HomeMy WebLinkAbout3.0 Resolution 2005-47ililIililr illilt ffi]ffilllil fiilililil]llll
675766 06/07/2005 09:32F 81694 P55l t'l HLSDORF1 of 6 R O.gO D @.OO GRRFIELD COUNTY C0
STATE OF COLORADO
County of Garfield
John Martin , Commissioner Chairman
Larry rvlcuown _ ._ , Commissioner
Trbsi Houpt .. _. , Commissioner
t.-lon t-reroro , County Attorney
Mildred Alsdorf , Clerk of the Board
Ed Green , County Manager
when the following proceedings, among others were had and done, to-wit:
RESOLUTION NO. )oo5_{l
A RESOLUTION CONCERNED WTTH THE APPROVAL OF A SPECIAL USEPERMM FOR A IO-INCH NATURAL GAS GATHERING PIPELINE FORWILLIAMS PRODUCTION RMT AT THE COUNry ANVIL POINTS LANDFTLL
PROPERTY
)
)ss
)
At a regular meeting of the Board of County Commissioners for Garfield County,
Colorado, held in the Commissioners'Meeting Room, Garfield County plaza Building, in
Glenwood Springs on Monday, the 16th day oi May, 2005, there were present:
Parcel ID: 2 I 75-20 t -00- I 87
WHEREAS, the Board of County Commissioners of Garfield County, Colorado,received a Special Use Permit (sUP) request for "Pipeline" submitted by WilliamsProduction RMT to install a 1.3 mile long lb-inch natural gas pipeline across the CounryAnvil Points Landfill property; and
WHEREAS, the proposed natural gas pipeline crosses land owned by GarfieldCounty which is zoned Resource Lands (Centte-siopes & Lower Valley Floor) and where
a pipeline is permitted as a Special Use; and
WHEREAS, the proposed pipeline is to be located within a legally described areaattached hereto as Attachment A; and
,.* ,__Y{{YAS.:J!? Board of county commissioners opened a pubric hearing on the
I o-' day of May' 2005 upon the question of whether thJ above-described SUp for apipeline should be granted or denild, <luring which hearing the public and interested
,,. ir.{
);.,',V
illllil lllil llilil ilililIilillr ilillt ilililL| lllr
675766 06/07/2005 09:324 81694 P552 l'l ALSD0RF
2 of 6 R O.OO D O.0O GRRFIELD COUNTY C0
persons were given the opportunity to express their opinions regarding the issuance of
said SUP;and
WHEREAS, the Board of County Commissioners closed the public hearing on the
l6m day of May, 2005 to make a final decision; and
WHEREAS, the Board of County Commissioners on the basis of substantial
competent evidence produced at the aforementioned hearing, has made the following
determination of facts :
I' That proper publication, public notice, and posting was provided as required by Iaw
for the hearings before the Board of County Commissioners.
2. That the public hearing before Board of County Commissioners was extensive and
complete; all pertinent facts, matters and issues were submitted; and that all interested
parties were heard at those hearings.
3. The proposed special use permit conforrns to Sections 3.10.04,5.03,5.03.07 and
5.03.08 of the Garfield county zoningResorution of 197g, as amended.
4- The proposed use is in the best interest of the health, safety, morals, convenience,
order, prosperity and welfare of the citizens of Garfield County.
Now, THEREFORE, BE IT RESOLVED by the Board of county
Commissioners of Garfield County, Colorado, that based on determination of facts setforth above, the SUP request for "Pipeline" is approved for the installation a 1.3 mile
long lO-inch natural gas pipeline with the following conditions:
I ' That all representations made by Williams in the application and as testimony in thepublic hearing before the Board of County Commissioners shall be considered
conditions of approval, unless specifically altered by the Board of County
Commissioners.
2. Williams shall ensure that copies of the following plans are kept at the work site
during the entire construction of the pipeline:
a. Fugitive Dust Control plan;
b. Stormwater Management plan;
c. Fire Prevention and Suppression plan; andd. spill Prevention, Containment and countermeasure plan
3. Williams shall comply with the following conditions asserted by the County Road
and Bridge Department:
a. Prior to the start of the project, Williams Production RMT and any necessary
subcontractor shall hold a meeting with the County Landfill Manager in order
L;UUJ ;HI;,UUIr t I !
q1!
l! !1ll|il1, HILI|
I
;';;; i-o.oo o o.oo GARFTELD couNTY co
to ensure the construction phasing plan and these following conditions will be
b. complete the work around the guard shack and the sludge ponds as soon as
c. Use the back (east) gate as
customer traffic;
d. Traffic control according to
working next to the road;
97vo compaction on or near the road, all other area's need a minimum of 95vo
compaction;
Spacing of the above ground natural gas pipeline markers shall be spaced at a
distance required by the Landfill Manager;
Working hours within the landfill are limited from 7 a.m. ro 5 p.-.;
A Garfield counry urility permit will be issued upon the approval of the
BOCC;and
Dust control will be required as needed at the discretion of the road foreman
on the roads impacted by the equipment used in the construction of the
pipeline. Damage to the surface of the roads shall require replacement or
reconstruction for that portion of the damaged road;
Because weed problems on pipelines and their revegetated corridors tend to occur
after there is maintenance activity on a section of pipeline and the ground has been
disturbed, Williams shall respond to any cornplaints by landowners either private or
public, regarding noxious weeds in a timely manner.
