HomeMy WebLinkAbout1.0 Application• •
GARFIELD COUNTY PLANNING DEPARTMENT
109 8TH STREET, SUITE 303
GLENWOOD SPRINGS, CO 81601
Telephone: 970-945-8212 Fax: 970-945-7785
APPLICATION
SPECIAL USE PERMIT
Date: 10th, March 1997
Rulison Gas Company, L.L.C.
Applicant:
Address of Applicant: 1580 Lincoln Street, Suite 1270 Denver, Colorado 80203
Special Use Installation and operation of a Plant and Compression Facility.
Legal Description: SENE, Section 2, Township 7 South, Range 96 West, 6th P.M.
Practical Description (location with respect to highways, county roads, and residences):
North of the town of Parachute, west of County Road 215.
Requirement ss.
.
1. Plans and specifications for proposed use (hours of operation, number of vehicles/day, location and size
of structures, etc.).
2. Existing or proposed method of sewage, source of disposal and water. Road access and other
information deemed necessary to explain proposed use.
3. A vicinity map drawn to scale depicting the subject property, location and use of building and structures
on adjacent lots.
4. An impact statement on the proposed use where required by Sections 5.03-5.03.12 of Zoning
Regulations.
5 A copy of Assessor's map showing property; and a listing of all adjoining property owners of said
property.
6 A base fee of 5400.00 shall be charged for each application and shall be submitted with the application;
additional charges may be imposed if county review costs exceed the base fee.
7. Attach a copy of proof of ownership for your property (deed, title insurance).
If public notice is required, notice provided by the Planning Department shall be sent out at least fifteen (15) days prior
to hearing by return -receipt mail to all the above noted adjoining property owners. Mailing is the applicant's
responsibility and proof of mailing must be presented at the hearing. Additionally, the same notice shall be published
one (1) time in the official County newspaper at least fifteen (15) days prior to such hearing date. Applicant shall bear
the cost of publication and be responsible for presenting the "Proof of Publication" at the hearing.
The above information is correct to the best of my knowledge.
Applicant
D e
MAR -12-97 WED 14:34 PICEANCE NATURAL-RULISON 303$326463 P.04
•
Conditional and Special Uses 5.03.01
5.03.07 1ndustrialppeaations: Industrial Operations, iucl udingex traction, processing,
fabrication, industrial support facilities, mineral waste disposal, storage,
sanitary landfill, salvage yard, access routes and utility tines, shalt be permitted,
provided:
(1) `The applicant for a permit for industrial operations shall prepare and
submit to the Planning Director ten (10) copies of an impact statement on the
proposed use describing its location, scope, design and construction schedule,
including an explanation of its operational characteristics. (inc (1) copy oldie
impact statement shall be filed with the County Cominissioncrs by the
Planning Director. The impact statement shall address the following:
(A) Existing lawful use of water through depletion or pollution of surface
run-off, stream flow or ground water;
(13) Impacts on adjacent land from the generation of vapor, dust, smoke,
noise, glare or vibration, or other emanations;
(C) impacts on wildlife and domestic animals through the creation of
hazardous attractions, alteration of existing native vegetation, blockade of
migration routes, use patterns or other disruptions;
(D) Affirmatively show the impacts of truck and automobile traffic to and
from such uses and their impacts to areas in the County;
(E) That anffcientdistances shall separate such use from abutting property
which might otherwise be damaged by operations of the proposed use(s);
(F) Mitiga tion measures proposed for all of the foregoing impacts identified
and for the standards identified in Section 5.03.08 of this Resolution.
(2) Permits may be granted for those uses with provisions that provide
adequate mitigation for the following:
(A) A plan for site rehabilitation must be approved by the County
Commissioners before a permit for conditional or special use wilt be issued;
(11) The County Commissioners may require security before a permit for
special or conditional use is issued, if required. The applicant shall furnish
evidence of a bank commitment of credit, bond, certified check or other
security dented acceptable by the County Commissioners in the amount
calculated by the County Commissioners to secure the execution of the site -
zehabilitation plan in workmanlike manner and in accordance with the
specifications and construction schedule established or approved by the
County Commissioners. Such commitments, bonds or check shall be payable
to and held by the County Commissioners;
MAR -12-97 WED 14:55 PICEANCE NATURAL.,RULISON 3038326465 P.05
Conditional and Special Uses 5.03.01
(C) Impacts set forth in, the impact statement and compliance with the
standards contained in Section 5,03,08 of this Resolution. (A. 93-061)
5.03.08 Industrial P r tr anct Standards: All industrial operations in the County t.
shall comply with applicable County, State, and Federal regulations regulating I
water, air and noise pollution and shall not be conducted in a manner 1
constituting a public nuisance or hazard. Operations • .all be conducted in
such a manner as to minunizc heat, dust, smoke, vibration, glare and odor and
all other undesirable cnviroimlental effects beyond the boundaries of the ,L
property in which such uses ace located, in accord with the following
standards;
(1) Volume of sound generated shall comply with the standards set forth in
the Colorado Revised Statutes at the time any new application is made.. (A.93-
061) !
MAR -12-97 WED 14:36 PICEANCE NATURAL'RULISON 30326463
II
5.03.08
Conditional and Special Uses
P.06
(2) Vibration generated: every use ! shall be so operated that the
ground vibration inherently and tecurrently generated is not perceptible,
without instruments, at any point of any boundary line of the property on
which the use is located;
(3) Emissions of smoke and particulate matter: every use shall be
operated so as to comply with all Federal. State and County air quality
laws, regulations and standards;
(4) Emission of heat, glare, radiation 'and fumes: every use shall be so
operated that it does not emit heat,' glare, radiation or fumes which
substantially interfere with the existing use of adjoining property or which
constitutes a public nuisance or hazard. Flaring of gases, aircraft warning
signals, reflective painting of storage tanks, or other such operations
which May be required by law as safety or air pollution control measures
shall be exempted from this provision;
(5) Storage area, salvage yard, sanitary landfill and mineral waste
disposal areas:
(A) Storage of flammable laws
and
explosive as or shall gases
with the
accordance with accepted standards and
National Fire Code;
(B) At the discretion of the County Commissioners, all outdoor
storage facilities for fuel, raw materials and
produitiesfrom adjacent p aper y
cts shall be enclosed by
a fence or wall adequate to conceal such
(C) No materials or wastes shall be deposited upon a property in
such form or manner that they may be transferred off the property by
nny reasonably foreseeable natural causes or forces;
re hazard or
( All materials r wastes which might or otherwise be attractiveto constitute
which may be edible byrodent or insects
m
shall be stored outdoors in accordance with applicable State Board of
Health Regulations;
(6) Water pollution: in a case in which potential hazards
exist,
ulahsall
be necessary to install safeguards design to before operation with thof the ul tli ns
of the Environmental Protection Agency
may begin.
All percolation tests or grouCe=u
ce
tests as may be
must be rmet before operationutofdthe
by
local or State Health Offir
facilities may begin. •
e
ty
5.03.09' Uses Not Itemized: Upon application'
pplati n'or ton its the own
useinistedv , the oun h
Commiaddssioners may, by resolution,
District any other similar use which conforms to the conditions set for
in the following special findings:
64
• •
EXHIBIT "B"
ADJOINING PROPERTY OWNERS OF THE RIFLE COMPRESSOR SI1B
1. Unocal Corporation
10735 County Road 215
P.O. Box 907
Parachute, Colorado 81635
1-970-285-7600
2. Colorado Department of Transportation (Garfield County Road 215)
222 So. 6th Street, Room 317
Grand Junction, Colorado 81501-2769
970-248-7208
Chevron Shale Oil Company
P.O. Box 686
Englewood, Colorado 80155
ADDITIONAL PROPERTY OWNERS IN THE VICINITY PROVIDED WITH NOTICE OF
APPLICATION OF SPECIAL USE PERMIT
4. United States Department of Energy
Naval Petroleum and Oil Shale Reserves, Colorado, Utah, and Wyoming
907 N. Poplar, Suite 150
Casper, Wyoming 82601
307-261-5161
5. United States Department of the Interior (Vacant Land - No Buildings)
Bureau of Land Management
Glenwood Springs Resource Area
P.O. Box 1009
Glenwood Springs, Colorado 81602
970-945-2341
• •
FIRE CONTROL MEASURES
RIFLE COMPRESSION SITE
General
• All project personnel are instructed as to:
Fire danger for the day
Location of fire control equipment
Proper operation of fire control equipment
Emergency procedures and how to call for additional resources
Welding Operations
• A minimum of one person is dedicated to act as a fire watch during welding operations
with a fire extinguisher at hand.
• Welding shields are used during grinding operation to prevent sparks from leaving the
work areas and igniting vegetation.
• Water trucks are used to wet down ground and nearby vegetation, as conditions dictate.
• At the close of each day, welding personnel inspect the area of welding activities for any
smoldering debris and any conditions conductive to fires.
Communications
• All Rulison Gathering Company, LLC vehicles are equipped with cellular
communications on board.
In the event of a fire
• In the event of a fire, all personnel and appropriate equipment on site will be committed
to its containment and control.
The BLM and appropriate fire authorities will be notified immediately.
• Direction of fire control efforts will be transferred to appropriate fire fighting agency
personnel upon their arrival on site.
Nilson Gas Company, SL.C.
1580 Lincoln Street, Suite 1270
Denver, Colorado 80203
Ph 303.832.7893
Fax 303.831.6240
March 7, 1997
Mr. Mark L. Bean
Planning Department
Garfield County, Colorado
109 8th Street, Suite 303
Glenwood Springs, Colorado 81601
RE: Special Use Permit - Parachute Compression/Delivery Point Facilities.
