Loading...
HomeMy WebLinkAboutApplication-Permit• k `Garfield County Building & Sanitation Department 108 81* Street, Suite #201 Glenwood Springs, Co. 81601 Office- 945-8212 Inspection Line- 384-5003 Job Address a-, co fl i I I -r \/ f e uD C' re - c Nature of Work BuildingLN-1 Permit LI --Pil 1111(.1,9 e C Use of Building `)/-tdi" Ls)/ a' id-. 00A 3e + ()pin J pat? Owner f a cQ._. AN/n.2 B Contractor C t.f>r\ f2 Amount of Permit $ / 53G. y 7 Date a - / - o S c9c/67_ al -cg 603 Clerk r f s 4 Permit No: GARFIELD COUNTY BUILDING PERMIT APPLICATION 108 e'• Street, Salta 201, Glenwoed Syringe, CO 81601 Prone: 970.9454212 / Fax: 970-384-3470 / Inspect:os Lint: 970-3846003 Job Address: O27 Uew GI✓tit Parcel/Schedule No: 2!t 0 lig (O1}c0 PQr0, Sib 3S 1 Lot No: Block No: pi sum. / � n , & l / / J _ 6 c I-14 u 13 MVV/� UW IPhh:: _7 2 �/7 Owner e I IJO,.. S L G. -/ ti s i4t Ilett c4 . CS . J ho k 3 ConVactoOC.CQ HU..es I l Address: 7'J (Hliey ! 4 �+(' 1' Ph: 5 13 S -S1 S J C - Lic.20 G 3�I 4 Architect/pi-Writer: tliLgt Cow«F FK5. / Ad re1ss: /t..I.4 i Sy,,..5s Ph: r, gg oc133 LIC. No. 5 Sq. Ft. of Badding: I ! ` V Sq. Ftl orLot: 4C ,y., I t{ "I 7 t�" Height: No. of Floors: 6 Use of Building: �e' Wry -,e �W War►i[�74 4- aile.441,40 rata, 7 Describe Work: Uu A%„ Font 8 Class of Work: it,' New ❑ Alteration o Remove 0 Addition ❑ Move 9 10 Garage: ❑ Single ❑ `0 Double Carport: ❑ Single ❑ Double o Driveway Permit ❑ On -Site Sewage Disposal ❑ Site Plan II Valuation of Work: $ Adjusted Valuations: S124, 364 343 12 Special Conditions: viejukttyptv 4 ) • _ -/J taut? iak. NOT7 E A SEPARATE ELECTRICAL PERMIT IS REQUIRED AND MUST BE ISSUED BY THE STATE OF COLORADO. ISSLO THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCT/ON AUTHORMED IS NOT COMMENCED WITH N 180 DAYS, OR, IF CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 180 DAYS AT ANY TIME AFTER WORK IS COMMENCED. I HEREBY CERTIFY THAT I RAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE AND CORRECT ALL PROVISIONS OF LAWS GOVERNING THIS TYPE OF WORK WILL BE COMPLETED WITHIN WHETHER SPECIFIED HEREIN OR NOT. THE GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING CONSTRUCTION OR THE PERFORMANCE QF_CONSTf , ON. ,s1 t'4 /[j o It. -(1;„eIe„} 641/45 Plan Check Fee: 1� 7 A) I . 2Z Permit Fee: I ) 9 l / 44 ' / Total Fee: �� T L'j,.W / ]gyp/ /7 30 /-jv 47 Dated Permit Issued: C " " • OCC Group:n� Const. Type: --..1-:'NCI.._ Zoning: Setbacks: Manu Home: (V��PgC•�^- —002.44.. ISDSS No.& Fee: L ..,r I�.0, • •ER ^ ATE /1'] �T'/ BLIGr PT. PING. DEPT /yri • -,. AL/DATE APPROVAL/D W7 AGREEMENT PERMISSION IS HEREBY GRANTED TO THE APPLICANT AS OWNER, CONTRACTOR AND/OR THE AGENT OF THE CONTRACTOR OR OWNER TO CONSTRUCT THE STRUCTURE AS DETAILED ON PLANS AND SPECIFICATIONS SUBMITTED TO AND REVIEWED BY THE BUILDING DEPARTMENT. IN CONSIDERATION OF THE ISSSUANCE OF THIS PERMIT, THE SIGNER HEREBY AGREES TO COMPLY WITH ALL BUILDING CODES AND LAND USE REGULATIONS ADOPTED BY CANFIELD COUNTY PURSUANT TO AUTHORTIY GIVEN LN 30.28.201 CRS AS AMENDED. THE SIGNER FURTHER AGREES THAT IF THE ABOVE SAID ORDINANCES ARE NOT FULLY COMPILED WITH IN THE LCOATION, ERECTION, CONSTRUCTION, AND USE OF THE ABOVE DESCRIBED STRUCTURE, THE PERMIT MAY BE REVOKED BY NOTICE FROM THE COUNTY AND THAT THEN AND THERE IT SHALL BECOME NULL AND VOID. THE ISSUANCE OF A PERMT BASED UPON PLANS, SPECIFICATIONS AND OTHER DATA SHALL NOT PREVENT THE BUILDING OFFICIAL FROM THEREAFTER REQUIRING THE CORRECTION OF ERRORS IN SAID PLANS, SPECIFICATIONS AND OTHER DATA OR FROM PREVENTING BUILDING OPERATION BEING CARRIED ON THEREUNDER WHEN IN VIOLATION OF THS CODE OR ANY OTHER ORDINANCE OR REGULATION OF THIS JURISDICTION. THE REVIEW OF SUBMITTED PLANS AND SPECIFICATIONS AND INSPECTIONS CONDUCTED THEREAFTER DOES NOT CONSTITUTE AN ACCEPTANCE OF ANY RESPONSIBILITIES OR UABUTIES BY GARFIELD COUNTY FOR ERRORS, OMISSIONS OR DISCREPENCIES. THE RESPONSIBILITY FOR THESE ITEMS AND IMPLEMENTATION DURING CONSTRUCTION RESTS SPECIFICIALLY WITH THE ARTICTECT, DESIGNER. BUILDER. AND OWNER. COMMENTS ARE INTENDED TO BE CONSERVATIVE AND IN SUPPORT OF THE OWNERS LNTEREST. I n Garfom.003 I HEREBY ACKNOWLEDGE THAT I HAVE REAP AND UNDERSTAND THE AGREEMENT ABOVE (INITIAL): rI I $IoS CO -I4 %a-8' fQ f C t The following items are required by Garfield County for a final inspection: 1. A final Electrical Inspection from the Colorado State Electrical Inspector; 2. Permanent address assigned by Garfield County Building Department posted where readily visible from access road; 3. A finished roof, a lockable house, complete exterior siding, exterior doors and windows installed, a complete kitchen with cabinets, a sink with hot & cold running water, non-absorbent kitchen floor coverings, counter tops and finished walls, ready for stove and refrigerator, all necessary plumbing; 4. All bathrooms must be complete, with washbowl, tub or shower, toilet stool, hot and cold running water, non-absorbent floors and walls finished and a privacy door; 5. All steps outside or inside over three (3) steps must have handrails, guard rails on balconies or decks over 30" high constructed to all IBC and IRC requirements; 6. Outside grading done to where water will detour away from the building; 7. Exceptions to the outside steps, decks and grading may be made upon the demonstration of extenuating circumstances, i.e. weather, but a Certificate of Occupancy will not be issued until all the required items are completed and a final inspection made; 8. A final inspection sign off by the Garfield County