1 — 7, 38 and 39, Battlement Mesa, Phase II, Garfield
County, Colorado.
Reference: HP Geotech, `Preliminary Geotechnical Study, Proposed Roan Cliff Village
Development, Parcels 2-5 and 2-6, Battlement Mesa, Garfield County, Colorado",
dated September 16, 2002.
Dear Mr. Penny:
As requested, a representative of Yeh and Associates, Inc. observed backhoe test pits at the
subject site to investigate near surface conditions in order to provide recommendations for
shallow foundation design and construction. The findings of our investigation and
recommendations for construction of residences on the subject lots are presented in this letter.
A preliminary geotechnical report was conducted by HP Geotech in 2002, as referenced above.
Yeh and Associates, Inc. work was done in accordance with our agreement for geotechnical
engineering services for Grace Homes, Inc. dated November 5, 2004.
Based on conversations with the client, single-family residences are planned on these lots. We
anticipate the foundations will consist of a concrete mat with thickened edges. Basements are
not planned for these residences. The lots are rough graded and curb and gutter is installed.
Streets were not paved at the time of our investigation. Based on site observations, the lots are
near construction grade and fill placement should be negligible, if necessary.
We observed excavation of test pits located on the property line between Lots 1 and 2, 3 and 4,
5 and 6, 7 and 8, and 38 and 39 as shown on Figure 1. The soils exposed in the test pits for
Lots 1 - 6 consisted of sand and gravel to the maximum explored depth of approximately 6 feet.
The sand and gravel had 12 to 24 percent fines (passing No. 200 sieve) with liquid limits
ranging from 34 to 39 percent and plasticity indices of 13 to 18 percent. Soils encountered on
Lots 7, 38 and 39 consisted of silt and clay to the maximum explored depth of 6 feet. A grain
size analysis indicated that the silt and clay from these lots consisted of approximately 51 to 56
percent low to moderate plasticity silt and clay with liquid limits of 29 to 44 percent and plasticity
indices of 11 to 17 percent. The sand and gravel classified as SC and GP -GC or GM and the
silt and clay classified as ML and CL, respectively, based on the Unified Soil Classification
System. Laboratory test results are presented on Figures 2 through 7. Groundwater was not
encountered in the excavations and the soils were slightly moist to moist.
Project No. 24-116
Based on our investigation, spread footings or a mat foundation constructed on the undisturbed
natural soils can be designed for an allowable soil pressure of 1,500 psf for the above
referenced Tots. Soils encountered on adjacent lots near anticipated foundation level exhibited
compression during laboratory testing. Increases in moisture content due to irrigation or other
sources could cause hydro -collapse of the subsoils resulting in foundation settlement. Care
should be taken to provide drainage away from the residences. Recommendations for surface
drainage are presented in the referenced report. Loose, disturbed soils encountered at
foundation level should be removed and replaced with compacted fill or the foundation should
be extended to undisturbed soils. Other design and construction recommendations presented in
the above referenced geotechnical report should be followed.
This study was conducted in accordance with generally accepted geotechnical engineering
practices in this area at the time the investigation was performed for use by the client for design
and construction purposes. The recommendations submitted in this letter are based on our
observations of the subsoils encountered in the test pits and laboratory test results. This study
is based on the assumption that soils at other portions of the lot are similar to the conditions
encountered in the pits to the depths excavated. The risk of foundation movement may be
greater than indicated in this report because of possible variations in the subsurface conditions.
Expansive soils may occur on this site. If expansive clays are encountered in building areas,
they may need to be removed or the footings designed with a minimum dead load pressure to
reduce foundation and slab -on -grade movements. If the conditions encountered in foundation
excavations vary from what is described in this report, we should be notified to re-evaluate our
recommendations. We recommend on-site observation of excavations and foundation bearing
strata by a representative of the geotechnical engineer.
Please call if you have any questions.
YEH AND ASSOCIATES, INC.
y
Jclp' ®D �tt`'s
�•�tr
5 32 0 i
Richard D. Johnson, P.E.