Dear Mr. Bean,
Rulison Gathering Company, L.L.C. (RGC) is applying for a Special Use Permit to
install a Natural Gas Compressor/Delivery Point in Garfield County, Colorado. The facility will
be installed on property that RGC has a Surface Facility Easement Grant with Colorado Interstate
Gas Company (GIG). This property is located North of Parachute near the intersection of
Interstate -70 and Garfield County Road 215.
The following documentation is enclosed herewith for you review:
Application Form
Exhibit "A" (Property Description)
Exhibit "B" (Names and Addresses of Property Owners)
Assessors Map
Map of the Site
Drawings of the Facility
Plant/Road Letter of Authorization from CIG
Fire Control Measures
The purpose of these facilities are to provide an alternative enduse markets to those producers
using our gathering system by providing for a direct conect to CIG. A setback of 100 feet will be
adhered to on all property lines. This site was selected for its proximity to the Colorado
Interstate Gas' "Roans Cliff " receipt point. Construction is expected to begin May 1, 1997, and
expected to be completed by November, 1997. Except for maintenance and repairs, these
facilities are to run 24 hours per day, 365 days per year. The facility will be attended 8 hours per
day. During unattended operations, an alarm and call out system will notify an operation of
facility problems.
Access to the compressor site is west of Garfield County Road 215 and north of the town of
Parachute. Access is via constructed gravel roads as described in the map of the site attached
• •
hereto. The compression facility will be designed and installed in accordancewith DOT Part 192
specifications; the processing plant will be designed and installed in accordance with ANSI
B31.1 specifications. The facility will comply with the requirements of OSHA Part 1910
Process Safety Management requirements. When the site is abandoned, it will be reclaimed with
vegetation indigenous to the area per Sections 05.03.00 through 5.03.12 of the Garfield Zoning
Code. The compressor supplier has not been selected as of the date of this application; an air
quality permit application will be filed as soon as the vendor is selected and a copy of the
application will be forwarded to your office. After the compressor is selected and data is
available, noise assessment data will be submitted to your office.
To address Garfield County Zoning Resolutions, conclusions are submitted as follows:
Compressor installation and operation will not have any adverse impact on existing lawful use of
water though depletion or pollution of surface run-off, stream flow or ground water. A septic
system is planned for the office/shop building restroom.
Installation will be on property owned by Unocal, leased to Colorado Interstate Gas, Company,
and assigned to Rulison Gas Company, L.L.C. There will be no long term adverse impact on
adjacent land from the generation of vapor, dust, smoke, noise, glare, vibrations or other
emanations.
Impact on wildlife and/or domestic animals will be minimal. No migrations routes are being
changed or obstructed. The compressor site will be completely fenced after installation.
Construction personnel in the area will add to overall traffic on a short term basis during
installation. Upon completion, an estimated 5 tanker trucks per day will be required to take
delivery of the NGL recovered at these facilities.
No adverse impact to abutting property will occur due to the facility operation. The proposed
area was leased and designed for our facilities.
Hopefully the information and materials submitted herein satisfy the requirements to issue the
special use permit. Please contact me if any additional information is needed.
Sincerely,
<Top -most Iayer>
E
0
c
v
g
•
R ]1
� >r
71 R
E1
fl
6:61.
z
ai
N
in
C
0
m
0
J
as
U U
F-
.L .Z
CC CC
Z Z
0 O
i=
U U
J
0 0
0 0
CC tr
a. a
MM
(J) 0
Q Q
_J J
� J_ J
) _
+0
a
} ?-
Z
Z Z
a d
> U J
v GeceEw
Es,
v po
0 1= I- U
to
anwi'
OOceZ -
-.
ovaaOO Zao d
d d
d o Glnd
DO d
ti- a EEw= c-
LI1D 0 O d d Y 4l W d d
030
Q O C .J-. H O �-. L7 O N
c.CJ �DZOdb-co
— N d Ud') 3 a V P7 W V OD CJ t
ww .-a'
co 0
'� J Q d LL Uhl UU owwti O Z
Lu Zwo
I 1� O t) W
LL m V N V N Z V d d V m N d d
TrlanhiFiarl 9 Faahl frac
24 0901 4 00011
117132400958
1•
r
•
CI
s 0
>
CI
00-
a i.7 J M❑ 0 CC CI ln D � ❑.1 5 O~ 1p
d V V =, a s [led V •�
11.1101100000000 DIE") ❑
t
V
O
U
9)
0)
Lf)
CJ)
Air
3
T
of
108°4'25.88"W 39°2747.08"N
Thursday, Jul 31, 2008 07:39 AM
39°2727.62"N
1
•
c
14 34
icy
II II
}r i� ot?
tr.
O
tnl
O
w
dY
mils
wl ▪ r�
a)
O
o C I
T u :n m ZC4>. C w= wC3 a ❑ ❑ t9
CL L ' J ❑ toDtoD=
f
O it C 9 'fl c N¢ 0 v u J aan.cLaacea•- u TVHto J Jm❑t90JJE
RI O VY O ¢�>
d a O Ki a tJ a' r V V 47 t9 Ul • a N 00111.0000000031
tn
m❑ ❑1❑0❑❑❑❑❑❑❑❑
t X77 + + + + + + + + + + + 1
v
0
Thursday, Jul 31,
!
f
1
1
|
)
■
>
F.
2
#
)
\
3NIl3dld VS3M1 1N3W31UV8
• •
!III
P10
, ;[{§
$ I - -
°�\� § !/
NI 2 / ;,a\
j ) ) ,§§! \§
d i f / \ } ;, U
\ /P \
® 7 §
+ ` w
«v» ZIHIHXH
March 7, 1997
:on Gas Campany, lel..C.
1580 Lincoln Street, Suite 1270
Denver, Colorado 80203
Ph 303.832/893
Fax 303.831.6240
Mr. Mark L. Bean
Planning Department
Garfield County, Colorado
109 8th Street, Suite 303
Glenwood Springs, Colorado 81601
RE: Special Use Permit - Parachute Compression/Delivery Point Facilities.
Dear Mr. Bean,
Rulison Gathering Company, L.L.C. (RGC) is applying for a Special Use Permit to
install a Natural Gas Compressor/Delivery Point in Garfield County, Colorado. The facility will
be installed on property that RGC has a Surface Facility Easement Grant with Colorado Interstate
Gas Company (GIG). This property is located North of Parachute near the intersection of
Interstate -70 and Garfield County Road 215.
The following documentation is enclosed herewith for you review:
Application Form
Exhibit "A" (Property Description)
Exhibit "B" (Names and Addresses of Property Owners)
Assessors Map
Map of the Site
Drawings of the Facility
Plant/Road Letter of Authorization from CIG
Fire Control Measures
The purpose of these facilities are to provide an alternative enduse markets to those producers
using our gathering system by providing for a direct conect to CIG. A setback of 100 feet will be
adhered to on all property lines. This site was selected for its proximity to the Colorado
Interstate Gas' "Roans Cliff " receipt point. Construction is expected to begin May 1, 1997, and
expected to be completed by November, 1997. Except for maintenance and repairs, these
facilities are to run 24 hours per day, 365 days per year. The facility will be attended 8 hours per
day. During unattended operations, an alarm and call out system will notify an operation of
facility problems.
Access to the compressor site is west of Garfield County Road 215 and north of the town of
Parachute. Access is via constructed gravel roads as described in the map of the site attached
# •
hereto. The compression facility will be designed and installed in accordancewith DOT Part 192
specifications; the processing plant will be designed and installed in accordance with ANSI
B31.1 specifications. The facility will comply with the requirements of OSHA Part 1910
Process Safety Management requirements. When the site is abandoned, it will be reclaimed with
vegetation indigenous to the area per Sections 05.03.00 through 5.03.12 of the Garfield Zoning
Code. The compressor supplier has not been selected as of the date of this application; an air
quality permit application will be filed as soon as the vendor is selected and a copy of the
application will be forwarded to your office. After the compressor is selected and data is
available, noise assessment data will be submitted to your office.
To address Garfield County Zoning Resolutions, conclusions are submitted as follows:
Compressor installation and operation will not have any adverse impact on existing lawful use of
water though depletion or pollution of surface run-off, stream flow or ground water. A septic
system is planned for the office/shop building restroom.
Installation will be on property owned by Unocal, leased to Colorado Interstate Gas, Company,
and assigned to Rulison Gas Company, L.L.C. There will be no long term adverse impact on
adjacent land from the generation of vapor, dust, smoke, noise, glare, vibrations or other
emanations.
Impact on wildlife and/or domestic animals will be minimal. No migrations routes are being
changed or obstructed. The compressor site will be completely fenced after installation.
Construction personnel in the area will add to overall traffic on a short term basis during
installation. Upon completion, an estimated 5 tanker trucks per day will be required to take
delivery of the NGL recovered at these facilities.
No adverse impact to abutting property will occur due to the facility operation. The proposed
area was leased and designed for our facilities.
Hopefully the information and materials submitted herein satisfy the requirements to issue the
special use permit. Please contact me if any additional information is needed.
