HomeMy WebLinkAboutApplication-PermitGarfield County
Building & Planning Department
108 Bth Street Suite 401
Glenwood Springs, CO 81601-
Phone: (970)945-8212 Fax: (970)384-3470
Project Address
0055 Sage Meadow RD
GLENWOOD SPRINGS, CO
Owner Information
Robert & Denise Gordon
Contractor(s l
High Mark Construction Company
Proposed Construction I Details
Parcel No.
239308205009
Address
co
Phone
(970)947-9092
Single family multi level manufactured home on
unfinished basement and crawl space with attached
garage.
FEES DUE FEES PAID
Fee Amount lnv Total
Permit'rJo.,BLMF""B-1o.:{f27'··'
·P<~rmit Typ~:Ma~ttactui~~l3uil~~~g····
Wolk C(a~~ification: 1\!ey.r,Nh.llt!:-Level
··· · Permit Status: Active
Issue Date: 9/1 0/2010 Expires: 03/09/2011
Subdivision Section Township Range
PINYON MESA PUD, FLG 1
Phone Cell
503-590-1959
Primary Contractor Required Inspections:
Yes Fo• l"'p"Uo"' ooll • 1 (888)868-5306
Inspection IVR
Valuation: $ 118,651.20
Total Sq Feet: 2801 See Permit Record
Paytype Amt Paid Amt Due
Manufactured Building Fee
Multi Level-Manufactured Ho
Plan Check Fee
$1,100.15
$600.00
$715.10
$933.07
lnv # BLMF-8-10-20488
$ 3,348.32
Road Impact Fee
Total: $3,348.32
Friday, September 10, 2010
Check# 1011 $3,348.32
$0.00 Building Department
Copy
2
I
2
3
4
5
6
7
8
9 Descr ib e Work:
10 Class of Work:
11 Garage:
12 Driveway Permit:
GARFIELD COUNTY BU1LDING PERMIT APPLICATION
10 8 8th StTee t, Su ite 401, Glenwood Sprin gs, Co 81601
Phone: 970-945-82 12/ Fax: 970-384-3470 I Inspection Line: 888-868-5306
www.garfield-county .com
A/evJ SF!:>
o Alterati on o Addition
Sept ic:
o ISDS
Owners va luat ion of Work: $
NOTICE
Authority. This application for a Building Pe nnit must be signed by the Owner of the property, descnbed above, or an authorized agent . If the siguature be lo w is not that of the Owner, a separate
letter of authority, signed by th e Owner, must be provided with this Application.
Legal Access . A Building Pennit caonot be issued without proof of legal and adequate access to th e property for purposes of inspections by the Building Department.
Other P er ntits. Multiple separate pennits may be required: (I) State Electrical Perntit, (2) County JSDS Permit, (3) another penni! required for use on the property id entifie d above, e.g. State or
County Highway/ Road Access or a State Wastewater Discharge Pennit.
Void Perntil A Building Penni! becomes null and void if the work authorized is not commenced within 180 days of the date of issuance and if w ork is suspended or abandoned for a peri od of 180
days after commencement.
CERTIFICATION
1 I hereby certifY that I have r ead this Application and that the information contained above is true and correct. I understand that the Bui lding Department acceptS th e Application, along with the plans
and specifications and other data submitted by me or on my behalf(submittals), based upon my certification as to accuracy.
Assuming co mpleteocss of the submittals and opproval of this Application, a Building Pennit wiU be issued granting permission to me, as Owner, to construct the structure(s) and facilities detail ed on
the submittals reviewe d by the Bui lding Department
In consideration of th e issuance of the Building Penni!, I agree that I and my agents will comply with provisions of any fed eral, state or local Jaw regulating the work and the Garfield CoW>ty Bui lding
Code, JSDS regulations and applicable land usc regulations (County R egulation(s)). I acknowl edge that the Building Pennit may be suspended or revoked, upon notice fro m the County, if the location,
construction or use of the structure(s) and fucility(i es), descnbed above, are not in com pliance with County Regulation(s) or any other applicable law.
I hereby grant pennission to th e Building Department to enter the property, described above, to inspect the work. I further acknowledge that the issuan ce of the Building Permit does not prevent the
Building Official from : (I) requiring th e correction of errors in the s ubmittals, if any, discovered after issuance; or (2) stopping construction or use of the structure(s) or facility(ies) if such is in violation
of C ounty Regulation(s) or any other applicable Jaw.
Review of this Application, including submittals, and inspecti ons of the work by the Building Depar1ment do not constitute an acceptance of r esponsibility or liabil ity by the County of errors, omissions
or discrepancies. As the Owner, I acknow ledge that responsibility for compliance with fede ral, state and lo cal laws and County Regulations rest with me an d my authorized agents, including without
li mitatio y architect ' gincer and/ or builde r.
I HE AC I AVE READ AND UNDERSTAND THE NOTICE & CERTIFICATION ABOVE :
Do . Gf.J0 ./0
6V)~ /O il ~:2
$ ?3Li(().
Special Con ditions:
Adjusted Valu ation: P lan C heck Fee:
ll~b5J.Z0 715.10
DATE
STAFF USE ONLY
Permit Fee: ~aOOo me Fee2£1/
If DO . 15
Road tHRlet
1 Qi5s ~Ol
ISDS Fee: Tota l Fees: Fees Paid : Balance Due : BP No & Issu e Date: ISDS No & I ssued Date:
3 1 ~48 . 3?-flf 33'-18 .32--\1;Al-CDMM .
Set ba cks: OCCGroup: Const Type: ·r;~b P25 ,{!Z5 / I e-7 Jl'g )/0
BL~ 4~ ~':/~ ~ROVAL ~ DA jt:,/lttJ APPROVAL DATE
The following items are required by Garfield County for a final Inspection:
1) A final Electrical Inspection from the Colorado State Electrical Inspector.
2) Permanent address assigned by Garfield County Building Department and posted at the
structure and where readily visible from access road.
3) A finished roof; a lockable building; completed exterior siding; exterior doors and windows
installed; a complete kitchen with cabinets, sink with hot & cold running water, non-absorbent
kitchen floor covering, counter tops and finished walls, ready for stove and refrigerator; all
necessary plumbing.
