HomeMy WebLinkAboutApplication.pdfGarfield County
2 Vommunity Development Department
108 8th Street, Suite 401
Glenwood Springs, CO 81601
(970) 945-8212
www.garfield-county.com
4's
BUILDING PERMIT
APPLICATION
TYPE OF CONSTRUCTION
-
1
o
Commercial/Multi-Family
•
Demolition
•
Manufactured Home (SF or Duplex)
Mailing Address: 2181 45 1/2 Road, DeBeque, CO 81630
•
Residential (SF, Duplex, or Townhome)
•
Reroof
INVOLVED PARTIES
Property Owner:
Phone: ( 970 ) 263-3607
OXY USA WTP LP
Mailing Address; 760 Horizon Dr. Suite 101, Grand Junction CO 81506
Contractor: Elkhorn Construction, Inc.
Phone:
( 970 ) 283-1009
Mailing Address: 2181 45 1/2 Road, DeBeque, CO 81630
Architect:
Phone:
( )
Mailing Address:
Engineer: Enercon Engineering, Inc
Phone: (
.309 ) 694-1418
Mailing Address: #1 Altorfer Lane, East Peoria, IL 61611
Manufactured Home Installer:
Mailing Address:
Phone:
( )
PROJECT NAME AND LOCATION
Describe Work: A natural-gas powered generator and a galvanealed all-weather enclosure to provide
power to a water impoundment pond.
Job Address: NE1/4SE1/4 Section 4 Township 6 South, Range 97 West, 6th PM in Garfield County
Assessor's Parcel Number:
Owner's Valuation
Sq.Ft of Building:
2169-044-00-003 Sub. Lot Block
of Work: $
310 sq. ft.
20,000 Property
Size (Sq.Ft or Acres):
# of Floors: 1
Height:
13 ft
• Addition
■ Move/Relocation
Class of Work:
0 New
• Alteration
•
Repair
Garage:
• Attached
•
Detached
Septic:
• ISDS
■
Community
Type of Heat:
0 Natural
Gas
• Propane
1
• Electric
• Other
Driveway Permit:
0 Exempt
•
Permit #:
NOTICE
Authority. This application for a Building Permit must be signed by the Owner of the property, described above, or
an authorized agent. If the signature below is not that of the Owner, a separate letter of authority, signed by the
Owner, must be provided with this Application.
Legal Access. A Building Permit cannot be issued without proof of legal and adequate access to the property for
purposes of inspections by the Building Division.
Other Permits. Multiple separate permits may be required: (1) State Electrical Permit, (2) County ISDS Permit, (3)
another permit required for use on the property identified above, e.g. State or County Highway/ Road Access or a
State Wastewater Discharge Permit.
Void Permit. A Building Permit becomes null and void if the work authorized is not commenced within 180 days of
the date of issuance and if work is suspended or abandoned for a period of 180 days after commencement.
CERTIFICATION
I hereby certify that I have read this Application and that the information contained above is true and correct. I
understand that the Building Division accepts the Application, along with the plans and specifications and other
data submitted by me or on my behalf (submittals), based upon my certification as to accuracy. Assuming
completeness of the submittals and approval of this Application, a Building Permit will be issued granting
permission to me, as Owner, to construct the structure(s) and facilities detailed on the submittals reviewed by the
Building Division. In consideration of the issuance of the Building Permit, I agree that I and my agents will comply
with provisions of any federal, state or local law regulating the work and the Garfield County Building Code, ISDS
regulations and applicable land use regulations (County Regulation(s)). I acknowledge that the Building Permit
may be suspended or revoked, upon notice from the County, if the location, construction or use of the structure(s)
and facility(ies), described above, are not in compliance with County Regulation(s) or any other applicable law.
