HomeMy WebLinkAboutApplicationGARFIELD COUNTY BUILDING PERMIT APPLICATION
108 8'h Street, Suite 401, Glenwood Springs, Co 81601
Phone: 970-945-82121 Fax: 970-384-34701 Inspection Line: 888-868-5306
www.varfteld-Corunt's Limp
RECEIVED
FEB 2 5 2011
GFO COUNTY
1
Parcel No:} (1 s information is aayailable t the office 970-945-9134)
c 7,53r7- "Qb—Or e
- '' ''•T-- -..
ow , G7iils+t+/1lrJ
2
Job Address: (if an address has not been igned, please provide Cr, Hwy or Strect N & Ci ) or and legal desc ' on
;. &L crier ( fja27 r,�, 1f/1t 7f 4
3
Lot No: Block Na: i7 / / (1i1 t 'fl 1 �
4
Owner. ropcuy
sr f.C.,
o )
>!--i(241 ( 4,151
Mallin Ad
9C ,Reacatt&CO
, '/4
Mailing Address:
Ph:
9'74 —,9 f5 /;g
Ph: g -
Alt Ph;
Alt Ph:
5
Contractor: ?,Lffe
6
Architect / Engineer:
Mailing Address:
Ph:
Alt Ph:
7
Sq. Ft. of Building: {Mq�y,{r�
Sq. Ft or Acres of Lot: c 9 #
Height: - (
No. of Floors:
8
Use of Building4f6; PiC:1-1
9
cribe Work: / . I, I II ,�,/
4h14 Df c e 5,4 (45) & t D !1? o i) l5r, /pr) I — ' Gt 1 tf Z- 15hei hi5TiR/ i1/I le L/DSp6
10
Class of Work:
a New Alteration a Addition
f 11Garage:
_ �'
Attached o Detached ,
Septic:
Comunity
o ISDS_ )(Community
12
Driveway Permit:
Owners valuation of
above, or an authorized
property for purposes of inspections
ISDS Permit. (3) anther permit
180 days of the date of
correct. 1 understand that
as to accuracy.
issued granting permission
provisions of any federal,
that the Building Permit may
County Regulation(s) or any
the work. I further acknowledge
issuance: or (2) stopping
do not constitute an acceptance
and local laws and County
ABOVE.
Work S,a N' 1-16
f( !J
agent, lithe signature below is not that of the Owner. a separate
by the Building Department
required for use on the property identified above, e.g. State or
issuance and ifwotk is suspended or abandoned for a period of 180
the Building Department =teas the Application. along with the plans
to me, as Owner, to constrain the amreture(s) and facilities detailed on
state or load law regulating the work and the Garfield County Building
be suspended or revoked, upon notice from the County, ifthe Iocndon.
other applicable law
that the issuance of the Building Permit does not prevent the
construction or use ofthe structure(s) or facility(ies) if such is in violation
ofresponsbillry or liability by the County of camas, omissions
Regulations test with me and my authorized agents, including without
Authority. This application fora
letter of sutlnrity, signed
Land Access, A Building Permit
NOTICE
Building Pemit mist be signed by the Owner of the property, described
by the Owner, muss be provided with this Application.
cannot be issued without proof of legal and adequate west: to the
pertmis may be required: (1) State Electrical Permit, (2) County
Read Access or a State Wastewater Discharge Pamir
becomes null and void if the week authorized is not commenced within
CERTIFICATION
Application and that the information contained above is true and
submitted by me or on my behalf(submittals), based upon may criiifi®tion
and approval of this Application, a Building Permit will be
Department
of the Building Permit, I agree that] and my agents will comply with
lid use regulations (County Regulation(s)) I acknowledge
and facility(ies), described above, are not in compliance with
Building Department to enter the property, described above, to Inspect
the correction of error in the submittals, 'Wanly, discovered after
applicable law.
submittals, and inspections oldie work by the Building Department
1 acknowledge that responsibility for compliance with federal, state
engineer and/ ar builder.
THAT I HAVE READ AND UNDERSTAND THE NOTICE & CERTIFICATION
0"4/pelf
Other Permits, Multiple separate
County Highway!
Void Permit, A Building Permit
I hereby testify
and specifications
Assuming
the submittals
In consideration
Code, ISDS
eonsuucsion
I hereby grant
Building
of County
Review of
or discrepancies.
limitation
1 HEREBY
OWNER
days after tet.
that 1 have read this
and other data
completeness of the submitsats
reviewed by the Building
of the issuance
regulations and applicable
or use of the stmclure(s)
permission to the
Official front (1) requiring
Regulations) or any other
this Application, including
As the Owner,
my architect designer,
ACKNOWLEDGE
GNA 1
E DATE
Pll3�l C1.4tt l-CrA �
l.S
STAFF USE ONLY
Special Conditions:
Adjusted Valuation:
6,coo. oo
Plan Check Fee:
81. y /
Permit Fee:
it5• zS
Manu home Fee:_
Mise Fees:
�—
ISDS Fee:
Total Fees:
0°6.6 6
Fees Paid
ti • 41
. Balance Due:
i Z5 z5
BP No & Issue Date:
ISDS No & Issued Date:
19 2.2.
