At a reqular meetirg of the Board of County Comrnissioners for Garfield Corurty,
Colorado, held irr the Cornrnissioners'Meeting Room, Garfield Coturty Coufthouse, in Glenwood Springs
on MondaY , the IOth day of aPri I A.D. 19 95 , there were present:
Marian I. Smith , Cou-turissiouer Chaitmau
Arnold L. Ilackley
-,
Comnrissioner
Elmer (Buckey) Arbaney , Comrnissioner
Don DeFord , County AttomeY
, Clerk of the Board
, Coutty Administrator
)
)ss
)
l"lildred Alsdorf
Chuck Deschenes
lvhen tlte following proceeclings, among otlters were had attd dotte, to-wit:
RESOLUTION NO. gS_O3O
A RESOLUTION CONCERNED WITI{ TFIE APPROVAL OF A SPECIAL USE' PERMIT
APPLICATION FoR RoCKY MOUN.TAIN NATURAL GAS ancl COLORADO PUBLIC SERVICE
COMPA}.IY.
WI{EREAS, t5e Board of Coturty Conrmissioners of Garfield Corulty, Colorado' ltas reccivecl
applicatiol fi.orn Rockry Morurtaiu Natural Gas aud Coloraclo Ptrblic Sen'ice Contpany for cortstructilrg a
natural gas pipeline on tlte lollowing described tracts of land:
Located in portions of Section I T7S R89w, Sections 3,4 artd 5 T7S R88w, Sections 35 and 36' T65
Rggw, ancl Sections 2g,{,g and 3l T6s RgTw of the 6th PM (Detailed rnapping available for revierv at tlte
Garfield County Planning Departnlerrt)
(in the State of Coloraclo and the Coturty of Garfield); and
WFIEREAS, the Board held a public hearing on the 3rd day of April 1995, uport the question of
*hetSer tle above-6escribed Special Use Pemrit should be granted or dertied, at rvhich headng the ptrblic and
i,terested ,ersous rvere given the oppornurirl,to erpress their opinions regarding the issuance of said Special
[Jse Pennit; aud
WHEREAS, the Board on the basis of subsantial conlpetent evidence produced at the
aforentetttioued hearing, has macle the follo*ing detennitlation of fact:
l. TSat proper publication and public norice rvas pror.ided as required by Iarv for the hearing
before the Board olCouttl' Conttrtissiotters'
Z. Tlat t5e hearilg belore the Boarcl of Corurty Cornntissioners \vas eKetlsive atrd complete, that
all pertipelt facis, rnatters and issres rvere subnritted and that all irlterested panies rvere lteard
at that hearing.
ful ",ltn, P {
176559 8-937 P-t2-1 0t/l-tl35 l2:Ollr [C 2 ')f 6
3. That the application is in compliance with the Garficltl CorurtyZoning Resolution of 1978,
as arnended.
4. Forthe above stated anclother reasons, the proposed use is in the best iuterest of the health,
safety, rnorals, convenience, order', prosllerity and rvellhre of the citizens of Garfield County.
NOW, TIIEREFORE, BIr IT RESOLVED by the Boald of Coturty Coulnissioners of Garfield
Coturty, Colorado, that the Special Use Pennit be and hereby is authorized permitting the construction of a
natural gas pipeline, upon the fbllowing specilic conclitions:
(Note: The following sor.u'ce cocles are showu following each condition - ( I ) r'epresents standard conditions
fi'orn Garfield Corurty, (2) r'epresents rnitigation mea$lres lrorn the Environrneutal Assessment, (3) represents
couditions of approval li'onr the IILM, and (4) represeuts conditions fi'onr the 404 pennit)
l. AII proposals of the applicant shall be considered conditions of approval rmless stated
otherwise by the Board of County Cornrnissioners. ( I )
Z. The applicant shall have 120 days liornthe date of the Resolution of ConditionalApproval
to rneet all couditions set forth in the Resolution. The Special Use Pennit shall be issued
when all couditions are rnet and shall expire 120 days after issuance, tmless constnrction or
use have comntenced. ( I )
3. Standard procedures for the project will include irnpleurentation of erosiott coutrol aud
revegetation rneasu'es to insure that lantls disturbed by constnrction activities will be restored
to a stable. productive, arrd aesthetically acceptable condition. (2)
4. During coustnrction of the project, a representative of RMNG or PSCo will: (a) act as a
liaisou rvith the laudovrrrer/agency lel)resentative; (b) llrovide expenise to direct restoratiorr
of the right-of-rvay rvheu special conditious are eucouutered. rvithout causiug cortstnrctiorr
delays, and (c) prolnote favorable public relations. (2)
5. Installation of the pipeline will follorv clearing of the constrrrctiolr area. Rcclarnrtion anrl
revegetatiou rvill follorv the pipeline's installation. especially in areas rv'ith soils tltat are hiqhlv
strsceptible to N'ind ol'\vater erosion. (2)
6. RMNG and PSCo rvillconduct all activities associated *ith the projcct in a rtranner tlurt rvill
avoid ormiuiurize degradation of air, lanrl arrrl \vater qunlitr,. In the constnrction. operatiorr