I hereby grant permission to the Building Division to enter the property, described above, to inspect the work. I
further acknowledge that the issuance of the Building Permit does not prevent the Building Official from: (1)
requiring the correction of errors in the submittals, if any, discovered after issuance; or (2) stopping construction
or use of the structure(s) or facility(ies) if such is in violation of County Regulation(s) or any other applicable law.
Review of this Application, including submittals, and inspections of the work by the Building Division do not
constitute an acceptance of responsibility or liability by the County of errors, omissions or discrepancies. As the
Owner, I acknowledge that responsibility for compliance with federal, state and local laws and County Regulations
rest with me and my authorized agents, including without limitation my architect designer, engineer and/ or
builder.
I hereby acknowledge that 1 have read and understand the Notice and Certification above as well as
have provided the required information which is correct and accurate to the best of my knowledge.
Property Owner Print and Sign
November 7, 2014
Date
OFFICIAL USE ONLY
Special Conditions:
Adjusted Valuation:
12790. pb
Plan Check Fee:
5.//
Permit Fee:
8�. 15
Manu home Fee:
400. Co
Misc Fees:
Total Fees:
537, (
Fees Paid:
too . Rh 1
Balance Due:
3 Z 8. Ss
BP No:
ISDS No:
FAO- MO,
F2SK 4 S�7
OCC Group:
—
Const Type:
.5
Zoning: V ,
�
BUILDING / PLANNING
DIVISION : 4,,
//-,,,76-#
Signed Approval Date
pdsool, Cv1 11-1,0-I
NOTE: If any required information is missing, delays in issuing the permit are to be expected. If
determined by the Building Official that additional information is necessary to review the application
and/or plans for compliance, the application may be placed on hold until the required information is
provided. Work may not proceed without the issuance of a permit.
The Building Division will collect a Plan Review fee at time of application submittal. The Permit Fee, as
well as any Septic or Road Impact fees will be collected when the permit is issued.
The permit application must be signed by the owner or by a person having written authority from the
owner to act as their representative.
I hereby acknowledge I have read, understand, and will abide with the requirements of this
checklist.
November 7, 2014
Property Owner Print and Sign Date
r
Garfield County
Community Development Department
108 8th Street, Suite 401
Glenwood Springs, CO 81601
(970) 945-8212
www.garfield-countv.com
COMMERCIAL OR
MULTI -FAMILY
BUILDING PERMIT
APPLICATION CHECKLIST
COMMERCIAL OR MULTI -FAMILY BUILDING PERMIT APPLICATION CHECKLIST
In order to understand the scope of work intended and to expedite the issuance of a permit, it is
important that complete information be provided. Please review this document to determine if you have
adequate information to design your project and to facilitate a plan review.
APPLICATION FORM: Please make sure the following information is provided on the application.
• Parcel number obtained from the County Assessor's Office.
• Job address (assigned physical address).
• Legal Description: lot, block, filing, subdivision or tract, section, township and range.
• Owners name, mailing address, phone, fax, or cell.
• Contactors name, mailing address, phone, fax, or cell.
• Architect/Engineer's name, mailing address, phone, fax or cell.
• Building size, height, number of stories, lot size.
• Use of building (commercial)
• Class of Work (new, addition, alteration, repair, demo, move, other)
• Description of work.
• Type of heating (natural gas, propane, electric, other)
• Sewer system (Community or ISDS), also see other items below.
• Garage (attached or detached)
• Driveway permit (please see other items below)
• Valuation (labor and materials)
OTHER ITEMS:
• If you anticipate obtaining a water -tap from the City of Rifle, please provide a letter indicating that
the City will provide water service. (Required to submit building permit application).
• ISDS requires a septic permit application to be submitted with the building permit application.
• A separate electrical permit must be obtained from the State of Colorado Electrical Board.
• At the time of building permit submittal, you are required to show proof of legal and adequate
access to the site. This may include proof of right to use a private easement, County Road &
Bridge permit, or Colorado Department of Highway permit, including a Notice to Proceed. The
County Road & Bridge Department can be reached at 970-625-8601.