Setbacks:
SLCye lope
OCC Group: ��C
Coast Type: C
Zoning:
1 .
BLDG DEPT.
,, . 3fr//
PLNG DEPT.
_ ,e,-3 3-i/
APPROVAL DATE
APPROVAL DATE
Building Plan Review
Description of Work: Remodel master bath
Bin #:
Location Address: 000029 SPRUCE CT
BATTLEMENT MESA, CO
•
General Information
rCase Manager: David Bartholomew
Plan Case Number: BLDG -2-11-6748
Parcel: 240718406006
Application Date: 02/25/2011
Contacts
Owner: Garay & Beckie Davis
Applicant: Garry & Beckie Davis
Applicant Phone: 970-285-6128 Emelt
Building
fi engineered Foundation
Driveway Permit
Surveyed Site Plan
Septic Permit and Setbacks
Grade/Topography 30%
Attach Residential Plan Review List
Minimum Application Questionnare
Subdivision Plat Notes
Fire Department Review
Valuation Determination/Fees
!?ed Line Plans/Stamps/Sticker
Attach Conditions
j,—Application Signed
• plan Reviewer To Sign Application
Parcel/Schedule No.
40# Snowload Letter - Manu. Homes
Soils Report
Planning/Zoning
Property Line Setbacks
30ft Stream Setbacks
Flood Plain
Building height
Zoning Sign -off
Road Impact Fees
OA/DRC Approval
GradefTopography 40%
Planning Issues
—Subdivision Plat
General Comments:
r i ' i,4,1,C, 000 . - (5w/_/d4dJ
The following items are required by Garfield County for a final Inspection:
1) A final Electrical Inspection from the Colorado State Electrical Inspector.
2) Permanent address assigned by Garfield County Building Department and posted at the
structure and where readily visible from access road.
3) A finished roof; a lockable building; completed exterior siding; exterior doors and windows
installed; a complete kitchen with cabinets, sink with hot & cold running water, non-absorbent
kitchen floor covering, counter tops and finished walls, ready for stove and refrigerator; all
necessary plumbing.
4) All bathrooms must be complete, with washbowl, tub or shower, toilet, hot and cold running
water, non-absorbent floors, walls finished, and privacy door.
5) Steps over three (3) risers, outside or inside must be must have handrails. Balconies and decks
over 30" high must be constructed to all IBC and IRC requirements including guardrails.
6) Outside grading completed so that water slopes away from the building;
7) Exceptions to the outside steps, decks, grading may be made upon the demonstration of
extenuating circumstances., i.e. weather. Under such circumstances A Certificate of
Occupancy may be issued conditionally.
8) A final inspection sign off by the Garfield County Road & Bridge Department for driveway
installation, where applicable; as well as any final sign off by the Fire District, and/or State
Agencies where applicable.
A CERTIFICATE OF OCCUPANCY (C.O.) WILL NOT BE ISSUED UNTIL ALL THE
ABOVE ITEMS HAVE BEEN COMPLETED.
A C.O. MAY TAKE UP TO 5 BUSINESS DAYS TO BE PROCESSED AND ISSUED.
OWNER CANNOT OCCUPY OR USE DWELLING UNTIL A C.O. IS ISSUED.
OCCUPANCY OR USE OF DWELLING WITHOUT A C.O. WILL BE CONSIDERED AN
ILLEGAL OCCUPANCY AND MAY BE GROUNDS FOR VACATING PREMISES
UNTIL ABOVE CONDITIONS ARE MET.
I understand and agree to abide by the above conditions for occupancy, use and the issuance of a
C.O. for the building identified in the Building Permit.
'II'
OWNERS S1GNATU'
Bapplicationdecember2007
/ 9 1/
DATE
GARFIELD COUNTY BUILDING AND PLANNING
970-945-8212
MINIMUM APPLICATION REQUIREMENTS
For
SINGLE FAMILY DWELLING CONSTRUCTION
Including
NEW CONSTRUCTION
ADDITIONS
ALTERATIONS
And
MOVED BUILDINGS
In order to understand the scope of the work intended under a permit application and expedite the
issuance of a permit it is important that complete information be provided. When reviewing a plan and
it's discovered that required information has not been provided by the applicant, this will result in the
delay of the permit issuance and in proceeding with building construction. The owner or contractor shall
be required to provide this information before the plan review can proceed. Other plans that are in line
for review may be given attention before the new information may be reviewed after it has been
provided to the Building Department.