Road & Bridge Department for driveway installation, where applicable; as well as any final sign off by the Fire District, anchor State Agencies where applicable. A CERTIFICATE OF OCCUPANCY WILL NOT BE ISSUED UNTIL ALL THE ABOVE ITEMS HAVE BEEN COMPLETED. ****CANNOT OCCUPY OR USE DWELLING UNTIL A CERTIFICATE OF OCCUPANCY (C.O.) IS ISSUED. OCCUPANCY OR USE OF DWELLING WITHOUT A C.O. WILL BE CONSIDERED AN ILLEGAL OCCUPANCY AND MAY BE GROUNDS FOR VACATING PREMISES UNTIL ABOVE CONDITIONS ARE MET. I understand and agree to abide by the above conditions for occupancy,ytse and the issuance of a Certificate of Occupancy for the dwelling under building permit # % 5- ic& Signature BpcontOct2004 «/15/05 Date 3 4 VALUATION/FEE DETERMINATION Applicant Address C2'7(p C � �Ff (kJ Circ(... Date 7 -2A -06 - Finished -2A-o' Finished (Livable Area): Main Upper Lower Other Total Square Feet Valuation Subdivision (moi ' P'441R 6 Lot/Block 3 Contractor / SQ) sf 74) 18 = I I (p, sto 8o Basement: Unfinished Conversion of Unfinished to Finished Plan Check Fee for Conversion Valuation Garage: Crawl Space: Valuation 452f / Valuation Decks/Patios: Covered Valuation Open Valuation /44 w la = 1723 Fri Total Valuation 124,, 3‘4 go GARFIELD COUNTY BUILDING AND PLANNING 970-945-8212 MINIMUM APPLICATION REQUIREMENTS For SINGLE FAMILY DWELLING CONSTRUCTION Including NEW CONSTRUCTION ADDITIONS ALTERATIONS And MOVED BUILDINGS In order to understand the scope of the work intended under a permit application and expedite the issuance of a permit it is important that complete information be provided. When reviewing a plan and it's discovered that required information has not been provided by the applicant, this will result in the delay of the permit issuance and in proceeding with building construction. The owner or contractor shall be required to provide this information before the plan review can proceed. Other plans that are in line for review may be given attention before the new information may be reviewed after it has been provided to the Building Department. Please review this document to determine if you have enough information to design your project and provide adequate information to facilitate a plan review. Also, please consider using a design professional for assistance in your design and a construction professional for construction of your project. Any project with more than ten (10) occupants requires the plans to be sealed by a Colorado Registered Design Professional. To provide for a more understandable plan in order to determine compliance with the building, plumbing and mechanical codes, applicants are requested to review the following checklist prior to and during design. Applicants are required to indicate appropriately and to submit the completed checklist at time of application for a permit. Plans to be included for a Building Permit, must be on drafting paper at least 18"x24" and drawn to scale. I - Plans must include a floor plan, a concrete footing and foundation plan, elevations all sides with decks, balcony, steps, hand rails and guard rails, windows and doors, including the finish grade line and original grade. A section showing in detail, from the bottom of the footing to the top of the roof, including re -bar, anchor bolts, pressure treated plates, floor joists, wall studs and spacing, insulation, sheeting, house -rap, (which is required), siding or any approved building material. Engineered foundations may be required. A window schedule. A door schedule. A floor framing plan, a roof framing plan, roof must be designed to withstand a 40 pound per square foot up to 7,000 feet in elevation, a 90 M.P.H. wind speed, wind exposure B or C, and a 36 inch frost depth. All sheets to be identified by number and indexed. All of the above requirements must be met or your plans will be returned. All plans submitted must be incompliance with the 2003 IRC. 1. Is a site plan included that identifies the location of the proposed structure or addition and distances to the property lines from each corner of the proposed structure(s) prepared by a licensed surveyor and has the surveyors signature and professional stamp on the drawing? Properties with slopes of 30% or greater must be shown on the site plan. (NOTE Section: 106.2) Any site plan for the placement of any portion of a structure within 50 ft. of a property line and not within a previously surveyed building envelope on a subdivision final plat shall be prepared by a licensed surveyor and have the surveyor's signature and professional stamp on the drawing. Any structure to be built within a building envelope of a lot shown on a recorded subdivision plat shall include a copy of the building envelope as it is shown on the final plat with the proposed structure located within the envelope. Yes 2 2. Does the site plan also include any other buildings on the property, setback easements and utility easements? Please refer to Section 5.05.03 in the Garfield County Zoning Resolution if the property you are applying for a building permit on is located on a corner lot. Special setbac do apply. Yes 3. Does the site plan include when applicable the location of the I.S.D.S. (Individual Sewage Disposal System) and the distances to the property lines, wells (on subject property and adjacent properties), streams or water courses? Yes_ 2 4. Does the site plan indicate the location and direction of the County or private road accessing the prop'? Yes J� 5. Do the plans include a foundation plan indicating the size, location and spacing of all reinforcing steel in accordance with the IRC or per stamped engineered design? Yes 6. Do the plans indicate the location and size of ventilation openings for under floor crawl spaces aqd the clearances required between wood and earth? Yes 7. Do the plans indicate the size and location of ventilation openings for the attic, roof joist spaces 'soffits? Yes p 8. Do the plans include design loads as required by Garfield County for roof snow loads, (a minimum of 40 pounds per square foot up to & including 7,000 feet above sea level), floor loads and)wind loads? Yes r 9. Does the plan include a building section drawing indicating foundation, wall, floor, and roof construction? 