• If you anticipate excavating or grading prior to issuance of a building permit, you will be required
to obtain a separate grading permit.
• If you belong to a Homeowners Association, it is your responsibility to obtain written approval, if
required.
• Provide copies of any Resolutions and/or Land Use Permits associated with this property.
• Projects with more than 10 occupants require plans sealed by a Colorado Licensed Design
Professional. Occupant load shall be calculated by IBC Table 1004.1.1.
• A Colorado State Licensed Electrician and Plumber must perform installation and hook-ups.
BUILDING PLANS: 2 sets of plans must be submitted. Plans must be 18"x24" minimum size, complete,
identical, legible, and to scale. Certain projects may also require a third copy of the plans be submitted to
the local Fire District for review prior to permit issuance. All plans will be checked at the counter for
completeness. If any of the required information is missing, the building permit application cannot be
accepted.
SITE PLAN: Please make sure the following information is provided on the site plan.
• Property address/legal description.
• North Arrow and Scale on each page.
• Show all property lines, building envelopes, flood plain, and easements.
• Provide setback distances from boundaries, buildings, septic, well, and waterways.
• Location and direction of the county or private road and driveway accessing the property.
• Proposed and existing structures include sheds, barns, decks, patios, and any other buildings.
• Existing and proposed grade, positive drainage around structure (to be contained on site).
• Streams, rivers, creeks, springs, ponds and ditches.
• Existing and proposed wells, septic tanks, leach fields, and other systems. (if applicable)
• Retaining walls (engineer stamped detail required for walls over 4 ft, measured from bottom of
footing to top of wall).
NOTE: Any site plan depicting the placement of any portion of the structure within 50 feet of a property
line or not within an established building envelope shall be prepared, stamped, and signed by a licensed
surveyor. For structures to be built within a building envelope, provide a copy of the recorded subdivision
final plat with the proposed structure located in the building envelope.
COVER SHEET:
• Project identification.
• Project address and/or legal description.
• Design specifications to include building use and occupancy classification, type of construction,
building height and area calculations, occupant load, and fire sprinkler systems.
ARCHITECTURAL PLANS: Please provide the following information on the architectural plans.
• Per C.R.S. 12-4-112; Structures designed with an occupant load exceeding 10 require Colorado
State Licensed Design Professional stamped plans.
• Minimum 4 elevations (N,S,E,W)
• Floor plans for each level including dimensions and scale noted.
• Clearly label each room or space (office, storage, mechanical, elevator, etc).
• Wall types; clearly labeled and referenced. Identify all fire resistive wall construction.
• Construction details for all fire resistive elements referenced on floor plans and cross sections.
Include wall, floor/ceiling, roof/ceiling, shaft wall assemblies, and structural frame. Provide the fire
resistive listing number referenced on each assembly detail. (ex. UL P123)
• Window & door sizes, types, and operation and direction of swing noted on the floor plan.
• Specify roof slope/pitch, roof covering, and siding materials.
• Energy design specifications/details for R -values, U -factors, and SHGC's per IECC.
• Stair and guard details specifying rise, run, height and spacing.
• Accessibility; show compliance with accessibility requirements for all elements of the building per
IBC, Chapter 11 and ICC/ANSI A 117.1, ADA, FHA, and UFAS.
STRUCTURAL PLANS: Please provide the following information on the structural plans.
• Per C.R.S. 12-4-112; Structures designed with an occupant Toad exceeding 10 require Colorado
State Licensed Engineer stamped plans.
• Engineered foundation design per soils report. Geotechnical report referenced.
• Design specifications to include roof and deck snow load, wind and seismic design, frost depth.
• Foundation plan showing complete footing and foundation dimensions.
• Footing and foundation details specifying reinforcement referenced on plans.
• Framing plans for each floor level and roof. All beams, columns, joists, rafters, trusses and all
live/dead loads specified.