4) All bathrooms must be complete, with washbowl, tub or shower, toilet, hot and cold running
water, non-absorbent floors, walls finished, and privacy door.
5) Steps over three (3) risers, outside or inside must be must have handrails. Balconies and decks
over 30" high must be constructed to all IBC and IRC requirements including guardrails.
6) Outside grading completed so that water slopes away from the building;
7) Exceptions to the outside steps, decks, grading may be made upon the demonstration of
extenuating circumstances., i.e. weather. Under such circumstances A Certificate of
Occupancy may be issued conditionally.
8) A final inspection sign off by the Garfield County Road & Bridge Department for driveway
installation, where applicable; as well as any final sign off by the Fire District, and/or State
Agencies where applicable.
A CERTIFICATE OF OCCUPANCY (C.O.) WILL NOT BE ISSUED UNTIL ALL THE
ABOVE ITEMS HAVE BEEN COMPLETED.
A C.O. MAY TAKE UP TO 5 BUSINESS DAYS TO BE PROCESSED AND ISSUED.
OWNER CANNOT OCCUPY OR USE DWELLING UNTIL A C.O. IS ISSUED.
OCCUPANCY OR USE OF DWELLING WITHOUT A C.O. WILL BE CONSIDERED AN
ILLEGAL OCCUPANCY AND MAY BE GROUNDS FOR VACATING PREMISES
UNTIL ABOVE CONDITIONS ARE MET.
I understand and agree to abide by the above conditions for occupancy, use and the issuance of a
C.O. for the building identified in the Building Permit.
Bapplicationdecember2007
Building Plan Review
Description of Work: Single family multi level manufactured home on unfinished basemen·
Bin#:
Location Address: 0055 Sage Meadow RD
GLENWOOD SPRINGS, CO
Case Manager: David Bartholomew
Plan Case Number: BLDG-8-10-6573
Parcel:239308205009
Application Date: 08/30/2010
Building
__ ,/ ____ Engineered Foundation
__ !V~/_A __ Driveway Permit
__ .£/ ___ Surveyed Site Plan
__ N..Jf.__A __ Septic Permit and Setbacks
___ / __ Grade/Topography 30%
___ / ___ Attach Residential Plan Review List
___ /_r-_Minimum Application Questionnare
7 _____ Subdivision Plat Notes
__ M_0"--A __ Fire Department Review
_ ___:/:..__ __ Valuation Determination/Fees
_ _____;/':..__ __ Red Line Plans/Stamps/Sticker
___ / ___ Attach Conditions
___ V ___ Application Signed
__ .;.~ ___ Plan Reviewer To Sign Application
___ / ___ Parcel/Schedule No.
__ /_~_40# Snowload Letter-Manu. Homes
_ __;.7 ___ Soils Report
Contacts
Owner: Robert & Deni se Gordon
Applicant: Robert & Denise Gordon
Applicant Phone: 503-590-1959 Email:
Planning/Zoning
__ __:_/ __ Property Line Setbacks
__ ....;/ ___ 30ft Stream Setbacks
-__ v/_...,...._Fiood Plain 7 ' _____ Building height
___ / __ ~Zoning Sign-off
___ / ___ Road Impact Fees
---~---HOAIDRC Approval
___ V' ___ Grade/Topography 40%
---7:::.._-_,~..<_Pianning Issues
----~Subdivision Plat
VA I U./rft /II'S
PerM If-Fee
{2el;ttuJ Pe~
mMuf fee..
(2t>Y IMf~t
-rofAl
AWl+ f.A-\ ol
:Due.
General Comments:
I J 8 1 65 I . 2-D
J1 /()0. IS
115. 10
600 .00
q J~.o1 __:...:.-:.----
3; -;f./8.32-
,P
VALUATION FEE DETERMINATION
Applicant
Address
Date
Robert & Denise Gordon Subdivision ~~~~~~~~~~--------:0..:::0::-:55~S::::a~gz.:.e..:.;M..:.;e:..::a:;;;.do:::..;w;,;.,..:.;R:..::d;.... _G.;:;..;;W:..;:S;__ _____ Lot/Block
9/9/2010 Contractor ~~~---------------------
Finished (Livable Area):
Main
Upper
Lower
Other
Total Square Feet
Valuation
Basement:
Unfinished
Conversion of Unfinished to Fini shed
Total Valuation
Garage/Storage (wood framed)
Carport:
Total Valuation
Crawl Space
Tota l Valu ation
Decks/ Patios/Porches
Covered
Open
Total Valuation
Type of Construction:
Occupancy:
Valuation
Total Valuation
120 sq .ft
720 sq.ft
sq .ft
sq .ft X $74 .68
840 sq .ft
600 sq .ftX $41.00
sq .ft X $33.68
720 sq.ftX $18.00
sq.ft X $12.00
800 sq .ft X $9.00
465 sq.ft X $24.00
sq.ft X $12.00
Commercial
sf X
sf X
sf X
sf X
sf X
sf X
Pinyon Mesa
Lot9
High Mark Construction, Jim Pidcock
62,731.20
24,600.00
12,960.00
7,200.00
11,160.00
0.00
118,651.20
GARFIELD COUNTY BUILDING AND PLANNING
970-945-8212
MINIMUM APPLICATION REQUIREMENTS
For
MANUFACTURED HOMES
In order to understand the scope of the work intended under a permit application and expedite the issuance of a
permit it is important that complete information be provided. When reviewing a plan and it's discovered that
required information has not been provided by the applicant, this will result in the delay of the permit issuance
and in proceeding with building construction. The owner or contractor shall be required to provide this
information before the plan review can proceed. Other plans that are in line for review may be given attention
before the new information may be reviewed after it has been provided to the Building Department.
Please review this document to determine if you have enough information to design your project and
provide adequate information to facilitate a plan review. Also, please consider using a design professional
for assistance in your design and a construction professional for construction of your project.
To provide for a more understandable plan in order to determine compliance with the building, plumbing and
mechanical codes, applicants are requested to review the following checklist prior to and during design.