10. Does the building section drawing include size and spacing of floor joists, wall studs, ceiling joists, roof rafters or joists or trusses? Yes 11. Does the building section drawing or other detail include the method of positive connection of all columns and beams? Yes \O 12. Does the elevation plan indicate the height of the building or proposed addition from the undisturbed grade to the midpoint between the ridge and cave of a gable or shed roof or the top of a flat roof? (Building height measurement usually not to exceed 25 feet) Yes 13. Does the plan include any stove or zero clearance fireplace planned for installation including make andel and Colorado Phase II certifications or phase II EPA certification? Yes No 3 14. Does the plan include a masonry fireplace including a fireplace section indicating design to comply with the IRC? Yes No 15. Does the plan include a window schedule or other verification that egress/rescue windows from sl g rooms and/or basements comply with the requirements of the IRC? Yes_ No 16. Does the plan include a window schedule or other verification that windows provide natural light and ventilation for all habitable rooms? Yes No 17. Do the plans indicate the location of glazing subject to human impact such as glass doors, glazing immediately adjacent to such doors; glazing adjacent to any surface normally used as a walking surface; sliding glass doors; fixed glass panels; shower doors and tub enclosures and spe ' safety glazing for these areas? Yes No 18. Is the location of all natural and liquid petroleum gas furnaces, boilers and water heaters indicated on the plan? Yes No 19. Do you understand that if you are building on a parcel of land created by the exemption process or the subdivision process, are building plans in compliance with all plat notes and/or covenants? Yes %0 No 20. Do you understand that if you belong to a homeowners association, it is your responsibility to obtain written permission from the association, if required by that association, prior to submitting an application for a building permit? The building permit application will not be accept thout it. Yes No 21. Will this e the only residential structure on the parcel? Yes No If no -Explain: 22. Have two,Q) complete sets of construction drawings been submitted with the application? Yes 23. Do you understand that the minimum dimension a home can be on a lot is 20ft.wide and 20ft. long? Yes No 4 24. Have you designed or had this plan designed while considering building and other construe ion code requirements? Yes_ No 25. Do your plans comply with all zoning rules and regulations in the County related to your properties z n_e district? Yes l" No 26. Does the plan accurately indicate what you intend to construct and what will receive a final inspectioT�b_y the Garfield County Building Department? Yes iCJ No 27. Do you understand that approval for design and/or construction changes are required prior to the applioat'on of these changes? Yes No 28. Do you understand that the Building Department will collect a "Plan Review" fee from you at the time of application submittal and that you will be required to pay the "Permit Fee" as well as any "Road Impact" or "Septic System" fees required, at the time you pick up your buildin permit? Yes No 29. Are you aware that you must call in for an inspection by 3:30 the business day before the requested inspection in order to receive it the following business day? Inspections will be made from 7:30 a.m. to 3:30 p.m. Monday through Friday. Inspections are to be called in to 384-5003. Yes 50 No 30. Are you aware that requesting inspections on work that is not ready or not accessible will result in $ 0.00 re -inspection fee? Yes No 31. Are you aware that you are required to call for all inspections required under the IRC including approval on a final inspection prior to receiving a Certificate of Occupancy and occupanof the building? Yes No 32. Are you aware that the Permit Application must be signed by the Owner or a written authority being given for an Agent and that the party responsible for the project must comply with the IRC? Yes No 5 33. Are you aware that prior to submittal of a building permit application you are required to show proof of a driveway access permit or obtain a statement from the Garfield County Road & Bridge Department stating one is not necessary? You can contact the Road & Bridge Department at 625-8601. Yes )2 No 34. Do you understand that you will be required to hire a State of Colorado Licensed Electrician and Plumber to perform installations and hookups, unless you as the homeowner are performing the work? The license number of the person performing the work will be required at time of applicable inspection. Yes 20 No 35. Are you aware, that on the front of the Building Permit Application you will need to fill in the Parcel/Schedule Number for the lot you are applying for this permit on prior to submittal of a building rmit application? Your attention in this is appreciated. Yes No 36. Do you know that the local flt3listrict may require you to submit plans for their review of fire safety issues? Yes No (please check with the building department about this requirement) 37. Do you understand that if you are planning on doing any excavating or grading to the property prior to issuance of a building permit that you will be required to obtain a grading permit?