HomeMy WebLinkAboutInspection NoticeDavid Bartholomew
From: David Bartholomew
Sent: Monday, September 10, 2012 12:36 PM
To: 'jim@highmarkaspen.com'
Cc: 'Andrew Collins'; Matt Provost; Jim Wilson; Andy SchwaIler
Subject: Inspection requirements
Attachments: David Bartholomew.vcf; Kroll -Witt Residence.pdf
Hi Jim,
Please see the attached alternative construction inspection notice. Garfield County will inspect #1, #2, #3, #5 and #8.
CDOH/MHIP inspectors will inspect #4, #6, and State Electrical inspectors will inspect #7, #9. Feel free to call with any
questions or concerns.
Thanks,
Dave
David Bartholomew
Plans Examiner
Garfield County Bldg & Ping
108 8th Street, Suite 401
Glenwood Springs, CO 31601
(970) 945-8212 Work
dbarthalomew garfield-caunty,com
1
2012 -APR -17 06:30AM FROM -
+8038668012 T-406 P.003/006 F-090
STATE OF COLORADO
DIVISION OF HOUSING
AC (alternative construction) INSPECTION REQUIRED NOTICE
The following is based on information provided to the Codes Section and may be modified
used an the actual findings of the fietd inspection.
(SATE: April 13. 2012
John Areumlooper
Governor
Reovcs Brmvn
Etccutivc Dirccwr
MANUFACTURER Btu Homes
ID NO.: 3499
CONTACT: Mike Reed / mike,reed@bluhomes.com _ FAX NO.: (707) 368.0442
MODEL NO,: Kroft -tett
PRA NO_: 512602AC
INSPECTION REQUIREMENTS:
O K 1) Separation of garage and dwelling (FRC 309). Mud Room is site -built, but still part of the dwelling, Check for
separation between Garage and Mud Room (RC 309.2). Check ductwork from Mech Room in Garage for
compliance with IRC 309.1.1 (see page M201).
D(K, 2) Site -built Entry with required exit door (IRC 311.42).
dg 3) Completion of the home's thermal envelope, particularly around the site -built portions and where they
interface with the faotory•built structure. Mud Room walls & ceiling should be insuteted. Entry walls &
Should be insulated. Crawl space will be conditioned. See REScheck for insulation R -values,
Clefs* 4) This Is the initial Mu Homos installation in Colorado. They utilize an `unfolding' type of home. Check that
P tube installation Is In conformance with their engineering package forthis home (structural paekeee begins
With page CV). Check for engineered foundation to support point loads from modular unit (page A101 and
page 8001). Check hold-downs and cennectiofts to foundation (page 6002 to $005). Cheek welding of
"fixed' floors (page 8201 to 8205). Check seam connections (page 820910 5226). Check connections in
upper portion (page 5227 to 8233). Cheek trapezoidal gable wall Installation (S302 end page 5303)_ Check
installetion aired SIP panels (page 340110 5402). Check connection of roof SIP'S to steel frame (page
8501 to S504). Enjoy yourself.
CP011 ? CIL 5) On-site framing of Entry roof (see page A130).
6) Check roof covering after roof is assembled and connected to steel frame,
5-4 & _.--7) Maln electrical panel is in site-buill Garage.
G k 8) Check vents thru roof (fireplace, plumbing page A130 A392).
.-.. 8) Check completion fo eleclrleal circuits with ceiling eutleta. Oo dielectric , operational, continuity, polarity
�k6-ec. checks. Test emoketoarbon monoxide alarm system for interconnectivity.
Site Address',
The local building department by signing this form fakes responsibility for inspecting the site built
construction stated above to approved plans and Current codes-
Normal
odesNormal permits and fees for these inspetti'ons are to be per the Iocal jurisdiction.
State sppreved plans for Rimy Built ConstruCtipri inay aa Obtained from the Builder/Mencrfacturer,
1313 Sherman Street, Room 321, Denver, Colorado 8O2O3 (303) e66-4616 t"AX (303) a6d.3672