HomeMy WebLinkAbout6.0 Land Use Change PermitIttt lilt u n l,'J{Jl{ t l{ rt lJ I h I Jlllil$lt tLh,t'h l+, hL ll ll I
i"fF?fu'gH,i#'.HBr..+!E,BlBE'iBfi ,,ELoco,JNryco
LAND USE CHANGE PERMIT
for
A 6,320 square foot site (aka Nolte SWD 1-14) located wrthin a COGCC
approved well pad location (aka Nolte 1&796) and within a 147.29 Acre Parcel
of Land Owned by Puckett Land Co. Located Soulhrryest of the Town of
Parachute Off US Highway 6, in the SE %, SE % of Sedion 14, Township 7
Soufh, Range 96 t#esf Of The 6th P.M., Garfteld County
(Assessor's Parcel No. 2409-1 33-00-01 3)
ln accordance with and pursuant to provisions of the Garfield County Land Use and
Development Code, as amended, the following activity is hereby authorized by Land
Use Change Permit:
An lnjection Well, Smallas shown on the Site Plan Attached as *hibit A
(GAPA -7985 and SUAA-8153)
This Land Use Change Permit is issued subject to the conditions contained in the
Exhibit B and shall be valid only during compliance with such conditions and other
applicable provisions of the Garfield County Land Use and Development Code, as
amended, Building Code, and other regulations of the Board of County Commissioners
of Garfield County, Colorado.
ATTEST:DIRECTOR OF THE COMMUNITY
DEVELOPMENT DEPARTMENT
Fred A. Jarman,
Page 1 of 4
ril fl,rhlllrffi lilrffiir
Receotion$: 857930otos'/2o15 l2:59: 58 Pl'li'of 4 Rec Fee:So.oo Doc
lir,h"{ltl,\IllJhl' l{th {tttl Il ll I
'ffi3,8lB3"lERFrELD couNTY co
Exhibit A
(Project Site Plan)
.P
Jg?.
i ..,
,l!r-llo,rJ8-r!o,.t^-r. o,af8-t. ol.!C-la O,4q-lao,.aa-taa
,.rC-1. olsttD t-ta o
---- - -zl
t
C.dt,
o fltf,-rlofitrO-tJOrlrl-laol[.t-tJor.c-ll
o r:lD-!Jo/,tl-l.o,l rB- 2r
o rilc-2{
I'
o&a
t'9r c(
(.) MtGbryEE
'1
lt'
I
t
kta
Caerus Oll & Gas ll,Cffi
NoLIE ,l,t-7e5stglls{ rr, T?s. ng6ir,6th P.u.
sE t,/4 s€ 1/4
lFrcuRE t2lt....'............,..........'....-
Ec[Er r' . .tf
oarE, il-!0-r4
Dnrm 8* rt
I
't
btttbc
c4A
E thg
{
I
I
I
I
I
I
I
I
I --)
aasr d
&e,
\\Eagc ot
amowlG rffi6@-srEW-;-;etie7-
Vtr$ro E:EtprraDE t LtNo Sulvm]'{& eu' l.dHga'l.g)rr-@rmgtD ArrE atlt ,t ln-rr L@, srxt. 5N&l'
Paqe 2 of 4
!i#i+S:!1',',,#fl l[,*[H':.::*]*errilr
Exhibit B
(Conditions of Approval)
Gonditions Prior to lssuance
1. An impervious liner made of a membrane or bentonite shall be installed as a
secondary containment to prevent potential contamination of high ground
water in the area. Construction drawings shall be submitted and reviewed by
the Garfield County Contract Engineer demonstrating the type and installation
method for the liner prior to issuance of the Land Use Change Permit.
2. The Applicant shall provide an explanation as to the permitting status of the
Storm Water Management Plan prior to issuance of the Land Use Change
Permit. This explanation shall be reviewed by the Garfield County Contract
Engineer prior to issuance of the Land Use Change permit.
Other Conditions
3. That all representations made by the Applicant in the application shatl be
conditions of approval, unless specifically altered by the Board of County
Commissioners.
4. That the operation of the Caerus SWD 1-14 lnjection Well, Small shall be
done in accordance with all applicable Federal, State, and tocal regulations
goveming the operation of this type of facility.
5. The facility shall maintain compliance with CDPHE Storm Water Management
Permits, Drainage and Grading Plans, Rectamation and Erosion -Control
Plans for the site.
6. Th9 Applicant shall maintain all required CDPHE permits for the facility
including any applicable air quality, APEN permits.
7. lmplernentation of the Applicant's Dust control plan is required.
8. Diffuse Knapweed has been identified in the vicinity of the site. The Applicant
and operator shall monitor and control any weeds, including
-Diffuse
Knapweed, in the vicinity of the site and take measures to control State and
County listed noxious weeds on at least an annual basis.
9. The Applicant shall maintain all required COGCC permits and forms for the
facility and shall comply with all conditions or requirements of said permits
and forms.
Page 3 of 4
!{",&qi{iit#.,i#_'fJilffi:|j::',0h/,r'*},ril,
10.The facility shall maintain compliance with cocCc Noise
Standards/Regulations and the facility shall be required to utilize an electric
F-ump as represented. lf future compliance issues are identified the Applicantshall provide noise mitigation in order to achieve comptiance along *itn .technicalevaluation by a qualified professional to confirm compliancel
1l-The Applicant shall compty with all SPCC Plan provisions and shall keep theplan cunent and updated for any changes to the facility.
12.The facility shail maintain comptiance with Section 7-306 Lighting, with alllighting to be directed inward and downward toward the inteior oi'the site.Facilities and storage tanks shall be painted a non-glare neuhat color to
lessen any visual impacts.
tS.]h9 Emergency Response Plan provided with the Application submittal
including contact information shall be kept updated.
14.The Applicant shall comply with their Noxious weed Management plan
including the best management practices.
15-Hours of operation for the injection well pump is effectively 24 hours a day.However other support or maintenance activities should be conducted
between the hours of 7 a.m. and 7 p.m.
16.The subject site shall be limited to the previously disturbed portion of the site.
Total subject site area shalr not exceed 6,320 square feet.
17-Total water storage shatl not exceed s,000 bbl., including any condensate
tanks.
Page 4 of 4