During revegetation, Williams shall submit the tags from the bags containing the
approved md certified seed mix for verification that the seed mix used in the field on
the corridor is acceptable. These tags shall be submitted to the County Vegetation
Manager for verification prior to the reseeding of the disrurbed area.
Prior to the issuance of the Special Use Permit, Williarns shall post a revegetation
security in the amount of $16,000.00 for the portion of land disturbed by rhe pipeline.
This may be in the form of a letter of credit, Form Treasurer's Deposit (cash) oi other
method deemed appropriate by the County Attorney's Office to bl deposited with the
County Treasurer. The security shall be held by Garfield County untii vegetation has
been successfully reestablished according to the Reclamation Standards in the
Garfield County Weed Management plan.
Regarding stormwater, erosion and sediment control measures, the Williams shall
only use straw bales as sediment barriers so long as they are certified as weed-free
bales.
8' Prior to the issuance of a Special Use Permit, Williams shall submit the following
approved permits to the county Building and planning Department:
a'. US Army Corps of Engineers: Nationwide Permit (or other appropriate permit
much as possible so as not to interfere with
MUTCD standards and proper signage when
0D'
h.
4.
5.
6.
7.
I
Lruut ru#uJ r u !ul!!F,LHllLUHT';';;; i-s.60-o o.oo GRRFIELD counrY co
required by the Corps of Engineers)
b. Road and Bridge Department: Aoproved Utility permit
c. Colorado DepartmeJrt of Public Health and. Environment: General
Construction Stormwater plan
9. Williams shall comply with the following Industrial Performance Standards in
Section 5.03'08 of the Garfield County Zoning Resolution of 1978, as amended
including:
a. Volume of sound generated shall comply with the standards set forth in the
Colorado Revised Statutes;
Vibration generated: every use shall be so operated that the ground vibration
inherently and recurrently generated is not perceptible, withoJt instruments, at
any point of any boundary line of the property on which the use is located;
Emissions of smoke and particulate matter: every use shall be operated so as
to comply with all Federal, state and county air quality laws, regulations and
standards; and
Emission of heat, glare, radiation and fumes: every use shall be so operated
that it does not emit heat, glare, radiation or fumes which substantially
interfere with the existing usJ of adjoining property or which constitutes apublic nuisance or hazard. Flaring of gases, aircraft warning signals,
reflective painting of storage tanks, or other such operations which may be
required by law as safety or air pollution control measures shall be exempted
from this provision.
10. That the issuance of a permit by Garfield County to Williams for the sole purpose of
the installation and maintenance of the pipeline does not grant any additionaj rights
othenuise regulated by the provisions specifically contained in the Land patent from
the Bureau of Land Management which is memorialized in a clocument recorded on
January 13, 1998, in Book 1049, Page 941, having a reception number of 519059.
The Board of County Commissioners' grant of permission to use the designated areafor the Iimited pipeline purposes named will not include any warrantiei as ro the
Board of County Commissioners' title to the Anvil Points LanAm. The permittee is
responsible for gaining any additional permit or right to use the land that may be
required by the BLM or any other federal agency.
Dared tnis 6/! day or {a ne-A.D.2005.
b.
i,,\
GARFIELD
BOARD
COUNTY
illlilHilr ililil lilillffi lllil ill il ilil lll llll
675766 06/01/20,05 09:328 81694 P555 I'l RLSDORF
5 of 6 R O.OO D s.OO GARFIELD COUNTY C0
Upon motion duly made and seconded the foregoing Resolution was adopted by
the following vote:
John Martin , Aye
l-auy McCown , Aye
Tr6si Houpt ,, Aye
STATE OF COLORADO
County of Garfield
, County Clerk and ex-officio Clerk of the
Board of County Commissioners in and for the County and State aforesaid do hereby
certify that the annexed and foregoing Resolution is truly copied from the Records of the
Proceeding of the Board of County Commissioners for said Garfield County, now in my
office.