• Framing /connection details referenced on plans.
• Pre -manufactured structures require an engineers stamp, signature, and date.
MECHANICAL PLANS: Please provide the following information on the mechanical plans.
• Per C.R.S. 12-4-112; Structures designed with an occupant Toad exceeding 10 require Colorado
State Licensed Engineer stamped plans.
• Energy design calculations and details verifying compliance with the 2009 IECC.
• Floor plans for each level showing size, location and materials of all ductwork, plenums, return
and outside air intake registers.
• Size and location of all combustion air ductwork and openings.
• Size, type and termination of all gas appliance flues and vents.
• Location of all fire and combination smoke/fire dampers.
• Equipment schedule for all mechanical equipment (boiler, furnace, exhaust fans, etc).
• Commercial kitchen hood location, hood and duct sizes, CFM calculations.
PLUMBING PLANS: Please provide the following information on the plumbing plans.
• Per C.R.S. 12-4-112; Structures designed with an occupant load exceeding 10 require Colorado
State Licensed Engineer stamped plans.
• Floor plans for each level showing DWV layout and sizing, materials, slope and sewer location.
• Water piping materials, length and size of pipe, water meter location, fixture unit demands,
location and type of backflow prevention devices.
• Gas piping materials, length and size of pipe, gas meter location, and BTU/hour demands.
• Additional piping plans for roof/deck drains, condensate, medical gas, etc.
• Plumbing fixture schedule for all plumbing equipment.
• Commercial kitchen plumbing fixtures, food preparation equipment, grease interceptors, etc.
ELECTRICAL PLANS: Please provide the following information on the electrical plans.
• Per C.R.S. 12-4-112; Structures designed with an occupant load exceeding 10 require Colorado
State Licensed Engineer stamped plans.
• Floor plans for each level showing location of lighting fixtures, switches, receptacles, emergency
exit signs and lighting, and panel location.
• Diagram showing service entrance, conduit/wire size, main disconnect size, grounding
electrode/conductor size, feeder conduit/wire size, transformers and generators.
• Panel schedule showing bus/breaker sizes, circuit description, voltage, phase, amperage, etc.
®1 OXY USA WTP LP
%
11111 PdKIWIPIV,IiiiREihatetiih{r 11 PULA Ili 11111
Reeeptlon5: 855321
10/28/2014 04:36:00 PM Jean Rlberico
1 of 1 Rea Fee:$11.00 Doc Fee:0.00 GARFIELD COUNTY CO
June 4, 2014
Ms. Tamra Allen
Community Development Department
Garfield County
108 8"' Street, Suite 401
Glenwood Springs, CO 81601
RE: Agent Authorization for OXY USA WTP and OXY USA Inc. permitting projects
Garfield County, Colorado
Dear Ms. Allen,
760 Horizon Dr., Suite 101
Grand Junction, CO 61506
Phone 970.263.3600
OXY USA WTP LP and OXY USA Inc. (Oxy) authorizes Blair Rollins with Olsson Associates and Katy Middleton with
Blue Sky Permitting and Planning, LLC to act on behalf of and represent Oxy in matters related to land use
permitting projects located in Garfield County, Colorado.
Please contact me if you have any questions, comments, concerns, or if you require additional information. I can
be reached at 970.263.3607 or at chris clark@oxv.com.
Sincerely,
is Clark
Operations Manag
Cc: file
Olsson
1
1111 11III
Reeeptlonli: 783258
03/15/2010 02:32:69 P11 Jean Alberioo
1 of 1 Reo Fee:$11.00 Doc Fee:0.00 GARFIELD COUNTY CO
STATEMENT OF AUTHORITY
Chris G. Clark, Regulatory Coordinator/Lead for OXY USA WTP LP, a Delaware
limited partnership, and for OXY USA Inc., a Delaware corporation (jointly "Oxy"),
760 Horizon Drive, Grand Junction, Colorado 81506, is authorized to act on
behalf of, and represent Oxy in all matters related to applications for special use
permits, conditional use permits, administrative permits, limited impact review,
major impact reviews, and land use change permits (and may execute such
applications) submitted to Garfield County, Colorado until such time as Oxy files
of record a statement that Mr. Clark no longer has such authority. Oxy
acknowledges that when any such permits are issued by Garfield County,
Colorado, the County may choose to file them of record and such permits may
contain certain covenants that run with the particular lands identified in such
permits.