‘ Yes I hereby acknowledge that I have read, understand and answered these questions to the best of my ability. Signature of Ow Phone: S23 55)-c Project Name: /' / f / (days); �//� VG��ty Vi[�„ HI N�4k.& (245105 Date (evenings) Project Address: Gz7 C ((4 U, C,44t Notes: If you have answered "No" on any of the questions, you may be required to provide this information at the request of the Building Official prior to beginning the plan review process. Delays in issuing the permit are to be expected. Work may not proceed without the issuance of a permit. If it is determined by the Building Official that additional information is necessary to review the application and plans to determine minimum compliance with the adopted codes, the application 6 may be placed behind more recent applications for building permits in the review process and not reviewed until required information has been provided and the application rotates again to first position for review, delay in issuance of the permit or delay in proceeding with construction. BpminreqFeb2005 7 Jun. 2. 2005— $:48PM—HIGH COUNTRY ENGINEERING OTE: J,. ALL DRAINAGE SHALL FLOW AWAY FROM THE 'BUILDING WITH A GRADE DROP OF 1 VERTIC5F IN 10 HORIZONTAL FEET. -� DRAINAGE ARROW No.0759 P. 4/4 T 2 12-1 s a'$ GRAVEL ROSEWOOD 1560 S.F. 0276 CUFF VIEW,. CIRCLE - FE ELEV:.5435.98 HIGH COUNTRY ENGINEERING, INC. t4lHV iN®OWKLAn,ITIE P110. UNCL,{IYOG .Oo 10111 Puma9YEYSY MONO uaa n 1s1)BLMRPHONE 110508711101r6L ax S COMM rwnmr— DARTER. LI C 6ARFIELD COUNTY. COLORADO VALLEY VIEW VILLAGE PHASE D LOT 3 SITE PLAN Fly'/JD7/1Oram, in aria /ierr Mr! • hr O L7 c cvc- FAYeh and Associates, Inc. Geotechnical Engineering Consultants 5700 E. Evans Avenue Denver. CO 80222 Tel : (303) 781-9590 Fax • (303)781-9583 0170 Mel Ray Road Glenwood Springs. CO 81601 Tel: (970) 3841500 Fax: (970) 3841501 June 1, 2005 Project No. 24-116 Mr. Dan Penny Grace Homes, Inc. 786 Valley Court Grand Junction, CO 81505 Subject: Test Pit Observations, Lots 1 — 7, 38 and 39, Battlement Mesa, Phase II, Garfield County, Colorado. Reference: HP Geotech, `Preliminary Geotechnical Study, Proposed Roan Cliff Village Development, Parcels 2-5 and 2-6, Battlement Mesa, Garfield County, Colorado", dated September 16, 2002. Dear Mr. Penny: As requested, a representative of Yeh and Associates, Inc. observed backhoe test pits at the subject site to investigate near surface conditions in order to provide recommendations for shallow foundation design and construction. The findings of our investigation and recommendations for construction of residences on the subject lots are presented in this letter. A preliminary geotechnical report was conducted by HP Geotech in 2002, as referenced above. Yeh and Associates, Inc. work was done in accordance with our agreement for geotechnical engineering services for Grace Homes, Inc. dated November 5, 2004. Based on conversations with the client, single-family residences are planned on these lots. We anticipate the foundations will consist of a concrete mat with thickened edges. Basements are not planned for these residences. The lots are rough graded and curb and gutter is installed. Streets were not paved at the time of our investigation. Based on site observations, the lots are near construction grade and fill placement should be negligible, if necessary. We observed excavation of test pits located on the property line between Lots 1 and 2, 3 and 4, 5 and 6, 7 and 8, and 38 and 39 as shown on Figure 1. The soils exposed in the test pits for Lots 1 - 6 consisted of sand and gravel to the maximum explored depth of approximately 6 feet. The sand and gravel had 12 to 24 percent fines (passing No. 200 sieve) with liquid limits ranging from 34 to 39 percent and plasticity indices of 13 to 18 percent. Soils encountered on Lots 7, 38 and 39 consisted of silt and clay to the maximum explored depth of 6 feet. A grain size analysis indicated that the silt and clay from these lots consisted of approximately 51 to 56 percent low to moderate plasticity silt and clay with liquid limits of 29 to 44 percent and plasticity indices of 11 to 17 percent. The sand and gravel classified as SC and GP -GC or GM and the silt and clay classified as ML and CL, respectively, based on the Unified Soil Classification System. Laboratory test results are presented on Figures 2 through 7. Groundwater was not encountered in the excavations and the soils were slightly moist to moist. Project No. 24-116 Based on our investigation, spread footings or a mat foundation constructed on the undisturbed natural soils can be designed for an allowable soil pressure of 1,500 psf for the above referenced Tots. Soils encountered on adjacent lots near anticipated foundation level exhibited compression during laboratory testing. Increases in moisture content due to irrigation or other sources could cause hydro -collapse of the subsoils resulting in foundation settlement. Care