Loading...
HomeMy WebLinkAbout1.0 ApplicationGarfield County Community Development Department 108 8th Street, Suite 401 Glenwood Springs, CO 81601 (970)945-8212 www.garfield-county.com SMALL TEMPORARY EMPLOYEE HOUSING APPLICATION FORM This Application form must be completed and received by the Garfield County Community Development Department within 48 hours following occupancy of the Small Facility. In addition, documents shall be provided to the Sherriff's Office and relevant fire protection district(s) that demonstrate and certify compliance with the following standards. Notice shall also be provided to these entities within 48 -hours following removal of a Small Facility. It is the Operator's responsibility to confirm and obtain verification that this Application has been received by the Sheriffs Office and Fire Protection District. INVOLVED PARTIES Property Owner Name: Vouberg Beaver Creek Ranch Phone: ( 716 ) 622-4212 Mailing Address: 215 S 10th Street City: SAC City State: IA Zip Code: 50583 E-mail: Operator's Compliance Officer Name: WPX Energy Rocky Mountain, LLC Phone: ( 970 ) 285-9377 Mailing Address: PO BOX 370 City: Parachute State: CO Zip Code: 81635 E-mail: april.mestas@wpxenergy.com PROJECT NAME AND LOCATION Location of Housing Site (Section/Township/Range): S 7 T78 R 9sw Well Pad Number: RU 44-7 Assessor's Parcel Number: 240307300001 Zone District: Rural Maximum Number of Permitted Occupants: less than 8 Number of Days the Facility will be at Location: 80 State or Federal Permitting Agency Overseeing Reclamation, Restoration and Revegetation (Name): (Name): State/BLM (Relevant Permit Number): API # 05-045-22510-00 Date of Installation: 01 /23/2015 Date of Removal: 04/13/2015 24 -Hour Emergency Contact (1):yyl X tnergy KOCKy ivnn, LLL; Phone Number:U to zts5-y3/ 24 -Hour Emergency Contact (2): Phone Number: ELIGBILITY During times of housing shortage or in remote locations, the use of Factory Built Nonresidential Structures (as defined under C.R.S. § 24-32-3301, as amended, and Resolution #35 of the Colorado State Housing Board) utilized for a period of time not longer than 1 year or as otherwise specified, for workers who are engaged in commercial, industrial, mineral extraction, or highway operations and who are needed to support the proper execution and safety of the related operations. Temporary Employee Housing, shall not include Recreational Vehicles, except in a Small Facility. A Small Temporary Housing Facility shall have all of the following basic characteristics: Complies Y/N 1. The Small Facility and any associated infrastructure must be completely Yes contained within a State or Federally -permitted parcel (such as a COGCC- approved oil/gas well pad) in which reclamation and revegetation are secured with the permitting agency (Permitted Site); and 2. The Small Facility is located at the Permitted Site for less than a cumulative of 1 Yes year and at the end of the utilization period, all structures, foundations, and associated infrastructure are completely removed; and 3. The Small Facility shall have an occupancy of 8 or fewer people who are Yes employees, contractors, or subcontractors of the operator of the small facility and are needed for on-site safety of the related commercial, industrial, extraction, or highway operation. SUBMITTAL REQUIREMENTS. The application submitted to the County shall contain the following information: 1. A vicinity map indicating the section, township, and range of the subject lot and the location of Small Facility within the subject lot and the Permitted Site; general relation to surrounding public roads, private roads, adjacent utility systems, residential development, other actively permitted Small, Minor and Major Facilities, natural drainage courses and municipalities within one (1) mile of the proposed Small Facility; north arrow and scale; GPS coordinates and current surface ownership of the subject lot. The vicinity map shall be presented on a USGS 7.5 minute series quadrangle at a scale of 1"=2000' or equivalent, with a topography depicted at a minimum of 40' intervals. 