Applicants are required to indicate appropriately and to submit the completed checklist at time of application for a
permit.
TWO (2) SETS OF CONSTRUCTION DRAWINGS & TWO (2) SITE PLANS MUST BE
SUBMITTED FOR ALL APPLICATIONS.
All plans submitted must be in compliance with the 2003 IRC for Residences and 2003 IBC for Commercial
Offices and Storage, and 2006 IECC.
I
1. Is a site plan included that identifies the location of the proposed structure or addition and distances to the
property lines from each comer of the proposed structure prepared by a licensed surveyor and has the
surveyors signature and professional stamp on the drawing? Properties with slopes of 30% or more must
be shown on site plan. (NOTE Section 106.2) Any site plan for the placement of any portion of a
structure within 50 ft. of a property line and not within a previously surveyed building envelope on a
subdivision final plat shall be prepared by a licensed surveyor and have the surveyor's signature and
professional stamp on the drawing. Any structure to be built within a building envelope of a lot shown on
a recorded subdivision plat shall include a copy of the building envelope as it is shown on the final plat
with the ~posed structure located within the envelope.
Yes ____ _
2. Does the site plan when applicable include the location of the I.S.D.S. (Individual Sewage Disposal System)
and the distances to the property lines, wells (on subject property and adjacent properties), streams or
water courses? This information must be certified by a licensed surveyor with their signature and
p~~~essional stamp on the design. rv /!!r
3. Does the site plan include any other buildings, setback easements and utility easements? Please refer to
Section 5.05.03 in the Garfield County Zoning Resolution if the property you are applying for a building
permit on itcated on a corner lot. Special setbacks do apply.
Yes. ____ _
4. Does the site plaJI indicate the location and direction of the County or private road accessing the property?
Yes. __ '-._v' __ _
5. Have you provijled any RESOLUTIONS and/ or LAND USE PERMIT(S) associated with this property?
Yes v' If Yes please provide a COPY. No ____ _
6. Do the plans include a foundation plan indicating the size, location and spacing of all reinforcing steel in
accordance with the uniform building code or per stamped engineered design? A Floor Plan of the
Modular lJnit showing exterior doors is required.
Yes _ _._L __ _
7. Do you understand that if you belong to a homeowners association, it is your responsibility to obtain written
permission from the association, if required by that association, prior to submitting an application for a
building peJIDit? The building permit application will not be accepted without it.
Yes V No -------
2
8. Will this be the only residential structure on the parcel?
Yes 'f. No Ifno-Explain:. ______ _
9. Have two (2) COJJ!plete sets of construction drawings been submitted with the application?
Yes _ __,V,__ __
I 0. For the placement of a manufactured home, have the following been specified?
The size of the unit (min. 20ft. x 20ft.); live roofload (min. 40# could be more depending on elevation of
property);~nd design (min. wind speed of 90 mph); foundation design; method of anchoring?
Yes'---'-v __ _
11. Have you designed or had this plan designed while considering building and other construction code
requiremel}ts?
Yes _ __I!C!L_ __ _
12. Do your plans;eomply with all zoning rules and regulations in the County related to your zone district?
Yes __ ..;,__ __
13. Does the plan accurately indicate what you intend to construct and what will receive a final inspection by the
Garfield C9ID1ty Building Department?
Yes t/ --'-----
14. Do you understand that approval for design and/or construction changes are required prior to the application
of these ch}H\ges?
Yes _ __.L __ _
15. Do you understand that the Building Department will collect a "Plan Review" fee from you at the time of
application and that you will be required to pay the "Permit Fee" as well as any "Road Impact" or "Septic
System" ~required, at the time you pick up your building permit?
Yes. _ __:. __ _
16. Are you aware that you must call in for an inspection by 3:30 the business day before the requested
inspection in order to receive it the following business day? Inspections will be made between 7:30
a.m. andl.3:30 p.m. Monday through Friday. Inspections are to be called in to 384-5003.
Yes._.c.V ___ _
17. Are you aware that requesting inspections on work that is not ready or not accessible will result in a $50.00
re-inspectiQri' fee?
Yes __ V,__ __
3
I 8. Are you aware that you are required to call for all inspections required under the IRC including approval on a
final inspjPon prior to receiving a Certificate of Occupancy and occupancy of the building?
Yes , •
I 9. Are you aware that prior to as submittal for a building permit application you are required to show proof of a
legal and adequate access to the site? This may include (but is not limited to) proof of your right to use a
private/right of way; a County Road and Bridge permit; a Colorado Dept. of Highway Permit including a
Notice to Proceed; a permit from the federal government or any combination. You can contact the
Garfield Cqpnty Road & Bridge Department at 625-860I See phone directory for other agencies.
Yes_-"'-!L_ __ _
20. Do you understand that you will be required to hire a State of Colorado Licensed Electrician and Plumber to
perform installations and hookups, unless you as the homeowner are performing the work? The license
number of the person performing the work will be required at time of applicable inspection.
Yes bL
21. Are you aware, that on the front of the Building Permit Application you will need to fill in the Parcel/Schedule
Number for the lot you are applying for this permit on prior to the submittal of a building permit
application? Your attention in this is appreciated.
Yes V...
22. Are you aware that you will need to have your installer obtain an installation inspection as per the State
Division of Housing requirements prior to the County building department doing their final inspection?
The Statvvill charge a fee for this inspection.
Yes. __ ~"--"--
23. Are you aware that the Permit Application must be signed by the Owner or a written authority being given for
an Agent(d that the party responsible for the project must comply with the Uniform Building Code?
Yes .
24. Are you aware, that if you receive your water and/or sewer from an Association, a District or Municipality,
you will be required to provide the County with a copy of the Tap Permit (or evidence of an exemption) at
the time ~e building permit application submittal?
Yes
25. Do you understand that if you are planning on doing any excavating or grading to the property prior to
issuance ~a building permit that you will be required to obtain a grading permit?
Yes
4
26. If you anticipate obtaining a water tap from the City of Rifle, please provide a letter indicating that the City
will provide water service. No building permit application will be accepted without such a letter.