should be taken to provide drainage away from the residences. Recommendations for surface drainage are presented in the referenced report. Loose, disturbed soils encountered at foundation level should be removed and replaced with compacted fill or the foundation should be extended to undisturbed soils. Other design and construction recommendations presented in the above referenced geotechnical report should be followed. This study was conducted in accordance with generally accepted geotechnical engineering practices in this area at the time the investigation was performed for use by the client for design and construction purposes. The recommendations submitted in this letter are based on our observations of the subsoils encountered in the test pits and laboratory test results. This study is based on the assumption that soils at other portions of the lot are similar to the conditions encountered in the pits to the depths excavated. The risk of foundation movement may be greater than indicated in this report because of possible variations in the subsurface conditions. Expansive soils may occur on this site. If expansive clays are encountered in building areas, they may need to be removed or the footings designed with a minimum dead load pressure to reduce foundation and slab -on -grade movements. If the conditions encountered in foundation excavations vary from what is described in this report, we should be notified to re-evaluate our recommendations. We recommend on-site observation of excavations and foundation bearing strata by a representative of the geotechnical engineer. Please call if you have any questions. YEH AND ASSOCIATES, INC. y Jclp' ®D �tt`'s �•�tr 5 32 0 i Richard D. Johnson, P.E. Senior Geotechnical Engineer 2 of 2 • 9 J 9 5 9 5 n J Y v 2 fi Q Q 1 4 1 1 Y • 1 r 1 1 1 r 1 s44bGmmW ••••M N►ffl111Ml NOM a, C P N C CO CO CL i I I I g CO a O] CO 97 a CO fD CD 39 co N N 2" \ r a \ \g #10 #40 o ev # Hydrometer Analysis Size of Particles in mm 0 C • 07 U.S. Standard Sieves Sieve Opening in Inches 8 A 0 A 0 0 C•4 0 1 I 11 Ii 1i II i .. III IUIIII1-lµ 1I 11111111111 Y � 111■�11111■■NIIINIINN■11 III MINI U IIIIIiiMiIUNUNUUUII SEI MM nuu n IMO 1 N . 'I ........... n� ....n... nn... r ..u.nMME....n ....a1. .. ....M� n..7 .. - Ti ....0�0••. .. ...W Hi1 1111 r ,;n l 1 � III III 1111 1111 � i sA NNNI■�11 MIIII N t un• nn�n Innnnnnnlui .nmi..... n.nn...nn. - III III aamaIlnflhIIlI I eir 1 1 PRIM I1NiiIII .eiiilwi11 _ •nwi .n.n. nnollufUlUnin ..n ....n■ nn. ..._. n.0 no.... ..nn...I nnn...n.. ... ■ pi ill 1 LH, 4. „_. ' -:~ u ■4:, + -- , , , • _ _ _ :on.' , _ 1 T_r_a_ _i ,.__._,_ I ,_,_, 1 �-1 ' '1- - - } - - -1-1--i-ti- - -4_ t- 1+ , ' I }l I El + - L_. L 4_ S T m i Y 6u!ssed luaOJad M N 0 0 G E N Co 0 u t O. o 0 S U Co 43) Cu U C CA y 03 ste >NI SIEVE ANALYSIS CO N 0 z V a d z d 0) LL 0 a N COCC CC CO V C Y 000 Valley View Village Lots 1 and 2, Phase II C O) a E € U) CO N en r J -J J a a U, CD N a C CO 0, C ii clayey SAND (SC) C 0 c0. E w N. 0 Hydrometer Analysis Size of Particles in mm U.S. Standard Sieves Sieve Opening in Inches 0) C c N 0 a 68 I I1 it 50 _I 0) v 46 45 1 N v 0) o) 29 N Sieve Size c+1 ry 1r N I 2" ry r � � �I'+ W 111111 #10 #40 #200 8 St R 0 rrit A Iw m 0 rn m n 0 n a Bussed 111103Jad n 0 0 0 0 0 E C N CO C u t A D. SIEVE ANALYSIS S r- 14- a) - N d a` ci z 2 O) L 0 0 CC is ;.m m� C U 0 0 Valley View Village Lots 3 and 4, Phase II C n E m rn 14) 0) P7 N J J J a o a to O M N G) 0 0 COC c CO CO N C U- clayey GRAVEL (GP -GC) N a 0 I If 1 I1 it I � � �I'+ I I I 111111 0111 I I I 11111 11111M1 III , I • - r1 a IIuIHIuluIUuilimilIusyI H•NHuu •VuN••uum •ENE 1' Noo�ao Sao T ` ■ II I 1 1 / I • 1 • • JT: _ -- __ I i � _I I F MP• !1 • I • I I T; T • I. 114 t 1 IIS T m ME • L 1 • 11 I!I 1j {4 d • -- r _L , �, ' 1.. +t --++r+ _• - - __ _F -_ __,--1-4,+4+- 1 - ----. _ti -I____1_ 1 it -{ i-1 I �--i" r : I ' L 17 + i- -1-1,-2-1-t_ 1 7,:f 1 I 1 r- I -Hf ITT .il -7 i I l rt Tii �i I 0 rn m n 0 n a Bussed 111103Jad n 0 0 0 0 0 E C N CO C u t A D. SIEVE ANALYSIS S r- 14- a) - N d a` ci z 2 O) L 0 0 CC is ;.m m� C U 0 0 Valley View Village Lots 3 and 4, Phase II C n E m rn 14) 0) P7 N J J J a o a to O M N G) 0 0 COC c CO CO N C U- clayey GRAVEL (GP -GC) N a 0 • Hydrometer Analysis Size of Particles in mm U.S. Standard Sieves Sieve Opening in Inches Passing .Cr 49 48 47 45 44 30 14 Sieve Size h IV #200 0,1 C0 8 A M1 8 m m n m (0i v Bussed 4uaOJad 0 Cu O 0 0 0 0 S 0 O Particle Size (mm) SIEVE ANALYSIS w a 01 6 z U d a d z cu 0 0 It CC Valley View Village Lots 5 and 6, Phase II 0 N a coE m 10 N t co co p CD 01 N J J J a CO a 1 O 1 0 0 2 '0 c l0 co r ele 0 LL silty GRAVEL (GM) `0 CI a Q 'C E co c r. 0 j I' I I 1 �f • 1 I • -. 1--,r • II 1 •• •! ill I NM •• ill ' • II • L ' 4- l• 1-t- in 1 1 ■■■■ ■ - II,+- �I� I I It -4-I_ ' t1 I i — -irt -TT T + -__ - - i -i +- i-� -t - - T '� r4- 11 ,�- _ - r } - ii ' Mem o■■■o -t i, i1I I II 1.1 _- 8 m m n m (0i v Bussed 4uaOJad 0 Cu O 0 0 0 0 S 0 O Particle Size (mm) SIEVE ANALYSIS w a 01 6 z U d a d z cu 0 0 It CC Valley View Village Lots 5 and 6, Phase II 0 N a coE m 10 N t co co p CD 01 N J J J a CO a 1 O 1 0 0 2 '0 c l0 co r ele 0 LL silty GRAVEL (GM) `0 CI a Q 'C E co c r. 0 Hydrometer Analysis Size of Particles in mm U.S. Standard Sieves Sieve Opening in Inches Passing , 0) 94 88 76 56 Sieve Size N '- :co cD #40 #200 8 0 r -m 8 e Buissed lueaied N 0 0 O 0 0 0 0- Particle Size (mm) SIEVE ANALYSIS N o z 0 O1 O rE cc m co 32 00 Valley View Village E co O Lots 7 and 8, Phase II 0 •) 0. E l0 10 01 � d L co CO o z 1 N J -J J a 0 ID ID err C7 c c N 0) c ii sandy SILT (ML) X11 118. 