2. Surveyed layout of the proposed Small Facility within the surveyed boundaries of the Permitted Site, including at a minimum: sewage and wastewater disposal, trash receptacles, potable water storage, all other associated infrastructure and all other equipment located within the Permitted Site. 3. Identification of the private and public roadways accessing each Small Facility. Roadways shall be marked as open, gated, and/or locked (include combinations). Detailed directions, with mileage, shall be given from the nearest town within Garfield County, nearest Garfield County Sheriffs Office dispatch location and responsible fire district headquarters to each Small Facility, along each roadway. STANDARDS 1. Small Facilities shall comply with all applicable Federal, State (i.e. Building Codes and electrical permits), and local laws and regulations (i.e. fire code), but are not subject to County Building Permit. 2. Water Systems. a. Water systems shall comply with standards set forth in section 7-705.B. Water systems must comply with all applicable State and local laws and regulations. b. All potable water systems must include a meter and the Operator must keep a record of the daily usage. C. For sites to which potable water is hauled, Operators shall: Keep appropriate records, to be provided to the County upon request, to demonstrate that water supplied to a site is from an approved source and that wastewater is disposed at an approved facility. ii. For water facilities not permitted by the CDPHE, the Operator must conduct monthly tests (or quarterly if an on-site disinfection system is installed) and maintain records of potable water samples specific for coli form. Any tests indicating coli form contamination must be disclosed to the County Public Health Department. iii. Water systems facilities permitted by the CDPHE must obtain all necessary State permits or demonstrate that applications for any necessary permits have been submitted prior to a determination by the County that an application is complete. IV. Maintain compliance with State regulations at all times during operation. d. In no case shall unsafe water be used for drinking nor shall raw sewage or used water be discharged onto the ground surface. 3. Wastewater Systems. a. Wastewater systems shall comply with standards set forth in section 7-705.C. Wastewater systems must comply with all applicable State and local laws and regulations. b. Wastewater may be disposed of using either an OWTS or a vault -and -haul system. A vault - and -haul system must demonstrate the following: I. Year-round access is available and maintained for safe and regular access for sewage hauling vehicles; ii. The Operator can demonstrate and guarantee an arrangement for hauling sewage; iii. The Operator will maintain all records, including but not limited to, trip logs/reports and landfill receipts; IV. The sewage disposal records will be maintained as public records to be available to the County upon request; V. The facility will not exceed a cumulative of 1 year at the approved location; and 4. The facility has been designed to accommodate 75 gallons of wastewater per person per day or an amount derived from engineered calculations taken from metered usage rates at a similar facility that has been reviewed and approved by the County. 