aud maintenance olthe project. I(MNG ancl PSCo *ill pertbnrr tlreir irctivitics accorrlins to
applicaLl>air and water quality starrrlards. rellted lacilitv siting stanrlards. autl related plaus
of inrplenrentation. (2)
7. Alldesiglr. constnrctiou, opcratiou, ancl nraiutenance prflcticcs rr,ill be concluctcd according
to safe and proven Engineering Practices. (2)
When possible, project work willbe coordinated rvith othcr rvork occurring on or planned lor
locations along the route. (2)
Where laudo*,rrers har,'e not specified measrlres for the reclarnation and revegetation of,their
property, RMNG and PSCo rvill trse the ureasures identified in the appendix and plan lor
constructiorr stunmnrized irr tlre Etwirorrntetrtal Assessmettl -fot' lhe Rocb' lvlotttttairt Nalttral
Gas atd Colorado Public Sen,ice Conpott-trs Rr_/le to Avorr, Colorado Natural Gas Pipcline,
Jure 1993. (2)
All Courty Roads disturbed durirrg the project's constnlctiorr rv'ill be reconstnrctetl to nreet
the approval of the Garfield County Road and Bridge Su1;en'isor. RMNG aud PSCo rvill
obtain approval lrorn Road and Bridge for all road reconstmction. (2)
Cortstnrction- relatecl traffic rvill be restricted to routes allprovecl by the corrtrolling
jtrrisdiction. Nerv access roads or cross-corurtry r,ehicle travel rvill not be pennitted unless
prior approval rvas given by Garfield County. Auy ternporary roads used by RMNG and
PSCo rvill be rehabilitated rvhen constnrction activities are conrllleted, as allproved by
d.
9.
10.
il.
o
176559 8-937 P-t25 ol/L'-/95 L2:()lPPG3 OFE
Garfield Corurty. (2)
Wfuere possible, the riglrt-of:way itself rvill be usetl as all access road during tlte cortstructiotr
period. (2)
Boring, if specified by Garfielcl Coturty Road and Bridge Deparlmettt, will be required for
developed roads. (2)
Pe11a1e1t culverts shall meet the specifications of Garfield County Road and Bridge
Departmeut or t[e private lanclorvner. W}ere drainages will be crossed by temporary roads,
clirt fills, or ctrlverrs will be placecl aurl removed upon cornpletiou of the project. Cttlvetts olt
tellrporary roacls shall rneet the requirements of Garfield County Road and Bridge
Dellartmeut. All streatn chaunels aud rvashes lvill be retttuted as near as practical to their
natural state. (2)
All darnagecl Coturty Roacls shall be repaired to the requiretnents of Garfield County Road
and Bridge Deparlment. (2)
To rninirnize disturbance associated rvith installation of the pipeline, RMNG and PSCo will
lot g1a{e tfie riglrt-of-rvay outside olthe trench liue, except rvltere necessaly, ou all level and
gently sloping ten'ain. (2)
SideSill cuts rvillbe kept to a miuimunt to protect local resources while providiug a safe and
stable plane fbr the efficient ttse of eqtrillrnent. (2)
Existiug grotrndcover such as grasses, leaves, bnrsh, attd trees will be cleared only where
luecessary for operation of eqtriprneut. Iu gerteral, grasses, fbrbs, artd shrtrbs willbe cut off
lear grolncl level leaving their root systelns intact. 1-he ctrttings will be redistributed over
t|e rig[t-of:way dtying reclamation or disposerl of as directed by the private land orvner. (2)
Trees a1fl slylbs that are not cleared fiom the right-of-rvay lvill be protected {i'om damage
dgr-ing colstlrction by avoiding thenr rvith equiprnent. For exatttple. bullclozers rv'ill nlairttain
tSeir blacle ip a raised positiou except at areas designated lbr clearing or to snlooth out sharp
breaks in relief. (2)
Graclilg for t5e pipeline rvill be donc ottl1, rvltett Itecessary lor the sale ol)eratioll ol tlre
iustallatiou. (2)
21. Materir\ excavated fi'onr the treuch will be stored nexl to thc tretrclt to f,rcilitate using a
niniplrnr autoult of right-of-rvay, ancl l)rotect the nratedal fi'ont velticttlar artd eqttiptnertt
traffic. (2)
The trench rv-ilt be excavated using as small au area olclisturbaltce as possible to minimize
disturbattce of vegetation. (2)
Excavation ofthe trench in especially sensitive areas n)ay be cortducted according to special
techniques as specified b),the landorvrrer, or s1;ecified in the ROW agreenlent. (2)
Backfilling of the treuch rvill be re-installed aud approved by the lanclorvrler or agellcy
representative. (2)
Where local hl,drological conrlitions warrarrt, RIVING and PSCo rr,ill install breakers tttade up
of surclbags or loan in the trench before Backfilling. These breakers rvill corttrol sub-surface
dlainage alorrg the pipeline. (2)
In areas of steep slopes that are not aurtually cttltivated, rvaterbars or ntttofftliversions rvill
be installed as follorvs: (2)
12.