Yes ____ _
·_!_1!..:::.70_-~$ 7__1_1 _,-5ic:.G:.:_f7!___( days); __________ (evenings)
ProjectName: Wl?..fx2/J f<£3Sfl:t:/1Kc
Project Address: 55 5AG( fri(AWW fo#b
Notes:
If any required information is missing delays in issuing the permit are to be expected. Work may not proceed
without the issuance of a permit. If it is determined by the Building Official that additional information is
necessary to review the application and plans to determine minimum compliance with the adopted codes, the
application may be placed behind more recent applications for building permits in the review process and not
reviewed until required information has been provided and the application rotates again to first position for
review, delay in issuance of the permit or delay in proceeding with construction.
bpminreqmhMar2009
5
Robert & Denise Gordon, 13037 SW Ascension Drive, Tigard, OR 97223
August 11, 2010
To whom it may concern:
This letter is to inform you that my son, James H. Pidcock, is our agent in
conjunction with the home we are building at the Pinyon Mesa lot: 55
Sage Meadow Road, Glenwood Springs, Colorado. He is permitted to
sign any and all applications, documents and permits pertaining to the
building process.
Denise G. Gordon
Jim Pibcock
Ref: 55 Sage Meadow Rd.
jimpibcock@comcast.net
To Whom it May Concern:
Garfielcf County
Road and Bridge Department
July 27, 2010
This letter is to inform you that the property located at 55 Sage Meadow Rd., and owned by
Robert and Denise Gordon, is exempted from needing a driveway permit. The point of access
for the driveway does not connect to a Garfield County Road.
If you have any questions or need anything furlher, please let us know.
Deb Fiscus
Office Manager
Garfield County Road and Bridge
Cc: file
Building & Planning
0298 County Road 333A; P.O. Box 426
Rille, CO 81650 Phone: 970-625-8601 Fax: 970-625-8627
PINYON
Augu st 26, 20 I 0
Garfie ld Cou nty Building Dept.
Att n: Mr. Andy Sc hwa ller
1 08 Eighth Street
Sui te 40 1
G lenw ood Sprin gs, CO 8 1601
RE: Design Review Release for Building Permit
Dea r Mr. Sc hwa ll er,
MESA
The Pinyon Mesa Design Revie w Committee has reviewed the plans and is here by
issu in g approval for the release of a Building Permit(s) upon your sa ti sfac ti on of plans
submitted for th e follo w in g lot(s):
L ot: 09, Filing 1
Owner: Robert & Denis e Got·don
Contractor: High Mark Construction Company
U pon yo ur review and approval of s ubmitted plans and issuance of Building Permit, the
appli cant is authorized to proceed with cons tru ctio n at their own ri sk.
Final approval in w ritin g from the Des ign Review Committee w ill be necessary before
requesting final inspection and issuance of a Cet1ificate of Occupancy fro m Garfi e ld
C ounty .
Please feel free to contact us should you have a n y questions.
Si ncerely,
Pin yo n Mesa -Design Review Committee
_6\ .... ,
-?>._. ·-·-
'"
BARVISTA HOMES, INC.
390 MOUNTAIN VIEW ROAD
BERTHOUO,C0,80534
PH.970.532.4257
FX.970.532.4328 BARVISTA
Thursday, August 26, 2010
Re: Gordon Residence -located at Lot 9 in Pinyon Mesa; Glenwood Springs, Colorado
Jim Pidcock
High Mark Construction Company
PO Box 2121
Aspen, CO 81612
Jim,
This letter is to confirm that this order (identified as the Gordon Residence), located at Lot 9 in
Pinyon Mesa; Glenwood Springs, Colorado will be built with at least a 40# snow load for the roof,
and a minimum 90MPH wind load, per Garfield County's building requirements.
Sincerely,
Mike Morrow
Sales Manager
Barvista Building Systems
1
-, illl W.1 ~~.!'.~'.Mil .~·F.IIH lt~lrl'.MIL.Hr. ~i IIIII
Reception~: 716948
02/08/2007 04:38:23 PM 8:1893 P:0363 Jean Alberico
1 of 6 "Rec Fee:$0.00 Doc Fee: GARFIELD COUNTY CO
STATE OF COLORADO )
)ss
County of Garfield )
At a regular meeting of the Board of County Commissioners for Garfield County,
Colorado, held in the Commissioners' Meeting Room, Garfield County Plaza Building, in
Glenwood Springs on Monday, December 11, 2006, there were present:
"-'J o,.hn.,.,_M"""arti"-'=. n.._ ________________ , Commissioner Chairman
=Larry..._...I.-2M=cC=ow=n~---------------' Commissioner
:"T-"re,.s'"':i~H.,o='u"'p""t ----------------·· Commissioner
:D,o"'n'-'D"-e""F...,o,.r_,d ________________ ,, County Attorney
~Mi~·.,ldr"!e,d,_,Al~sd~o~rf~-------------'' Clerk of the Board
-'=E"'d'-'G..,r..,ee,n.,_ _________________ ,, County Manager
when the following proceedings, among others were had and done, to-wit:
RESOLUTION NO. 2007-04
A RESOLUTION CONCERNED WITH TilE APPROVAL OF A PRELIMINARY
PLAN APPLICATION FOR TilE PINYON MESA SUBDIVISION IN PHASE 3 OF
THE LOS AMIGO~ RANCH PLANNED UNIT DEVELOPMENT
WHEREAS, the Board of County Commissioners of Garfield County, Colorado,
received a Preliminary Plan Application from Pinyon Mesa Development, LLC to
subdivide a 60.49-acre property (also known as Phase 3 of the Los Amigos Ranch PUD)
in to 80 high-density single family residential lots and which property is generally located
in lower Spring Valley, approximately 1 mile east of the Highway 82 I CR 114-
intersection in the N \h of Sections 7 and 8, Township 7 South, Range 88 West of the
Sixth P.M., Garfield County; and
WHEREAS, the subject property is located in the High Density Single Family
Zone District within Phase 3 of the Los Amigos Ranch Planned Unit Development
(PUD); and
WHEREAS, Oil October 11, 2006, the Garfield County Planning and Zoning
Commission forwarded a recommendation of approval with conditions to the Board of
County Commissioners for the Preliminary Plan; and
WHEREAS, on December 11, 2006, the Board of County Commissioners opened
a public hearing upon the question of whether the Preliminary Plan should be granted,
granted with conditions, or denied at which hearing the public and interested persons
were given the opportunity to express their opinions regarding the issuance of said
Preliminary Plan; and , ,'
Iiiii\ ~?• t'l.a"l,\i-11: HI'.\Ko~.~.\tx"~~t'l'l~\'« !t:ti 1\\\\
Receptlonff: 716948
0210812007 04:38:23 PM 8:1893 P:0368 Jean Alberico
6 of 6 Ree Fee:$0.00 Doc Fee: GARFIELD COUNTY CO
High Density
Single Family
'HDSF)
Home
Occupation 10,000 sq. fl.