5. Each Small Facility shall be maintained in a clean, safe, and sanitary condition, free of weeds and refuse. Any hazardous or noxious materials that must be stored at the Small Facility for operational or security reasons must be managed in accordance with all applicable Federal, State, and local laws and regulations. 6. Wildlife -proof refuse containers must be provided for trash. Outdoor food storage is prohibited unless facilities are provided that prevent the attraction of animals to the Major Facility site. 7. Fire Protection and Suppression. a. Provisions for giving alarm in case of fire and fire suppression must be installed per fire codes and as required by the fire protection district. b. Single -station carbon monoxide alarms must be placed in each Manufactured Home or Recreational Vehicle unit. C. A water storage tank is required to provide water to the sprinkler system (if applicable) and initial suppression activities. The size of the water tank shall be determined based on sprinkler calculations and initial suppression demands. The relevant fire protection district shall be responsible for determining the size of the water storage tank. If the Small Facility is not within a fire protection district, the Operator shall provide at least 2500 gallons of water dedicated to initial fire suppression which is accessible with a dry hydrant. Required Size of water storage tank for sprinkler system and initial suppression activities: 550 13BLl21,000 eallnns 8. Domestic animals are prohibited. 9. The Operator shall obtain a certification inspection conducted by a qualified professional engineer. The certification shall verify that at the time of inspection the identified Small Facility meets or exceeds the requirements of this section. BUILDING INFORMATION (per unit) Unit 1 Make: ATCO 2013 Serial Number/Unit ID ##: 360138094 Division of Housing Insignia (provide copy) Square feet of unit: Unit 2 Make: ATCO 2007 Serial Number/Unit ID k: 354063907 Division of Housing Insignia (provide copy) Square feet of unit: Unit 3 Make: Serial Number/Unit ID q: Division of Housing Insignia (provide copy) Square feet of unit: OWTS PERMIT Permit q: SEPT -1 -15 -3503 I hereby attest that I am the designated Compliance Officer for the aforementioned Small Temporary Employee Housing Facility. I attest that I have read and understand the standards to which the Facility shall be installed and operated and that the Facility shall be constructed and maintained in accordance with all applicable Garfield County, State of Colorado and Federal Regulations and standards. I have read the statements bMand have provided the required attached information which is correct and accurate to t e of y knowledge. Do 6 D/S Signature of Compliance Officer Date I hereby attest that I am a Licensed Professional Engineer in the State of Colorado and that I have conducted a visual inspection of the installed Small Temporary Housing Facility identified in this application. Based upon my inspection, I certify that the Small Temporary Housing Facility complies with the standards as forth above and as codified in the Garfield County Land Use and Development Code. PE Certification Number: PE Stamp See Attached Report Date of Inspection: See Attached Report Name and Title: David Fox, Principal Engineer Signature OFFICIAL USE ONLY File Number: ____----- Fee Paid: $_ n/a '*FK Fox Engineering Solutions, Inc. 670 Canyon Creek Drive, Grand Junction, CO 81507 Ph: (970) 250-5505 Email. coloradofox@bresnan.net Inspection Report for: RLI 44-7 Small Temporary Employee Housing Client: WPX Energy Rocky Mountain LLC Location: SE 1/4 of Section 7, WS, R93W, 6th P.M. Garfield County Conducted By: David Fox, P.E. Date Conducted: January 23, 2015 Garfield