Senior Geotechnical Engineer
2 of 2
•
9
J
9 5
9 5
n
J
Y
v 2
fi
Q
Q
1
4
1
1
Y
•
1
r
1
1 1
r
1
s44bGmmW ••••M
N►ffl111Ml
NOM
a,
C
P N
C CO
CO
CL
i
I
I
I
g
CO
a
O]
CO
97
a
CO
fD
CD
39
co N
N
2"
\
r
a
\
\g
#10
#40
o
ev
#
Hydrometer Analysis
Size of Particles in mm
0
C
•
07
U.S. Standard Sieves
Sieve Opening in Inches
8
A
0
A
0
0
C•4
0
1 I
11 Ii
1i
II
i
..
III
IUIIII1-lµ
1I
11111111111
Y �
111■�11111■■NIIINIINN■11
III
MINI
U
IIIIIiiMiIUNUNUUUII
SEI
MM
nuu
n
IMO
1
N
.
'I
...........
n�
....n...
nn...
r
..u.nMME....n
....a1.
..
....M�
n..7
..
- Ti
....0�0••.
..
...W
Hi1
1111
r
,;n
l
1 �
III
III
1111
1111
�
i
sA
NNNI■�11
MIIII
N
t
un•
nn�n
Innnnnnnlui
.nmi.....
n.nn...nn.
-
III
III
aamaIlnflhIIlI
I
eir
1
1
PRIM
I1NiiIII
.eiiilwi11
_
•nwi
.n.n.
nnollufUlUnin
..n
....n■
nn.
..._.
n.0
no....
..nn...I
nnn...n..
...
■
pi
ill 1
LH,
4. „_.
'
-:~
u
■4:,
+
--
,
,
,
•
_ _ _
:on.'
,
_
1 T_r_a_
_i
,.__._,_
I
,_,_, 1
�-1
'
'1-
- - }
- - -1-1--i-ti-
- -4_
t-
1+
,
' I
}l
I
El
+
- L_.
L
4_
S
T m i Y
6u!ssed luaOJad
M
N
0
0
G
E
N
Co
0
u
t
O.
o
0
S
U
Co
43)
Cu
U
C
CA
y
03
ste
>NI
SIEVE ANALYSIS
CO
N
0
z
V
a
d
z
d
0)
LL
0
a N
COCC CC
CO V
C Y
000
Valley View Village
Lots 1 and 2, Phase II
C
O)
a
E
€
U)
CO
N
en
r
J
-J
J
a
a
U,
CD
N
a
C
CO
0,
C
ii
clayey SAND (SC)
C
0
c0.
E w
N.
0
Hydrometer Analysis
Size of Particles in mm
U.S. Standard Sieves
Sieve Opening in Inches
0)
C
c N
0
a
68
I
I1
it
50 _I
0)
v
46
45 1
N
v
0)
o)
29
N
Sieve
Size
c+1
ry
1r
N
I 2"
ry
r
� �
�I'+
W
111111
#10
#40
#200
8
St
R
0
rrit
A
Iw
m
0 rn m n 0 n a
Bussed 111103Jad
n
0
0
0
0
0
E
C
N
CO
C
u
t
A
D.
SIEVE ANALYSIS
S
r-
14-
a)
-
N
d
a`
ci
z
2
O)
L
0 0
CC
is
;.m
m�
C U
0 0
Valley View Village
Lots 3 and 4, Phase II
C
n
E
m
rn
14)
0)
P7
N
J
J
J
a
o
a
to
O
M
N
G)
0
0
COC
c
CO
CO
N
C
U-
clayey GRAVEL (GP -GC)
N
a
0
I If 1
I1
it
I
� �
�I'+
I
I
I
111111
0111
I
I
I
11111
11111M1
III
,
I
• - r1
a
IIuIHIuluIUuilimilIusyI
H•NHuu
•VuN••uum
•ENE
1'
Noo�ao
Sao
T ` ■
II
I
1
1
/
I •
1
•
•
JT: _ -- __
I
i
�
_I
I
F
MP•
!1
•
I •
I
I
T;
T
•
I.
114
t
1
IIS
T
m
ME
• L
1 •
11
I!I
1j
{4
d
•
--
r
_L ,
�,
'
1..
+t --++r+
_• - - __ _F
-_
__,--1-4,+4+-
1
-
----.
