HomeMy WebLinkAboutApplicationGarfield County
Community Development Department
108 8th Street, Suite 401
Glenwood Springs, CO 81601
(970) 945-8212
www.garfield-county.com
BUILDING PERMIT
APPLICATION
TYPE OF CONSTRUCTION
_❑ Commercial/Multi-Family
❑ Residential (SF, Duplex, or Townhome)
0 Manufactured Home (SF or Duplex) 0 Grading
O Demolition
O Reroof
INVOLVED PARTIES
Property Owner:+
Mailing Address: 15 3.3 4; A L , `-.a..nR
Contractor:
Mailing Address:
Architect:
W 1 a t4
z39L\ Rey
6-0
Phone: (S3I ) 4.51 Da Ile
.cz�•• e1 c.liy , e k 31 .2-q
Phone: (ql O )
2,20, a- , 1“6-'65
Phone:(
Mailing Address:
Engineer: Phone: ( )
Mailing Address:
Manufactured Home installer: C F vr\ .Zns \41—Loon xq 7., Phone: ((17 ) .2.61-16 3 2 -
Mailing
Mailing Address: (.q ` -'0 K\ A .. 'fir, (3.oSe l r0 . Ss 01 o 1
PROJECT NAME AND LOCATION
Describe Work: pic,�+h� Q sr‘e1i21"_
Job Address: ?
ar ce
Assessor's Parcel Number: 2' y7oqiot.oS __ Sub. Lot Block
Owner's Valuation of Work: $ ) y 2 13 Property Size (Sq.Ft or Acres): 2'N. Sb AC
1 �
Sq.Ft of Building: I / S Height: ( S Co # of Floors: 1
Class of Work:
Garage:
Septic:
Type of Heat:
Driveway Permit:
JNew
1KAttached
ElriSDS
0 Alteration
0 Natural Gas
0 Addition
I' Propane
0 Exempt
Grading Square Feet of Earthwork
O Repair
0 Move/Relocation
O Detached
O Community
0 Electric
O Permit #:
0 Other
Cubic Yards of Earthwork
NOTICE
Authority. This application for a Building Permit must be signed by the Owner of the property, described above, or
an authorized agent. If the signature below is not that of the Owner, a separate letter of authority, signed by the
Owner, must be provided with this Application.
Legal Access. A Building Permit cannot be issued without proof of legal and adequate access to the property for
purposes of inspections by the Building Division.
Other Permits. Multiple separate permits may be required: (1) State Electrical Permit, (2) County ISDS Permit, (3)
another permit required for use on the property identified above, e.g. State or County Highway/ Road Access or a
State Wastewater Discharge Permit.
Void Permit. A Building Permit becomes null and void if the work authorized is not commenced within 180 days of
the date of issuance and if work is suspended or abandoned for a period of 180 days after commencement.
CERTIFICATION
I hereby certify that I have read this Application and that the information contained above is true and correct. I
understand that the Building Division accepts the Application, along with the plans and specifications and other
data submitted by me or on my behalf (submittals), based upon my certification as to accuracy, Assuming
completeness of the submittals and approval of this Application, a Building Permit will be issued granting
permission to me, as Owner, to construct the structure(s) and facilities detailed on the submittals reviewed by the
Building Division. In consideration of the issuance of the Building Permit, I agree that land my agents will comply
with provisions of any federal, state or local law regulating the work and the Garfield County Building Code, !SOS
regulations and applicable land use regulations (County Regulation(s)). I acknowledge that the Building Permit
may be suspended or revoked, upon notice from the County, if the location, construction or use of the structure(s)
and facility(ies), described above, are not in compliance with County Regulation(s) or any other applicable law.
hereby grant permission to the Building Division to enter the property, described above, to inspect the work. I
further acknowledge that the issuance of the Building Permit does not prevent the Building Official from: (1)
requiring the correction of errors in the submittals, if any, discovered after issuance; or (2) stopping construction
or use of the structure(s) or facility(ies) if such is in violation of County Regulation(s) or any other applicable law.
Review of this Application, including submittals, and inspections of the work by the Building Division do not
constitute an acceptance of responsibility or liability by the County of errors, omissions or discrepancies. As the
Owner, I acknowledge that responsibility for compliance with federal, state and local laws and County Regulations
rest with me and my authorized agents, including without limitation my architect designer, engineer and/ or
builder.
I hereby acknowledge that 1 have read and understand the Notice and Certification above as well as
hamrovided the r ired infor ion which is correct and accurate to the best of my knowledge.
Property Owner Print and Sign
Date
OFFICIAL USE ONLY
Special Conditions:
Adjusted Valuation:
x 1, 0610.00
Plan Check Fee:
2.27.01
Permit Fee:
3 4/. 23'
Manu home Fee:
LlDO. v D
Misc Fees:
�-
TotalFees:
17(2..Z.-49
Fee(s� Paul::
PS'ia l
BalancefDue:
n.r 5.;5"
BP No:
ISDS No:
iel Sl lY-22819-
Setbacks: ,, ,
if -25;0g 10
OCC Group: ���[i
Const Type:
Z g:
BUILDING DIVISION :
• ed Approval Date
/
- 700
PLANNING DIVISION: e ....1111111111k:-�� 6)�
Signed Approval Date
Building Pian Review
Description of Work: new IRC modular on foundation
Bin #:
Location Address: 650 CR 339
PARACHUTE, CO
General Information
rCase Manager: David Bartholomew
Plan Case Number: BLDG -5-13-7550
Parcel: 244704100052
Application Date: 05/03/2013
Contacts
Owner: Bill Colohan
Applicant: 13i11 Colohan
Applicant Phone: (831)659-4026 Email:
Building
Engineered Foundation
Driveway Permit
/ Surveyed Site Plan
Septic Permit and Setbacks
Grade/Topography 30%
Attach Residential Plan Review List
Minimum Application Questionnare
Subdivision Plat Notes
A./A Fire Department Review
7
/ Valuation Determination/Fees
Red Line Plans/Stamps/Sticker
Attach Conditions
z
Application Signed
Plan Reviewer To Sign Application
ParcellSchedule No.
40# Snowload Letter - Manu. Homes
Soils Report
7
Planning/Zoning
Property Line Setbacks
30ft Stream Setbacks
r' Flood Plain
Building height
toning Sign -off
Road Impact Fees
HOA/DRC Approval
GradelTopography 40%
Planning Issues
Subdivision Plat
General Comments:
Nl4
C ` )5 'tee 07X44 //B8 la'9.00a 69Z. o!o
6701v e ?41X2¢7 57646k/6.00 /0, 36g.
Monday, May 20, 2013
NOTE: If any required information is missing, delays in issuing the permit are to be expected. If
determined by the Building Official that additional information is necessary to review the application
and/or plans for compliance, the application may be placed on hold until the required information is
provided. Work may not proceed without the issuance of a permit.
The Building Division will collect a Plan Review fee at time of application submittal. The permit fee, as
well as any Septic or Road Impact fees will be collected when the permit is issued.
The permit application must be signed by the owner or by person having written authority from the owner
to act as their representative.
Building cannot be occupied until a Certificate of Occupancy (CO) is issued. Using the building without a
CO will be considered an illegal occupancy and may be grounds for vacating the premises. (Final/CO
inspection requirements will be attached to your approved field set of plans.)
1 hereby acknowledge I have read, understand, and will abide by the requirements of this
checklist.
ad:4444/7
r
Property Owner Print and Sin Date