Sincerely,
Coastal
Thr En rprPiopla
1J• 1U �.�U ICxJ
•
Rulison
% Piceance Natural Gas
March 12, 1997
Attention: Dave Burnett
RE: Roan Cliffs Meter / Compressor Station Site
Dear Dave,
•
1 17.JGU'i0.LU r . r.l�
Colorado Interstate Gas Company (CIG) is the holder of an option to lease an additional 7.282
acres of land from Union pit Company of California (Unocal) located in the North Half of Section
2, Township 7 South, Range 96 West, Garfield County, Colorado. CIG plans to exercise this
option and plans, with the consent of Unocal, subject to the other provisions of this letter, to
assign a portion of this site, consisting of approximately 4-5 acres to Rulison for the purpose of
installing a plant and compressor facility. This assignment will cover the portion of the site lying
southeast of the barbed wire fence roughly splitting the overall site in half. In conjunction with
this assignment, CIG will also assign Rulison use of its approved access off of County Road 215,
as well as use of the existing temporary access off of Unocal's private road.
The foregoing plans are subject to CIG and Rulison completing a definitive agreement with such
agreement acceptable to Unocal, and management approval. Such assignment, if made, will
occur upon receipt by CIG of a survey of the portion of the site to be assigned and of the
proposed revision in the access road alignment.
If you have any question, please call me at (719) 520-4344. We appreciate you cooperation in
this matter.
Sincerely,
e7? -1:d1//4----"/
Laine L. Lobban
Project Manager
Colorado Interstate Gas Company
A SUSSIDI.RY OF THE COASTAL CORPORATION
P 0 BOX 1087- COLORADO SPRINGS CO 80944 -7191479-2300
TOTAL P.02
I•+
+ + + + +
• 1 + + +
_o
00000000 1 1 1+000❑ 0
" Ii❑❑ n1 2' In c? ci n n= 0 0 0 0 El El o a a• -o
c.0
7 D O D ry �' cr a o 1 -1 1 Q I I f1 I S a rn a N
1 73 in Q 10 ¢ 10 0 ,{ ▪ I m n o i5 =rcal. o ,n r*
'� 01 ' ' C E C▪ I �n lJT1 ▪ 7
V 0 Irn d 7 = (A t�D � lel d X 4
•-• 01 m n d n
x
File Edit View Insert Selection Tools Window Help
D cat,' 12a, SE,
w
m
w
WV 93:80 800Z `1£ lnr `Aepain14.1.
4
4
A ,
0
C • 1 + + + + + + + + + +
1 ti
1:101:1001:101111E1E110 Del
0
- ▪ 1000000000111111100 r-J-0L-noMnn=73n-0>o-oni
a
GO ,c • 70 73 70 73 73 '0 -0 xi r— r, r, . ,c) 3, Nj ,. _. ▪ „
•-• 7 p_ n
a. 9,
CD
O )1 oCUl 0
)6-117) 00 rn2 nc; i..o. T-1 EI:3- .i:-. um
O ..,,, 7.;
O go .-+ ./1
LT4 ▪ Cil
" z ..-, .--,, • 0
Z. c.
NO i C-‹ 73 1
I_ 0,
.-.,
0CL. 7
In r-/-
7 ,a) 0 9,
X
11)
C.?
I 71
cr.
Edit View Insert Selection Tools
4
4
01
NAR— S-77 FRI 13:3 PICEHNCE NATURAL/RULISDN 3038
Raison Gas Company,0L
March 28. 1997
Garfield County Planning Department
109 8th Street, Suite 303
Glenwood Springs, Colorado 81601
Attn: Eric D. McCafferty
RE:: Special Use Permit
Dar Eric:
1580 iincoln Street, Suite 1270
Deriver, Colorado 80203
Ph 303.832.7893
Fax 303.831.6240
P.@,1
LIAR 2 3 1997
Post -It° Fax Note
7671
Da•19.3/
it of
papas
To Lei
y�
t 1 _
From
0 /3
f�
Co./Dept.
Phone #
Fax#
The following is a response to your letter of March 26, 1997 regarding our proposed compressor and gas processing
facility.
1 Written permission from Unocal statin g it approves of RGC's plans for developing the site: letters frorn
both Unocal and CIG were faxed to you March 26, 1998.
2 Type of compressor and engine that will be used; Caterpillar 3516TALEJAriel JGK2•
3 Noise assessments apprnxiznating the expected amount of noise to be generated by the compressor/engine
unit. The compressor(s) will be housed and include hospital grade mufflers. Noise levels will not exceed
60 decibels at the property line.
Plot plan: The plot plan original sent to you is to scale. An identical plan will be sent to you with a
proper scale.
5 Septic System: RGC will install the septic system in accordance with all state and county regulations, It
will be leach tested and installed by a certified septic installer, The , }tic system will be used by the one
facility operator.
6 Additions to the narrative: attached is the revised application letter to Mr. Bean. The letter you have was
an original draft and sent inadvertently. Please disregard the original letter.
Th.an_k you for your assistance with this matter. Please feel free to call should you have any questions.
Sincerely yours,
1'IHR-1G-1y7 t i:,. 1�J
IIP
Coastal
TM &orgy'mkt
Rulison
% Piceance Natural Gas
March 12, 1997
Attention: Dave Burnett
RE: Roan Cliffs Meter / Compressor Station Site
Dear Dave,
•
f 1'7JGY14t31YJ
Colorado Interstate Gas Company (CIG) is the holder of an option to lease an additional 7.282
acres of land from Union Oil Company of California (Unocal) located in the North Half of Section
2, Township 7 South, Range 96 West, Garfield County, Colorado. CIG plans to exercise this
option and plans, with the consent of Unocal, subject to the other provisions of this letter, to
assign a portion of this site, consisting of approximately 4.5 acres to Rulison for the purpose of
installing a plant and compressor facility. This assignment will cover the portion of the site lying
southeast of the barbed wire fence roughly splitting the overall site in half In conjunction with
this assignment, CIG will also. assign Rulison use of its approved access off of County Road 215,
as well as use of the existing temporary access off of Unocal's private road.
The foregoing plans are subject to CIG and Rulison completing a definitive agreement with such
agreement acceptable to Unocal, and management approval. Such assignment, if made, will
occur upon receipt by CIG of a survey of the portion of the site to be assigned and of the
proposed revision in the access road alignment.
If you have any question, please call me at (719) 520-4344. We appreciate you cooperation in
this matter.
Sincerely,
Laine L. Lobban
Project Manager
Colorado Interstate Gas Company
A SUBSIDIARY OF THE COASTAL CORPORATION
P D BOX 1087 • COLORADO SPRINGS CO 60944 • 71W47!-2300
TOTAL P.02
F•7AR-28-97 FRI 1x:33 PICEANCE NATURAL=RULISON 3n3S32F4E.5
P.F02
M Ison Gas Company ell.
1580 Lincoln Street, suite 12. ,
Denver, Colorado 80203
Ph 303.832.7893
Fax 303.83 X.6240
March 7, 1997
Mr. Mark L. Bean
Planning Department
Garfield County, Colorado
109 8th Street, Suite 303
Glenwood Springs, Colorado 81601
RE: Special Use Permit - Parachute Compression/Delivery Point Facilities.
Dear Mr. Bean,
Rulison Gathering Company, L.L.C. ("RGC") is applying for a Special Use Permit to install a natural
gas compressor and processing facility in Garfield County, Colorado. As proposed, the facility will
be installed on property that RGC has acquired through a surface facility easement grant with
Colorado Interstate Gas Company ("CIG"), The surface owner is Unical Corporation. Both CIG and
Unical have giver. their approval of our proposed processing plant and compressor facility. The
easement on which the proposed facilities are to be built is located north of the city of Parachute near
the intersection of Interstate 70 and Garfield County Road 215. The legal description of the property
is the SENE of Section 2, Township 7 South, Range 96 West, 6th P.M., Garfield County, Colorado.
The purpose of the facility is to connect RGC's existing gathering system to the CIG "Roan Cliffs"
mainline interconnect Point, located in the SENE of Section 2- Township 7 South, Range 96 West,
Garfield County Colorado. Presently, the gas gathered by RGC is sent to the Questar Public Service
interconnect points near Rifle. The proposed site was selected for it proximity to the CIG "Roan
Cliffs" receipt point. The proposed facilities are designed to meet both CIG's 850 psig maximum
operating pressure requirement and strict liquid control specifications. The proposed processing plant
will strip the liquids from the dry gas stream and the liquids will be transported by truck to the nearest
NGL delivery point.
The following documentation is enclosed herewith for you review:
Application Form
Exhibit "A" (Property Description)
Exhibit "B" (Names and Addresses of Property Owners)
Assessors Map
Map of the Site
Drawings of the Facility
PlantfRoad Letter of Authorization from CIG
Fire Control Measures
The facilities, as proposed, will not meet the 100' setback requirements provided for in the Garfield
F.1iR-2P-9? FR I 1:7:34 P1 CEHNC:E H HTURHL:.RUL I_SOH ?.C+S^72E.4ES P.03
• •
County Zoning Code. As the drawings of the proposed facilities show, major equipment is a least 25'
from the property line. The design location was developed both to maximize the efficiency of ow
system and satisfy Unical's concerns with respect to the optimal facility location. Accordingly, RGC
respectfully requests the approval of the Garfield County Planing Board of this modification to the
setback requirements. Construction is expected to begin May 1, 1997, and expected to be completed
by November, 1997. Except for maintenance and repairs, these facilities are to run 24 hours per day,
365 days per year, The facility will be attended 8 hours per day. During unattended operations, an
alarm and call out system will notify an operation of facility problems.
Access to the compressor site is west of Garfield County Road 215 and north of the town of
Parachute. Access is via constructed gravel roads as described in the map of the site attached Hereto.