TWO (2) SETS OF CONSTRUCTION DRAWINGS & TWO (2) SITE PLANS MUST BE
SUBMITTEDFOR ALL APPLICATIONS.
Please review this document to determine if you have enough information to design your project
and provide adequate information to facilitate a plan review. Also, please consider using a design
professional for assistance in your design and a construction professional for construction of your
project. Any project with more than ten (10) occupants requires the plans to be sealed by a
Colorado Registered Design Professional.
To provide for a more understandable plan in order to determine compliance with the building, plumbing
and mechanical codes, applicants are requested to review the following checklist prior to and during
design. Applicants are required to indicate appropriately and to submit the completed checklist at
time of application for a permit.
Plans to be included for a Building Permit, must be on drafting paper at least 18"x24" and drawn
to scale.
Plans must include a floor plan, a concrete footing and foundation plan, elevations all sides with decks,
balcony, steps, hand rails and guard rails, windows and doors, including the finish grade line and
1
original grade. A section showing in detail, from the bottom of the footing to the top of the roof,
including re -bar, anchor bolts, pressure treated plates, floor joists, wall studs and spacing, insulation,
sheeting, house -rap, (which is required), siding or any approved building material. Engineered
foundations may be required.
A window schedule. A door schedule. A floor framing plan, a roof framing plan, roof must be
designed to withstand a 40 pound per square foot up to 7,000 feet in elevation, a 90 M.P.H. wind speed,
wind exposure B or C, and a 36 inch frost depth.
All sheets to be identified by number and indexed. All of the above requirements must be met or your
plans will be returned.
All plans submitted must be in compliance with the 2009 IRC, and 2009 IECC.
1. Is a site plan included that identifies the location of the proposed structure or addition and distances to
the property lines from each corner of the proposed structure(s) prepared by a licensed surveyor
and has the surveyors signature and professional stamp on the drawing? Properties with slopes of
30% or greater must be shown on the site plan. (NOTE Section: 106.2) Any site plan for the
placement of any portion of a structure within 50 ft. of a property line and not within a previously
surveyed building envelope on a subdivision final plat shall be prepared by a licensed surveyor
and have the surveyor's signature and professional stamp on the drawing. Any structure to be
built within a building envelope of a lot shown on a recorded subdivision plat shall include a
copy of the building envelope as it is shown on the final plat with the proposed structure located
within th .envelope.
Yes V
2. Does the site plan also include any other buildings on the property, setback easements and utility
easements? Please refer to Section 3-301 in the Garfield County Zoning Resolution if the
property you are applying for a building permit on is located on a corner lot. Special setbacks do
apply. nVA
Yes /1�
3. Does the site plan include when applicable the location of the I.S.D.S. (Individual Sewage Disposal
System) and the distances to the property lines, wells (on subject property and adjacent
prope tiief earns or water courses?
Yes �,`/
4. Does the site plan indicate the location and direction of the County or private road accessing the
property? ,
Yes �/
5. Have you provided any RESOLUTIONS and/ or LAND USE PERNIIT(S) associated with this
property? y
Yes if Yes please provide a COPY. No 1�
2
6. Are you aware that prior to submittal of a building permit application you are required to show proof
of a legal and adequate access to the site? This may include (but is not limited to) proof of your
right to use a private easement/right of way; A County Road and Bridge permit; a Colorado Dept.
of Highway Permit, including a Notice to Proceed; a permit from the federal government or any
combination. You can contact the Road & Bridge Department at 625-8601. See phone book for
other agenci9
Yes
7. Do the plans include a foundation plan indicating the size, location and spacing of all reinforcing steel
in accord pn ,}vith the IRC or per stamped engineered design?
Yes
8. Do the plans indicate the location and size of ventilation openings for under floor crawl spaces and the
clearances required between wood earth?
Yes No
9. Do the plans indicate the size and location of ventilation openings for the attic, roof joist spaces and
soffits? ✓
Yes No
10. Do the plans include design loads as required by Garfield County for roof snow loads, (a minimum
of 40 pounds per square foot up to & including 7,000 feet above sea level), floor loads and wind
loads? �/j
Yes AjA
11. Does the plan include a building section drawing indicating foundation, wall, floor, and roof
construction?
Yes V
12. Does the building section drawing include size and spacing of floor joists, wall studs, ceiling joists,
roof rafters or,jgists or trusses?
Yes
13. Does the building section drawing or other detail include the method of positive connection of all
columns anDers?
