HomeMy WebLinkAbout4.0 Resolution 97-19� �b
STATE OF COLORADO )
)ss
County of Garfield )
At a regular hearing of the Board of County Commissioners for Garfield County,
Colorado, held in the Commissioners' Meeting Room, Garfield County Courthouse, in Glenwood Springs
on Monday , the 7th of April A.D. 19 97 , there were present:
Marian I. Smith
John Martin
Larry McCown
Don DeFord
Mildred Alsdorf
Chuck Deschenes
, Commissioner Chairman
, Commissioner
, Commissioner
,County Attorney
, Clerk of the Board
, County Administrator
when the following proceedings, among others were had and done, to -wit:
RESOLUTION NO. 97-19
A RESOLUTION CONCERNED WITH THE APPROVAL OF A SPECIAL USE PERMIT FOR PUBLIC
SERVICE COMPANY OF COLORADO
WHEREAS, the Board of County Commissioners of Garfield County, Colorado, has received
application from Public Service Company of Colorado for construction of a Natural Gas Pipeline on the
following described tract of land:
See Attached: Exhibit A
(in the State of Colorado and the County of Garfield); and
WHEREAS, the Board held a public hearing on the 18th day of December 1995, upon the question
of whether the above-described Special Use Permit should be granted or denied, at which hearing the public
and interested persons were given the opportunity to express their opinions regarding the issuance of said
Special Use Permit; and
WHEREAS, the Board on the basis of substantial competent evidence produced at the
aforementioned hearing, has made the following determination of fact:
1. That proper publication and public notice was provided as required by law for the hearing
before the Board of County Commissioners.
111111111111111111111111111111111111111III 1111111111111
506733 04/08/1997 03 19P B1014 P780 447
1 of 4 R 0.00 D 0.00 N 0.00 GARFIELD COUNTY CLER
That the hearing before the Board of County Commissioners was extensive and complete, that
all pertinent facts, matters and issues were submitted and that all interested parties were heard
at that hearing.
That the application is in compliance with the Garfield County Zoning Resolution of 1978,
as amended.
For the above stated and other reasons, the proposed use is in the best interest of the health,
safety, morals, convenience, order, prosperity and welfare of the citizens of Garfield County.
NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Garfield
County, Colorado, that the Special Use Permit be and hereby is authorized permitting the use of the above
described tract of land for the construction of a Natural Gas Pipeline, upon the following specific conditions:
That all representations of the applicant, either within the application or stated at the hearing
before the Board of County Commissioners, shall be considered conditions of approval.
That the applicant shall have 360 days from the date of the Resolution of Conditional
Approval to meet all conditions set forth in the Resolution. The Special Use Permit shall be
issued when all conditions are met and shall expire 360 days after issuance, unless
construction or use have commenced.
That all out-of-state vehicles or equipment to be used for the construction of this pipeline be
registered or apportioned within the State of Colorado or the County of Garfield.
4. That the applicant consult with the Rifle Fire Department and file a copy of the Gas
Emergency Plan and Procedures with said Department.
That revegetation of the lands disturbed by the installation of the pipeline shall be in strict
accordance with the revegetation plan that has been submitted with this application. Further,
all revegetation shall be done with certified weed -free seed. The applicant shall be responsible
for weed control in accordance with State and County regulations.
Prior to construction, the applicant shall obtain an excavation permit, for the crossing of
County Road 264, from the Garfield County Road and Bridge Department; and shall make
appropriate notification to the public concerning any road closure dates and/or times. If any
private roads will be crossed, the applicant will be required to receive approval, from the
appropriate party, prior to disturbance of the affected road.
7. That the applicant consult with and file a copy of the Gas Emergency Plan and Procedures
with the Garfield County Office of Emergency Management.
1111111 11111 111111 01111111111 1111 11111101 111111111111
506733 04/08/1997 03 19P 81014 P781 447
2 of 4 R 0.00 D 0.00 N 0.00 GARFIELD COUNTY CLER
Dated this 8th day of April ,A.D. 19 97 .