_ti
-I____1_
1 it
-{
i-1
I
�--i"
r
: I
' L
17 +
i-
-1-1,-2-1-t_
1
7,:f
1
I
1
r-
I
-Hf ITT .il
-7 i I l
rt Tii
�i
I
0 rn m n 0 n a
Bussed 111103Jad
n
0
0
0
0
0
E
C
N
CO
C
u
t
A
D.
SIEVE ANALYSIS
S
r-
14-
a)
-
N
d
a`
ci
z
2
O)
L
0 0
CC
is
;.m
m�
C U
0 0
Valley View Village
Lots 3 and 4, Phase II
C
n
E
m
rn
14)
0)
P7
N
J
J
J
a
o
a
to
O
M
N
G)
0
0
COC
c
CO
CO
N
C
U-
clayey GRAVEL (GP -GC)
N
a
0
•
Hydrometer Analysis
Size of Particles in mm
U.S. Standard Sieves
Sieve Opening in Inches
Passing
.Cr
49
48
47
45
44
30
14
Sieve
Size
h
IV
#200
0,1
C0
8
A
M1
8
m m n m (0i v
Bussed 4uaOJad
0
Cu
O
0
0
0
0
S
0 O
Particle Size (mm)
SIEVE ANALYSIS
w
a
01
6
z
U
d
a
d
z
cu
0 0
It CC
Valley View Village
Lots 5 and 6, Phase II
0
N
a
coE
m
10
N
t
co
co p
CD
01
N
J
J
J
a
CO
a
1
O
1
0
0
2
'0
c
l0
co
r
ele
0
LL
silty GRAVEL (GM)
`0
CI a
Q 'C
E
co
c
r.
0
j
I'
I
I
1
�f
•
1
I
•
-.
1--,r
•
II
1
••
•!
ill
I
NM
••
ill
'
•
II
•
L
'
4-
l•
1-t-
in 1
1
■■■■
■
-
II,+-
�I�
I
I
It
-4-I_ '
t1
I
i
— -irt
-TT
T
+
-__
- -
i -i
+- i-�
-t -
- T
'�
r4-
11 ,�- _ -
r
} -
ii
'
Mem
o■■■o
-t
i,
i1I I
II
1.1
_-
8
m m n m (0i v
Bussed 4uaOJad
0
Cu
O
0
0
0
0
S
0 O
Particle Size (mm)
SIEVE ANALYSIS
w
a
01
6
z
U
d
a
d
z
cu
0 0
It CC
Valley View Village
Lots 5 and 6, Phase II
0
N
a
coE
m
10
N
t
co
co p
CD
01
N
J
J
J
a
CO
a
1
O
1
0
0
2
'0
c
l0
co
r
ele
0
LL
silty GRAVEL (GM)
`0
CI a
Q 'C
E
co
c
r.
0
Hydrometer Analysis
Size of Particles in mm
U.S. Standard Sieves
Sieve Opening in Inches
Passing
,
0)
94
88
76
56
Sieve
Size
N
'-
:co
cD
#40
#200
8
0
r -m 8 e
Buissed lueaied
N
0
0
O
0
0
0
0-
Particle Size (mm)
SIEVE ANALYSIS
N
o
z
0
O1
O
rE cc
m
co
32
00
Valley View Village
E
co
O
Lots 7 and 8, Phase II
0
•)
0.
E
l0
10
01 �
d L
co
CO o
z
1
N
J
-J
J
a
0
ID
ID
err
C7
c
c
N
0)
c
ii
sandy SILT (ML)
X11
118.
1
111111111
ill
I�
�n
•
MEM
1E11111
nu
• %no•n
•uuinuu
nn
n•�nunomh•••nnn•un�
.�
e
I=
iii
•
•
11111
•
1111111111
It
11111111N
rr
:I
-
Ifs,T-L
..
•
i
'
Ii
Il•
- !V
}+
+
-V
Ir+,
-I
_L
'-_ --- -- M`--
.-'
1h
�-
---�-'—
---'�
---
------ - -- ---r---'11-
-77-
.-
1_,i
__
4.I
L,
— L_
ItT
-.
