HomeMy WebLinkAboutApplicationGARFIELD COUNTY BUILDING PERMIT APPLICATION
108 8t Street, Suite 401, Glenwood Springs, Co 81601
Phone: 970-9454212 / Fax: 970-384-34701 Inspection Line: 970-384-5003
Urn
1
Parcel No: (this information is available at the assessors office 970-945-9134)
l7q —; t q -. t -- UL(
2
Job Address: (if= address has not been assigned, please provide Cr, Hwy or Street Name & City) or and legal description
P � "sp t f rt, fi 1 r bi. S` le
�Aa 16 �
3
Lot No: Block No: SuXJ Exemption:
A fli L{b
4
Owner. (property owner) o Lkli-ai-+"a'•t
(fly
Mailing Ad ress• • r-.
( D51.). &F,,p 1`
Maili dress:
Ph:'
,;1.(1. 1 fl
Ph: _
Alt Ph;
It Ph:
5
Contractor
6
Architect / Engineer:
Mailing Address:
Ph:
Alt Ph:
7
Sq. Ft. of Building:
Sq. Ft. or Acres of Lot:
t
Height: q / r
No. of Floors:
r
8
Use of Buil Ing: p
`�,f 3,r t . I' : ., t .IA_I Ncculiile '.. ( w f F
9
Des , i Wo - 7 40S, 1,r (ow AiztoTot 1A --i 72u1
10
Class of Work:
taw o Alteration a Addition _
I1
Garage:
a Attached a Detached
Septic:
o ISDS a Community
12
Driveway Permit:
etq-� i' . -, lt>.
Owners valuation of Work: $
.
Authority.
This application for 8 din it must be signed by
letter of authority, signed by thc Owner, must be provided
A Building Permit cannot be issued without proof of legal
NOTICE
the Owner of the property, described above, or an authorized agent. If the signature below is not that of the Owner, a separate
with this Application.
and adequate acccss to the property for purposes of inspections by the Building Department,
Electrical Permit, (2) County ISDS Permit, (3) another permit required for use on the property identified above, c.g State or
Discharge Permit.
authorized is not commenced within 1 O days of the date of issuance and if work is suspended or abandoned for a period of ISO
CERTIFICATION
contained above is true and correct. 1 understand that the Building Department accepts the Application, along with the plans
based upon my certification as to accuracy.
a Building Permit will be issued granting permission to ate, as Owner, to construct the structure(s) and facilities detailed on
and my agents will comply with provisions of any federal, state or local law regulating the work and the Garfield County Building
Regulation(s)). I acknowledge that the Building Permit may be suspended or revoked, upon notice from the County, if the location,
are not in compliance with County Regulation(s) or any other applicable law.
described above, to inspect the work. 1 further acknowledge that thc issuance attic Building Permit docs not prevent the
Warty, discovered after issuance; or (2) stopping construction or use of the structure(s) or facility(ies) if such is in violation
work by the Building Department do not constitute an acceptance of responsibility or liability by the County of errors, omissions
compliance with federal, state and local laws and County Regulations rest with me and my authorized agents, including without
THE NOTICE & CERTIFICATION ABOVE:
(-2C -6%'/C)
Legal Access,
Other Permits, Multiple separate permits may be required: (1) State
County Highway/ Road Access or a State Wastewater
Vold Permit, A Building Permit becomes null and void if the work
I hereby certify
and specifications
Assuming
the submittals
In consideration
Code, 1SDS
construction
1 hereby grant
Building Official
of County
Review of
or discrepancies.
limitation
1 HEREBY
e
days after commencement.
that 1 have read this Application and that the information
and other data submitted by me or on my behalf (submittals),
completeness of the submittals and approval of this Application,
reviewed by the Building Department.