1 111111111 ill I� �n • MEM 1E11111 nu • %no•n •uuinuu nn n•�nunomh•••nnn•un� .� e I= iii • • 11111 • 1111111111 It 11111111N rr :I - Ifs,T-L .. • i ' Ii Il• - !V }+ + -V Ir+, -I _L '-_ --- -- M`-- .-' 1h �- ---�-'— ---'� --- ------ - -- ---r---'11- -77- .- 1_,i __ 4.I L, — L_ ItT -. I , I L 4 1 . I 1 7 -1 I I fl �, • ; I 1, H_ { ' + 1---F •, f il I t N.. I I-ri • T I I I f - r -m 8 e Buissed lueaied N 0 0 O 0 0 0 0- Particle Size (mm) SIEVE ANALYSIS N o z 0 O1 O rE cc m co 32 00 Valley View Village E co O Lots 7 and 8, Phase II 0 •) 0. E l0 10 01 � d L co CO o z 1 N J -J J a 0 ID ID err C7 c c N 0) c ii sandy SILT (ML) Passing 1 1 I , 1 95 I V- 0) 87 83 75 i Sieve Size ih N 2" #10 #40 #200 Hydrometer Analysis Size of Particles in mm U.S. Standard Sieves Sieve Opening in Inches 8 8 9 R m 0 w 0 0 0 4*) 6u!ssed wowed CV 0 0 0 8 Particle Size (mm) SIEVE ANALYSIS klq S 4 CD ci Z U a` O z 91 0 rn a al 3 0 cc Valley View Village Project Name: Lots 38 and 39, Phase II d a n E u) p 0) N J J o N J a a 01 01 C% In silty CLAY (CL 0 o\-- e o o -o 1.0 o > • G N N f a. 0 c LL E 2 au 0 II �j I ! 1 1 I II;I I I ��" I 1 I II 4,,,. I • I • -j-' I I 1_2. l • -1r-moi— I • . r, - Ii • I I I ' y 4 it ' ' 1 • I I r 1-- ��T LIT - r Y 1-y yJ1 rT1 ' un ril tt . +i i 0 H— + i I -I-4'it � T ay 11;1! r 1; I I -HT • • ,--1; - rt+ I I I -rI 1. ien. I I }-T-T I I I r T I I I I I w 0 0 0 4*) 6u!ssed wowed CV 0 0 0 8 Particle Size (mm) SIEVE ANALYSIS klq S 4 CD ci Z U a` O z 91 0 rn a al 3 0 cc Valley View Village Project Name: Lots 38 and 39, Phase II d a n E u) p 0) N J J o N J a a 01 01 C% In silty CLAY (CL 0 o\-- e o o -o 1.0 o > • G N N f a. 0 c LL E 2 au 0 C C O '0 . I 1 r a)I I CD 0) co 0) 94 r 0) 77 N 10 CL Sieve Size 3" N 2" Si - _ m \ #10 #40 0 0 N \ r � \ a # Hydrometer Analysis Size of Particles in mm U.S. Standard Sieves Sieve Opening in Inches 8 m 0 • A 8 e n v Buissed WeOJed M 0 O O 0 8 Particle Size (mm) U C 11 CC I- U O Ca It N C O V on r: u C Cc A s U 0 O 0 OM SIEVE ANALYSIS co v N N- 0 z U O 0 z 7 m LL DO Er fr m U 00 Valley View Village Lots 38 and 39, Phase II 0 a) a E m U) In an u) CD J -J N J a a (O N N 2° 0 V C CO w.0 0 N C silty CLAY (CL) C O y a •c yE II III it r I 1 i, I 111 111111 n■■N■■,I ii + , ffff.!' I' fir' • I I1 'I I 11 I 11 ,, n 1 n 1• " �11NNIINII ' , Mille. tri ■•■■nn■■■■■■■ t ' * ■■■■■■ 11 ■■■■■■■■■■■■■ • •••••••■■■ ■ ■ ■■■■■■■■■■■■■■■■■ N■N■■■■■B MN In vr,�d w ■a■■iiiii • K•1111M111111 1101 iT I' •uuimn mmu 11111 1E111NINNI 1IN 11111 ■1■ n ■nnn■■■■■ r1■ OMEN ■ B■�■■8■ ■N■■ i NH ij.1 MEN t ' i4 -,4; -rl-' I l y— - I 1_H. _--11----- f , ifi� r - __ -- ? I 1I Y-- I' Iii MITI J H rHt 1_4 - F l T1 T 1 I I l 8 e n v Buissed WeOJed M 0 O O 0 8 Particle Size (mm) U C 11 CC I- U O Ca It N C O V on r: u C Cc A s U 0 O 0 OM SIEVE ANALYSIS co v N N- 0 z U O 0 z 7 m LL DO Er fr m U 00 Valley View Village Lots 38 and 39, Phase II 0 a) a E m U) In an u) CD J -J N J a a (O N N 2° 0 V C CO w.0 0 N C silty CLAY (CL) C O y a •c yE Summary of Labor Valley View Village C) E m z d 0 a CLASSIFICATION CO D GP -GC I AASHTO N < N < N Q m I.-. m < (15 < R -VALUE Unconf. Comp. Strength (psn 1--..J. o 71) y 0 yO O U 10 9 0 w v .1,1a' m A 3 = e CO 0ra. Atterberg Limits a CO � 01 N N 1 a N CO C N N � A 2 a v N N Grain Size Analysis II g C N en i! ' it v N N N * CL 4� 114 C o m CO CCO CO 35 42 IT) U� A Dry Density (pcf) Moisture Content (%) m N. N o a 18.7 9.8 Sample Location Sample Type Bulk Bulk Y J co _le 5 m Bulk Bulk Depth (ft) 3 N 06 .- 't .6 CO CD 05 in CO *6 N a) CO) 06 co 0 d a m a Liza REVIEW CHECKLIST ApplicantQt 4G(t Date /'Zg'i j Lor 3 Building XEngineered Foundation jj 4. Driveway Permit ✓ Saraeyed Site Plan AM -Septic Permit and Setbacks Grade/Topography 30% L/ Attach Residential Plan Review List ‘•/�Minimum Application Questionnaire ✓ Subdivision Plat Notes Al. Fire Department Review "'Valuation Determination/Fees Red Line Plans/Stamps/Sticker ✓ Attach Conditions Application Signed / cPla�n Reviewer To Sign Application — 'ParceUSchedule No. 40# Snpwload Letter- Manf. Hms. ll.) GENERAL NOTES: Planning/Zoning Property Line etbacks 30ft Stre. Setbacks Flood lain B ' ding Height ning Sign -off Road Impact Fees HOA/DRC Approval Grade/Topography 40% Planning Issues Sub) Plat Notes • COPY BATTLEMENT MESA SERVICE ASSOCIATION ARCHITECTURAL COMMITTEE APPLICATION & CHECKLIST (for New Home Construction projects) S Homeowner: Horne f4t' f ( M t 5 HomeMa�lingAddress: 78& (Li IIfy L`oartt- a/AN/d Toeve tie a, Co, 8/505 Home Phone: 9/0-0423--55'53' WorkPhone(ifdesired): 476 Z,'s'– 070 Project Address: 0176 C1;FF V,ew Lot: 3I Block: PIB Subdivision: (/c,li V; Vt, Production Home P]aanName(if appplicable): Rvu -vt'it Homebuilder: C.t 1 Atm, Business Mailing Address: 3Y ¢n7 a 41/25:1t Business Phone: 04nt Fax (if desired): 970 `SZ 3 - 0/0 3 Submittal Date: Estimated Start Date: Estimated Completion Date: SUBMITTAL REQUIREMENTS: Two Copies each of items 1, 2 & 4 need to be submitted. (Check -off items attached to the Application. Fill in spaces as indicated.) 1. Site Plan Drawing (1" = 10' or 1" = 20' scale) with the following information shown: Lot, Block & Subdivision name Street Address of Project. Building Setback Lines (also fill-in the shortest distance between property line to the exterior wall closest to that property line). Please be aware that all Building Setback Lines are taken from your Property Line Pins!! Your Property Line is NOT the Curb Line!! Dwelling Unit Garage 4"3 `'// / a Front Setback: Left Side Setback: /6— Right Side Setback: /T Rear Setback: L5-191 'it's" v/ Utility Easements. 