I ,
I
L
4
1
. I
1 7
-1 I I
fl
�, • ; I
1,
H_
{
'
+
1---F
•,
f il
I
t
N.. I I-ri • T I I I f
-
r -m 8 e
Buissed lueaied
N
0
0
O
0
0
0
0-
Particle Size (mm)
SIEVE ANALYSIS
N
o
z
0
O1
O
rE cc
m
co
32
00
Valley View Village
E
co
O
Lots 7 and 8, Phase II
0
•)
0.
E
l0
10
01 �
d L
co
CO o
z
1
N
J
-J
J
a
0
ID
ID
err
C7
c
c
N
0)
c
ii
sandy SILT (ML)
Passing
1
1
I
,
1
95 I
V-
0)
87
83
75
i
Sieve
Size
ih
N
2"
#10
#40
#200
Hydrometer Analysis
Size of Particles in mm
U.S. Standard Sieves
Sieve Opening in Inches
8
8
9
R
m
0
w
0 0 0 4*)
6u!ssed wowed
CV
0
0
0
8
Particle Size (mm)
SIEVE ANALYSIS
klq
S
4
CD
ci
Z
U
a`
O
z
91
0
rn
a
al 3
0 cc
Valley View Village
Project Name:
Lots 38 and 39, Phase II
d
a n
E
u) p
0)
N
J
J
o
N
J
a
a
01
01
C%
In
silty CLAY (CL
0
o\-- e o
o
-o 1.0
o
> • G N N f
a.
0 c LL E 2
au
0
II
�j
I !
1
1
I
II;I
I
I
��"
I
1 I
II
4,,,.
I
•
I
•
-j-'
I
I
1_2.
l
•
-1r-moi—
I •
. r,
- Ii
•
I
I
I
'
y
4 it '
'
1
•
I
I
r
1--
��T
LIT
- r
Y
1-y
yJ1
rT1
'
un
ril
tt
.
+i i
0
H—
+ i
I
-I-4'it
�
T
ay
11;1!
r 1; I
I
-HT
•
•
,--1; -
rt+
I I I
-rI
1.
ien.
I
I
}-T-T
I I I
r
T
I
I I I I
w
0 0 0 4*)
6u!ssed wowed
CV
0
0
0
8
Particle Size (mm)
SIEVE ANALYSIS
klq
S
4
CD
ci
Z
U
a`
O
z
91
0
rn
a
al 3
0 cc
Valley View Village
Project Name:
Lots 38 and 39, Phase II
d
a n
E
u) p
0)
N
J
J
o
N
J
a
a
01
01
C%
In
silty CLAY (CL
0
o\-- e o
o
-o 1.0
o
> • G N N f
a.
0 c LL E 2
au
0
C
C
O '0
.
I
1
r
a)I
I
CD
0)
co
0)
94
r
0)
77
N
10
CL
Sieve
Size
3"
N
2"
Si
-
_
m
\
#10
#40
0
0
N
\
r
�
\
a
#
Hydrometer Analysis
Size of Particles in mm
U.S. Standard Sieves
Sieve Opening in Inches
8
m
0
•
A
8
e n v
Buissed WeOJed
M
0
O
O
0
8
Particle Size (mm)
U
C
11
CC
I-
U
O
Ca
It
N
C
O
V
on
r:
u
C
Cc
A
s
U
0 O
0
OM
SIEVE ANALYSIS
co
v
N
N-
0
z
U
O
0
z
7
m
LL
DO
Er fr
m
U
00
Valley View Village
Lots 38 and 39, Phase II
0
a)
a
E
m
U)
In
an
u)
CD
J
-J
N
J
a
a
(O
N
N
2°
0
V
C
CO
w.0
0
N
C
silty CLAY (CL)
C
O
y
a •c
yE
II
III
it
r
I
1
i,
I
111
111111
n■■N■■,I
ii
+ ,
ffff.!'
I'
fir'
•
I
I1
'I I
11
I
11
,,
n
1
n
1• "
�11NNIINII
'
,
Mille.
tri
■•■■nn■■■■■■■
t '
*
■■■■■■
11
■■■■■■■■■■■■■
•
•••••••■■■
■
■
■■■■■■■■■■■■■■■■■
N■N■■■■■B
MN
In
vr,�d
w
■a■■iiiii
•
K•1111M111111
1101
iT I'
•uuimn
mmu
11111
1E111NINNI
1IN
11111
■1■
n
■nnn■■■■■
r1■
OMEN
■
B■�■■8■
■N■■
i
NH
ij.1
MEN
t
'
i4
-,4;
-rl-' I
l
y—
- I
1_H.
