Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT BLCO-11-14-3458, SEPT -10-14-3429 Bethel Party Rentals, Inc Whse/Office, Building A 5447 CR 154 GWS, Colorado 1) ALL WORK MUST COMPLY WITH THE 2009 IBC, IMC, IPC, IFGC, IECC, IFC, AND THE MANUFACTURERS INSTALLATION SPECIFICATIONS. 2) ALL WORK SHALL COMPLY WITH THE CURRENT "CL" ZONE DISTRICT REGULATIONS. 3) A COPY OF THE AMENDED PLAT, DELETING THE PARKING EASEMENT, IS REQUIRED PRIOR TO SEPTIC PERMIT ISSUANCE. 4) BUILDING IS APPROVED AS TYPE V -B CONSTRUCTION, S-1, B OCCUPANCY. AREA INCREASE REVIEWED UNDER 2009 IBC, SECTIONS 506 AND 705.3. 5) CONTACT LOCAL FIRE DISTRICT FOR PERTINENT IFC REQUIREMENTS. FIRE DISTRICT FINAL APPROVAL REPORT IS REQUIRED FOR CO/FINAL INSPECTION. 6) CONTACT GARFIELD COUNTY ROAD & BRIDGE DEPARTMENT REGARDING ACCESS IMPROVEMENTS. FINAL APPROVAL IS REQUIRED FOR CO/FINAL INSPECTION. 7) A LOT IMPROVEMENT CERTIFICATE, SEALED BY A COLORADO LICENSED SURVEYOR, IS REQUIRED AT FOOTING/FOUNDATION INSPECTION TO VERIFY BUILDING SETBACKS. 8) OPEN -HOLE SOILS REPORT IS REQUIRED AT FOOTING INSPECTION, 2000 PSF. 9) ACCESSIBILITY PER 2009 IBC, CHAPTER 11 AND ICC/ANSI A117.1-2003. 10) ALL HIGH STRNGTH BOLTING AND FIELD WELDING REQUIRES SPECIAL INSPECTOR. PROVIDE AN APPROVAL REPORT AT FRAME INSPECTION. 11) ELECTRICAL ROUGH IN APPROVAL IS REQUIRED AT FRAME INSPECTION. 12) ELECTRICAL FINAL APPROVAL IS REQUIRED FOR CO/FINAL INSPECTION. 13) ENGINEERED SEPTIC APPROVAL REPORT IS REQUIRED FOR CO/FINAL INSPECTION.