l3
l4
15.
16.
t7
18.
19.
20
22.
L)-
21.
25.
26.
o
t76J53 B-937 i',- l2ti ()
ot/ t'L /115 l2: 0 LI' FC -l OF B
o
Sl-OI'E (7o)
3to7
8 to 15
l6 to 30
3l to 40
'l l+
Diversion Spncinq (Feet)
150
100
75
50
35
30.
31.
)L.
27. All cuts ntacle itr stcep or rolling terrain cluring constn:ctiou will be regradecl and contoured
to bleud into the acljoining landscape and to reestablish the natural drainage pattenrs. (2)
28. Where required, erosion control stnrctures such as water bars, diversion channels, and
teu'aces will be constntote(l to divert water away fi'om the trench and reduce soil erosion
along the riglrt-of,-rvay and other adjoining areas disttrrbed during corstruction. (2)
29. RMNG and PSCo will dispose of mater-ials unsuitable for use as backfill or excess backfill
nraterial at approve(l locations. (2)
Teurporary rvork sllaces rrsecl for crossing strearns and highways and other special sites will
be restorecl to approxirnate precoustnrction conditions. (2)
Suitable nrulches and other soil stabilizing practices lvill be used on regraded and topsoiled
areas, rvhere required, to protect rulvegetated soil fi'om wind and rvater erosion and to
inrprove \vater absorption. RMNG and PSCo will constrlt rvith the laudovrter to define the
appropriate rnulches fbr each segmel)t of the route. (2)
Unless othenvise directed by the landorvner, RMNG aurl PSCo will retlistribute rocks, cut
vegetation, arrd other surlace material ternllorar-ily stockpiled lor constnrction back across the
riglrt-of-rvay disturbed cluring constnrction. (2)
RN{NG and PSCo will seed disturbed areas using seed rnixes approllriate to the location. The
qrecific locations aloug the selected altenrative rvhere each seerl nrir rvill be allplictl rvill be
identified in the "Plan of Constnrction".(2)
Seeding will be done rvheu seasonal or rveather conditions arc n'rost firvorable accortlirrq to
schedules irlentified by the landowrrer. Wlrenever llossible. seeding rvill L'tc tirnetl to tlke
advantase ol nroisture, such as early sllring or late lhll to bencllt lirlly liorrr rvintcr'
precipitation. (2)
Seed ru"res rvill be lllanted in the anlorlnt specificd in potrnds olptrre live seed/acre. rvhere
necessar)/. There w,ill be uo llrirnarl, or secon(h11' uoxious *'ectls in tlte secd nrix.
Coururercial seed w,ill be either cerrilierl or res,istcred seed. (2)
The reestablishnrent of vegetatir/e cover as rvell as rvatcrshed stabilization rncasures rvill be
schedtrled during the rvork season and before the succeedirg rvinter. hr any case,
re\/esetation treatnreuts *ill be accornplished as quickly as possible after installing the
pipeline. (2)
Iu general, RMNG aud PSCo riill not nrulch the ROW durirtg reclatttatiort artd revegetation.
Mtrlch lvill only be applied at the request of the landouler in areas rvhere the cut vegetation
atrd rock are not redistributed over the ROW. \Mrere stra\v or hay mulch is requested,
RMNG and PSCo rvill appll,the nrulch at a rate of trvo tor)s I)er acre artd crintp it into the soil.