of the issuance of the Building Permit, 1 agree that I
regulations and applicable land use regulations (County
or use of the structure(s) and facility(ies), described above,
permission to the Building Department to enter the property,
from: (1) requiring the correction of errors in the submittals,
Regulation(s) or any other applicable law
this Application, including submittals, and inspections of the
As the Owner, I acknowledge that responsibility for
my architect designer, engineer and/ or builder
ACKNOWLEDGE THAT 1 HA D AND UNDERSTAND
OWNERS SIG DATE
102
4it' 46135
STAFF USE ONLY
Special Conditions:
k [�
.,�� Kare0)�o9 47
Adjusted Valuation:
lit4e-4O
Plan Check Fee:
208•g(
Permit Fee:
2[i4.-
Manu home Fee:
Mise Fees:
ISDS Fee:
Total Fees:
i.C6
Fees Paid:
1a...6 1
Balance Due:
4 i7•%
BP No & Issue Date:
ISDS No & Issued Date:
_ 4-7:1
Setbacks:
OCC Group:
Const Type:
Zonin :
G DEPT:
Ve14/10
\.\
P`LNG DEPT:
/44
\ KO 107/toAPP
OVAL \ DATE
APPROVAL DATE
GARFIELD COUNTY
BUILDING AND PLANNING DEPARTMENT
108 8T1 STREET, SUTE 401
GLENWOOD SPRINGS, CO 81601
PHONE: 970-945-8212 FAX: 970-384-3470
MINIS PERMIT SUBMITTALS
1. Completed building application & septic when applicable.
2. Parcel number.(obtained through the assessors office 970-945- 9134)
3. Completed minimum requirements questionnaire
4. Surveyors stamped site plans (2) indicating the setbacks from
property line to building (front, rear & sides) well, septic, water
course if closer than 50' to any property line. A hand drawn site
plan is acceptable if you are greater than 50' to all property line.
5. Two sets of completed plans (structural & foundation).
6. Owner Signature or Letter from Owner Authorizing agent to
sign.
7. Driveway permit or letter from the Garfield County Road &
Bridge Dept. Stating one is not needed.
8. #40 Snow -load letter for manufactured homes.
9. Payment for plan check fee.
Please Note: Most forms and documents are located on-line at
http./Annt..garfield-county.comfindex.aspx?page=577
The following items are required by Garfield County for a final Inspection:
1) A final Electrical Inspection from the Colorado State Electrical Inspector.
2) Permanent address assigned by Garfield County Building Department and posted at the
structure and where readily visible from access road.
3) A finished roof; a lockable building; completed exterior siding; exterior doors and windows
installed; a complete kitchen with cabinets, sink with hot & cold running water, non-absorbent
kitchen floor covering, counter tops and finished walls, ready for stove and refrigerator; all
necessary plumbing.
4) All bathrooms must be complete, with washbowl, tub or shower, toilet, hot and cold running
water, non-absorbent floors, walls finished, and privacy door.
5) Steps over three (3) risers, outside or inside must be must have handrails. Balconies and decks
over 30" high must be constructed to all IBC and IRC requirements including guardrails.
6) Outside grading completed so that water slopes away from the building;
7) Exceptions to the outside steps, decks, grading may be made upon the demonstration of
extenuating circumstances., i.e. weather. Under such circumstances A Certificate of
Occupancy may be issued conditionally.
8) A final inspection sign off by the Garfield County Road & Bridge Department for driveway
installation, where applicable; as well as any final sign off by the Fire District, and/or State
Agencies where applicable.
A CERTIFICATE OF OCCUPANCY (C.O.) WILL NOT BE ISSUED UNTIL ALL THE
ABOVE ITEMS HAVE BEEN COMPLETED.
A C.O. MAY TAKE UP TO 5 BUSINESS DAYS TO BE PROCESSED AND ISSUED.
OWNER CANNOT OCCUPY OR USE DWELLING UNTIL A C.O. IS ISSUED.
OCCUPANCY OR USE OF DWELLING WITHOUT A C.O. WILL BE CONSIDERED AN
ILLEGAL OCCUPANCY AND MAY BE GROUNDS FOR VACATING PREMISES
UNTIL ABOVE CONDITIONS ARE MET.
I understand and agree to abide by the above conditions for occupancy, use and the issuance of a
C.O. for the building identified in the Building Permit.