_--11-----
f ,
ifi�
r
- __ -- ? I
1I
Y--
I'
Iii
MITI
J H rHt
1_4
- F
l
T1 T 1 I I l
8
e n v
Buissed WeOJed
M
0
O
O
0
8
Particle Size (mm)
U
C
11
CC
I-
U
O
Ca
It
N
C
O
V
on
r:
u
C
Cc
A
s
U
0 O
0
OM
SIEVE ANALYSIS
co
v
N
N-
0
z
U
O
0
z
7
m
LL
DO
Er fr
m
U
00
Valley View Village
Lots 38 and 39, Phase II
0
a)
a
E
m
U)
In
an
u)
CD
J
-J
N
J
a
a
(O
N
N
2°
0
V
C
CO
w.0
0
N
C
silty CLAY (CL)
C
O
y
a •c
yE
Summary of Labor
Valley View Village
C)
E
m
z
d
0
a
CLASSIFICATION
CO
D
GP -GC I
AASHTO
N
<
N
<
N
Q
m
I.-.
m
<
(15
<
R -VALUE
Unconf.
Comp.
Strength
(psn
1--..J. o
71) y 0
yO O
U 10
9
0
w v
.1,1a' m
A 3 = e
CO 0ra.
Atterberg Limits
a
CO �
01
N
N
1
a
N
CO
C
N
N
�
A
2
a
v
N
N
Grain Size Analysis
II g
C N en
i! '
it v
N
N
N
*
CL
4�
114
C o
m
CO
CCO
CO
35
42
IT)
U� A
Dry Density
(pcf)
Moisture
Content
(%)
m
N.
N
o
a
18.7
9.8
Sample Location
Sample
Type
Bulk
Bulk
Y
J
co
_le
5
m
Bulk
Bulk
Depth (ft)
3
N
06
.-
't
.6
CO
CD
05
in
CO
*6
N
a)
CO)
06
co
0
d
a
m
a
Liza
REVIEW CHECKLIST
ApplicantQt 4G(t Date /'Zg'i j
Lor 3
Building
XEngineered Foundation
jj 4. Driveway Permit
✓ Saraeyed Site Plan
AM -Septic Permit and Setbacks
Grade/Topography 30%
L/
Attach Residential Plan Review List
‘•/�Minimum Application Questionnaire
✓ Subdivision Plat Notes
Al. Fire Department Review
"'Valuation Determination/Fees
Red Line Plans/Stamps/Sticker
✓ Attach Conditions
Application Signed
/
cPla�n Reviewer To Sign Application
—
'ParceUSchedule No.
40# Snpwload Letter- Manf. Hms.
ll.)
GENERAL NOTES:
Planning/Zoning
Property Line etbacks
30ft Stre. Setbacks
Flood lain
B ' ding Height
ning Sign -off
Road Impact Fees
HOA/DRC Approval
Grade/Topography 40%
Planning Issues
Sub) Plat Notes
• COPY
BATTLEMENT MESA SERVICE ASSOCIATION
ARCHITECTURAL COMMITTEE APPLICATION & CHECKLIST
(for New Home Construction projects)
S
Homeowner:
Horne
f4t' f ( M t 5
HomeMa�lingAddress: 78& (Li IIfy L`oartt- a/AN/d Toeve tie a, Co, 8/505
Home Phone: 9/0-0423--55'53' WorkPhone(ifdesired): 476 Z,'s'– 070
Project Address: 0176 C1;FF V,ew Lot: 3I Block: PIB Subdivision: (/c,li V; Vt,
Production Home P]aanName(if appplicable): Rvu -vt'it
Homebuilder: C.t 1 Atm,
Business Mailing Address: 3Y ¢n7 a 41/25:1t
Business Phone: 04nt Fax (if desired): 970 `SZ 3 - 0/0 3
Submittal Date: Estimated Start Date:
Estimated Completion Date:
SUBMITTAL REQUIREMENTS: Two Copies each of items 1, 2 & 4 need to be submitted.
