Loading...
HomeMy WebLinkAbout3.0 PermitNIP 141 VINOD& Wit.E"iadgWILNITA101.1411 III Receptionu: 847957 0a/0;;2014 07 13 27 PM Jean Plber,co 1 of 5 Rec Fee.$0 00 Doc Fee 0.00 GARFIELD COUNTY GO LAND USE CHANGE PERMIT for A Parcel of Land Owned by OXY USA WTP LP Located Approximately 15 Miles North of DeBeque in Section 16, Township 6 South, Range 97 West of the 6th P.M. and Legally Described in a Deed found at Reception Number 759939 in the records of the Garfield County Clerk and Recorder with the Project Area Described in Exhibit A" (Assessor's Parcel No. 2169-214-00-026) In accordance with and pursuant to provisions of the Garfield County Land Use and Development Code, as amended, and Resolution No. 2013-77 of the Board of County Commissioners of Garfield County, State of Colorado, the following activity is hereby authorized by Land Use Change Permit: Water Impoundment, Material Handling and Storage Facility known as the Pond G Centralized E&P Waste Management Facility as shown on the Site Plan Attached as Exhibit eB" (LIPA —7650) This Land Use Change Permit — Limited Impact Review is issued subject to the conditions contained in Resolution No. 2013-77 and set forth in Exhibit "C" and shall be valid only during compliance with such conditions and other applicable provisions of the Garfield County Land Use and Development Code, as amended, Building Code, and other regulations of the Board of County Commissioners of Garfield County, Colorado. ATTEST: s /Y) al---11,--ttal_ erk of the Board GAR' + COUNTY BOARD OF CO NTY••MMISSIONERS, GA IELD COUNTY, COLORADO Date S Exhibit A (Project Area Description) 1111 Mr.itilitalitiliT !NNW law, III Recepkiend: 847957 04/07/2014 02,13.27 PM jean Plberico 2 of 5 Roc Fee $0 00 Doc Fee 0 00 GARFIELD COUNTY CO PROJECT AREA DESCRUPTIOTh Aq MEA OF LANG 91UATE 1H TIE NORTHWEST OHM= OF SEOTNH le, TOWNSHIP S SOUTH. RANGE 97 NEST OF TME Gill PJ4., BARFIELD COUNTY. C01O1tA04 flG MORE PAROOLARLY MENN E* AS FOLLOA'S: ONNDEINO AT RIE WORT %CST CORNER Cf SAID SECTION 11 METIGE SCUM 83YC!4Y EAST A DISTANCE Or 1605144 MET TO lit Pawl OF ($GEfFIR DOM MUM . Pat EAST A MAW OF 660.40 FEET: 11TNCE 9W111.00100'00" EAST A OISTTMIR or 4101.74 FEET, RENEE HORN eo'w 0" TEST A OISTANOE OF 091.44 FEET TO A POINT FROM V ENCE DHE SEMMES, CORNER Or 116 1401111111191 WAITER OF SASE SECTION 16 BEARS, SOUTH 0618'42" 1EESr A ORA= OF 1487.19 FLET; THENCE NORTH 030334" CAST A OISTIWCE OF 038.73 FEE/ 1NENCE NORM 8804'04" VEST A DISTANCE of 1413:40 FEETN THENCE NORTH 45'391/" EA$T A OEM= Or 376.44 FEET TO THE PONT Or NEONMI024 SAID AMA Cr LANG CONTNNaO 666046 SQUARE FEET OR 14.11 AORES MORE OK LESS AND SRI= 70 ANY EASEMENTS, OR mourns OF FECOAD. 1111 N!rjrj1jirIh14.'LIKiL1,'',ti'IJilli'iirif'ft1,114.51iiii 11111 Receptiond: 847957 04/0/7014 02 13 27 PM Jean Plberico 3 of 5 Rec Fee. -$0 00 Doc fee 0 00 GARFIELD COIJNIY GO Exhibit B (Project Site Plan) DETAIL . "A" • scriic t •=eo : O:e..r •KnaulaKGiliC ; ' 1 . 1 i • r.1 1 rdttsarn •1- cerntNe ` , � I ,elp —, auseura claim i ..r,, - A 1 t III ` -ffsp1, 9 - 4 _ 111 Lqp..._; I 1 r •r. lI 1 .. �.. I ! covratiammerat I. w 'ft. Q r1 4/ I 1 4214 11 11 i�{� ll ; I / I 1 '���^p{1I `1 / / / 1 i5588��` +I , ;, 1 #7ypvM „ ; II 1// I !Ii t \ 1 kx r / • .1,°, ..N1 ," P g1 fr r,ff1MiNY,NIhdbl'IisiFiligilt,Ylli'Egitih11111 Re4ep€ion#: 847957 0=.0:!2014 02.13.2' P11 Jean Rlberico I or 5 Pec Fee En.00 Inc)Fee.O.00 GARFIELD COUIITV (0 txnfaft C (page 1 of 2) 1. That all representations made by the Applicant in the application shall be conditions of approval, unless specifically altered by the Board of County Commissioners. 2. That the operation of the Pond G Water Impoundment — Material Handling and Storage Facility shall be done in accordance with all applicable Federal, State, and local regulations governing the operation of this type of facility. 