The compression facility will be designed and installed in accordancewith DOT Part 192
specifications; the processing plant will be designed and installed in accordance with ANSI B31.1
specifications. The facility will comply with the requirements of OSHA Part 1910 Process Safety
Management requirements. When the site is abandoned, it will be reclaimed with vegetation
indigenous to the area per Sections 05.03.00 through 5.03,12 of the Garfield Zoning Code. The
compressor supplier has not been selected as of the date of this application; an air quality permit
application will be filed as soon as the vendor is selected and a copy of the application will be
forwarded to your office. After the compressor is selected and data is available, noise assessment
data will be submitted to your office.
To address Garfield County Zoning Resolutions, conclusions are submitted as follows:
Compressor installation and operation will not have any adverse impact on existing lawful use of
water though depletion or pollution of surface run-off, stream flow or ground water. A septic system
is planned for the office/shop building restroom.
Installation will be on property owned by Unocal, leased to Colorado Interstate Gas, Company, and
assigned to Rulison Gas Company, L.L.C. There will be no long tem adverse impact on adjacent
land from the generation of vapor, dust, smoke, noise, glare, vibrations or other emanations.
Impact on wildlife and/or domestic animals will be minimal. No migrations routes are being changed
or obstructed. The corepressor site will be completely fenced after installation.
Construction personnel in the area will add to overall traffic on a short term basis during installation_
Upon completion, an estimated 5 tanker trucks per day will be required to take delivery of the NGL
recovered at these facilities,
No adverse impact to abutting property will occur due to the facility operation. The proposed area
was leased and designed for our facilities.
Hopefully the information and materials submitted herein satisfy the requirements to issue the special
use pet it. Please contact me if any additional information is needed.
Sincerely,
David M. Burnett
BaseMap
• •
GARFIELD COUNTY
Building and Planning
6 May, 1997
Dave Burnett
Rulison Gas Company
1580 Lincoln Street, Suite 1270
Denver, CO 80203
RE: Special Use Permit Conditional Approval
SENE Section 2, T7S, R96W, 6th P.M.
Dear Dave:
On Monday, May 5, 1997, the Garfield County Board of Commissioners granted conditional approval
to your request for a Special Use Permit to place and operate a natural gas compressor and
processing facility at the above-described site. The conditions that shall govern the Permit are as
follow:
That all representations of the applicant, either within the application or stated at the meeting
before the Board of County Commissioners, shall be considered conditions of approval.
Prior to the operation of the facilities, all air pollution emission permit(s) shall be issued and
operation of the facilities shall be consistent with the conditions of approval of such permit(s).
Upon receipt of the permit(s), copies shall be submitted to the Planning Department for
review and inclusion within the file.
3. The amount of noise to be generated by the operation of this facility be consistent with the
predicted levels. If noise complaints are received by the County, the Board of County
Commissioners shall have the authority to require the applicant or operator of the facility to
conduct a noise assessment and develop strategies to reduce the amount of noise emanating
from the applicant's property.
4. The construction of the foundation for the engine/compressor unit and all other facilities shall
be done in a manner to prevent perceptible vibration from occurring outside of the property
boundary. Any foundations shall be constructed with respect to the shrink -swell and erosive
potential of the soil and construction shall strive to minimize soil disturbance.
5. Reclamation and revegetation of the site shall be required when the operator ceases use of the
facility, in a manner that returns the site to its original, preconstruction state.
6. The applicant shall file an emergency plan with the appropriate fire protection district and the
Garfield County Department of Emergency Management, prior to the issuance of the Special
Use Permit.
109 8th Street, Suite 303
(970) 945-8212/285-7972 Glenwood Springs, CO 81601
1
• •
7 Any out-of-state vehicles used in the construction, operation or maintenance of the facility
shall be registered or apportioned in the State of Colorado.
The Special Use Permit shall be issued upon demonstration of satisfactory compliance of all
listed conditions of approval.
The applicant/operator of the facility shall control noxious weeds on the site.
10. The allowance for a bathroom and/or toilet facilities shall be allowed within the proposed
shop/office building so long as the applicant demonstrates a legal water right at the time of
building permit application to the County Building Department. Such application shall clearly
indicate the bathroom facilities. The shop/office may be permitted without bathroom
facilities.
11. The shop/office shall not be used for housing employees or agents of the applicant or operator
of the facility, either temporarily or permanently.
12. The operator of the facility shall notify the appropriate fire protection district prior to use of
the natural gas flare.
If you have questions concerning these conditions. please contact this office.
S incerely,
Eric D. McCafferty
Garfield County Planner
• •
EXHIBIT "B"
ADJOINING PROPERTY OWNERS OF THE RIFLE COMPRESSOR SITE
1. Unocal Corporation
10735 County Road 215
P.O. Box 907
Parachute, Colorado 81635
1-970-285-7600
2. Colorado Department of Transportation (Garfield County Road 215)
222 So. 6th Street, Room 317
Grand Junction, Colorado 81501-2769
970-248-7208
3. Chevron Shale Oil Company
P.O. Box 686
Englewood, Colorado 80155
ADDITIONAL PROPERTY OWNERS IN THE VICINITY PROVIDED WITH NOTICE OF
APPLICATION OF SPECIAL USE PERMIT
4. United States Department of Energy
Naval Petroleum and Oil Shale Reserves, Colorado, Utah, and Wyoming
907 N. Poplar, Suite 150
Casper, Wyoming 82601
307-261-5161
5. United States Department of the Interior (Vacant Land - No Buildings)
Bureau of Land Management
Glenwood Springs Resource Area
P.O. Box 1009
Glenwood Springs, Colorado 81602
970-945-2341
.MAY -01-97 THU 10:10 P I CEANCE NATLIRAL/RUL I SOH 30338326465 P.01
• •
facsimile
TRANSMITTAL
to:
fax #:
re:
date:
pages:
Eric McCafferty
1-970-945-7785
Air Quality Permits
May 1,, 1997
14, including this cover sheet.
Eric,
Please find the following summaries for each of the stacks in the proposed facility. Should you
need the component detail for these, please feel free to call.
From the desk of..,
Jason Spence
Transportation & Exohange Coordinator
Piceance Natural Gas, tnc.
1580 Lincoln Street, Sulte 1270
Denver, Colorado 80203
1-303-832-6465
Far'1-3o3-832-6356
L%.
L!J
+4 �
✓ F c
v
G
`
* C N
E L ti
b -C •
N v.
W `" r, 0.
U c
4 tY e F
ac 'ava° P.
x c G E 3
"L u `e o E
v- N F
tC l9
v G' oc v 2 9 c
7 v e� v
`c � kp," c°°? e n G „; a c_ n. c�..c
•a aa € GC
p6/L I- ��ap ZGL VULi
11110:11141MOGWIIIMMMMMWM
P. 02
'i-
O
z
Loi NAME: RUL/SON GAS COMPANY
MAY -01-97 THU 10:11 PICEANCE NATURAL-RULISON 3030326465
PHONE: { 303? 832 -6465
Managing MemFtr
ERAL TAX I.D, NO
RSON TO CONTACT REGARDING VHS INFORMATION: Dave Burnett
ttS
z
C4
d
7,71
C
a
0
z
o M
y
g
cr.
kr
Normal Oren
2
i
6
‘k2.
!NCONT•ROLLE
De
t -
LE n
5
u
F
a
a
�fI
Q
a
'1.
Ci
z
b
4:11
to
Wuen
coT
a E
54 0 '1_
E
uYY
o �
ei
u
Atte
r t
L h
O
=
ZIR
POLLUTANT EMISSION NOTICE
FIRM NAME: ILULISON GAS COMPANY
HAY -01-97 THU 10:12 PICEANCE NATURAL/RULISON 30.38326465
COUNTY: GARFIELD
PLANT LOCATION: SEI4 NEr4 SECTION?. TMS R96W
PHONE: (313) 832-64+_x5
Managing Menthe:
FEDERAL TAX I.O. NO.: R4 -I35 -I845
Z
U
1.13U
0
w z
z
P G
te
LiJ
0.
x
C
C
USa
10
d
a
z t
z °
C D
L.1 Ki.6
O 1
r_
9 P y
G z Z C
Lu LE L7
0 t J Z ▪ cc 4 G 4 p i I
�. w A a
0' z ni } 2 ��' a u 0
f 1 x -,5_ = c u m .Z
(� d cC
0 �.... W w.. 0
Ga w N se 2 ^ L v F'
- Z W U I 5 v W G . r '' D
F - 4 . - ! iia v r i r. _ �
Er I ��� IIS _� J'-. =_� �L_. -J.-
r SON TO CONTACT REGARDING THIS INFORMATION: Dave Burnett
ADDITIONAL INFORMATION OR REMARKS:
R
2,
U" Vl
6N
a
•
0
t duct -Anna
LL
61
N •
•
E
U
v
mow
N
.-D.
7
v
R
•
r -
a,
c
Po
2
P.03
1
1
1,
Yt
0.
AWS ID (APCD USE)
0
Li]
CAT 35I6TALE (
BEING BUILT
OCESS INFORMATION
BEING BUILT
Tyre of Cor irol Egclirrnent
UNCONTROLLED
0
ea
I'I
cx Q
en
0
0
m
tZ $.1^
ujo
W z E 2
a 0
r?—' Ls-
ce
C ❑ U i
U < .,•
)40
tl
0
O
�J
PERMIT NO
4i11.1tI NAME: RULISON GAS COMPANY
MAY -01-97 THU 10:13 PICEAMCE NATURAL-'RULISOH 3035326465
COUNTY: GARFIELD
PLANT LOCATION: SE/4 NE/4 SECTION 2 775 R96W
0
a
�v N
cc
FEDERAL TAY I.D. NO.:
Managing Member
;I RSON TO CONTACT REGARDING THIS INFORMATION; Dave Bunsen
•
P.04
ADDITIONAL INFORMATION OR REMAR
z r,
Ifj
.L Y
2
v,v
z
c
ro
0
t
=5
v
V.
er Cent by Weight 1 Sensorial Fetel Use
7
ry
CA
Ir
a
05(1 WIU]SCF
ADrina' Fuel Constrmplicn
0
0
0
mac.