OXY USA WTP LP
By: OXY USA Inc., its general partner
' Name: William B. Roby
Title: Vice President, Mid -Continent
OXY USA Inc. c�
By: L4—.5.( K
Name: William B. Roby
Title: Vice President, Mid -Continent
STATE OF TEXAS
COUNTY OF HARRIS
This instrument was acknowledged before me on this 5 day of March,
2010, by William B. Roby, Vice President of OXY USA Inc, a Delaware
corporation on behalf of OXY USA Inc., a Delaware corporation and on behalf of
OXY USA WTP LP, a Delaware limited partnership.
My Commission Expire
Cfv`tofvne M dcvnokay
Notary Public, State of Texas
0CHRISTINE M SANCHEZ
My Commission Expires
Jply 2, 2013
Nue- i-)
11110031atitilli.00,i IJ4T lY.11'I h104101,11111
Reeeptlonli: 845914
02/03/2014 03:29:19 PM ,lean Alberico
1 o/ 6 Roc Fee,E0.00 Doo Fee 0.00 GARFIELD COUNTY CO
STATE OF COLORADO )
)ss
County of Garfield )
At a regular meeting of the Board of County Commissioners for Garfield County,
Colorado, held in the Commissioners' Meeting Room, Garfield County Administration Building
in Glenwood Springs on Monday, the 20th day of January A.D. 2014, there were present:
John Martin
Mike Samson
Tom Jankovsky
Frank Hutfless
Jean Alberico (absent)
Andrew Goraev (absent)
, Commissioner Chairman
, Commissioner
, Commissioner
, County Attomey
, Clerk of the Board
, County Manager
when the following proceedings, among others were had and done, to -wit:
RESOLUTION NO. a+DI4-07
A RESOLUTION OF APPROVAL FOR A LAND USE CHANGE PERMIT FOR TWO
WATER IMPOUNDMENTS KNOWN AS 13E AND 13W, AND STORAGE OF
MATERIAL, EQUIPMENT AND SUPPLIES ON A SITE OWNED BY OXY USA WTP,
LP. THE 640 -ACRE SITE IS LOCATED IN SESE r SECTION 4, TOWNSHIP 6
SOUTH, RANGE 97 WEST OF THE 6Th P.M., GARFIELD COUNTY
PARCEL NO# 2169-044-00-003
Recitals
A. The Board of County Commissioners of Garfield County, Colorado, (Board) received
a request for a Land Use Change Permit for two existing Water Impoundments, and two
proposed Storage areas for material, equipment and supplies. This approval allows operation of
the facility to store a maximum of 121,480 BBLs of produced water in the two water
impoundments and storage area not to exceed 3.03 -acres within the 21.47 -acre project area as
shown in the site plan attached as Exhibit A.
B. This facility is Located within a 640 -acre parcel of land owned by OXY USA WTP, LP
as described in a General Warranty Deed at Reception Number 713681 in the records of the
Garfield County Clerk and Recorder.
C. The subject property is located within unincorporated Garfield County in the Resource
Lands (Plateau) zone district, north of the Town of DeBeque.
1
1111MirdlIVhh7MIR V 1 WM 116 11111
Reeeptlontt: 845914
02/03/2014 03:20:19 PM Jean Rlberioo
2 of 6 Rec Fee.$0.00 Doe Fee 0.D0 GPRFIELD COUNTY CO
D. Water Impoundment and Storage may be permitted in the Resource Lands (Plateau)
zone district with Limited Impact review.