3. Prior to issuance of the Land Use Change Permit, the Applicant shall provide a supplement to the Traffic Analysis confirming that Storage traffic was included in the analysis or updating the report as appropriate. The supplement shall include a finding consistent with the current study that no additional traffic improvements are recommended or provide specific recommendations that the Applicant shall be required to comply with subject to review by the County's Consulting Engineer. 4. Prior to issuance of the Land Use Change Permit, the Applicant shall provide written confirmation that all pipelines serving the facility have been properly permitted or are exempt from permitting requirements and that all water being stored on the site is from non -tributary geologic formations and therefore exempt from water well regulations. 5. The Applicant shall complete the RACT Analysis for the site as detailed in the OXY Air Regulatory Permitting Statement dated 10/18/13 and obtain any permits required by the CDPHE. The Applicant shall maintain compliance with said permits and copies shall be provided to the County upon issuance by the CDPHE. 6. The facility shall maintain compliance with CDPHE Storm Water Management Permits, Drainage and Grading Plans, Reclamation and Erosion Control Plans for the site. 7. Implementation of the Applicant's Dust Control Plan shall be required. A copy of the plan or applicable excerpts shall be provided for inclusion in the County Files. 8. Compliance with all COGCC fencing, lining, leak detection, monitoring well, and high level monitoring/alarms shall be required. Copies of the COGCC Form 28 approvals shall be provided to the County upon issuance by COGCC. Exhibit C (page 2 of 2) 1111 Pr11 y ir.1/211J,DIA I t WINfailitiuN11, Yll,f, U III Reception4: 847957 04/07/2014 02:13.27 PM Jean Al bar Ico 5 of 5 Rec Fee $0 00 Doo Fee 0 00 GARFIELD COUNTY CO 9. The facility shall maintain compliance with COGCC Noise Standards/Regulations. If future compliance issues are identified the Applicant shall provide noise mitigation in order to achieve compliance along with a technical evaluation by a qualified professional to confirm compliance. 10. The Applicant shall comply with all SPCC Plan provisions and shall keep the plan current and updated for any changes to the facility. 11. The facility shall maintain compliance with Section 7-306 Lighting, with all lighting to be directed inward and doward toward the interior of the site. Facilities and storage tanks shall be painted a non -glare neutral color to lessen any visual impacts. 12. The Emergency Response Plan provided with the Application submittal including contact information shall be kept updated. 13. The Applicant shall comply with their Noxious Weed Management Plan including the best management practices and provide confirmation that the site is covered by existing COGCC bonding for re -vegetation and reclamation. 14. The Applicant shall comply with the recommendations of the ERO Resources Biological Resource Report (dated July 15, 2013) included in the Applicant's submittals and the Colorado Parks and Wildlife recommendations contained in their referral letter dated October 3, 2013 and supplemental email dated October 17, 2013 including upgrading fencing, flagging and netting for waterfowl deterrents and calendar limitations on construction activities to avoid impacts on candidate species including the Sage Grouse. 15. Storage areas shall be limited to the previously disturbed portion of the site and a fire break separation between the storage areas and native vegetation shall be maintained at the perimeter of the site.