Loading...
HomeMy WebLinkAbout3.0 PermitADMINISTRATIVE PERMIT for A tract of Land in Sections 7 & 18, Township 7 South, Range 88 West of the P. M also known as 82 County Road 113 owned by Aspen Equity Group, LLC Parcel ID: 2393-074-00-357 In accordance with and pursuant to Section 6.00 of the Garfield County Zoning Resolution of 1978, as amended, and Resolution No. 2006 - 79 of the Board of County Commissioners of Garfield County, State of Colorado, the Director of the Building and Planning Department hereby authorizes, by Administrative Permit, the following activity: The placement of construction grading in the flood fringe of the designated 100 year floodplain of Cattle Creek for the construction of mini -storage units The Administrative Permit is issued subject to the conditions set forth in Exhibit A (attached hereto), and shall be valid only during compliance with such conditions and other applicable provisions of the Garfield County Zoning Resolution, Subdivision Regulations, Building Code, and other regulations of the Board of County Commissioners of Garfield County, Colorado. BUILDING AND PLANNING DEPARTMENT, GARFIELD COUNTY, COLORADO Director EXHIBIT A FLOODPLAIN PERMIT - 82 County Road 113 owned by Aspen Equity Group, LLC 1. All representations made in the application shall be considered conditions of approval, unless modified by this Exhibit A. 2. No alterations of the floodplain may be made other than the specific improvements noted in the application and shown on drawings by Deric J. Walter, P.E., as labeled "Civil Construction Set Site & Grading Plan" (SP -1) and stamped received April 11, 2008. 3. All new construction or substantial improvements shall be designed (or modified) and adequately anchored to prevent flotation, collapse or lateral movement of the structure resulting from hydrodynamic and hydrostatic loads, including the effects of buoyancy. 4. All new construction or substantial improvements shall be constructed with materials resistant to flood damage. 5. All new construction or substantial improvements shall be constructed by methods and practices that minimize flood damage. 6. All new construction or substantial improvements shall be constructed with electrical, heating, ventilation, plumbing, and air conditioning equipment and other service facilities that are designed and/or located so as to prevent water from entering or accumulating within the components during conditions of flooding. 7. All new and replacement water supply systems shall be designed to minimize or eliminate infiltration of flood waters into the system. 8. New and replacement sanitary sewage systems shall be designed to minimize or eliminate infiltration of flood waters into the system and discharge from the systems into flood waters. 9. On-site waste disposal systems shall be located to avoid impairment to them or contamination from them during flooding. 10. No disturbance of a regulated wetland will be allowed. 11. The boundaries of the 100 -year floodway shall be staked and fenced prior to site disturbance.