0
61.4 MMCFIYr
u
U
"Am
:.0
a�
7
A. GENERAL INFORMATION
v
Cr"n
Cr,
t
0 U
a
kefhlntle]: CAT 35I6TALE (L
E
0
w
C..
6-1
c
cc
c
w
t
n:---------
.073
E
2
n
1-5
r.
Ea
a
V
a
E
5
=
R
1 ueriais Used
c
G
c
VI
.16
Z .-
C
c i
O, c
z. ov
V - s 0
L - ,G'
o 'L
Gv' . F, L,
o kelhictke1: CAT351Y[ALE(Low Enticsinn)
Srriaf No.. BEING BUILT
Manufacturer
0
O
0
z
0
a.
r
E. POLLUTION CONTROL EQUIPMENT
Type of Control Equipment
0 0
0
6
STs
5
C
E
0
J
0
,
Cr
DATA YEAR {See Instructions on Reverse
Date source began or will begin opera
0
Z
.a ^ F—
F
0 0
CZ
r a
C F
d
PE
u)
G
L-]
2
Signature of Person L
L
K
z
PERMIT NO.
FIRM NAME: Rt.JL[SON GAS COMPANY
COUNTY: GARRELD
PLANT LOCATION: SEA NF./4 SECTION 2 VS R96W
MAY -01-97 THU 10:14 RICEANCE NATURALxRULISOH 3838326465
PIIQNE: (383) 832-6465
Managing Member
R.15
a-
}
\
Z
i.1.-=.
N
\
/
2_
. r
4
Fi
11.
/
)2
a.
§
)6
IartiWtate_ OLH) I f}Jt?
111,,, UCO) (XX)
SO, OW 000
�JNO‘ KV_ Wt.) 18.623 18.623 18.623 Matrufacrurer
VOC {I{Y)
MO 4.656 4.656 4.656 Data
CO ;H8) NO 13.468 13.964 I3. (168
PLEASE USE APi'1) HAP ADDENDUM FORM TO REPORT ❑ CHECK DERE IF YOU WISH THE DIVISION TO CALCULATE YOUR
IIA7.,tRDOUIS AIR POLL.IJTArvT EMISSIONS OR O111ER
POLLUTANTS NOT LISTED ABOVE"
EMISSIONS. SEE 'EMISSION ESTIMATES" INSTRUCTIONS ON BACK.
0 =
5 =
\
E
rt i l S NOTICE I5 VALID FOR FIVE YEARS. A revised notice sha11 be filed prior to this A $100 FILING FEE IS REQUIRED
vspiration dale, whenever a permit limitation must be modified, vrhenever control egetipme FOR EACH NOTICE FILED.
is changed, and annusdlt' whenever a significant emi+nwrehange occurs. For specific detai For information, call (303)692-3150
ere Regular/on 3. Part A, II.C.1. ,r,.n ma„:e.,, 0111.
Signature of Person Legally Authorized to Su . Iv ata. ii
�
f _G f
A nnual Fuel Consu intim
Requested level Data year level
/.
Ci>,
ce
Do
a
\
\
\
(
re
f
\
g
)
\\
\
\
M
-
» =
— /
\\
x
\ \
\:
-
\
(
\
i
\
<
\
e
-
2
}
PERMIT NO.
FIRM NAME: RULISON GAS COMPANY
'MAY -01-97 THU 10:15 PICEANCE HATURAL PUEIs0N 3832326465
COUNTY: GARFIELD
PLANT LOCATION: SEM NE/4 SECTION 2 T7S R96W
PHONE: (303) 832.1.465
TITLE: Managing ,Member
AIM lk
P_'6
1 I3_ SLACK OR VEh''r INFORMATION (]deri1ify below which stack if plant has two US more; refer 10 anached sketch of plant layout}
H_ighi • Diameter Temperature 1 Flow Rate 1 Velocity r Moisture HAW lD No. for Stack
3w_15D h 1.02 lit 8'Xt"F 6,357 ACFM 7,766 fthniu o C-5
.�,
CITECK ALL BOXES THAT APPLY
',few or previously unreported sev.lrce+
Requesting midi liotion of existing perntittt
:hange in emissions. throughputs or equipment$
transfer of ownership {List previous owner in REMARKS
section of box A.!i
Relocation of Source$
Previous APEN is expiring$
Mandatory update or deferrer! repnrtirtgf
Request for Emission Reduction Credito;
Complete all applicable portions of ADEN
Complete shaded areas l'Rr•grtested' glues)
Complete all inflntroaiinn above box A. and Hoose
remaining portions which reflect changes
DATA YEAR (See Instructions On Reverse): 1997 •
IN
CA
f NO"PICE 1S VALII) FOR FIVE YEARS, r1 revised notice shall he filed prior to this A S.100 FILING FEE IS REQUIRED Mail 10:
vl ir.trion date, whenever a permit limitation mutt be wmdiIicd, whenever control equiFOR EACH NOTICE FILED. COLORADO DEPT. OF PUBLIC HEALTH
Ltu
chongedand annully wheeer a significant ernistier drane occurs. For specific detail.AND ENVIRONMEN [', APCDS-B1
ee Regulation 3, Part A, § ILC.1. for information, call (303)692-3150. 4300 Cherry Creek Drive South
419EARN MI&OMR
riwouPt‘ r rNinnrin R0-177-1 S'tn
r.
.
ACTUAI, ESTIMATION
EMISSIONS METHOD
(DATA YEAR)
A
\
2
j
❑ CHECK HERE IF YOU WISH TIIE twitsiorl to CALCULATE YOUR
EMISSIONS. SEE "EMISSION ESTINIATES" INSTRUCTIONS ON BACK.
SN
0
§Il
=
u. c--,
—
2
2
/
/
/
16.7 MlMC1nYrI 16.7 MMCFTYrl
Raw rNixieriars UsedRaw Materials -Annual Consumption
Description f Requested levet 1 Data year level
kn
41-1
coo
\/
C`
f{\
\
/
/Cr,
—^
E
)\\
16}/
ISE AICD IIAP ADDENDUM FORM TO REPORT
)US MR POLLLrT'ANT ENIISSIONS OR OTI[ER
NTS NOT LISTED ABOVE.
f Person Legally Anrftorized to Su
• -
$
Refrigeration Cmnpressor 1 2C
%
k
}
§
1.E:. POLLUTION CONTROL EQUIPMENT
`
(
$
2
e
/
\
\
*
\
»
\
2
%
2
g
\
/
&
(
./
§ \
,
§
$
k
§
2
\
/
/
\
Z
>
— A _
AIR POLLUTANT EMISSION NOTICE
PERMIT NO
NRM NAME: RUL1SON GAS COMPANY
' MN`r'-U 1 -97 THU 10:16 P I CERNCE NPTURfHL-`RUL I SUN 30383 6465
COUr`tTY: GA RE IrLD
PLANT LOCATION: SEM NEM SEC -110N 2 T7S R96 NV
PHONE: (303) 812645
Managing Member
EiJ
FEDERAL TAX I.D. NO.: 84-135-1345
P! oesS Seasonal T7troueltput {% of Annual)
Nonni! One ration of PI ant
erg
rJ
ra
-
G,
-w3r�
P.07
Plant Ill Ni. 0)r Slack - II -1
4orinmo.
I -1ES •NOTICE 15 VALID FOR FIVE YEARS. A revised notice shalt be filed prior to this A $100 FILING FEE IS REQUIRED Mail to.
pir:,tion date, whenever a permit limitation must he modified, whenever control equipme FOR EACH NOTICE FILED. COLORADO DEFT. OF PUBLIC HEALTH
is ch:uiged, and annually whenever a significant emission change occurs. For specific detail AND ENVIRONMENT, APCD-SSBI
ser Regslalion 3, Port A, §-11-C-1-• For information, calf (303)642-3150.
CV) Wherry Creek Drive South •
%ICT FORM 2mA LRbll
hrnurr rntnr,dn SY77'.1 CAN
v
R
c
4
ESTIMATED EMISSIONS
(TONS/YEAR) AT THROUGHPUTS
REQUESTED ABOVE
CONTROLLED •UNCONTROLLED
C
rr
N
3
Flow Rate
317 ACFRI
6.
v
L
G
El'
tr
^i"
r
4
.c —
v,
r
-�J
DATA YEAR (See Instructions on Rever
AIR POLLUTANT EMISSION NOTICE
PERMIT NO,
FIM (NAME: R1ILISON GAS COMPANY
COUNTY: GARF1 LD
MAY -01-97 THU 10:17 PICEANCE NATURAL-'RULISON 30383 6465
{303? 832 4.4(5
TITLE: Managing Member
FEDERAL TAX T.D. NO.:
4T
L
a7
w
• n
N
"
r -a
2
ti
451
v
* • a
0
U
v
Cl
0
ti
Z :o
T
tt
tCK OR VENT INFOSMATK
•
eu
Et -
e t of Annual Use)
N
N
Dec-F0Mar-Ma}
1-4
7d 7
w
a
c�
41.71 MMCFfY
C'1
6'
e4
T�
C
iL a
S
_
• C C -
Y 'U
+.. z v
'j _f -r¢
d r:
F. C• � v C �. rii C u
E G E. L 5, C L.9 N
LI: 7 K = _
t own w - ..-‚3-
•-;___-.C
v
-] F .K E a+4 x y is d
Q ,U C v JW U N G U
_ ' - v v E `C C
.1'. .N = c V is G y v G
C1 c tc � G.1 E w ; C
w�
Z cz CU [- M ce c,_i aC U CJ U w
'-� ri t -i rr it i , 4- ow
rriF
y' C • -
G as
d • -E
E-
< C
00
2▪ t
,
I...,=====1.14 le J ib .- r J "
BEING BUILT
7,7
v
a
N
00
N
O
r,
H
c,
✓
OY CONTR
`▪ 1
7
L
0.