(Check -off items attached to the Application. Fill in spaces as indicated.)
1. Site Plan Drawing (1" = 10' or 1" = 20' scale) with the following information shown:
Lot, Block & Subdivision name
Street Address of Project.
Building Setback Lines (also fill-in the shortest distance between property line to the
exterior wall closest to that property line). Please be aware that all Building Setback
Lines are taken from your Property Line Pins!! Your Property Line is NOT the
Curb Line!!
Dwelling Unit Garage
4"3
`'// / a
Front Setback:
Left Side Setback: /6—
Right Side Setback: /T
Rear Setback: L5-191 'it's"
v/ Utility Easements.
55' Clear Site -Line at Intersection Corner Lots.
Site Grading Elevations & Drainage.
First (main) Floor Height in relation to top of street curb at front -center of lot.
�– Driveways (including width of driveway), Walkways, Patios, etc.
Outbuildings.
Page 2 of 6
2. Architectural Drawings (1/4" = I' or 1/8" = 1' scale) with the following information shown.
1/
Floor Plan(s) with overall dimensions (fill-in the following square foot areas).
First Floor Finished Living Area: 1 c6 0 square feet
Second Floor Finished Living Area: square feet
Lower Floor Finished Living Area: square feet
Total Finished Living Area: 1 5-60 square feet
Total Unfinished Living Area:
square feet
Garage Area: to'?" r 27' 'it." its 2 square feet
Building Elevations Plans indicating doors, windows, exterior materials, building height,
roof pitch, roof -mounted evaporative coolers, etc. (fill-in maximum height below).
Maxiyum�, building height to highest ridge line or building structural projection
id % feet above top of street curb at front -center of your lot.
Engineered (stamped) Foundation Plan.
t/ Outbuildings indicating dimensions, elevations and overall height to ridge line.
3., Exterior Materials (fill-in the selections below): I
r./ Roofing Material: en r 0,1,-, 4, Color: 1 Q7�.�jn4.tp_,GA (/ l
e/ Primary Siding Material:aAM4Atec,, QloeunColor:
1/ / Accent Siding Material: 1� l � �$ t r. Color: Ltikct Q.
TrimMateriat !1 t ► . •� 1 1 ►�� ' olor: LX JL* 0 .
/ Masonry Material: Color: fj a Oka
Stucco Materials: Color: 0
V Front Door Material: cJ 1 Color: 33 ,
`J Garage Door Material: s i $ Color: U IN ttQ,
COLOR SAMPLE COLOR SAMPLE COLOR SAMPLE
COLOR SAMPLE COLOR SAMPLE COLOR SAMPLE
Page 3 of 6
•
7
4. Landscape/Irrigation Plans with the following information:
Planting Plan (indicate areas of irrigated lawn, tree placement, shrub beds, ground cover,
etc.).
Plant Material listing by species of trees, shrubs and grasses.
✓ Groundcover Material with weed control bather.
Fences.
/ ✓ Other Landscape Improvements (decks, site lighting, flag poles, etc.).
U— 5. Variance Request (if applicable) Give details below:
6. Residential Construction Monetary Deposit:
I/We hereby acknowledge and understand that our failure to complete Home Construction, Improvement
Projects or Landscaping Construction within the time constraints noted in Conditions 2. & 3. On Page
6 of this Application will result in a Notice and Opportunity for a Hearing before the BMSA Board of
Directors. If I/We are found in violation of these Conditions at the Hearing it will result in a fine to the
Owner of not less than $500.00 per month for each full month in excess of the allotted completion time
frame.
I/We hereby acknowledge that Home Construction or Improvement Projects or Landscape Construction
features which are built in non-conformance with this full application, including the Conditions of
Approval noted on Page 6 of 6 herein, I/We will be cited by the BMSA/AC in written citation form at the
time of discovery. In extenuating circumstances a Variance may be requested from the BMSA/AC,
provided such Variance request item is within the purview and approval jurisdiction of the BMSA/AC.