E. The Board is authorized to approve, deny or approve with conditions a Limited Impact
application resulting in issuance of a Land Use Change Permit pursuant to the 2013 Land Use
and Development Code.
F. The Board of County Commissioners opened a public hearing on the 16th day of
December, 2013 for consideration of whether the proposed Land Use Change Permit should be
granted or denied, during which hearing the public and interested persons were given the
opportunity to express their opinions regarding the request.
G. The Board of County Conunissioners continued the public hearing to the 200i day of
January, 2014 to obtain and review additional information related to the request.
H. The Board of County Commissioners continued the public hearing on the 200i day of
January, 2014 at which time additional information was considered to determine if the Land Use
Change Permit should be granted or denied, during which hearing the public and interested
persons were given the opportunity to express their opinions regarding the request.
I. The Board of County Commissioners closed the public hearing on the 200i of January,
2014 to make a fmal decision.
J. The Board on the basis of substantial competent evidence produced at the
aforementioned hearings, has made the following determinations of fact:
1. That proper public notice was provided as required for the hearing before the
Board of County Commissioners.
2. That the hearing before the Board of County Commissioners was extensive and
complete, that ail pertinent facts, matters and issues were submitted and that all
interested parties were heard at that meeting.
3. That for the above stated and other reasons, and upon compliance with conditions
of approval, the Land Use Change Permit for two (2) Water Impoundments, 13E
and 13W, and Storage of Equipment, Material and Supplies, is in the best interest
of the health, safety, convenience, order, prosperity and welfare of the citizens of
Garfield County.
4. That, upon compliance with conditions of approval, the application is in general
conformance with the Comprehensive Plan 2030, as amended.
5. That, upon compliance with conditions of approval, the application is in
conformance with the 2013 Land Use and Development Code.
2
1111 WIr1A' I/YLM1�1144L Mt lel„ �111Y�R�UrN!?11i�,tl s 1I III
Receptionfl 845914
02/03/2019 03:29:19 PM Jean Alberloo
3 0l 6 Reo Fee:E0.00 Doc Fee:0.00 GARFIELD COUNTY CO
RESOLUTION
NOW THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Garfield
County, Colorado, that:
A. The forgoing Recitals are incorporated by this reference as part of the resolution.
B. The Land Use Change Permit for a for two (2) Water Impoundments, 13E and 13W, and
Storage of Equipment, Material and Supplies is hereby approved subject to compliance
with the following conditions:
1. That all representations made by the Applicant in the application and public hearing shall be
conditions of approval, unless specifically altered by the Board of County Commissioners.
2. That the facility shall operate in compliance with all applicable Federal, State, and local
regulations governing the operation of this type of facility.
3. The land use change permit is for two water impoundments, 13E and t3W, not to exceed 3.3 -
acres in size and storage capacity not to exceed 121,480 Barrels of produced water. In
addition, the 21.47 -acre project area is approved for two storage facilities as indicated on the
approved site plan for a total area of 3.03 -acres. No hazardous material or fuel storage is
permitted within the facility.
Prior to Issuance of the LUCP
4. Prior to issuance of the Land Use Change Permit, the Applicant shall provide a supplement to
the Traffic Analysis utilizing the 2011 Road & Bridge Traffic Counts and updating the report
as appropriate to include traffic generated by the storage areas. The supplement shall include
a finding consistent with the current study that no additional traffic improvements are
recommended or provide specific recommendations that the Applicant shall be required to
comply with subject to review by Garfield County.
5. Prior to issuance of the Land Use Change Permit, the Applicant shall provide written
confirmation that all pipelines serving the facility have been properly permitted or are
exempt from permitting requirements.
6. Prior to issuance of the Land Use Change Permit, the Applicant shall provide copies of the
well permits related to the three monitoring wells for the site.