0
z
0
1)
F
P
0,
Dale stance began or will begin operation:
P.08
t
iG
I:]
AIR POLLUTANT EMVMISSION NOTICE
PERMIT NO.
FIRM NAME: RULMON CAS COMPANY
'MAY -01-97 THU 10:19 PICEANCE NATURAL/RULISON 3838326465
COUNTY: GARFIELD
PLANT LOCATION: SEM NFJ4 SECTION 2 T75 R946W
61A1f, ,ADDRESS: 1580 Lincoln Street, Suite 1270, Berner. Cntoradn 50203
PHONE: (303) 832-6464
TITLE: Managing Member
PERSON TO CONTACT REGARDING THIS INFORMATION: Dave Burnett
P.09
D. NO.:84-L35-]845
FEDERAL TAX
ONAL INFORMATION OR RE
U
rii
2
a
Annual Fuel Cnnsumplion
0
z
A. GENERAL INFORMATION
h
N
1050 BTU/SCE
Natural GRs
BEING BUILT
Z
Finished Product -Annual Ornrnrt
Requested level
U
E
Raw Materials Used
c
V
Q
11. PROCESS INFORMATION
0
0
74.
fyprd Name and Tire: Date source began or will begin nn:ration: 1997
�/
N
V
z
E
AIRS [1) (ARCD USE)
Mail to:
COLORADO DEPT. OF PUBLIC HEALTH
AND ENVIRONMENT, APCD-SS-B!
43100 Cherry Creek Drive South
1 , . . t.-.. (til
9tY,} 951 i 0.066 0.0(16 0-066 Ar 42
VOC (xxl I 9Tx] j 0.0T13 0.093 0.003 AP 42
CO (kx) (Itxl _ 0.013 0.03 0.013 AP 42
A $10(1 FILING FEE IS REQUIRED
FOR EACH NOTICE FILED.
For information, call -(.303)692-3150.
1.0(D FTI 209.10195)
I1 : II - NOTICE IS VALID FOR FIVE YEARS. A revised 'notice shall be filed prior to this
a.pirativn date, whenever a permit limitation must be tiwiified, whenever control equipinri
c
t. cfr,,r,ged, and annually whenever a significant n Mange occurs. For Specific details
.er Rrgulalirm 3, Part A, $ II.C.1.
PERMIT NO
LLI
0
0
z
z
0
rV)
r^
(/)
z
1—
O
GL
• MAY -01-97 THU 10_20 PICEANCE NATURAL-RULISC'N 3032326465
COUNTY: GARFTELD
'FIRM NAME: RUUSON GAS COMPANY
PLANT LOCATION: STs14 NEi4 SECTION 2 T7S R96W
PHONE-: (:D3) 812 -6465 -
TITLE: Managing Member
FEDERAL TAX I.D. NO.: 84-!75-1845
PFRSON TO CONTACT REGARDING THIS INFORn4AT)!ON: Dave Burnett
ADDITIONAL INFORMATION OR REMARKS
Z'^
u� r
c
u1)
fJ
z
Norma! O' oration a Plant
w• „J
c
u
v
r
F-.
V C
v r,
A. GENERAL INFORMATION
-gam
Alk
2
r_
0
c
fV
3
c
E
0
m
c
4”
4)
e)
a
P. 1 0
r
CrN
v
V
0
ca
3 c
G
.0
FI 'EL INFORMATION
C
�Sakell�Todel:
z.-
0-E
5
St
Z G
G fA
w
� _yc
ee,LI 47)
^
4)
W
0
2
0
F
f Comm! Equipm
0
ti
9
x
0
r4'
P
N
� O
< F
u H
Q w,
Z
G �
G ▪ i-+
Pp
• v.
9.
CeW
W �
X z
to
❑
L �
cr
G
a• r<
pc.ia
.7. w • z.
C z
144
^. y
f r E
2
AIRS ID (APCD USE)
G
m
c
CI
W
PG o
C 1 M
e.
Ca0
M
J 0 u
G n. g E
i `, °
PERMIT NO.
FIRM NAME: RULJSON CAS COMPANY
MAY -01-9f THU 10:21 RICEANCE NATURAL/RULISOH 3038326465
COUNTY: GARFIELD
Colorado R(12t13
PRONE' 13341'3)832 -WO
E
cu
Y1
2
4
00
Q
JON AND PROCESSING
GENrRAL DESCRIPTION OF THIS PLANT'S RANI:
•
n3] Throu,l+r
GENERAL INFORMATION
:!
V.
(96 of Annual U:
G1,
r
a;
CL
Feel Cuusumption
1N: C1'RMA rrf)
tiaItein4ndel-
z
1
r
F 4 �.
,
E"Fc��1 rtr } Z la i
f•-•* R n�3 i C .L v � ‘.C f!
.. Rl Lv` V
U: r. =. L G y12:
r. a,.. +* - U t l ..
,.. w. eft CL
W E. , .c u v- c u
� c .2 ''n. epi c R t, 5$
¢- ''N .a=N'v.'u"
# iF --
c' c.E .5 O 4 g....a ei D v w
ai L) L°u L .,. u t' o
zP<UF' vxc.r.oCU VU
'c N n f-1 fl Cl r] L x --+a
J
UNCONTR(
N
flIE DIVISION TO CALCULATE YO
'EMISS1
.
L
U 77-
W 07
❑ L
F 'I
it
o
v t
4
z
ELI
0
0
U
0
77.
C
0
4-1
N
2
2
y Authorized hr Suppl
5
,;r j Narne arx3 Title
P.11
0
L)
0.
0
C
PERMIT NO
Fri•tl NAME: RUL1SOh CAS COMPANY
MAY—I1-97 THU 10:22 PICEANCE HATURAL'RUEIGON 3038326465
GARFPF.L
Suite 1270. Denver, Colorado Rlr203
i1: IL ADDRESS: 158[) Lincoln Ser
PHONE: (303) 832
TITLE: Managing Menrbe r
PTISON TO CONTACT REGARDING THIS INFORMATION: Dare Burnett
•
P. 12
DATA YEAR (See Instructions on Reverse): [97
Fype.1 Name and Title: _ — T / f` Date source began or will begin operation: 1997
Dave flurried ]vtarral•ing Member
1,1�
—
La
4
AIRS lD {ArCD USE}
ADDITIONAL INFORMATION OR REMIARKS:
rn STACK OR VENT INK/Rh/ATM/4 (IJentify b low whirl[ stack if plant has two or more; refer to attached sketch of plant layout)
tack
?dive VOC Emissions
/
z>
t
Finished Product -Annual Outpost
au
CHECK ALL BOXES THAT APPLY
dew or previously unreported source'
tegreesting modification of existing perntirtt
'Stange in emissions, thraugtlputs or cquipnreis
FransFet of uwi rship-i,List previous owner in REMARKS
cticn of box A.)t
2eIncation of Source[
?revinus APEN is expiring;
13andarnry update or deferred reporting[
equest for Emission Reduction Crcdiitt
Complete all applicahle portions of APEN
Complete shaded areas {'RequesleOF values;
Complete all information abuve box A. and those
remaining portions which reflect charges
hr Weight . Seasonal Fuel Use Annual of Annal llse)1
ƒ
/
.
)
.
_
\
Mail to:
COLORADO DEPT. OF PUBLIC HEALTH
ASID ENVIRONMENT. APCD-SS-B1
4300 Cherry Creek Drive South
T epr f nlnra1n RIV7?-1•511}
.
re.
§
/
A
}
k
&
=
{
)k
z\
Ia
2
'
CO (y>(> 1 {N7 .
E'LE.%S USE APCD EIA!' d17I}F,�+ T I FORM TO REPt)KT
ii CHECK HERE IF YOU WISH TILE DIVISIONTO CALCULATE, YOUR
tIAIARDOUS AIR POLLUTANT' F,MISSIOCVS OR OTIIER
POLLUTANTS NOT LISTED A6OVE, EMISSIONS. SFI. "OMISSION ESTIMATES" INSTRUCTIONS ON BACK,
ACTUAL ESTIMATIO['
EMISSIONS METHOD
(DATA YEAR)
.
\/E
/
}
A $[OO FILING FEE IS REQUIRED
FOR EACH NOTICE FILED.
For information, call (3O3)692 -31S0.
.rreo FOAM 2ooe av»
Prowess Se.asarla] T]ir ughmrt ('o01. Aintual)
}
E/E
_
_
'c5\
(!
p.
a
\
2
a_
—
p
Le)!
�\
\m
¥
j
Materia][ Used Raw Materials -Annual Consumption
Description Requested level I Data year revs!