If a Variance is not granted by the BMSA/AC and if the Non -Conforming Items are not corrected within
60 days after the date of written citation, I/We will be served Notice of a Hearing before the BMSA Board
of Directors, and if UWe are found in violation of these Non -Conforming Items at the Hearing I/We will
be fined a minimum of $500.00 per Non -Conforming Item. Notwithstanding the foregoing, I/We
acknowledge that the BMSA Board of Directors and/or Architectural Committee may pursue any legal
remedy available in the event of a non-compliance.
Page 4 of 6
AS PER THE ARCHITECTURAL STANDARDS,PLEASE INDICATE THE
FOLLOWING POINTS ON THE PLOT PLAN AND BELOW:
ELEVATIONS AT EACH CORNER OF THE LOT.
LOCATION
1.
2.
3.
4.
5.
6. --THE HIGH POINT OF THE LOT.
7. --THE LOW POINT OF THE LOT.
8. --HEIGHT OF GARAGE FLOOR.
9. --HEIGHT OF HOUSE MAIN FLOOR.
10. --HEIGHT OF ROOF ABOVE FOUNDATION.
( MAXIMUM-- 35 FEET )
1 1. --HEIGHT OF ROOF ABOVE CENTER
OF THE MID CURB.
( MAXIMUM--- 29 FEET )
ELEVATION ( FEET )
12: -DRAINAGE FLOW LINES THE PLOT PLAN.
13. --ROOF PITCHES: ------1 1 2-
2. 2.
3.
15. -SQUARE FEET OF LIVING SPACE.
MO .
08/04/4003 21:36 9702438407 SUDAN E PACE 07
Failure to pay fines levied as determined at the Hearing may also result in a Lien being placed on you:
Property or litigation Process initiated by the BMSA Board of Directors to secure conformance with thi
full Application and its respective Conditions Of Approval
I/We understand that Architectural Committee approval does not constitute approval of the local building
department, drainage design or structural soundness, nor does it constitute assurance that the plat
comply with ail applicable codes, regulations, ordinances and laws-
I/We further acknowledge that any subsequent field changes which I/We may desire to the Hem
Construction or Improvement Projects of this original Application Submittal and the original Condition:
of Approval issued by the BMSA/AC will require an additional Revised Application Submittal on our
behalf, and that I/We will not proceed with any subsequent field changes until a Revised Conditions of
Approval have been issued to us by the BMSA/AC.
Owner's Signature(s): /4v"G
Owner'sPrintedNames:—�� , Date:
Date:
Builder's Signature:
Builders Printed N ame:
Date:
Page 5 of 6
I
This portion of the Application Form is to be completed by the
Architectural Committee (not the Applicant).
CONDITIONS OF APPROVAL or DISAPPROVAL
1. No sitework or building construction may proceed on any Lot (including no preliminary site clearing,
grubbing, grade alteration, storing of material, foundation excavation, extension of underground utilities,
etc.) until the Project has received a Project approval from the Architectural Committee and has been
issued a Building Permit (as required by Garfield County for new home or Renovation projects).
2. All general building and site improvements construction for any Project shall be completed and shall have
issued a Certificate of Occupancy from the Garfield County Building Department no later than one (12
year after the issuance date of this Architectural Committee Approval.
3. The complete landscaping and revegetation of the improved Lot, to specifically include the front side and
rear yard areas, shall be completed no later than six (6) months from the date of the Certificate of
Occupancy.
4. If the selection of colors and /or landscaping plans are not included with this application they must be
submitted for approval before any action is taken to install the missing items.
5.
6.
7.
Application Approval(IRif a� 1 of Architectural Committee Members):
By:
Application App ed for,onstruction su ect to the above conditions:
By Chairman:
Application Denied (Initials of Architectural Committee Members):
By:
Date:
Application Denied for reason(s) stated above:
By Chairman: Date:
Page 6 of 6
•
Lower Valley Engineering end Consulting, lac.
K5 Moor Plume Drive Fruits, Colorado '1521
Ph. (979) ssntoo. Pas(970) 5504525
# 9551
David Mead
Garfield County Building Department
Fax: 970-384-3470
10-17-05
RE: Grace Homes Valley View Battlement Mesa, Single Family Residence at 0276 Cliff
View Circle.