IN wmNESS WHEREoF, I have hereunro ser my hand and affixed the seal of
said County, at Glenwood Springs, this day of , A.D. 2005
county clerk and ex-officio clerk of the Board of county commissioners
)
)ss
)
Lruflllllllll lLilillllilililt l]iltil []67s765 06/07/2e,e,5 @9:320 81694 p556 ]1 ALSDOiFF of 6 R o.OO D O.O@ GRRFIELD COUNTY co
A+tah,rn*tt A
SIrL/ATE ,m\I SgcruOl\ tZ k20, T65, R,g4w, 6TH P.l,l
GARFIELD COTI,VT}',
COLORADO
LIGAL DESCRIPTION:
A PROPOSED IO" NArURAL GAS ptpELtNr- S]t!]lra [.] LCT I (NE 1i..1 -c,t 1,Zo;, jol.,:(sw 1/4 sE 1/ )' Lot i,g.()l',/1 iE y7i; 0i: sECTroN rz AND ,.r ro' z (NVi r,i.1 r.rr1/4), Lw J (NE 1 /4 )ry^1'/-4), LC; + lse .i/l_*l: 1/4), sw 1/4 r.tw 1/4 0F si-crr(.)N20 AtL rr'l rowr'rs'irp o souii, nnncE'dc- wbsi or iHd'Oirr dnrr.rcipAl ruERrDrAN,COUNIY OF GARFI[LD,_STAT[ Or CCJiOrrNrrO, THE CENTERLINE OF hl{ICH IS IUORI-pARlrcuLARLy orscniaro ni r-oriowi, --' '1.'\1"\L vr
LTEGINI.IING AI"A POINT ON AN EXIS]'II.IG 4" NATURAL GAS PIPILINE, VYHENCE A IOL,I.IDi9C3 GLO I]RASS CAP IN PINC. iON rrlr SOUTHEAST CORNER CF SAID SECTION 17BEARS S2O'01'J4"E. 1O:5.99 rEET. TI.IENCE ALONG TIII CENIER|-IhIE OF SAID PROPOSET)l0' SUCTION PlPELtNti THE FOLLO\rlfic J4-COURSTS; 1) 585.07,02,,\r, l82.J.tr rerl Z)s69'18'3r"w, 100.04 FElr; 3) Sr8'2i'58;W, -102.02 r[[r; a) s:or +'.rz"wf lso.,0 itr'f,s)_ssJ'25'J7"w, rJ4.97-rret o) s2z.ir,ro,,w, .l2s 48 r€Et; 7) s20.22,14,,t, zs2_06FEtl 8) 549'J6'J4"E, 2i5..37 ltrr; g) S17.(J5'09,,f., eS.6B'rrdr,*1o) 506.1B,1S,,u/,46'82 f EET; ttl ssa'.:?,??:"ryi. s.l Zg_fi!,r' ,r) zts.'si-iiir oio,r,; rr{E ARC oF A9yTy! ro THL RlcHT, HA.\4t'lc a aaotLri br ros.oo FEEr AND A Lor.lc cHoRD yvF{lcHB.ARS 573'26',.10"w. 2o9.8_? _F[_ET; 13) N67,45'OO"W, 121.59 FEET; 1rt) 79.73 tE.F.TA:ONG lFtE ARc oF A_cuRvE rc'rrri'ieir, uAvtr\rc A RADtus ot 65.28 FFIT /^ND Ar"oNG cHcriD wHrcH BEARS S77'04',39"w, zq a.g rrrr, rsl s+i.s+',7,,w, 150.09 FErrr;16) s67'47'54"W, 166.06 FtET; 1L,S iZ+ito's+,,w, 5i.52 FEt,t: 1B) s06.2:i.51-w, 193.36FEET; re) sr8'os'017"w,. g1.g,o .'rri' io) .sie'os'rs"r, -<s+.qa rilir, :rr) s:r4.03,J3,.r/r,l58.88 rElli 22) ss6'1 4'4e"W ii2.09 rtrrr, z.:) soi.:,,:+A:\,.,,,'ioo.r, r-i:rr; 24)s82'46'06"W, ,o.10 FEET; 2s) sg zs rriJ At.oNG THE ARC or r, r.:uR..{ T0 .r.fii rgpr,HAVTNG A RADrus oF rJo,00 Frer nrun A cHoRD wHrcH BEARS s69-42,43,,w, s8.74FErr; 26) ss6'3s'20"wr -Joqes IEET; 27) s;ls-+:,r2,'v!, rji.ril-iirr, ze) s58.i7,00,.!v,33B.Jl lrEl; 2e) Ss4'01'2S"w, 2at.i:2 r'rti, ro) .is.ie,i6;;W- iit o+ F-rrT; .l)s42'59's7"w, 288.20 rEET; J2) Sor.ro'si;w. sst.92 FEEr; .J3) 538'44,52"W, 29,i.11FE[T; 34) s46'33',13"W, 247.g7 FF_I.T ro n'potNr rERf./r,\iATiNG Ar r,r.r tx;srri.]G 6,,NATURAL CAS PIPELINE, WHENCF A r-OUTVC ISSZ ELM ALI",,I\,,III..]I.JM CAP IN Pi.,ACi: rORTlrE c-v/ i/1 6 CORI{IR of:SAID S[C:]roN 20 EEARS Sr8.5+,+5"E, 1r0..].i r.Et.r.