2
•
Iag1st Diameter Temperarttre Plow Rate i Velocity
ft ft "'F ACFM Wolin
E
»
\
0
~
7
§<
2 {
NNW
Tfll.i NI -TICE 1S VALID FOR FIVE YEARS. A revised notice shall be filed prior to this
expiration date, whenever a permil limitation muss be modified, whenever control equipmer
'.s changrd, and annually wheneter a significant emission change occurs. For specific details
zee Regulction 3, Tart A, § ILC.!.
/~�
§w
�}
\\
Ij A GENERAL INFORMATION Normal Operation of Plant
of Employees • Land Arca I flours/Day [[ours/Year
iL 2 4.35 24 8.760
Incsiccn Rall'
1tn`-nrunIR
_
/
/
Vi .!
.".__,
D PROCESS INFORMATION
I` iription of Processing Unit
k Loading Fugitive VOC Emissionis
--
Id •' infeI:
No.:
F'C}LLtrT[ON CONTROL EQUIPMENT 1
Type of Control Equipment
Primary Secondary.
6
.
5 6 6 6
\
\ \
\
6 6 2
\ �_
\
-
.5
E
/
= E
=
i
\N
2 .%
rz«////
LI
u
MH Y-01 -97 THU 10:23 P I CEANCE NATURAL- RUL I SUN 30383' 6465
P. 13
FEDERAL TAX
n f -i r-1 fl • s- "-r
PLANT LOCATION: SEf4 NE+4 SECTION 2 T7S R96R'
TITLE: Managing Member
AAVJINOJ SVO NOSTV12.1: J Jv J tWtl3
PE SON TO CONTACT REGARDING THIS INFORkALTION: Dave Burnett
NATURAL CAS COMPRESSION AND PROCESSING
GINERAL (DESCRIPTION OF THIS PLANT'S FUNCTION(:
L
d
I'It-it;—lc 17� r IJ. iU
Coastal
Pm Emmy People
Rulison
Piceance Natural Gas
•�.iu I�kJ
March 12, 1997
Attention: Dave Burnett
RE: Roan Cliffs Meter / Compressor Station Site
Dear Dave,
•
( 17JG✓ -4oiu f . L. .
Colorado Interstate Gas Company (CIG) is the holder of an option to lease an additional 7.282
acres of land from Union Oil Company of California (Unocal) located in the North Half of Section
2, Township 7 South, Range 96 West, Garfield County, Colorado. CIG plans to exercise this
option and plans, with the consent of Unocal, subject to the other provisions of this letter, to
assign a portion of this site, consisting of approximately 4.5 acres to Rulison for the purpose of
installing a plant and compressor facility. This assignment will cover the portion of the site lying
southeast of the barbed wire fence roughly splitting the overall site in half In conjunction with
this assignment, CIG will also assign Rulison use of its approved access off of County Road 215,
as well as use of the existing temporary access off of Unocal's private road.
The foregoing plans are subject to CIG and Rulison completing a definitive agreement with such
agreement acceptable to Unocal, and management approval. Such assignment, if made, will
occur upon receipt by CIG of a survey of the portion of the site to be assigned and of the
proposed revision in the access road alignment.
If you have any question, please call me at (719) 520-4344. We appreciate you cooperation in
this matter.
Sincerely,
Laine L. Lobban
Project Manager
Colorado Interstate Gas Company
A SUBSIDIARY Of THE COASTAL CORPORATION
P D BOX 1087 • COLORADO SPRINGS CO 80944 - 7121479-2300
TOTAL P.02
on Gas Company, fol..
1580 Lincoln Street, Suite 1270
Denver, Colorado 80203
Ph 303.832.7893
Fax 303.831.6240
March 7, 1997
Mr. Mark L. Bean
Planning Department
Garfield County, Colorado
109 8th Street, Suite 303
Glenwood Springs, Colorado 81601
RE: Special Use Permit - Parachute Compression/Delivery Point Facilities.
Dear Mr. Bean,
Rulison Gathering Company, L.L.C. (RGC) is applying for a Special Use Permit to
install a Natural Gas Compressor/Delivery Point in Garfield County, Colorado. The facility will
be installed on property that RGC has a Surface Facility Easement Grant with Colorado Interstate
Gas Company (GIG). This property is located North of Parachute near the intersection of
Interstate -70 and Garfield County Road 215.
The following documentation is enclosed herewith for you review:
Application Form
Exhibit "A" (Property Description)
Exhibit "B" (Names and Addresses of Property Owners)
Assessors Map
Map of the Site
Drawings of the Facility
Plant/Road Letter of Authorization from CIG
Fire Control Measures
The purpose of these facilities are to provide an alternative enduse markets to those producers
using our gathering system by providing for a direct conect to CIG. A setback of 100 feet will be
adhered to on all property lines. This site was selected for its proximity to the Colorado
Interstate Gas' "Roans Cliff " receipt point. Construction is expected to begin May 1, 1997, and
expected to be completed by November, 1997. Except for maintenance and repairs, these
facilities are to run 24 hours per day, 365 days per year. The facility will be attended 8 hours per
day. During unattended operations, an alarm and call out system will notify an operation of
facility problems.
Access to the compressor site is west of Garfield County Road 215 and north of the town of
Parachute. Access is via constructed gravel roads as described in the map of the site attached
• •
hereto. The compression facility will be designed and installed in accordancewith DOT Part 192
specifications; the processing plant will be designed and installed in accordance with ANSI
B31.1 specifications. The facility will comply with the requirements of OSHA Part 1910
Process Safety Management requirements. When the site is abandoned, it will be reclaimed with
vegetation indigenous to the area per Sections 05.03.00 through 5.03.12 of the Garfield Zoning
Code. The compressor supplier has not been selected as of the date of this application; an air
quality permit application will be filed as soon as the vendor is selected and a copy of the
application will be forwarded to your office. After the compressor is selected and data is
available, noise assessment data will be submitted to your office.
To address Garfield County Zoning Resolutions, conclusions are submitted as follows:
Compressor installation and operation will not have any adverse impact on existing lawful use of
water though depletion or pollution of surface run-off, stream flow or ground water. A septic
system is planned for the office/shop building restroom.
Installation will be on property owned by Unocal, leased to Colorado Interstate Gas, Company,
and assigned to Rulison Gas Company, L.L.C. There will be no long term adverse impact on
adjacent land from the generation of vapor, dust, smoke, noise, glare, vibrations or other
emanations.
Impact on wildlife and/or domestic animals will be minimal. No migrations routes are being
changed or obstructed. The compressor site will be completely fenced after installation.
Construction persoimel in the area will add to overall traffic on a short term basis during
installation. Upon completion, an estimated 5 tanker trucks per day will be required to take
delivery of the NGL recovered at these facilities.
No adverse impact to abutting property will occur due to the facility operation. The proposed
area was leased and designed for our facilities.
Hopefully the information and materials submitted herein satisfy the requirements to issue the
special use permit. Please contact me if any additional information is needed.
Sincerely,
03/31/1997 11:13 30377293019
BAUMBERGER & ASSOC. PAGE 01
• •
BAUMBERGER & ASSOCIATES, INC.
NATURAL GAS CONSULTANTS
MalWALE TRANSMITTAL
Date: March 31, 1997
To: Mr. EriG D. McCafferty
Company: Garfield County
Fax No: (970) 945-7785
From: Joe Baumberger
P.O. Box 887-13873 WCR NO. 3
1 ON,SMoA7, Col O ADO 80502
OFFICE: (303)440-8167
FAx: (303) 772-9309
Reference: Rulison Gas Company LLC
Parachute Compression Delivery Point Facilities
Plot Plan
TOTAL PAGES FOLLOWING THIS COVER SHEET: 1
If you do not receive all pages, please call (303) 440-8167.
COMMENTS:
Mr. Eric McCafferty,
Mr. Dave Burnett asked that I fax you the attached plot plan for his proposed facility north of
Parachute, Colorado. The plot plan has changed significantly based on the revised site from
Unocal; the equipment has not changed. We have noted the distances from the property lines to
the equipment. The drawing is scaled at 1" = 65'.
If you have any questions, please feel free to call.
ThankYou
Joe Baumberger
cc: Mr. Dave Burnett, Rulison Gas Company LLC, Denver, Colorado
>DDDD
SONIMVtlO 30N3b3338
ISSUED CARFIELD COUNTY SPECIAL USE PERMIT APPLICATION
1
1VA02lddy 1N3110
CAO nit: \DRAYnNCS\RULISON\PLOTPL
b30N38NTR '0 Y
PaP16as APW
BAUMBERCER & ASSOCIATES. INC.
g9
gi
1$
>Cp
0
r-
0
r c)
o 0
c
13 4Z
Z
0
0
0
0
00+0 M
00+1. 'M
00+Z 'M t'6+Z 'M
00+Z 'S
00+1. 'S
0
me
-
0_
0
L
0
o
N
N
-4 00+0 'S
O
n
C)
I
(
"E.11±,
1/1
PI
C)
SIN
N (A
�W
W
0)
NOLLV301 3115
la '�
N
/11.411111114.
�
•top,,,:ii_.,r.