County Paragraph Article 7-707 Land Use& Development Code (7/15/13) Reference Characteristic or Standard Description Inspection Comments A. Within 48 hours following occupation of the Small Facility, Not subject to visual inspection and certification by third party documentation shall be provided to the Community Development Professional Engineer. Department, Sheriff's Office, and relevant fire protection districts) that demonstrates and certifies compliance with the following standards. Notice shall also be provided tothese entities within 48 -hours following removal of a Small Facility. B. General Information reguirements Not subject to visual inspection and certification by third party Professional Engineer. C. Small Facilities shall comply with all applicable Federal, State (i.e. Colorado Division of Housing certifications noted on Company Building Codes and electrical permits), and local lawsand regulations trailer, Unit ID. 360138094 with Certification No. 25857, (i.e. fire code), but are not subject to County Building Permit. manufactured by ATCO Structures in 2013; and Driller's trailer, Unit ID. 354063907 with Certification No. 21940, manufactured by ATCO Structures in 2007. All other aspects not subject to visual inspection and certification by third party Professional Engineer. D Water systems shall comply with standards set forth in section 7- The water system at this location is not a public water system, as 705.8. defined by the Colorado Department of Public Health & Environment- WQCC Regulation No. 11. It is not subject to State permitting requirements. A potable water tank with a capacity of approximately 4000 gallons is located at the permitted site. A water meter is to be installed on the potable water tank. Page 1 of 3 RU 44-7 Inspection WPX Energy Rocky Mountain LLC E. Wastewater systems shall comply with standards set forth in section 7-705.C. F Each Small Facility shall be maintained in a clean, safe, and sanitary condition, free of weeds and refuse. Any hazardous or noxious materials that must be stored at the Small Facility for operational or security reasons must be managed in accordance with all applicable Federal, State, and local laws and regulations. G. Wildlife -proof refuse containers must be provided for trash. Outdoor food storage is prohibited unless facilities are provided that prevent the attraction of animals to the Major Facility site. H.1 provisions for giving alarm in case of fire and fire suppression must be installed per fire codes and as required by the fire protection district. H.2 Single -station carton monoxide alarms must be placed in each Manufactured Home or Recreational Vehicle unit. Domestic animals are prohibited. J The Operator shall obtain a certification inspection conducted by qualified professional engineer. The certification shall verify that at the time of inspection the identified Small Facility meets or exceeds the requirements of this section. Page 2 of 3 Fox Engineering Solutions, Inc. January 23, 2015 Wastewater disposal at the permitted site will be a vault -and -haul system. One 4000 -gallon sewage holding tank onsite. Sewage flows estimated to be 300 gallons/day (4 individuals x 75 gpcd). Sewage holding tanks need to be emptied approximately every 13.3 days (4000 gallons / 300 gallons per day). Wastewater vault equipped with overflow alarm device. Site appeared to be maintained in clean, safe and sanitary condition, free of weeds and refuse. One wildlife -proof trash recepacle with a capacity of approximately 20 cubic yards onsite. Individual refuse containers in each office/housing structure. Smoke detectors and fire extinguishers (ABC -rated) located in all factory built non-residential