. --
25%
. bf reJ,r~ , A.D. 2007.
I
Front I Rear:
25'
Sides: 10'
28 feet 3,294 sq. fl.
COUNTY
OF
GARFIELD
BOARD
COMMISSIONERS,
GARF COUNTY,
COL.vRru.r
Upon motion duly made and seconded the foregoing\&!W'Ifi "'"-"~
the following vote:
_J~o~hn~~~art~in~-----------------------------------------'Aye
_Larr~~y~~~c~C~o~w~n~---------------------------------------'Aye
_T~re~s~iH~o~u~t~----------------------~--------~-------'Aye
STATE OF COLORADO
County of Garfield
)
)ss
)
I, , County Clerk and ex-officio Clerk of the
Board of County Commissioners in and for the Counry and State aforesaid do hereby
certify that the annexed and foregoing Resolution is truly copied from the Records of the
Proceeding of the Board of County Conullissioners for said Garfield County, now in my
office.
IN WITNESS WHEREOF, I have hereunto set my hand and affixed the seal of
said County, at Glenwood Springs, this __ day of , A.D. 2007
County Clerk and ex-officio Clerk of the Board of County Commissioners
1111 ~IIJ fw·I,I+JtNllr lWllllrl,lw~·r~·rrrn.l~tH JHnl IIIII
Reception~: 716948
02/08/2007 04 :39 :23 PM 8 :1893 P :0367 Jean Alberico
5 of 6 Rec Fee :$0 .00 Doc Fee : GARFIELD COUNTY CO
subdivision. One (1) new solid-fuel burning stove as defied by C.R .S. 25-7-
401. et. seq., and the regulations promulgated thereunder, will be allowed in
any dwelling unit. All dwelling units will be allowed an unrestricted number
of natural gas burning stoves and appliances".
d. No further subdivision shall be allowed of a subdivided lot. "
e. "All exterior lighting shall be the minimum amount necessary and that all
exterior lighting be directed inward and downward, towards the interior of
the subdivision, except that provisions may be made to allow for safety
lighting that goes beyond the property boundaries".
f "Colorado is a "Right-to-Farm" State pursuant to C.R .S. 35-3-101 , et seq.
Landowners, residents and visitors must be prepared to accept the activities,
sights. sounds and smells of Garfield County's agricultural operations as a
normal and necessary aspect of living in a County with a strong rural
character and a healthy ranching sector. Those with an urban sensitivity may
perceive such activities, sights, sounds and smells only as inconvenience,
eyesore, noise and odor. However, State law and County policy provide that
ranching, farming or other agricultural activities and operations within
Garfield County shall not be considered to be nuisances so long as operated
in conformance with the law and in a non-negligent manner. Therefore, all
must be prepared to encounter noises, odor, lights, mud, dust, smoke
·chemicals, machinery on public roads, livestock on public roads, storage and
disposal of manure, and the application by spraying or othe1wise of chemical
fertilizers, soil amendments, herbicides, and pesticides, any one or more of
which may naturally occur as a part of a legal and non-negligent agricultural
operations.
g. . "All owners of land, whether ranch or residence, have obligations under State
law and County regulations with rega1·d to the maintenance of fences and
irrigation ditches, controlling weeds, keeping livestock and pets under
control. using property in accordance with zoning, and other aspects of using
and maintaining property. Residents and landowners are encouraged to learn
about these rights and responsibilities and act as good neighbors and citizens
of the County. A good introductory source for such infmmation is "A Guide
to Rural Living & Small Scale Agriculture" put out by the Colorado State
University Extension Office in Garfield County."
h. "All lots shall require site specific geotechnical ·Studies before a building
pennit will be issued by the County Building Department and all foundations
shall be designed by a professional engineer licensed to practice in Colorado.
z. Zone District Parameters:
li\\ ft'l~~ flil.l'l~\llij, ~b.li'J,I~'I:!ofl'.M«.(Lt'.,IN IIIII
· RLcGptionU: 716948
02/08/20B7 04:38:23 PM 8:1893 P:0366 Jean ~lberico
4 of B Rae Fee:$0.00 Ooc Fee: GARFIELD COUNTY CO
Analysis I Impact and Mitigation Report" prepared by Rocky Mountain
Ecological Services, Inc. contained in the Application and shall be included as a
component in the CCRs.
13. Prior to Final Plat submittal, the Applicant shall meet with the DOW in order to
prepare an Elk Management Plan due to the amount of critical wintering habitat
being eliminated with development. (This was not completed.)
14. The Applicant shall cause the open space tracts to be deeded to the Homeowners
Association as part of the Final Plat.
15. The Applicant shall provide a security for revegetation in the amount to be
determined by the County Vegetation Manager (based on disturbed acreage) for
all areas to be disturbed in connection with the final plat and the obligations of
said security which security shall be incorporated into the Subdivision
Improvements Agreement. The security shall be held by Garfield County until
vegetation has been successfully reestablished according to the Reclamation
Standards in the Garfield County Vegetation Management Plan.
16. The Applicant shall provide a Soil Management Plan that includes 1) provisions
for salvaging on-site topsoil, 2) a timetable for eliminating topsoil and/or
aggregate piles, and 3) a plan that provides for soil cover if any disturbances or
·stockpiles will sit exposed for a period of 90 days or more. The Applicant shall
prepare this plan to be submitted with the final plat documents so that the County
can review prior to final plat approval.