OWNERS SIGNATU
Bapplicaliondecember2007
DATE
GARFIELD COUNTY BUILDING AND PLANNING
970-945-8212
MINIMUM APPLICATION REQUIREMENTS
FOR
CONSTRUCTION OF
COMMERCIAL OR MULTI -FAMILY RESIDENTIAL BUILDINGS
Including
NEW CONSTRUCTION
ADDITIONS
ALTERATIONS
And
MOVED BUILDINGS
In order to understand the scope of the work intended under a permit application and expedite the issuance of a
permit it is important that complete information be provided. When reviewing a plan and it's discovered that
required information has not been provided by the applicant, this will result in the delay of the permit issuance
and in proceeding with building construction. The owner or contractor shall be required to provide this
information before the plan review can proceed. Other plans that are in line for review may be given attention
before the new information may be reviewed after it has been provided to the Building Department.
Please review this document to determine if you have enough information to design your project and
provide adequate information to facilitate a plan review. Also, please consider using a design
professional for assistance in your design and a construction professional for construction of your
project. Any project with more than ten (10) occupants requires the plans to be sealed by a Colorado
Registered Design Professional.
To provide for a more understandable plan and in order to determine compliance with the building, plumbing
and mechanical codes, applicants are requested to review the following checklist prior to and during design.
TWO (2) SETS OF CONSTRUCTION DRAWINGS & TWO (2) SITE PLANS MUST BE
SUBMITTEDFOR ALL APPLICATIONS.
Plans to be included for a Building Permit must be on draft paper at least 18"x 24" and drawn to
scale.
Plans must include a floor plan, a concrete footing and foundation plan, elevations all sides with decks,
balcony steps, hand rails and guard rails, windows and doors, including the finish grade and original grade
line. A section showing in detail, from the bottom of the footing to the top of the roof, including re -bar,
45. If you anticipate obtaining a water tap from the City of Rifle, please provide a letter indicating that
the City will provide water service. No building permit application will be accepted without such
a letter.
Yes IA.✓
I hereby acknowledge that I have read, understand, and answered these questions to the best of my
ability.
Signature Date
Phone: Ido 2 G 277 (days); 7aD 233'5 - TT 5 (evenings)
Project Name: v cw11 1riv, F
Project Address:tvij V Mvsm er2,Fc. , t %d 14*I 1
Note:
On any of these questions you may be required to provide this information. If required information is not
supplied, delays in issuing the permit are to be expected. Work may not proceed without the issuance of the
permit.
*If you have answered "Not necessary for this project" on any of the questions and it is determined by the
Building Official that the information is necessary to review the application and plans to determine minimum
compliance with the adopted codes, please expect the following:
A. The application may be placed behind more recent applications for building permits in the review process
and not reviewed until required information has been provided and the application rotates again to first position
for review.
B. Delay in issuance of the permit.
C. Delay in proceeding with construction.
bpminrepcommMar2009
7
37. Are you aware that you must call in for an inspection by 3:30 the business day before the requested
inspection in order to receive it the following business day? Inspections will be made between
7:30 a.m. and 3:30 p.m. Monday through Friday. Inspections are to be called in to 384-5003.
Yes
38. Are you aware that requesting inspections on work that is not ready or not accessible will result in a
$50.00 re -inspection fee?
Yes t�
39. Are you aware that prior to submittal of a building permit application you are required to show proof of a
legal and adequate access to the site? This may include (but is not limited to) proof of your right to use
a private easement/right of way; a County Road and Bridge permit; a Colorado Dept. of Highway
Permit including a Notice to Proceed; a permit from the federal government or any combination. You
can contact the Road & Bridge Department at 625-8601. See Phone book for other agencies
Yes
40. Do you understand that you will be required to hire a State of Colorado Licensed Electrician and Plumber
to perform installations and hookups? The license number will be required at time of inspection.
Yes ✓
41. Are you aware, that on the front of the building permit application you will need to fill in the Parcell
Schedule Number for the lot you are applying for this permit on prior to submittal of the building
permit application? Your attention in this is appreciated.
Yes
42. Do you know that the local fire district may require you to submit plans for their review of fire safety
issues?
Yes `V (Please check with the building department about this requirement)
43. Do you understand that if you are planning on doing any excavating or grading to the property prior to
issuance of a building permit that you will be required to obtain a grading permit?
Yes Not necessary for this project r/
44. Did an Architect seal the plans for your commercial project? State Law requires any commercial project
with occupancy of more than 10 persons as per Section 1004 of the IBC to prepare the plans and
specifications for the project.
Yes a Not Necessary for this project
6