Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT BLC0-8-14-3350 WPX Energy Rocky Mtn. LLC Dewatering Facility Parachute, Colorado 1} ALL WORK MUST COMPLY WITH THE 2009 IBC AND MANUFACTURERS SPECIFICATIONS. 2) ALL WORK MUST COMPLY WITH STATE AND FEDERAL REGULATIONS. 3) All WORK MUST COMPLY WITH THE CONDITIONS OF THE CURRENT LAND USE PERMIT. 4) PRIOR TO CONSTRUCTION, CONTACT LOCAL FIRE DISTRICT FOR ANY PERTINENT IFC REQUIREMENTS. FIRE DISTRICT FINAL APPROVAL REPORT IS REQUIRED FOR FINAL/COMPLETION INSPECTION. 5) ENGINEER SHALL BE ON SITE DURING PIER INSTALLATION. PROVIDE APPROVAL REPORT AT FINAL/COMPLETION INSPECTION. 6) ENGINEER SHALL INSPECT ERECTION OF STEEL FRAME SUPERSTRUCTURE AND PROVIDE AN APPROVAL REPORT AT FINAL/COMPLETION INSPECTION. 7) ELECTRICAL FINAL APPROVAL IS REQUIRED FOR FINAL/COMPLETION INSPECTION . 8) LIGHT AND VENTILATION PER 2009 IBC, CHAPTER 12. 9) LOCKS, LATCHES AND LANDINGS PER 2009 IBC, SECTION 1008. 10) GARFIELD COUNTY FINAL INSPECTION REQUIRED FOR COMPLETION APPROVAL.