, 5_ '.\
aka-- —.... I
\f ,_
1W1333
(S)Zd311VONI1 S
m
L'
••v
/' /
p4,
44,a
01
0
IL '
li
I (W)33d
SM3H1VI3 •HV
(s) SNI Aga orgy
I.�
(NI S)NOINf1
1' (W)333
4S)1SNOD Na00
(W)33d
(S)AVNaW'3
(WBS)
NOINfl
(W9S)NOIN
9Z 9L
(W9S)NOINn
V- £99L
•
•
•
•
•
•
•
3N1-13did
_ '03 AO83N3113a24V13
-Y-_-
1
Y
Y L
RIBS )NOINfI
J
9S)NOINfI
969L
r---(W9/1)'ian•!a SAVW•1.0 i
(16.19 11NaS-13N W f,ii
(WZ/I) 11
(Wb/19S)NOINl \\`
g—OL9L
.3S
)dOad
3NI1 3MOd ^N 0£Z NO►NI1
(W) 33d
(S)NaV3HV'r
VS\)NOI \'
8—E99L'
Y �
le
Y
:,
Ifirr.
\---
...„........„,
,-
1 w 4
vr
Y
1 #`((?M JalDIR Janopu(1 J -r'
•
\� a Db.
.54
•n
SITE LOCATION
0
0
N
UD O
rn or o
Q
V) CC
(\ O
• J
O
N O
O Z
CJ
• O
U9 0
▪ O
J
w W
Z
CE
or
d Q
C7
LJ
V)
O
0
N
V1
N
Ir
N
I�;
w
cR� cr«r«<rRrR , ,c ,,
U
O
REQ
11
O °r3mandimmummi
N
K
lJ
z
z
0
O
+
0
I O
3
L
V1
6n
U�
z
z
Z 4
O
1-
1
C1:
0�
W7
a 0
N
}0
W =
t
0
0
+
0
o
z
J
w
a_
a
S
jj �
1—
Z
w
W
J
0]
1
a
0
00
J
0
o z
3
_1
GARFIELD COUNTY,
C
N
C
I
41
>
w
cr
0
7
v
c
0
7
41
J
V
to
a
1)
gAU.NBERGER & ASSOCIATES. iNC.
i
tE
'J
06
sm
Y
1
L;ENT APPROVAL
0
5
i �s� �ermn ..oa�caran
REFERENCE DRAWINGS
Sr)
v
•
40.'82
itketi
)
40.38
3-08" 0 C.S.P SLEEVES
?- Lindauer Water Wet{#
J.AHEARN(S)
FEE (M)
0
/ 1
00
UNION 230 Kv POWERLINE
x ''•
' 11 ION(SSM)
PROP(
SE
7670-8
\ UNION(SSI/4M1
1,
McBR00SON(1/I/ )
t-RBL.NELSON(I/BM)
4C.L.MAYS et.ver.(I/8M)--�+�.
• xx x 7696
UNION(SSM)
c.0
0:
BARRETT ENERGY CO. -
PIPELINE
UNION(SSM)
7628
NION(SSM)
0c
7663-A
UNION(SSM)
E.MCKAY(S)
FEE(M)
x x \
UNION(SSM)
�t
1'1
ALJO DEV INC.(S)
Ail. F.MATHEW1
FEE(M) I
11
k
•
ti
2"GATHERING
PIPPLHJE
I � %
(,
/
`r
•r
n''
•
�-) rte) 7/
l r�
x
.000. .YkA'a Ja�wao
�'•� j�owz� srjmwwa. —
II
•
• a
1
O
p •.
NAN
S.LINDAUER(S) `
•
FEE (M)--
N
•
•
EXXON VZ:;'i w � �`ir
FEE(M) tt
4v>
�
CE TERY
//
0431/1997 11:13 3037729309
BAUMBERGER ASSOC. PAGE 02
g,N
—7
Pt,
FACIUTY SITE
,s1
•
C3
0 ,
,s. o+oc:$1— "
5, 1+00
lg
v
W 2+94 W, 2+00
%LUC BO RCS —1
W. 1+00 W 04-00
S. 2 -CC
s, 3+00
S. 4+00
5, 5+00
5. E+OG
S. 7, 00
ISA PIPELINE
z
Id
X
6
g
e
A
X
1
5
1)126-6-r1 u ,./ 5
l (-) )4g ' L
/ yi,451 p ege
A i c a
&>J Gr1'( (��r��"�
�� UL � l/
CI 6 (�C ►,' PCU ✓" ��l V J�Lvi S, 1. i_
T C .
/to/ g4u7Pf
LC 1e) .5
5119 C(:
�� cztic,
SONNIVNO 33N383138
9
fA
1VA08ddy 1N3110
X
A
'3M 'S31V130SSV 09213131,01V8
gm
R
45
1,,
2a
D
snLv15 ONMrao
N
n
D
Z
O
Z
m
:'ON 'DM210
0
O
0
m
D h
▪ z
N
- A
0
m
m
0
0
r 0
O C
z
e
00+0 'M
00+ l 'M
OO+Z 'M 1/6-1Z 'M
00+Z S
00+1. S
tt
0
0
A A
g-
m
m
z
tnr
>0
00
n
o0
Z
L7�
c�
v
to
1
0
,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
00+0 'S
O
0
N
W
NJ
N
rn
G�
D -;
79
TI Z
r- D �
n
O
C)
O
r
O
D
CDO
M962: SLI Z NO1103S
NOLLV001 31.1S
-H
sn-
A
R
n
0
9s
tj7
QO
m
O
N
ON S31VID0SSv 'F 2!3Db3811fntl8
In
O
D
z
O
2
z
O
0
O
r*1
PARACHUTE GAS COMPRESSION AND PRCCESSING FACILITY
1
11........
pAA
2 G
11
O p
O
Z D C
m m A
mIIII
■•u
1 11
L .°
No
A
O N
N
O
n
oNp
T.
rt
1
O (1
ct�
cC
C
4 x
N
I � �
A
C
2 x
Li Dr
xo
•
I
I
CA C4
I4'
N C
U1
Ln N (n
N
N _, O
+ + + oN
0 O O 0 p
O 0 O c'.
m
z
P1
0)
fn
n
0
z
J
cn
NOIld00l 1 IS
40.38
.-iiLindauer Water We11.,-14
J.ANEARNCS)
FEE (M
0
Nett
•
•
7663-8
ION(Sam)
)
7670 - B
\; UNION(SB,1/4M)
'J. MC BR00M et . u x (I/ 2M)
--4L_RBL.NELSON(I/8M)
<� 4 C,L.MAYS et. ver. (1/BM)`—mss
XA x 7696
UNION(S&M)
UNION( SBtA)
•
00
BARRETT ENERGY CO.
PIPELINE
�fc
x
•
amt
UNION 230 )(y POWERLINE
PROP(',
SE
7663-A
UNION(SBM) ' T-`.c.s
UNION
(SaM)
�.•
E.McKAY(S)
F EE(M)
1
r
1
UNION(SSM)
ALJO DEV. INC.(S)
FE (M)
twr
NR
t•
ALJO DEV INC�(S)
Att. F. MATHEWS
FEE(M)
i!I
ImmotwoopotaratutitialigicOlS,..l,11:-.1 7.3:37., 404
—~ P
•
i g ;
' ' 2"GATHERING
PIPPLINE—
i / ( 1 11
/ iY t
r
.r
•
!1
•
O
•
m0
4-
C C
s.
•
O m
20
•
c
r
•
i
S.LINDAIIER(S)
FEE (M) - -
EXXON
0
FEE(M)
•
0
64
SONIMV210 30N363336
V
//
rn
‘g'
S
1YAO8ddV 1N3110
OMO' 101d�b\NOSFlllb\SsNpm.c\
pR
2i
is
gg
0
n
r-
0 0
J
(3
0
2
0
N
0
0
0
co
r
rn
m
z
eg
rn
D $
'D
95
m
r_
z
m
(33
0
0
D
m
O
N
N
N
�o
oN
0
0
— —"— 'L--- — — — —
(-
N
Ao Q
me
(SAD 2
- p N
_A
AG 33o
(00 0
5y>0
Z
OZN
2m
—H-
ZZZZZZZZZ
,
`
ZZZZZZZZ
so
0
4 ❑ I
ZZZZZZZZ
a
ZZZZZZZ
ZZZZZZZ
CO
01
o -
D
rn � z
Fn
o 4,
0 N
o rn
c C)
z
O
Q N
O
0
CDD
O
M96N SLI
N OIld001 1LI S
(n
+
0
O
•
4O.'?Z
40.38
3-48"p'C.S.P. SLEEVES
!- Lindauer Water We1LLII
)`4
J.AHEARN(8)
FEE (M)
0
UNION 230 Kv POWERLINE
X •
1 7663-B
ION(Sam)
PROP(
SE
•
7670-8
UNION(S81/4M)
,
.ux(I/2M)
iii -RB L. NELSON(1/8M)
,�C.L.MAYS et.ver.(I/BM)=_
xx x 7696
UNION(SBM)
9/.
-A
00
o
UNION(SBM)
7/
BARRETT ENERGY CO. -
PIPELINE
7628
MON (S&M)
7663-A
• UNION(SBM)
• _- til�r�
UNION
(SBM)
t•
I.I
ALJO DEV INC.(S)
Al(. EMATHEWI
FEE(M) I•
I
II
•
i
UNION(SBM)
•
CM
0
"••••4 2"GATHERING
' PIP?LHJE—.
/
IJ
1• -
(
s+ona~i..a::1 7..1:31•474
•
W
0
0
ti
0101.6,0 Anar., 011111.10
:9 • 0
+V 00orazJtSI,s^.jawv+----.-
mn
O qq
0
•
e
1 y4k-ti ••
C
Amon —
4
4
S.LINDAUER(S)
FEE (M) - -
•
EXXON
FEE(M)
r/
•
CE • TERY
•
COLUMBI
9
1-
F
2
0 t
P 4
a a
q.