17. The Applicant shall follow all of the recommendations provided in the
geotechnical analysis prepared by HP Geotech (reports in the Application and
Exhibit S to the Staff Report) as well as the follow the recommendations provided
by the Colorado Geologic Survey in their Jetter dated August 30, 2006 also
attached as Exhibit J to the staff report).
18. All easements of record shall be shown on the Final Plat.
19. The Applicant shall include the six points provided in the letter from the Bureau
of land Management dated August 22, 2006 (and attached to the Staff report as
Exhibit P) in the CCRs to place residents in the PUD on notice of these issues.
The CCRs shall be provided as part of the Final Plat submittal.
20. The following plat notes shall be placed on the final plat.
a. "Control of noxious weeds is the responsibility of the property owner."
b. "01te (I) dog will be allowed for each residential unit and the dog shall be
required to be confined within the owners property boundaries."
c. "No open hearth solid-fuel fireplaces will be allowed anywhae within the
II II ~:1·~ t'~i.lt~'~MIJ.I'tliL Lllll.l-\~:!.~.Jr:ri.J.l~'~ M'·~ IIIII
Reception~: 716948
02/08/2 007 04 :38 :23 PM 8 :1893 P :0365 Jean Alber i co
3 of 6 Rec Fee :$0.00 Doc Fee : GRRFIELD COUNTY CO
4 . The Applicant shall furnish a design and specifications for the secondary
emergenc y point at the end of Paintbrush Way that indicates the ability to handle
large I he avy emergency vehicles and methods of break-away gates or other
appropriate mechanism to deter use unless for emergency. This shall be prepared
and provided prior to fmal plat.
5. Applicant shall obtain a driveway access permit for both the main entrance into
the projects and for the secondary emergency access point onto CR 114 these
shall be obtained prior to final plat.
6 . The Appli c an t shall install a stop sign at each entrance to CR 114. The signs,
posts and location shall be as required by the MUTCD (Manual on Unifonn
Traffic Control Devices). An intersection sign shall be placed on both sides of the
main e ntrance to the subdivision alerting uphill and downhill traffic to the
entrance. The signs, posts and installation shall be as required in the MUTCD
(Manual on Uniform Traffic Control Devic es).
7. Pursuant to the suggestions by the Road and Bridge Department in Exhibit M, the
Applicant may e ither 1) construct a right-band tum lane should be installed on the
uphill lane to the main entrance to the subdivision and be reimbursed by the total
amount of Traffic Impact Fees required by the Development (approximately
$150,000.00) or 2) choose not to construct the improvement a only pay the Traffic
Impact F ee.
8. The Applicant shall pay the appropriately calculated Traffic Impact Fee for Study
Area 10 which results in a fee of approximately $149,292.00. Only half of this fee
(approxima tely $74,646.00) is required to be paid at Final Plat with the remaining
half to be amortiz ed by way of individual building permits a s the project develops
over time. ( C(-:; ~.o1
9. The Applic ant shall 'cause the conveyance of the School Parcel by deed to theRE-
1 School District prior to Final Plat or pay the appropriately calculat ed School I
Land Dedication Fee pursuant to the Subdivision Regulations .
. 10 . All development of this property shall follow the recommendations of the
Colorado State Forest Service as stated in their letter dated August 28 ,2006,
(attached as Exhibit N to the Staff report) which shall be incorporated into the
CCRs as a requirement of the BOCC particularly as they relate to lots 17-20, 36-
48, 66-72 and lots 59-65. ·
11. The Applicant shall pay-in-full the fire impact fee of $437 per dwelling unit to
Carbondale Fire Protection District at the time of Final Plat. (Th..is fee shall be
$34,960.00)
12 . The Applicant shall incorporate the recorrimendations containe d in the "Wildlife
WHEREAS, the Board of County Commissioners closed the public hearing on the
December 11, 2006 to make a final decision; and
WHEREAS, the Board of County Commissioners on the basis of substantial
competent evidence produced at the aforementioned hearing, has made the following
determination of facts:
1. That proper publication, public notice, and posting was provided as required by law
for the hearings before the Planning and Zoning Commission and before the Board of
County Commissioners.
2. That the public hearings before the Planning and Zoning Commission and the Board
of County Commissioners were extensive and complete; all pertinent facts, matters
and issues were submitted; and that all interested parties were heard at those hearings.
3. The application is in compliance with the standards set forth in Section 4:00 of the
Garfield County Subdivision Regulations of 1984, as amended.
4. That the proposed subdivision of land is in compliance with the recommendations set
forth in the Comprehensive Plan for the unincorporated area5 of the County.
5. The proposed subdivision ofland conforms to the Garfield County Zoning Resolution
of 1978, as amended and the provisions of the High Density Single Family zone
·district in the Los Amigos Ranch PUD.
6. The proposed use is in the best interest of the health, safety, morals, convenience,
order, prosperity and welfare of the citizens of Garfield County.
NOW, THEREFORE, BE IT . RESOLVED by the Board of County
Commissioners of Garfield County, Colorado, that based on determination of facts set
forth above, the Preliminary Plan request is approved with the following conditions:
1. That all representations made by the Applicant in the application and as testimony
in the public hearings before the Planning & Zoning Commission and Board of
County Commissioners shall be conditions of approval, unless specifically altered
by the Board of County Commissioners.
2. All internal roads shall be designed to have a road surface of at least two 12-foot
driving lanes with curb and gutter throughout the subdivision with a minimum
right of way of 50 feet. Such design of the internal road system shall be consistent
with the design proposed to the BOCC in the Preliminary Plan.
3. The length of the cul-de-sac represented as Pinyon Mesa Drive shall be allowed to
be designed, as shown, to 900 linear feet and the bulb at the end of the cul-de-sac
may remain as designed with a landscaped island in the middle.