55' Clear Site -Line at Intersection Corner Lots. Site Grading Elevations & Drainage. First (main) Floor Height in relation to top of street curb at front -center of lot. �– Driveways (including width of driveway), Walkways, Patios, etc. Outbuildings. Page 2 of 6 2. Architectural Drawings (1/4" = I' or 1/8" = 1' scale) with the following information shown. 1/ Floor Plan(s) with overall dimensions (fill-in the following square foot areas). First Floor Finished Living Area: 1 c6 0 square feet Second Floor Finished Living Area: square feet Lower Floor Finished Living Area: square feet Total Finished Living Area: 1 5-60 square feet Total Unfinished Living Area: square feet Garage Area: to'?" r 27' 'it." its 2 square feet Building Elevations Plans indicating doors, windows, exterior materials, building height, roof pitch, roof -mounted evaporative coolers, etc. (fill-in maximum height below). Maxiyum�, building height to highest ridge line or building structural projection id % feet above top of street curb at front -center of your lot. Engineered (stamped) Foundation Plan. t/ Outbuildings indicating dimensions, elevations and overall height to ridge line. 3., Exterior Materials (fill-in the selections below): I r./ Roofing Material: en r 0,1,-, 4, Color: 1 Q7�.�jn4.tp_,GA (/ l e/ Primary Siding Material:aAM4Atec,, QloeunColor: 1/ / Accent Siding Material: 1� l � �$ t r. Color: Ltikct Q. TrimMateriat !1 t ► . •� 1 1 ►�� ' olor: LX JL* 0 . / Masonry Material: Color: fj a Oka Stucco Materials: Color: 0 V Front Door Material: cJ 1 Color: 33 , `J Garage Door Material: s i $ Color: U IN ttQ, COLOR SAMPLE COLOR SAMPLE COLOR SAMPLE COLOR SAMPLE COLOR SAMPLE COLOR SAMPLE Page 3 of 6 • 7 4. Landscape/Irrigation Plans with the following information: Planting Plan (indicate areas of irrigated lawn, tree placement, shrub beds, ground cover, etc.). Plant Material listing by species of trees, shrubs and grasses. ✓ Groundcover Material with weed control bather. Fences. / ✓ Other Landscape Improvements (decks, site lighting, flag poles, etc.). U— 5. Variance Request (if applicable) Give details below: 6. Residential Construction Monetary Deposit: I/We hereby acknowledge and understand that our failure to complete Home Construction, Improvement Projects or Landscaping Construction within the time constraints noted in Conditions 2. & 3. On Page 6 of this Application will result in a Notice and Opportunity for a Hearing before the BMSA Board of Directors. If I/We are found in violation of these Conditions at the Hearing it will result in a fine to the Owner of not less than $500.00 per month for each full month in excess of the allotted completion time frame. I/We hereby acknowledge that Home Construction or Improvement Projects or Landscape Construction features which are built in non-conformance with this full application, including the Conditions of Approval noted on Page 6 of 6 herein, I/We will be cited by the BMSA/AC in written citation form at the time of discovery. In extenuating circumstances a Variance may be requested from the BMSA/AC, provided such Variance request item is within the purview and approval jurisdiction of the BMSA/AC. If a Variance is not granted by the BMSA/AC and if the Non -Conforming Items are not corrected within 60 days after the date of written citation, I/We will be served Notice of a Hearing before the BMSA Board of Directors, and if UWe are found in violation of these Non -Conforming Items at the Hearing I/We will be fined a minimum of $500.00 per Non -Conforming Item. Notwithstanding the foregoing, I/We acknowledge that the BMSA Board of Directors and/or Architectural Committee may pursue any legal remedy available in the event of a non-compliance. Page 4 of 6 AS PER THE ARCHITECTURAL STANDARDS,PLEASE INDICATE THE FOLLOWING POINTS ON THE PLOT PLAN AND BELOW: ELEVATIONS AT EACH CORNER OF THE LOT. LOCATION 1. 2. 3. 4. 5. 6. --THE HIGH POINT OF THE LOT. 7. --THE LOW POINT OF THE LOT. 8. --HEIGHT OF GARAGE FLOOR. 9. --HEIGHT OF HOUSE MAIN FLOOR. 10. --HEIGHT OF ROOF ABOVE FOUNDATION. ( MAXIMUM-- 35 FEET ) 1 1. --HEIGHT OF ROOF ABOVE CENTER OF THE MID CURB. ( MAXIMUM--- 29 FEET ) ELEVATION ( FEET ) 12: -DRAINAGE FLOW LINES THE PLOT PLAN. 13. --ROOF PITCHES: ------1 1 2- 2. 2. 3. 15. -SQUARE FEET OF LIVING SPACE. MO . 08/04/4003 21:36 9702438407 SUDAN E PACE 07 Failure to pay fines levied as determined at the Hearing may also result in a Lien being placed on you: Property or litigation Process initiated by the BMSA Board of Directors to secure conformance with thi full Application and its respective Conditions Of Approval I/We understand that Architectural Committee approval does not constitute approval of the local building department, drainage design or structural soundness, nor does it constitute assurance that the plat comply with ail applicable codes, regulations, ordinances and laws- I/We further acknowledge that any subsequent field changes which I/We may desire to the Hem Construction or Improvement Projects of this original Application Submittal and the original Condition: of Approval issued by the BMSA/AC will require an additional Revised Application Submittal on our behalf, and that I/We will not proceed with any subsequent field changes until a Revised Conditions of Approval have been issued to us by the BMSA/AC. Owner's Signature(s): /4v"G Owner'sPrintedNames:—�� , Date: Date: Builder's Signature: Builders Printed N ame: Date: Page 5 of 6 I This portion of the Application Form is to be completed by the Architectural Committee (not the Applicant). CONDITIONS OF APPROVAL or DISAPPROVAL 1. No sitework or building construction may proceed on any Lot (including no preliminary site clearing, grubbing, grade alteration, storing of material, foundation excavation, extension of underground utilities, etc.) until the Project has received a Project approval from the Architectural Committee and has been issued a Building Permit (as required by Garfield County for new home or Renovation projects). 