If strarv mulch is used, it uill be cerrified rveed-liee. (2)
Temporary measures that RMNG artd PSCo could irnplement to lacilitate reclamation and
reve,getation shall include:
(a)constnrcting ternporan,breakers at llrol)cr ittten,als on slopes and access roads to
control nurolf rvltenever app licable;
(b) install silt screens as silt barriers irt srvales. at the base of snrall slopes, and in other
areas subject to sedirrrcrttatiott fi'otrt lorv velocity nrnoff:
3.+.
35.
36.
)t-
Jd.
r7ri553 B-937 oF tr
(c) sectling critical arcas suctr as roacl cuts aud strearn banks rvith an allproved grass seed
nrix;
(d)
(e)
tuurlcltiuq slolles, rvhere requircd; and
protect drains rvith ban'iers. (2)
39
40.
4t.
42.
43.
4-t.
Dtning l)rcpnration of tlre ROW, RMNG and PSCo rvill trirn trees in preference to cutting
trees attd rvill cut trees in llref'erence to bulldozing. These techniqtres will be trsed in
conrbination to produce a uatural looking or feathere<l-edge appearance ratlter thau a straight-
liucd appearalrce. 'frees rvill only be cut or trimrned to facilitate clearing, grading, and safe
installation. (2)
Adjacent to rnajor higlnvays, trees over six (6) iuches in diarneter at breast height will be left
ilrside the ROW. rvhen practical. Trees rvhich must be reuroved will be cut. Trees outside
the area of disturbance rvill not be cut, but will only have overhanging lirnbs removed by
cuttittg, rvith the tree to remaiu. The bulldozers will rnaintain theil blade in a raised positiou
in these seusitive visual l'esource areas, where practical. (2)
Unless otherrvise requested by the laudorvner. RMNG and PSCo rvill leave the ROW in a
"roughened" stAte that riill discourage the recreational use of the ROW by offiroacl vehicle
enthusiasts.(2)
Care rvillbe taken to avoid qrill of lubricants or firels anrl other tvpes of pollutiou in all areas,
including streanls and other bodies olwater. Although spills are unlikely, any spills and trash
'uvill be cleaned up imrnediately. Also, all apllropriate ageucies rvill be prolr)ptly notified of
any sigrrificant spills irr a tirnely firshion. (2)
[Jsed engine oil rvill be contained in suitable containers and removed fi'orn the ROW. (2)
Coustnrctiou equil;urent w,ill uot be relireled or serviced witlLi-u ornear streaur chanuels. (2)
Garbage aud other refuse lvill be disposed of in stritable containers and rernoved fi'orn the
ROW. (2)
Coustnrctiou sites ivill alrvavs be nraintained in a sauitary coldition; \vaste rr)aterials at those
sites rvill be disposed of prourptly at au al)propdate \vastc disposal site. "Waste" rtteans all
discarded ulater including hurnau \vaste, trash. garbage. refilse. oil dnrrns, ;letroleurn
produci\ ashes and equiprnent. (2)
Existing fbuccs, -eates. arrd llrace llancls that reqtrire rrroclification during constnrction rvill be
reconstrlrcted to allpropriate staudards. (2)
All strlctrrres such as ten'aces, levees, underground drainage s)'sten)s, irrigation llipelines, and
canals rvill be restored to preconstnrction conditions so that they rvill lunction as originally
intended, tuiless directed othenrise b),the controlling jurisdiction. (2)
RMNG and PSCo ri.illprotect all sun,ey rnonunlerrts lourd uithin the l(OW by marking and
avoiding thenr. Strn,el' rnonuurents include. but are not lirnited to, General Land Office
Cadastral Sun'e1'Conrers, reference lloiuts, rvitrtess conlers. US Geodetic benchnrarks and
triangrlatiol) stations. militarl,coutroln.lonrments, and recosnizable civil (public and private)
sun,ey lnonunleuts. If anY of these n)onunrellts are obliterated or disturbed, RMNG and
PSCo rvill report the incident, in writing, to tlte lartdou'ner/agencv representative and the
author-ity that installed the nronurnent. il krtonrr. \Mrere Ceneral land Offrce ROW
nlonr.uneuts or references \\,ere oblitcrated drrring operations. RMNC and PSCo rvill secrrre
the serr.ice or a registered laud sun,e),or to restore the disturbed uronurrrents and references
tusing sruvelingproceclures found in the Manual of Sun'e1,ine Instructions lorthe Survey of
Public Lanrls of the United States. latest edition. RMNG and PSCo rvill record auy suclr
surveys in the prol)er county and scnd an col))/ to the laudorvner/aqency represelttative. If
sun/eyors are used to restore the disturbcd sun,ey rllouunrcnt. RMNG and PSCo rvill be
resllonsible fbr the srrn,ev cost. (2)
45.
