HomeMy WebLinkAbout2.0 BOCC Staff Report 03.04.1985REQUEST: APPLICANT: LOCATION: SITE DATA: Eck 464, D BOCC 3/4/85 PROJECT INFORMATION AND STAFF COMMENTS For a Special Use permit for a natural gas pipeline Nortnwest Pipeline Corporation Sections 30 and 31 Townsnip 6S, Range 92W and Sections 34, 35 and 36 Township 6S, Range 93W approximately 4 miles southwest of Rifle in the vicinity of County Rds. 333 and 319. Tne site is a 16,000 ft. right-of-way easement WATER: N/A SEWER: N/A ACCESS: Private and BLM access off of County Rds. 333 and 319 EXISTING ZONING: A/R/RD and O/S ADJACENT ZONING: A/R/RD, O/S, PUD I. RELATIONSHIP TO THE COMPREHENSIVE PLAN The site is located witnin District B, Subdivisions/Rural Serviceable Areas due to its proximity to the Garfield County Airport Industrial Park PUD and District C, Rural Areas with Minor Environmental Constraints, District F, Rural Areas with Severe Environmental Constraints and the Public Lands classification. II. DESCRIPTION OF THE PROPOSAL A. Site Description: The site is located in a rural area, cnaracterized by ranching operations and open space. Tne pipeline will cross a variety of terrain including some significant slopes, based on review of topographic maps. B. Project Description: The proposal is to construct a 16,000 ft., 4 1/2 O.D. steel welded pipeline across privately owned and BLM property. Employment is estimated at 20 workers witn an expected construction time of three weeKs. Machinery involved will be a backnoe and trenching machine. III.MAJOR ISSUES AND CONCERNS 1. The applicants will not be using heavy equipment potentially damaging to County roads, thus, no road bond should be required. 2. The applicant has obtained some access easement and restoration agreements and is currently negotiating tne remainder of tnese agreements. The applicant has not yet submitted copies of these agreements with private landowners or tne BLM. o• oe N N 3. The applicant's proposal includes restoration and reseeding ot all affected lands and no impacts to wildlife or water courses and no discharge of pollutants. 4. The applicant's proposal includes no temporary nousinq associated with the construction. However, due to the length of construction time estimated, tne applicant snould provide suitable temporary/portable sanitary facilities. 5. Tne applicant's proposal includes access ott ot County Roads 333 and 319 and a pipeline crossing ot County Road 319. Tne applicant shall apply tor any road cut or access permits as required by the County Road and Bridge Supervisor. IV. SUGGESTED FINDINGS 1. That proper publication and public notice was provided as required for tne nearing betore tne Board of County Commissioners. 2. That the hearing before the Board of County Commissioners was extensive and complete, tnat all pertinent facts, matters and issues were submitted and that all interested parties were heard at tnat nearing. 3. That tor the above stated and other reasons, the proposed use is in the best :interest of tne health, safety, morals, convenience, order, prosperity and welfare of the citizens of Garfield County. V. RECOMMENDATION APPROVAL, with the following conditions: L. Ali proposals of the applicant shall be considered conditions of approval unless stated otherwise by the Board ot County Commissioners. 2. That the use of the tract of land comply with all regulations of Garfield County relating to industrial operations in tne zone district in which the property is located. 3. That all conditions of approval be met within 120 days ot the signing of the Resolution of Approval and be met prior to the issuance of the Special Use permit. 4. The Special Use permit shall only be valid for a period of 120 days from the date of issuance unless construction or use nas commenced thereunder; and if construction or use nas not commenced, tne permit snail expire. 4 car tr'vc by 1r (ht 5. The fl applicant shall provide suitable temporary/portable sanitary facilities for workers during the construction phase of the pipeline. 6. Tne applicant shall apply for and receive any road cut or access permits needed as required by tne County Road and Bridge Supervisor. 7. The applicant shall submit signed copies ot all right-of-way easement and restoration agreements with botn private landowners and the BLM. c'v huN r- / u.- r3 C.T44 lolNwAhosi rypv, i, A.fte y. -.i 00J -✓1 - Sv c h -F -ear 8. TheA applicant snail contact tne ClerK and Recorders office concerning the licensing ot all equipment ana motorized vehicles used for the project. N N