Loading...
HomeMy WebLinkAboutLand Use Change PermitLAND USE CHANGE PERMIT .• for A Portion of a Parcel of Lsnd Owned by Mary and Rick James Located Approximately 5 Miles East of the Town of Carbondale off County Road 100 and Described as.4003 County Road 100 in Section 30, Township 7 South, Range 87 West of the 6"' P.M. with a Project At&a of Approximately 11.541 aC1&s Within an Overafl 35 acm Property · (Assessor's Parcel No. 2391--303-00.007) In accordance with and pursuant to provl1Jions of the Garflekf County Land Use and Development Code of 2013, as amended, and a Resolution of Approval (ReaoluUon Number 2014-64) of the Board of County Commissioners of Garfield County, state of Colorado, the following activity Is hereby authorized by Land Use Change ~emllt: An 11.541acre SO/arEnergySystem, Large (AKA •sunnyS/deRanch Community Solar Ana}'? as shown on the Site Plan Attached as Exhibit •A 11 · (MIPA-7900) This Lan·d Use Change Permit -Major Impact Review is issued subject to conditions of approval as set forth in Exhibit 0 e• and shal be valid only during compliance with such conditions and other appllcabfe provisions of the Garfield County land Use and Development Code, as amended, B~ilding Code, and other regulatlons of the Board of County Commissioners of Garfield County. Colorado. AlTEST: COUNlY BOARD OF OMMISSIONERS, • COUNTY, COLORADO Date. I ' I ' ' I • : \ I \ I I I ' .,. ... .. --, I I If -· -- II ~' ... 't• • ,\ ' -:• :' •• . ..... ' ... ,.,-J 1-1\l llUll /'"\ (Project Site Plan) J • ·~ /~ ·-···: ... / ~ J ! ~ I \ .'I- ' \ ~i ' ~~ \ ·-. .. -· -· --------____ ...) __ 1111 WJr.rmt&t Dt'.i.l\iflL tlr\ 1h.lf J'·~J~~1·NTlt 'J,iW.11111 --------ReceP.Uonl: 855977 11/1312014 02 1 2~145 PH Je~n Albarloo 3 ot 4 Reo Feo 1so.OO Doo Fea:0.00 GMFIE1.0 COUl~TY CO t=XnJDIC /;j Conditions of Approval 1. That all representations made by the Applicant in the application shall be conditions of approval, unless specifically altered by the Board of CoWlty Commissioners. 2. That the operation of the Clean Energy Collective -Solar Energy System, Large shall be done in accordance with aJl applicable Federal, State, and local regulations governing the operation of this type of facility. · 3. The facility shall follow the Best Management Practices (BMPs) as recommended by Colorado Parks and Wildlife, as outlined below: a. Complete the bulk of construction activities outside the time period of December I to April IS to reduce disturbances to wintering animals. If construction is not completed by December 12 the ApPlicant ma r uest an extension from CPW. b. Limit post construction site visits to the hours between 10.00AM and 3.00PM between the months of D~ember and April. c. Ban workers and contractors from bringing dogs on site during the construction period. d. During the construction phase, all garbage must be kept in a bear-proof container and disposed of on a ICgular basis. The sit.e should be kept clean of all garbage and waste to eliminate attractants for wildlife. e. If the expected disturbance may impact threatened or endangered plant species, conduct the proper surveys prior to commencing construction. 4. The Applicant shall control fugitive dust during construction and operation of the site as outlined in the BMPs of the Weed Management and Rcvegetation Plan. 5 •. Signage around the perimeter of the facility warning of electrical shock must be installed. 6. The facility shall maintain compliance with Section 7-306 Lighting, with all lighting to be directed inward and doward toward the interior of the . 1111 M~.,~~H'l~1 MJ.~.~~Mll'N~HIM"M~llM1 11111 .--Rec:eP.llonlt: 85!5977 ,,113/2014 02:24:46 Pn J•an Rlb•rlao 4 or 4 Reo Fee:$9.80 Dae Fee:0.00 GARFIELD COUNTY CO mu=. ri:Wmnes snau oe pawtea a non-glare neutral color to lessen any visual impacts . . 7. The Applicant shall comply with their Noxious Weed Management Plan including the best management practices. Conditions Prior to Issnance 8. The final design of the perimeter fence shall be reviewed and approved by Colorado Parks and Wildlife (CPW). This design and acceptance by CPW shall be provided prior to issuance of the Lend Use Change Pennit. ' 9. The Applicant shall conduct a fall treatment of the identified Scotch Thistle and Whitetop infestations. Satisfactory confumation of treatment shall be submitted to the Vegetation Management Office by October 31, 2014. I