7. Prior to issuance of the Land Use Change Permit, the Applicant. shall provide a statement by
a qualified professional or representative of the Applicant confirming the adequacy of the
access road to serve the site. A waiver from Article 7, Roadway Standards is approved
pursuant to the approval criteria contained in Section 4-118 of the Land Use and
Development Code, subject to compliance with the above requirement.
3
1111IAFJP11f4Y1M'LWh!i L%kIIflrYaTNOr iii 11111
Reoeptionff: 848914
02103(2014 0329:19 PM Jean Alberico
4 of 6 Rec Foo.$0.00 Doc Fee:0 00 GARFIELD COUNTY CO
8. Prior to issuance of the Land Use Change Permit, the Applicant shall obtain the proper
building permits for structures on the site, including existing/proposed fencing that shall
consist of a minimum of a 7 -foot chain-link fence capable of preventing elk and deer from
entering the pit; concurrently it should have a small mesh type of fencing along the bottom of
the fence (buried on -foot below grade level and extending a minimum of two -feet above
grade capable of preventing small animals from entering between the gaps (gaps should be
no larger than three -inches).
9. Prior to issuance of the Land Use Change Permit, the Applicant shall provide specifications
and details for the proposed liners and leak detection systems of the ponds subject to review
by Garfield County.
10, Prior to issuance of the Land Use Change Permit, the Applicant shall provide a Drainage and
Erosion Control Plan that includes analyzes the 21.47 -acre project area including sufficient
detail to determine how site runoff is directed on the site and includes additional BMPs in
areas of concentrated flaw. This plan shall be reviewed for sufficiency by Garfield County.
11. Prior to issuance of the Land Use Change Permit, the Applicant shall provide a signed and
stamped Drainage Report prepared by an engineer that satisfies the requirements of Section
7-204 of the 2013 Land Use and Development Code and includes documentation on the
source of the runoff calculation intensities as well plans indicating how water will drain
around the impoundments and storage areas (including grading plans). The Applicant shall
provide information related to how the levels in the ponds will be monitored and
management concerning items such as active water level, precipitation, freeboard, overflow
level, etc. This information, once submitted shall be reviewed by Garfield County for
compliance with code standards and BMP's.
12. Prior to issuance of the Land Use Change Permit the Applicant shall provide information
regarding total amount of site disturbance related to proposed improvements and provide a
revegetation security based upon $2,500.00 per acre of revegetated area if the amount of
disturbance is greater than one-half (1/2) acre.
13. Prior to issuance of the Land Use Change Permit the Applicant shall provide a Soil Plan that
provides for soil cover if any topsoil stockpiles will site exposed for a period of ninety days
or longer.
Wildlife Conditions
14. The Applicant shall comply with the following Colorado Parks and Wildlife
recommendations regarding protection of wildlife:
A. Night Lighting should be of the full -cutoff type and/or timed or otherwise minimized to
reduce disruption to wildlife.
4
IlicitiMnilnk,dF111:10#11MMIAlk 11III
R.55011on4: 845814
02/03/2014 03:29:19 PM Jean Rlber}oo
5 of 6 Ree Fee.50.00 Dao Fee:0.00 GARFIELD COUNTY CO
B. The Applicant shall install bear -proof trash containers at this facility and workers shall be
advised that feeding bears is aprohibited activity.
C. The wastewater pit(s) should be adequately protected to ensure that waterfowl and other
birds are prevented — excluded — from entering or coming in contact with water in the
pit(s), Adequate protection may include netting (preferred by CPW and USFWS),
RADAR triggering noise deterrents, floating cover, or other device that is a demonstrably
proven method of avian deterrent. Unacceptable methods including flagging, floating 4
inch hollow plastic balls, decoy predators, or other sight deterrents, reflectors, strobe
lights, or zon guns (sonic blast). See the USFW web page for additional guidance at
http://www.fws.gove/mo untain-prairie/fontaminants/contaminants l c.html
D. Construction activities (on a daily basis, continuous, intermittent loud noise) such as
heavy equipment operations (backhoes, bulldozers, generator, and heavy trucks) and or
intensive human activities should occur outside of the time period from March 1 to June
30 to minimize impacts to greater sage -grouse production areas. Construction activities
include earth moving and or pit liner removal or installation.