structures. Factory -Built Nonresidential Structures have a minimum separation distance of 20 ft. One potable aboveground water tank of approximately 4000 gallons capacity on-site. Potable water demand is estimated to be 300 gallons/day (4 individuals x 75 gpcd). Required fire suppression demand is 2500 gallons. Dry hydrant connection observed on water tank. Single -station carbon monoxide detectors located in all factory built non-residential structures No domestic animals observed on-site. This inspection was conducted by a qualified Professional Engineer licensed in Colorado and certifies compliance with applicable standards set forth in Article 7.707 of the Land Use and Development Code (7/15/13), as amended, that are subject to visual inspection. RU 44-7 Inspection WPX Energy Rocky Mountain LLC Professional Engineer's Attestation Fox Engineering Solutions, Inc. January 23, 2015 I hereby attest that I am a Licensed Professional Engineer in the State of Colorado. I attest that 1 or my agent have conducted a visual inspection of the Small Facility identified in this Checklist, as installed, and, based on information from that inspection I certify that the Small Facility complies with the standards, subject to and limited to visual inspections items as identified above; set forth in Article 7-707 of the Land Use& Development Code (Effective 7/15/13), for Garfield County, Colorado. PE Certification Number: Date of Inspection: No. 25420 (Colorado) January 23, 2015 Print Name and Title:: David J. Fox, Principal Engineer Signature: / `'r -crt Page 3 of 3 PE Stamp W 2 F— LL 0 ccw 0.O cca. W Cl) Z C) Fn cn EE I -- O D a 0 J 0 U O W W IL n O I -, I O' O a 4 j U CCJ w d � Q _J OC _ Z V' CO O � a O a F } J O_ ¢J O U ''� w W H LL U O w LL F W F 0 Z x i Z D N LL O O 0W (I) z ca J O = a oc LL LL p Z Z w U z = O Lti N p QNZ D Z u w 2 a n LL O1-2 � D W N cc V w J 1-- 0 a ui Z cc 0 z �` W w U cc 0 J w wcc F U z Z O a LLL Z z 1 W LA Q L [ _. Z F Z Z �i a ,64 O O W W IL n O I -, I Q O O j V CCJ w d � O a. m .. Q j Q � a O O W W IL n O I -, I TCO 1puctre$ & WHO (USA)101 1106 North Temple Drive, Diboll, Texas 75941 U.S.A. 1-800-575-2826 Registration No. State Decal No. -, Constructed On Aw -IF / M /Y .Floor Live Loads PSF Volts Fiaof toads PSF Hz Wind Load �'' `PSF Phase Wind Speed ;' , �� i) MPH Amps Gas Type Seismic Zone 11, .Seismic design Category Vi�,cupency Group Construction Type This unit comprlea with the: a O 0 a O J O U LL O W N W H LL O N D a 0 z 9 N z O H V 7 N z O U J Q z w C N w Z z O z t A J J lz z 0 p Z O LL z w g H co DO J t- v O w z li W a W o m � cc 4 oa a Z 3 W v � w z W LL w cc F' Q LL M W Z 411 2z :.. O r =' of cc Z J a m � � W t A J J J Z Z 3 DO J 0 z O W W O w j V L5 aa W a W o m � W 4 0 a in J L L i L Z Z= A J 3 DO J 0 z O W W O w j V L5 aa W a W o m z ~ z a m z. e s oa a Z 3 0 66 a m z W LL ATCO ATCO Structures (USA) Inc. 2.100 Burkbunlott HOed, Wichita Fells, Texas 76306 U.S.A. istration No. State Decal No. Model 13 X -o u- h i a n Serial No. F 4:1 Constructed On Floor Live Loads Roof Loads Wind Load Wind Speed Gas Type Seismic Zone I Seismic Design Category Occupancy Group Construction Type This unit complies with the: ;^ /M 2097/Y PSF volts 12 0 PSF Hz PSF Phase MPH Amps 200 Htiliding Regulations In force at Date of Construction i Speclal Conditions: i 8UILDING Consurr 888.811-328 www.modular,oIf UI ISI X i y mT $Taz,m SE A� ao s3. `o F u m� ° 49 oaavuw EEEn`oc w a�3«`a iaa n3c nm�n3 9 �o «= m a -i`o- ymmma« nmwo � $a O om aw $w w°C oaD flo8 oa as _ T3emry So o9�°y _ sm9p= c ^ 9�9y $ «`noo„a cm y9av m$ 9> O g O O O 6 F 9 c qq TiOOC L 0 6m�PYj YAO° 9V q « o' ao3x o c$o a3 0$ q Q 9W °`�`n a t�� a�Tomsr �m�st za o tI Tmi 'c oo e q G }{4 tit 3 - [ Ya°xIB ��AM�>>XIONFRGY, WPX Energy 1058 County Road 215 P.O. Box 370 Parachute, Colorado 81635 (970)285-9377 January 26, 2015 Colorado River Fire Protection District Emergency Operations Attn: Fire Marshall Moon 5255 County Road 335 New Castle, CO 81647 Ph: 970-984-3323 RE: Emergency Response Notification RU 44-7 pad Dear Fire Marshall Moon: This letter is to inform the Colorado River Fire Protection District that WPX Energy will soon commence drilling operations on the above mentioned drilling location. WPX will provide rig site housing accommodations for the duration of the drilling operation approximately 80 days. In accordance with Garfield County Planning and Zoning Regulations, the attached documentation provides emergency response information and driving directions for the WPX RU 44-7 pad. Should you have any further questions or concerns regarding this notification, feel free to contact me at (970) 319-8089. Sincerely, Dylan Goodie Drilling Engineer— Piceance District Dylan.Goudie(@,wnxenergv.com Ix W Z W a i C E 8 a n 2 o m ®o O �q- m$;9 aOom.y"qQ %E% yE.agm� oX 3 3-788 -2g- 23 .$mon3788 � o B ca SnmS am�,am$ ®aw8_"m ccWaa 0o v 3 E a m» x c E a •� o` z 3 n o N" E$ u a$ y $ E mmao_$ II� °.e E tmaeq 39338 n qm 8a8o , o a< .m ,., a ma co v L cE£at of mo' `mE nN ;?ode E3Nv3$E maammcQ ®� moC«u �% ps y mmm ng3m« 3� �o$na am32•n Xc° g-emao nn 2 as E`E araE rm o` e = m g m $ $ E m n L'E �d FS$�c On.mu O$rn o Ko me a''iiE ass WPONFRGY, I%- WPX Energy 1058 County Road 215 P.O. Box 370 Parachute, Colorado 81635 (970) 285-9377 January 26, 2015 Garfield County Sheriff s Office Emergency Operations Attn: Jim Sears 108 8'" Street Glenwood Springs, CO 81601 Pli: 970-945-0453 RE: Emergency Response Notification RU 44-7 pad Dear Jim: This letter is to inform the Garfield County Sheriff's Department that WPX Energy will soon commence drilling operations on the above mentioned drilling location. WPX will provide rig site housing accommodations for the duration of the drilling operation approximately 80 days. In accordance with Garfield County Planning and Zoning Regulations, the attached documentation provides emergency response information and driving directions for the WPX RU 44-7 pad. Should you have any further questions or concerns regarding this notification, feel free to contact me at (970) 319-8089. Sincerely, Dylan Goudie Drilling Engineer — Piceance District Dylan.Goudie(2(wpxenergy.com 0902 Q> E P°S = OE e- L^ n o x a %" C =o a ®338 oWaa.�n EEE�a=x W h oM=X3-a `uo �ttr;om $ wao�3g`Smcc =o rZ ff.A f ' 22 �f -'B-EW o c T C x am X o y °i -coq �a ° 0tiso y, n U mwomwo ca y,i g v j o O O o° `0 YY -o o%F L x�9m �qB 8 p$m L cc CL �• 41U 3 >a 9 0a9 W. 3° o gs E.-com E.0 3 xu?iB c" EQ' Evvqq v°i m O. o �3 cv •E•o a o Oa S eM Swa oo C0 a=op Qyc >aa cso Lc mjO�u 00 (n U `Q. 0 N «� E€oe9 a°��L�E��-ntz s9 was«°; qqk E WoQ aNRva $U ®oaona0 bn 'nP 3t9 mn rF0 N(1 R ��y� 0wy- E V1_U I n mbE>® 07�o�e g'oaaSm Bn °xE°e Lc m a ° 3 w�� x8a3 $�c° O `o x �s Oc6o me' iiE m E H'c `uw C7 (A U) < o ii 6 cy I�uuIIyy[v LLO c f j2a o SpoE= 3 `¢B =BES o 4'�� i MCN- { I — C � I Y6 j ) • a NS MIR till Tw UVU 1')� 3849 oO�Y� i� fri'�J �l(Jfi. a ail ne U /JJ' - J� 7 � f i'i'//iW . flafiP p o FF Ip It W 1, € S n a 1s Section 7 T. 7S, R. 93 W. rProperly Boundary Daylight Line__ ---50, REr--.. "-�-_ to !to (ea__._____.