ATTEST:
GARFIELD COUNTY BOARD OF
COMMISSIONERS, GARFIELD COUNTY,
COLORADO
oz 4
xdize'-t7e-
Chairman
Upon motion duly made and seconded the foregoing Resolution was adopted by the following vote:
Commissioner Chairman Marian I. Smith
Commissioner John F Martin
Commissioner Larry L. McCown
, Aye
Aye
, Aye
STATE OF COLORADO
)ss
County of Garfield
I, County Clerk and ex -officio Clerk of the Board of County
Commissioners in and for the County and State aforesaid do hereby certify that the annexed and foregoing
Resolution is truly copied from the Records of the Proceeding of the Board of County Commissioners for
said Garfield County, now in my office.
IN WITNESS WHEREOF, I have hereunto set my hand and affixed the seal of said County, at
Glenwood Springs, this day of , A.D. 19 .
County Clerk and ex -officio Clerk of the Board of County Commissioners
HUHU! 111111111111111111111111111III INN If
506733 04/08/1997 03.19P 81014 P782 447
3 of 4 R 0.00 D 0.00 N 0.00 GARFIELD COUNTY CLER
LEGAL DESCRIPTION
AN EASEMENT FOR CONSTRUCTION, MAINTENANCE AND REPAIR OR
RECONSTRUCTION OF A GAS PIPELINE DESCRIBED AS BEING 25 FEET ON
EACH SIDE OF THE FOLLOWING DESCRIBED CENTERLINE;
A PARCEL OF LAND LYING IN SECTION 13, T6S, R94W OF THE 6TH P.M.,
COUNTY OF GARFIELD, STATE OF COLORADO BEING MORE PARTICULARLY
DESCRIBED AS FOLLOWS;
COMMENCING AT THE NORTHEAST CORNER OF SAID SECTION 13 (BEING A
FOUND STONE MONUMENT);
THENCE S01°59'11"E, 1380.82 FEET TO A POINT WHENCE THE NORTH ONE-
QUARTER CORNER OF SAID SECTION 13 (BEING A FOUND BRASS CAP)
BEARS N63°32'49"W, 3097.88 FEET;
THENCE N85°05'06"W, 132.4 FEET TO TEE TRUE POINT OF BEGINNING,
SAID POINT BEING ON THE WEST BOUNDARY LINE OF THE RIFLE
COMPRESSOR STATION AS DESCRIBED IN BOOK 669 PAGE 461;
THENCE M850 05'06"W, 8.99 FEET;
=';C'E N08°28'27"E, 70.16 FEET;
-.__'_ICP_ S39°29'14"W, 714.79 FEET;
THENCE N16°42' 06"W, 420.29 FEET;
._?;CE N25°44' 06"W, 440.49 FEET;
THENCE N5041'S1"W, 477.03 FEET;
THENCE N66°53'16"W, 33.25 FEET;
THENCE N84°10'36"W, 41.6 FEET TO THE POINT OF TERMINUS OF SAID
CENTERLINE, SAID POINT BEING ON THE EASTERLY BOUNDARY LINE OF THE
RIFLE GAS PLANT AS DESCRIBED IN BOOK 0906 PAGE 806;
THENCE N84°10'36"W, 49.39 FEET TO A POINT WHENCE SAID NORTHEAST
CORNER OF SECTION 13 BEARS N82°15'53"E, 1644.24 FEET AND WHENCE
SAID NORTH ONE-QUARTER CORNER OF SECTION 13 BEARS N78°35'16"W,
1118.51 FEET.
I
1IIII1 H111 111111 11111 III 1111 111111 111 11111 1111 1111
506733 04/08/1997 03:19P B1014 P783 447
4 of 4 R 0.00 D 0.00 N 0.00 GARFIELD COUNTY CLER