46.
47.
48.
49.
o
i 76559 8-937 f'-l2B O+/ll/95 12:OlF'tri 6 OF B
RMNG and PSCo willprovide lbr the
ROW. Safbty rneasures will inclurle.
trenches, aud flagltcrsons. (2)
safer_v of the public usirrg publio roads intersecting the
[)ut not lirnited to, roacls detours. barricadcs lor operr
50.
52.
5 l. If rtoxiotts rveeds irrlest portions of the ROW. the populations rvill be continuously controlled
ttsirtg chetttical, tuechanical, biological. or other urefllls. Control ol'the 1lo;lulations would
occtlr cltrring tlte seasou or grorvlh stage tvhere it rvould be urost effectivc. (2)
Wltere the ROW crosses streanls ancl other borlies of rvater. the banks will be stabilized to
prevent erosiott. Appropriate coustlllction techniqrres rvill be usecl to rninitnize daurage to
shorelittes, recreational areas, and lish aud *.ildlife habitat. (2 aud 4)
Durirrg consturction neat' stl'eauts or lakes. sedirneutation (rletention) basins. stratv bales. or
labric liuers lnay be coustnrcted to preveut suspeutled palticles fi'onr reaclrinq dorvlstrcam
watercourses or lakes. (2 aud 1)
Dry strearns rvill be crossecl by trenchius. Surall flo*ing streanls rvill be crossed by fltrnring
or tretrcltiug rvith a tlownstrearn silt banier to reduce dorvlstreaur sediurerrtation. (2 and -l)
Disturbance to riparinn vegetatiou and *,etlantls uill be rnininrized by keeping clearing aud
installation to as narrorv a disturbauce as possibte. Approaches to strcaurs rvill iuvolve
selected clearirtg of vegetation. Willorvs and cottoll\voorls clealetl during constnrction rvill
be reestablished as parl olreclauration. Atltlitional sllecilic nleasurcs are irlentilietl in thc
stipulations to the CEO Natiorrrvitle pennit. (2 antl -l)
Ifrvork is required in *,illouy'shnrb trlle rvetlauds. tlre surall trees anrl shnrtls rvillbe trinuned
to grourd liue in areas rvhere equillnrent sill be w'orking to nriniurizc darnage to veqetation.
(2 and -l)
To ntirtiutize inrpacts orr rvetlarrrls. onlv equiprueut ucedctl to dig tlre trcnch, install thc
llipeline. backllllthe trench. and reclairn the I\OW rrill bc allorverl to rvork irr tlre arca. unless
a suitable route is unavailable for'persounel urovernerrt. (2 antl {)
Where standirtg \vater or saturated soils exist. eqtril)rncut rrill opcrate off tinrber ;lads.
llrefhllicated eqttiptttcrtt pads, or geote\1ile labric overlain sith gravel {lll rvhcn necessary lor
cottstnrction. Alter construction. all llads sill bc rcrnovctl. (2 and J)
The first l2 inches of topsoil fi'onr *etlarrds sill bc salvagcrl and retlistributed ov'er the trenclr
as rltricl$'as possiblc lbllorv'ing installrtion ol'the llillclirre'. 'l'lre seeds, r'oots, rhizolnes,
tubers. and brrlbs l)resent in the tollsoil rrill crtltarrce antl hclp speed trll reclnltration of
\\'etlauds disttrrbed by corrstruction. (2 and -l)
Where necessary, rvaterbars or sedinrent filters. such as staked stra\v bales or silt fences, rvill
be coustnrcted adjacent to the crossings to rerluce potcr)tial sedirneutation iu strearrls or
\\'etlauds. (2 and -l)
Tlte crossirtg of tire Roarius Fork Rii'er shallbe constructc(l as quickly as ;;ossible during low
florv. The pipeline lor tlte crossiug uill be asseurbled arrrl tested in a staging area uear the
river before tlte trench is dug. Inrrnediatelv after the trackhoes have opened the trench. the
pipeline *,ill be installed and the trench backfilled. (2 and -{).
