Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT BLCO-12-14-3491 OXY USA WTP, LP Pump Bldg @ Pond 10 Facility DeBeque, Colorado 1) ALL WORK MUST COMPLY WITH THE 2009 IBC AND MANUFACTURERS SPECIFICATIONS. 2) ALL WORK MUST COMPLY WITH STATE AND FEDERAL REGULATIONS. 3) ALL WORK MUST COMPLY WITH THE CONDITIONS OF THE CURRENT LAND USE PERMIT. 4) ENGINEER SHALL INSPECT THE CONDITION OF EXISTING FOUNDATION AND ANCHOR BOLTS. AN APPROVAL REPORT IS REQUIRED PRIOR TO FINAL/COMPLETION INSPECTION. 5) ALL HIGH STRENGTH BOLTING AND FIELD WELDING REQUIRES SPECIAL INSPECTOR. PROVIDE AN APPROVAL REPORT AT FINAL/COMPLETION INSPECTION. 6) ELECTRICAL FINAL APPROVAL IS REQUIRED FOR FINAL/COMPLETION INSPECTION. 7) LIGHT AND VENTILATION PER 2009 IBC, CHAPTER 12. 8) LOCKS, LATCHES AND LANDINGS PER 2009 IBC, SECTION 1008. 9) GARFIELD COUNTY FINAL INSPECTION REQUIRED FOR COMPLETION APPROVAL.