Building Department:
I have been retained by Grace Homes to provide engineering services for the
above referenced project. I have supervised inspection of the foundations and walls prior
to concrete placement to ensure conformance with the drawings that I prepared and were
submitted for permit.
The foundations are structurally adequate to satisfy the building codes currently
adopted by Garfield County.
Please contact me if there are any questions concerning this project.
Signed,
Darren R. Adams, P. E.
Sep 12 05 04:36p Battlement Mesa Metro Dis 9702859631
BATTLEMENT MESA METROPOLITAN DISTRICT
109 TAMARISK TRAIL / P.O. BOX 6116 / BATTLEMENT MESA, CO 81636
(970) 285-9050 / FAX (970) 285-9631
FACSIMILE TRANSMISSION
Date: 09/02/05
TO: Andy Schwaller
COMPANY: Garfield County Building & Planning
FAX NUMBER: 384-3470
FROM: Arnie Arneson
FAX NUMBER: 970-285-9631
p. 1
MESSAGE
All tap fees have been paid and Water & Sewer Service is
approved for
276 Cliff View Circle. re
Thanks, Arnie
TOTAL NUMBER OF PAGES: 1
CONFIDENTIALITY NOTICE:
This fax communication is intended only for the above-named recipient. If you have received
this transmission in error, please call (970)285-9050 as soon as possible. It is unlawful to
disclose, in any manner, such confidential information to anyone other than the person to whom
it is directed.
, COUNTY OF GARFIELD - BUILDING DEPARTMENT
CORRECTION N TICE
108 8th St., Suite 201 Glenwood Springs, Colorado
Phone (970) 945-8212
Job located at 0? 7C0 Si Com.
n
Permit No. '7 5 8 7
I have this day inspected this structure and these
premises and found the following corrections needed:
/ x-52 u f-
44-11
idAticor7 Lv tAijz?02-v--
53
You are hereby notified that the above correction must be inspected
before covering.
When correction(s) have been made, call for, pection at 970-384-5003.
Date 0
Building Inspector P_ !-/.ef
Phone (970) 945-8212
2
TLC
z
(continue on back)
FINAL CHECKLIST
•§
•
aE
Exhaust fan
8
U
k
■
!i||
-
g)u.L!
I
=BUILDING PERMIT
GARFIELD COUNTY, COLORADO
Date Issued ..417-0 ..Zoned Area......»............».»..»..Permit No». fl......»»
AGREEMENT
In consideration of the issuance of this permit, the applicant hereby agrees to comply with all
laws and regulations related to the , ' , location; construction and erection of the proposed
structure for which this permit is I I and further agrees that if the above said regulations
are not fully complied with in the zoning, location, erection and construction of the above
described structure, the permit may then be revoked by notice from the County Building
Inspector and IMMEDIATELY BECOME NULL AND VOID.
•
Use W P Lay Girfrl.�/1� *pctotas
Address or Legal Desaip i V firie f`i it Pmatt
Owner !at Pisan Condor
Q
Setbacks Front Side Side Rear
This Card Must Be Posted So It is Plainly Visible From The Street Until Final Inspection.
INSPECTION RECORD
Footing Driveway
Foundation t0I %ISS
Underground Plumbing y_Z(, -mi t_
Insulation /O -5:- 05'4-5
Rough Plumbing iq 2? "is''',_
DrYwall /O - to -OS /Om
Chimney & Vent Qj, 22 . tank
Electric Final (by State Inspector) ✓
Gas Piping 9-22 -05 egni
Final // 2-7-052 44
Electric Rough (By State Inspector) ✓
Septic Fillid A/4 -
Framing /0 -"-Sr—O.559-5
(To include Roof in place and Windows
and Doors installed).
Notes:
ALL LISTED ITEMS MUST BE INSPECTED AND APPROVED BEFORE COVERING -
WHETHER INTERIOR OR EXTERIOR, UNDERGROUND OR ABOVE GROUND.
THIS PERMIT IS NOT TRANSFERABLE
For Inspections Call 384-5003 108 8th Street Glenwood Springs, Colorado
APPROVEDDO NOT DESTROY THIS CARD
Dalt tekeBY