Irt streams *'ith florv, material e\cavated from the trench rvill be spread out and piled
irreeularll'to avoid darttnring the flo*,. (2 and {)
RMNG antl l'}SCo rrill nreet all stipulatiorts to lulfill all fcderal and state cultural anrl
paleoutolosical resource Iegal reqrrirenrents. This inclrrrles having a Class III Cultural
resource artd llaleontological sun'ey cottducted by a qrralified archaeologists anrl
paleoutoloeists belore constnrction occurs. (2)
Any cultural or paleontological resources (historical or prehistoric site or object) discoveretl
rvill be immediatcly rel)orte(l to thc lando*rter/agencv rel)resentative. All opcrations rvill be
53
54
55
56.
5'1
58.
59
60
6l
62.
63.
64.
o
+7ti553 3-937 P- I29 Ot/ rr/35 12:Olp PG 7 ,-t[ o
suspeltded in the ilnmediate areas of such discovery until authorization to llroceetl is isslefl
by the lattdowtter/agellcy representative. An evaluation of tlre rliscovery will be nracle by the
controlling jtrrisdictiort to deterrnine apllropriate actions to l)revent the loss of significant
cultulal or scientific values. RMNG aud PSCo will be responsible for the cost ol-evaluatiorr
and rnitigation, and any decisiou as to prol)cr rnitigation rneasures will be nrade by the
lartdowrler/agency representative after consultation with RMNG ancl PSCo. (2)
No hazardotls Inatedalwillbe storeclrvithin 100 lbet of the streambank. nor will any refrreling
or pipe coating be done within that clistance. (3)
The channel contour will not be altered. (3)
Eqrosed slopes attcl streatnbanks rvill be stabilized irnrnetliately trpon conrpletion using rip-r'a;l
and other nlealls as appropriate (3)
Streambanks willbe revegetatecl rvith narive plants. (3)
Crossiug of rrutltittg strefllns rvhich have uattrrally reltrocluciug brorvl trout or rainborv tr.orrt
populations rvill be restricted to tltose periods dru'ing rvhich constnrction effects will lriliprize
the irnpact of the ttattual propagation and survivability of those species. Detennination of,the
restricted periods rvillbe per"forrned by the Colorado Divisiou of Wilcllife. The applicanr *,ill
coordinate rvith the Colorado Division of Wildlili: to obtain the reqtrired inlorrnntion. A co1t1,
of the restricted periods for the pennittee's crossing will be provided to the Corps of
Engineers and Garfeld Coturty irnmediately after receipt. Any restrictiorrs on tinring based
on DOW revierv are cottsidered conditious of approval. Constnrction shallbe cornpleted by
Septernber lst, based on clocurnentation of verbal approval by Division of Wildlifc stalf
presented at tlle hearing ( l, 2, and 3)
Allcottstutctiort rvithin the regrrlated floodplairr of tlre Roaring Fork l(iver shall be consistcut
with the representatious and recornrneudatiorrs containecl in the Febnrary 14, 1995 letter fiont
Chris Conley, Engineer for KN Enersy, Inc. ( l)
Allvehicles associated rvith the project shallbe licensccl irr tlre Stlte ot'Colorarlo arrrl Glrlicltl
Coturty. ( I )
Dated this IOthdal, sg
ATTEST: i
ApriI A.D. le es
GARFIELD COUN]-\' I}ONI(D OF COMMISSIONIRS.
GAI(FIELD COUN-TY. COLOITADO
65.
66.
67.
68.
69
70.
71.
!1 a: r:- -:-
t..l-/
-<-:7--2,/-.J
Cltairnrarr
Upon motion duly rnade and seconded the loregoinq Resolutiorr
I"l,arian I. Smirh
\\as adol)ted by the following vote:
Arnold L. I.lackley
, Aye
, Aye
, AyeElmer (Buckey) Arbaney
i765J9 B-r-;.i7 F',-l30 )l/'"Lit)5 i-:0IP tll B CF B
STATE OF COLORADO )
)ss
Cotutty of Garfield )
I,, Corurty Clerk and ex-officio Clerk of the Board of County
Cornrnissioncrs in and for the Coturty and State afbrcsaid do hereby certify that the auttexed and foregoing
Resolution is tmly copied [i'om the Records of the Proceeding of the Board of Cotrnty Cornmissioners for
sairl Carlield County, ttow in my ofiice.
IN WITNESS WFIEREOF, I have heretrnto set rny hand and affixed the seal of said Couuty, at
Glcnrvood Springs, this _ day of , A.D. tq_.
Coturty Clerk aud ex-officio Clerk of the Board of County Cotnntissioners