___-- _169A '--'-- _n --_----- --= $lU —_ --- - ___-_____ ------ --_ _- _- __ _ NW#7-------------------------------- --- NE#1 -F _. GRAPHIC SCALE IN FEET - IINCHe 80 FEET ,y `, 18.0'- 165'--- N(E#8--_ 18Y —_ ----- F 17.5' `til ,�7gp0 --- F17.5'---------- -- ' 6120 ----------fdge-of------------ ---- ---- - ---------- --- -- ` 6200 TOTALS 37110 24690 --------------------- 6300 ,- __ PraosedPad d � Exist. Ground Eiev.: 7917.5 \ \\ ------------- 'x Pad lay.: 7916.6-_- \\ G�551vaod----"----Proposed 0__010_______ '- C \ yy (0 Proposetl RU 532-]ropose3RlF4-43 — \ ed Pr RU 3& oposetl RU 5434 7 I 1`1-1` dRU 333-7 roposed 11944-T---" -�� \fpro i ____ ___________---FLOInsed RU 43& roposed RU N4-7CuLIHILine � \ -___ -- Proposed RU 533-7 ropose3 RU 444-] --' - -_ RU 34-7 RU SN �\ \ \ \`\ ' •---P oposeE roposed -7 -L ` \ iT W #6---------, A9_ _ e9 _ -___ _Preros�RU 3st-7 91T------N_Az. E#2 U77�-� / Proposed RU43 7-7 \ .IOD C2.2' 16$' -MPosedR 175'_-_,_ F 1. �' �60---------� — — ` — _ — \ `\ \\ / t---- Proposed\ \ Aacbss Roar F- `-(Afax. 6fade01%)\\ r ----------- t- Prep: Seppratorilma ' -�� 2a \ \\ \ \ \ -1999 -PraposedDullings-Tierrh SW#5- 7 . C-- -----tz5'-. 20' SE #3 - - - 1 ' 1 11 \ ` 1 C 19.6' --- 165' -' `-t85 r�''�' 1 / -- 50'0/S � 'Dayl/gh(LrB� r 7 ----- \ eN\ \ \ \ Pit and Pad REF._T. \ \ 1 \ \ ______-_ Excess '--- gfeckP9e Area--��, 7 - ` �P-rDperryBoundary — —7050_ 7 _ \ / '- _ _ 7/ �'� '— ------------ *NOTE: ____ ------1.) Topsoil Volume Based on 12" Soil Depth. - - -------_ 2.) 10% Swell Factor Applied to Earthwork Cut Volume. r ' ' 3.) Total Disturbed Area =:t6.04 ac. ESTIMATED EARTHWORK QUANTITIES (Cy) ITEM CUT FILL ITOPSOIL EXCESS PAD 30910 24690 6120 100 PIT 6200 6200 TOTALS 37110 24690 6120 6300 Rcu1SED:6/4/14 Construction Plan Prepared for: SCALE. r=sD WPXENERGY. 136East MMsneer wsppw� WPX Energy Rocky Mountain, LLC Rijle,C k.do81650 DATE: 4/14/14 Pk (9 70) 62 5-2 720 DF7' r s PLAT.' 2of7 Fa e /970/625-2773 PROJECR valley RU44-7RU44-7D7111Pad - Plat2 FaCONSTRUCTIONLAYOUT Section 7 2' 7S., IL 93 W. 1000 0 2000 GRAPHIC SCALE N FEET ACCESS DESCRIPTION: IINGH= 2000 FEET FROM THE INTERSECTION OF STATE HIGHWAY 6 AND COUNTY ROAD 323 (RULISON ROAD) NORTH OF RULISON, PROCEED SOUTHERLY ALONG COUNTY ROAD 323 (RULISON ROAD) ±1.1 MILES TO THE INTERSECTION WITH COUNTY ROAD 309 (RULISON PARACHUTE ROAD), PROCEED LEFT IN AN EASTERLY DIRECTION±2.3 MILES TO THE INTERSECTION WITH COUNTY ROAD 320 (RIFLE RULISON ROAD), PROCEED RIGHT IN AN EASTERLY DIRECTION ±6.2 MILES TO THE INTERSECTION WITH COUNTY ROAD 317 (BEAVER CREEK ROAD), PROCEED RIGHT IN A SOUTHERLY DIRECTION ±3.6 MILES TO AN INTERSECTION WITH A DIRT/GRAVEL ROAD, PROCEED LEFT IN AN EASTERLY TO NORTHEASTERLY DIRECTION±2.0 MILES TO AN INTERSECTION WITH A DIRT/GRVEL ROAD, PROCEED RIGHT IN A SOUTHEASTERLY DIRECTION ±0.7 MILES TO AN INTERSECTION WITH A DIRT/GRAVEL ROAD, PROCEED RIGHT IN A SOUTHERLY DIRECTION ±0.3 MILES TO THE RU 44-7 DRILL PAD LOCATION, AS SHOWN HEREON. 126E M Ml d S(.eel SCALL: 1"=2000' ••--._.. _.._. -- WPX Energy Rocky Mountain, LL RI/IC, Coi0mdo 816W� DATE: 4/14/74 Pk(9701625-272p PLAT. ' 5of7 Fu (9 ]0)625-27'p,i/ RUi14-7DI71ZPQC1�- Plat Jr , PROJECT.- Vnlletl n�2 s ACCESS ROAD & TOPO MAP l�lll hlrat'I�114Ngg bl� fWEh4lrl�I�Mdt41�'14h,41+b,INa milli 02/21%2012 1 8600111 Jea, Rrbarim t of 9 Rao Fea:if6.M 0c. Faet0.00 CMFIFfo COUirr Co LIMITED POWER OF ATTORNEY WPX ENERGY ROCKY MOUNTAIN, LLC ("Company") a Delaware limited liability company, having its principal place of business in the City of Tulsa, County of'rulsa, State of Oklahoma, does hereby make, constitute and appoint Bryan S. Hotard with the fill authority hereinafter provided, the true and lawful Attorney -in -Fact of the Company, authorized and empowered on behalf of the Company and in the Company's name, and for the sole and exclusive benefit of the Company and not on behalf of any other person, corporation or association, in whole or in part, to enter into, execute, deliver, file and accept all instruments and documents affecting the real property or real estate rights of the Company as more specifically set forth below:: I. Applications and