E. CPW shall be notified immediately if any birds and/or wildlife are found dead or trapped
within or around the pit, netting, or fences.
F. Following the completion of construction activities, newly exposed soils should be
revegetated as soon as possible to prevent erosion and to reduce the likelihood of non-
native plants becoming established in the area. Seed mix used for revegetation should be
certified as weed -free and consist of native seeds from plants that are common to the
area.
G. To reduce the likelihood of truck — wildlife collisions, proper speed limits (<25 mph)
should be posted and enforced on all service roads.
Other
15. Any future air quality permits for this facility shall be provided to the County upon issuance
by CDPHE.
16. The applicant shall conduct on-site weed inventory in the spring or early summer of 2014
and provide the information to the County Vegetation Manager by June 30, 2014.
224e
Dated this $ day of f'e6.4.4.c suet , A.D. 20 Pi
5
ATTEST:
1111II11:11LITill'L ili I1JIW1/2t'1M7100/P 'i PN0001011111
Reception#: 845914
02/03/2014 03:25:19 PM Jean Plberloo
6 of 6 Reo Fee $0,00 Doo Fee:0,00 GARFIELD COUNTY CO
GARFIELD COUNTY BOARD OF
COMMISSIONERS, GARFIELD
COUNTY,R6I.,ORADO
erk of the Board Ch
Upon motion duly made and seconded the f• egoing R . u ion was ado. d by the
following vote:
COMMISSIONER CHAIR JOHN F. MARTIN
COMMISSIONER MIKE SAMSON
COMMISSIONER TOM JANKOVSKY
STATE OF COLORADO
)ss
County of Garfield
, Aye
Aye
Aye
1, , County Clerk and ex -officio Clerk of the Board of
County Commissioners, in and for the County and State aforesaid, do hereby certify that the
annexed and foregoing Resolution is truly copied from the Records of the Proceeding of the
Board of County Commissioners for said Garfield County, now in my office.
IN WITNESS WHEREOF, I have hereunto set my hand and affixed the seal of said
County, at Glenwood Springs, this _ day of , A.D. 20
County Clerk and ex -officio Clerk of the Board of County Commissioners
6
Building Plan Review
Description of Work: metal generator building
Bin #:
Location Address: Sec04, TO6S, R97W
DEBEQUE, CO 81630
General Information
Contacts
Case Manager: David Bartholomew
Plan Case Number: BLDG -11-14-8151
Parcel: 216904400003
Application Date: 11/20/2014
Owner: OXY USA WTP LP
Applicant: OXY USA WTP LP
Applicant Phone: Email:
Ny,d
/
N/X
Building
Engineered Foundation
Driveway Permit
Surveyed Site Plan
Septic Permit and Setbacks
Grade/Topography 30%
Attach Residential Plan Review List
Minimum Application Questionnare
Subdivision Plat Notes
Fire Department Review
Valuation Determination/Fees
Red Line Plans/Stamps/Sticker
7
Attach Conditions
Application Signed
Plan Reviewer To Sign Application
Parcel/Schedule No.
40# Snowload Letter - Manu. Homes
Nfr1
Soils Report
Planning/Zoning
Property Line Setbacks
30ft Stream Setbacks
Flood Plain
Building height
Zoning Sign -off
Road Impact Fees
/1///t
HOA/DRC Approval
Grade/Topography 40%
Planning Issues
Subdivision Plat
General Comments:
Vt/t7/7
3/0 x 9 eo folz 790,
Tuesday, November 25, 2014