Rakowski-Millard
Structural Design, LLC
580 Main St., Suite 310
Carbondale, CO 81623
Phone (970) 963-9643
March 7, 2011
Jim Pidcock
High Mark Construction
P.O. Box 2121
Aspen, CO 81612
RE: Gordon Residence
Lot 9, Pinyon Mesa Subdivision
Sage Meadow Road
Garfield County, Colorado
Subject: Garage Rafter Bearing and Fastening @ Exterior Walls
Dear Mr. Pidcock:
I conducted a site observation of the Gordon Residence garage rafter bearing and fas-
tening repair on January 28, 2011. The purpose of the observation was to determine if
the construction for this repair was proceeding in conformance with our specification.
Repair Specification:
For the rafters bearing on the exterior wall and hung from the ridge beam, fasten a 2x6
on flat on top of and flush with the 2x6 plate with 2 -16d nails @16" o.c .. Rip a bevel at
the edge of the 2x6 to fit the roof pitch. Fasten each rafter to the edge of the double
plates with an H2.5T.
For the short rafters which are part of the ladder framing near the gable ends, fasten the
rafter to the blocking with 4-16d end nails and fasten the blocking to the wall with 1 -
LSTA12@ 32" o.c .. If the H2.5T or LSTA12 hardware does not allow full nailing, please
contact me. I would like to observe this repair once you have had a chance to install one
or two ties.
Observations:
The garage rafter bearing and fastening repair was proceeding in general conformance
with our repair specification at the time of my site observation.
Scope of Observation:
The above report is based an isolated site observation and there is no claim, either stated
or implied, that all conditions were observed. This letter does not address any portions of
the structure other than those areas mentioned. No physical testing was performed by
Rakowski-Millard Structural Design, LLC or it's associates.
If you have any questions regarding this report, or if we can be of further service, please
contact us.
Sincerely,
Steve Millard
Project Engineer
steve.rms@qwestoffice.net
~· ,~.· --BARVISTA
SUlLDING SYSTEMS
Date: Od .2<1 I ao I 0
To: \1·~\., M,p.;K C~\.lc:t\&\
398 MIIIIITAIN VIEW RiAD
BERTHOUD -COliBADI 80513
918.532.4251
FA11910.532.4328
Subject: Alternate Construction {A C) Inspection Requirements -Plan Approval# 51;;! :!J.9D ..ArJ
Serial# , I 12,-I 55'7-4 Model# ~ -2'71[
Due to the nature of the on-site work required for completion ofthe unit built, a Colorado Division of
Housing (CODOH) oversight inspection {AC inspection) is required before this unit can be considered
compliant with Colorado State Law.
A new procedure adopted by the CO DOH regarding the AC Inspections requires that the local building
department must be given the opportunity to take responsibility for the AC inspections on-site. It also
requires that Barvista BUilding Systems provide CO DOH with a copy of the letter acknowledging
whether the local jurisdiction is willing to perform the AC inspection or not, PRIOR to shipping the
units from the BBS facility.
Please take the attached AC INSPECTION REQUIRED NOTICE that lists the items that will need to be
inspected prior to close up and finish to your local building department. The local building inspector
must acknowledge their acceptance or denial of the responsibility of this AC Inspection. Please fax it to
my attention at 970-532-4328 to prevent delay of shipment.
If the local building inspector agrees to perform this inspection, the horne will leave the BBS facility
with the FB insignias installed at the facility. In the event that the local building inspector does not agree
to perform this inspection the CODOH will perform the inspection and install the FB insignias at that
time.
You will need to notifY your installation crew that the unit is an AC unit requiring the AC INSPECTION
NOTICE to be followed and be constructed to the drawings and engineering provided. Before rough
installation is closed up, the installer shall contact the local inspector or the CODOH (whichever is
performing the AC Inspection) to schedule the inspection. The inspection shall be done prior to close up
or the inspector may and most likely will require the close up to be removed so the proper inspection can
be made.
If you have any questions regarding the AC Inspection items, please feel free to call Todd Anderson
with the CO DOH at 303-866-4657.
Thank you, c t3f~: ,---_
Debbie Kindred
STATE OF COLORADO
DIVISION OF HOUSING
AC (alternative construction) INSPECTION REQUIRE)) NOTICE
The foiiQWing is based on information provided to the Codes Section and may be modified
based on the actual findings of the field inspection.
DATE: October 27, 2010
MANUFACTURE~ BaMsm IDNO.: 3446
Oovernor
Sli!all Kirkpatrick
Executive Oim::tor
CONTACT: Robert Strickland FAX NO.: {970) 532-5508
MODEL NO.: R-2771 P/A NO.: 512300AC
INSPECTION REQUIREMENTS:
Check onstte completion{lnsmUation ot.
..1,.'\.
1) Si::iel: ef all eed:si,..ets, sinks and plumbing fixtures.
2) Fireplace
3) Radiant heat system
4) Interlace of sfte-buitt Mud/Laundry Room and factory-buin structure
site Address: 55 5~ ;vle,4-bo«J fb~b bJT Cf, ft#'PAJ 1165t)-r ' .
The local building department by signing this form takes responsibility for inspecting the site built
constnJction stated above to approved plans and current codes.
Normal permits and fees for these inspections are to be per the local jurisdiction.
State approved plans for Factory Built Construction may be obtained froni the
Builder/Manufacturer.
A copy of this Notice must be Included with the installation Instructions and
shipped with the unit.
Please direct questions to DOH Engineer, @ 303-866-4657.
I.H3 Sbermao Street, Room 321, Denver, Colorodo 80203 (303) 866-4616 FAX (303) 866-3072.
~tech
HEPWORTH · PAWLAK GEOTEC HNI CAL
September 28 , 2010
High Mark Construction
Attn: Jim Pidcock
P. 0. Box 2121
Aspen, Colorado 81612
jimpidcock@ comcast .net
I h:l '"''nh -l\111 ltk ( •e••lec hlll, 1l. In,.