Yes
14. Does the elevation plan indicate the height of the building or proposed addition from the
undisturbed grade to the midpoint between the ridge and eave of a gable or shed roof or the top
ofa flat roof? uilding height measurement usually not to exceed 25 feet)
Yes ) J
15. Does the plan include any stove or zero clearance fireplace planned for installation including make
and model and Colorado PhaseII certifications or phase II EPA certification?
Yes No ,
3
16. Does the plan include a masonry fireplace including a fireplace section indicating design to comply
with the IRC?
Yes No
17. Does the plan include a window schedule or other verification that egress/rescue windows from
sleeping 77 -and/or basements comply with the requirements of the IRC?
Yes
18. Does the plan include a window schedule or other verification that windows provide natural Tight and
ventilation f ll habitable rooms?
Yes
19. Do the plans indicate the location of glazing subject to human impact such as glass doors, glazing
immediately adjacent to such doors; glazing adjacent to any surface normally used as a walking
surface; sliding glass doors; fixed glass panels; shower doors and tub enclosures and specify safety
glazing for these areas?
Yes V No
20. Is the location of all natural and liquid petroleum gas furnaces, boilers and water heaters indicated on
the plan?
Yes
21. Do you understand that if you are building on a parcel of land created by the exemption process or the
subdivisiop'rocess, are building plans in compliance with all plat notes and/or covenants?
Yes
22. Do you understand that if you belong to a Homeowners Association (HOA), it is your responsibility to
obtain written permission from the association, if required by that association, prior to submitting
an application for a building permit? The building permit application will be accepted without
it, but you run the risk of the HOA bringing action to enforce the covenants, which can result in
revocation of permit issued. Additionally, your Plan Review fee is not refundable if the plans
have been reviewed by the Building Department prior to any action by the HOA that requires either
revocation modification of the plans.
Yes
21 Will this be the a�1y residential structure on the parcel?
Yes No If no -Explain:
24. Have two (2) complete sets of construction drawings been submitted with the application?
Yes l/
25. Do you understand that the minimum dimension a home can be on a lot is 20ft.wide and 20ft. long?
Yes
4
26. Have you designed or had this plan designed while considering building and other construction code
requirements?
Yes
27. Do your plans comply with all zoning rules and regulations in the County related to your properties
zone district?
Yes /'
28. Does the plan accurately indicate what you intend to construct and what will receive a final inspection
by the Garfield County Building Department?
Yes
29. Do you understand that approval for design and/or construction changes are required prior to the
application of ese changes?
Yes
30. Do you understand that the Building Department will collect a "Plan Review" fee from you at the
time of application submittal and that you will be required to pay the "Permit Fee" as well as any
"Road Impact" or "Septic System" fees required, at the time you pick up your building permit?
Yes
31. Are you aware that you must call in for an inspection by 3:30 the business day before the
requested inspection in order to receive it the following business day? Inspections will be
made from 7:30 a.m. to 3:30 p.m. Monday through Friday. Inspections are to be called in
to 888-868-�5306.
Yes No
32. Are you aware that requesting inspections on work that is not ready or not accessible will result in a
$50.00 re -in ection fee?
Yes i/
33. Are you aware that you are required to call for all inspections required under the IRC including
approval on a final inspection prior to receiving a Certificate of Occupancy and occupancy of the
building? f
Yes l/
34. Are you aware that the Permit Application must be signed by the Owner or a written authority being
given for an Agent and that the party responsible for the project must comply with the IRC?
Yes
5
35. Do you understand that you will be required to hire a State of Colorado Licensed Electrician and
Plumber to perform installations and hookups, unless you as the homeowner are performing the
work? The license number of the person performing the work will be required at time of
applicableinspection.
Yes �/
36. Are you. aware, that on the front of the Building Permit Application you will need to fill in the
Parcel/Schedule Number for the lot you are applying for this permit on prior to submittal of a
building permit application? Your attention in this is appreciated.
Yes
37. Do you know that the local fire district may require you to submit plans for their review of fire safety
issues?
Yes V (please check with the building department about this requirement)
38. Do you understand that if you are planning on doing any excavating or grading to the property prior
to issuance
Yes
building permit that you will be required to obtain a grading permit?
39. Are you aware that if you will be connecting to a public water and/or sewer system, that the tap fees
have to be paid and the connections inspected by the service provider prior to the issuance of a
Certificate occupancy?
Yes
40. If you anticipate obtaining a water tap from the City of Rifle, please provide a letter indicating that
the City will provide water service. No building permit application will be accepted without such
a letter./ I�
Yes Cu
I hereby acknowledge that I have read, understand and answered these questions to the best of
my ability.
Date
Phone: q70 ` ?g w /cQ (days); 97L rd ? (evenings)
Project Name: 49-5 X31 th / /v f 1, iegOid.D `L Project Address: Oil i'IUCCC Aof7 //'EfI/fid i