2. All general building and site improvements construction for any Project shall be completed and shall have issued a Certificate of Occupancy from the Garfield County Building Department no later than one (12 year after the issuance date of this Architectural Committee Approval. 3. The complete landscaping and revegetation of the improved Lot, to specifically include the front side and rear yard areas, shall be completed no later than six (6) months from the date of the Certificate of Occupancy. 4. If the selection of colors and /or landscaping plans are not included with this application they must be submitted for approval before any action is taken to install the missing items. 5. 6. 7. Application Approval(IRif a� 1 of Architectural Committee Members): By: Application App ed for,onstruction su ect to the above conditions: By Chairman: Application Denied (Initials of Architectural Committee Members): By: Date: Application Denied for reason(s) stated above: By Chairman: Date: Page 6 of 6 • Lower Valley Engineering end Consulting, lac. K5 Moor Plume Drive Fruits, Colorado '1521 Ph. (979) ssntoo. Pas(970) 5504525 # 9551 David Mead Garfield County Building Department Fax: 970-384-3470 10-17-05 RE: Grace Homes Valley View Battlement Mesa, Single Family Residence at 0276 Cliff View Circle. Building Department: I have been retained by Grace Homes to provide engineering services for the above referenced project. I have supervised inspection of the foundations and walls prior to concrete placement to ensure conformance with the drawings that I prepared and were submitted for permit. The foundations are structurally adequate to satisfy the building codes currently adopted by Garfield County. Please contact me if there are any questions concerning this project. Signed, Darren R. Adams, P. E. Sep 12 05 04:36p Battlement Mesa Metro Dis 9702859631 BATTLEMENT MESA METROPOLITAN DISTRICT 109 TAMARISK TRAIL / P.O. BOX 6116 / BATTLEMENT MESA, CO 81636 (970) 285-9050 / FAX (970) 285-9631 FACSIMILE TRANSMISSION Date: 09/02/05 TO: Andy Schwaller COMPANY: Garfield County Building & Planning FAX NUMBER: 384-3470 FROM: Arnie Arneson FAX NUMBER: 970-285-9631 p. 1 MESSAGE All tap fees have been paid and Water & Sewer Service is approved for 276 Cliff View Circle. re Thanks, Arnie TOTAL NUMBER OF PAGES: 1 CONFIDENTIALITY NOTICE: This fax communication is intended only for the above-named recipient. If you have received this transmission in error, please call (970)285-9050 as soon as possible. It is unlawful to disclose, in any manner, such confidential information to anyone other than the person to whom it is directed. , COUNTY OF GARFIELD - BUILDING DEPARTMENT CORRECTION N TICE 108 8th St., Suite 201 Glenwood Springs, Colorado Phone (970) 945-8212 Job located at 0? 7C0 Si Com. n Permit No. '7 5 8 7 I have this day inspected this structure and these premises and found the following corrections needed: / x-52 u f- 44-11 idAticor7 Lv tAijz?02-v-- 53 You are hereby notified that the above correction must be inspected before covering. When correction(s) have been made, call for, pection at 970-384-5003. Date 0 Building Inspector P_ !-/.ef Phone (970) 945-8212 2 TLC z (continue on back) FINAL CHECKLIST •§ • aE Exhaust fan 8 U k ■ !i|| - g)u.L! I =BUILDING PERMIT GARFIELD COUNTY, COLORADO Date Issued ..417-0 ..Zoned Area......»............».»..»..Permit No». fl......»» AGREEMENT In consideration of the issuance of this permit, the applicant hereby agrees to comply with all laws and regulations related to the , ' , location; construction and erection of the proposed structure for which this permit is I I and further agrees that if the above said regulations are not fully complied with in the zoning, location, erection and construction of the above described structure, the permit may then be revoked by notice from the County Building Inspector and IMMEDIATELY BECOME NULL AND VOID. • Use W P Lay Girfrl.�/1� *pctotas Address or Legal Desaip i V firie f`i it Pmatt Owner !at Pisan Condor Q Setbacks Front Side Side Rear This Card Must Be Posted So It is Plainly Visible From The Street Until Final Inspection. INSPECTION RECORD Footing Driveway Foundation t0I %ISS Underground Plumbing y_Z(, -mi t_ Insulation /O -5:- 05'4-5 Rough Plumbing iq 2? "is''',_ DrYwall /O - to -OS /Om Chimney & Vent Qj, 22 . tank Electric Final (by State Inspector) ✓ Gas Piping 9-22 -05 egni Final // 2-7-052 44 Electric Rough (By State Inspector) ✓ Septic Fillid A/4 - Framing /0 -"-Sr—O.559-5 (To include Roof in place and Windows and Doors installed). Notes: ALL LISTED ITEMS MUST BE INSPECTED AND APPROVED BEFORE COVERING - WHETHER INTERIOR OR EXTERIOR, UNDERGROUND OR ABOVE GROUND. THIS PERMIT IS NOT TRANSFERABLE For Inspections Call 384-5003 108 8th Street Glenwood Springs, Colorado APPROVEDDO NOT DESTROY THIS CARD Dalt tekeBY IF PLACED OUTSIDE - "COVER WITH CLEAR PLASTIC