HomeMy WebLinkAboutConditions of PermitCONDITIONS TO PERMIT
CRMS Welcome Center
BLC0 -2-15-3522
1. All work to comply with 2009 IBC, IMC, IPC, IFGC, IECC, and IFC.
2. Verify elevator lift permit and construction with Northwest Colorado Council of Governments
(NWCCOG) prior to construction. NWCCOG to complete lift inspection prior to C.O.
3. Dwelling separation (Yi hour fire partition required) Sec. 420.7 and 709. Note fire rated door
requirements. See also Sheet Ml-2 regarding notes on membrane penetration of fire partition.
4. Means of egress illumination required Sec. 1006.1
5. Locks, latches and doors Sec 1008.
6. Building must be accessible from accessible parking through to structure into bathrooms and
other rooms. Chap 11.
7. All penetrations of fire barriers or partitions must meet Sec. 713, 715, and 716.
8. R-20 rigid insulation in roof cavity minimum or verify all non ·vented roofs have point of
condensation outside of the building envelope.
9. Carbondale Fire district to inspect all fire sprinkler and fire alarm i nstallations. Fire dist. final
required prior to C.O.
10. State Electrical Inspector to do all electrical inspections. Final electrical required prior to C.O.
11. One hour fire barrier required around fire pump room Sec. 707. 913.2.1. Note fire rated door
requirements.
12. All new construction must comply with Chapter 5 2009 IECC.
13. Test for asbestos prior to demo work. Follow state guidelines for proper removal.