documentation associated with Garfield County or Rio Blanco permitting requirements for including, but not limited to, Independent Sewage Disposal Systems, Small Temporary Employee Housing, Major Impact Reviews, Limited Impact Reviews, Oil and Gas well permitting, Driveway Access, County Road Maintenance, Temporary Living Quarters, Temporary Use Permits, Surface Use Permits, Surface Use Licenses, Utilities, Snow Removal and Private Construction of County Roads; 1 Agreements and other documentation that grant easements, rights of way, licenses, or permits to Company and also instruments where the Company grants such rights to others; 3. Agreements that assign easements, rights of way, licenses, permits or surface leases in connection with the Company's operations; 4. Releases and Partial Releases of easements and rights of way; 5. Agreements allowing encroachments onto easements and rights of way owned by Company and landowner instruments and conveyances on others easements; 6. Agreements subordinating mortgage rights to easement or lease; 7. Agreements relating to the modification and relocation of Company facilities; 8. Rental or lease agreements for surface use or other surface use agreements and all notices related to the pipeline agreements; 9. Agreements for the purchase or sale of real property and for the lease of real property for residential or commercial purposes or otherwise in connection with the Company's operations; 10. Agreements to obtain water services, electrical, gas or oil services or the provision of other utility services utilized by Company's facilities; 11. Agreements modifying, amending, renewing, extending, ratifying forfeiting, canceling and terminating any and all of the aforementioned types of instruments and documents. WPX ENERGY ROCKY MOUNTAIN, LLC hereby declares that each and every act, matter and thing which shall be given, made and done by Bryan S. Hotard in connection with the exercise of any or all of the aforesaid powers shall be as good, valid and effectual to all intents and purposes as if the sante had been given, made and done by WPX Energy Rocky Mountain, LLC in its limited liability company presence and it hereby ratifies whatsoever Attomey-in-Fact shall lawfully do or cause to be done by virtue hereof. This Limited Power of Attorney shall remain in full force and effect until terminated by -Company. iI 022121PItl N: BI�U�+&�41��d�'h�t{�e�CI�JI�I�.IN'�l����� Recap20121 815009 0322122012 12:18:10 Al F. q`b00 OA 3 of 2 Fec F... 16.M Dx Foe:0,00 00.FF1rt0 COUNTY CO IN WITNESS WHEREOF, WPX Energy Rocky Mountain, LLC has caused this Limited Power of Attorney to be signed by one of its Vice Presidents, duly authorized by its Management Corrunittee to grant powers of attorney this I" day of January, 2012. WPXIBRPiY RO 1 TAIN, LLC By D. mes Its: ice Pr ident ACKNOWLEDGMENT STATE OF OKLAHOMA ) ) ss, COUNTY OF TULSA ) BEFORE ME, the undersigned authority, a Notary Public in and for said County and State, on this day personally appeared, Jerry D. Eames personally known to me to be the Vice President of WPX Energy Rocky Mountain, LLC a Delaware limited liability company, who acknowledged to me that he has executed the above LIMITED POWER OF ATTORNEY authorized by Company's Management Committee, �/� IN WITNESS WHEREOF, I have hereunto set my hand and affixed my notary seal, the; ( I day ofdamlary; 2012. �.ekxtla,-y Notary Publio --i My Commission Expires: Z ' 23 — 2 (0 Iq After Recordation Please Return To: WPX Energy Rocky Mountian, LLC Atte Land Dept. PO Box 370 Parachute, CO 81635 i F ItlMBMYJ.DEm' �4 MJ,b,/ IW IOiMR WNVY,w After Recordation Please Return To: WPX Energy Rocky Mountian, LLC Atte Land Dept. PO Box 370 Parachute, CO 81635