'i02l1 ( 'oum ,. R. ~;~,) 15-1
llld t """'' ·~·l 'llll g>, l ~.~).,, .1du :'I (,L) I
l'h une: 9/\).l).j').(%~
I a:\: 9/L1-9-I~-K-I'i-l
t'lll<H l · hp!(.:"fi hl 'gc<~tc·ch <.:<tm
Job No. 110 069A
Subject: Observation of Excavation, Proposed Residence, Lot 9 , Pinyon Mesa
Subdivision Filing 1, Sage Meadow Road, Garfield County, Colorado
Dear Jim:
As requested, a representative ofHepwot1h-Pawlak Geotechnical, Inc. observed the
excavation at the subject site on September 24, 2010 to evaluate the soils exposed for
foundation support. The ftndings of our observations and recommendations for the
foundation design are presented in this repot1. We previously conducted a subsoil study
for design of foundations at the site and presented our ftndings in a repot1 dated April 7,
2010, Job No . 110 069A.
The proposed construction is similar to that discussed in our previous report. Spread
footings bearing on the natural soils designed for an allowable soil bearing pressure of
1,200 psf were recommended for foundation support with a risk of settlement.
At the time of our visit to the site, the foundation excavation was essentially complete and
had been cut in multiple levels fi:om about 3 to 9 feet below the adjacent ground surface.
The soils exposed in the bottom of the excavation consisted of stiff, sandy clay and silt.
Results of swell-consolidation testing performed on samples taken from the site, shown
on Figure 1, indicate the soils are moderately compressible under conditions of loading
and wetting. The samples showed a low to moderate hydro-collapse potential when
wetted under a constant light surcharge, and no swell potential. No fiee water was
encountered in the excavation and the soils were slightly moist
The soil conditions exposed in the excavation are consistent with those previously
encountered on the site and suitable for suppot1 of spread footings designed for the
recommended allowable bearing pressure of I ,200 psf The risk of settlement and
distress is primarily if the bearing soils become w e tted and precautions should be taken to
prevent wetting. Loose and disturbed soils should be removed in the footing areas to
expose the undisturbed natural soils, and the subgrade moistened and compacted. Other
Pmk e r )(H-ti4 1-7 11 9 • Cdnrad o Sp rin gs 7 19-6 33 -"51 62 • S d w rt h u rn ~ 970-4 6~ 1 9~9
High Mark Construction
September 28, 2010
Page 2
recommendations presented in our previous repmt which are applicable should also be
observed.
The recommendations submitted in this letter are based on our observation of the soils
exposed within the foundation excavation and the previous subsurface exploration at the
site. Variations in the subsurface conditions below the excavation could increase the risk
of foundation movement. We should be advised of any variations encountered in the
excavation conditions for po ss ible changes to r eco mmendations contained in this letter.
If you have any questions or need further assistance, please call our office.
Sincerely,
attachment
Job No. II 0 0 69A
~~tech
Moisture Content = 8.4 percent
Dry Density = 97 pel
0 Sample of: Sandy Clay and Silt ---r-From: Bottom of Southeast Portion of Excavation -r-
1
~ -....... ..... I'
2 * I'\ Compression
c upon 0 ·u; 3 wetting en
!!! \ 0.
E
0 \ 0 4
5 1\
6
0.1 1.0 10 100
APPLIED PRESSURE-ksf
Moisture Content = 6.3 percent
Dry Density = 90 pel 0 Sample of: Sandy Silt -1-From: Bottom of Southwest Portion of Excavati on
1
2 1--,.--: Compression
* upon
3 wetting
c
0 ·u;
en
!!! 4 ..... 0.
E ~ 0
0 "'-, 5 ....... r--..,
6
0.1 1.0 10 100
APPLIED PRESSURE -ksf
110 069A c~£tech SWELL-CONSOLIDATION TEST RESULTS Figure 1
HEPWORTH·PAWLAK GEOTECHNICAL
~tech
HEPWORTH -PAWLAK GEOTECHNICAL
SUBSOIL STUD Y
FOR FOUNDATION DESIGN
PROPOSED RESIDENCE
LOT 9 , PINYON MESA SUBDIVISION, FILING 1
SAGE MEADOW ROAD
GARFIELD COUNTY, COLORADO
JOB NO. 110 069A
APRIL 7, 2010
PREPARED FOR:
HIGH MARK CONSTRUCTION
ATTN: JIM PIDCOCK
1>.0. BOX 2121
ASPEN. COLORADO 81612
TABLE OF CONTENTS
PURPOSE AND SCOPE OF STUDY ........................................................................ - 1 -
PROPOSED CONSTRUCTION ................................................................................. - 1 -
SITE CONDITIONS ................................................................................................... - 2 -
FIELD EXPLORATION ............................................................................................ -2-
SUBSURFACE CONDITIONS .................................................................................. -2-
SUBSIDENCE POTENTIAL ..................................................................................... - 3 -
DESIGN RECOMMENDATIONS ............................................................................. -4-
FOUNDATIONS .................................................................................................... -4-
FOUNDATION AND RETAINING WALLS ......................................................... -5-
FLOOR SLABS ...................................................................................................... - 6 -
UNDERDRAIN SYSTEM ...................................................................................... - 7 -
SURFACE DRAINAGE ......................................................................................... -7-
LIMITATIONS .......................................................................................................... - 8 -
FIGURE 1 -LOCATION OF EXPLORATORY BORING
FIGURE 2-LOG OF EXPLORATORY BORING
FIGURE 3 -LEGEND AND NOTES
FIGURES 4 and 5-SWELL-CONSOLIDATION TEST RESULTS
TABLE I -SUMMARY OF LABORATORY TEST RESULTS
PURPOSE AND SCOPE OF STUDY
This report presents the results of a subsoil study for a proposed residence to be located
on Lot 9, Pinyon Mesa Subdivision, Filing 1, Sage Meadow Road, Garfield County,
Colorado. The project site is shown on Figure 1. The purpose of the study was to
develop recommendations for the foundation design. The study was conducted in
accordance with our agreement fur geoteclmical engineering services to High Mark
Construction dated February 25, 2010. We previously performed preliminary
geotechnical engineering studies for the subdivision development and presented our
findings in reports dated November 11,2005 andApril10, 2006, Job No. 105 652. We
understand that the results of our findings will be considered in the purchase of the lot.
An exploratory boring was drilled on the lot to obtain information on the subsurface
conditions. Samples of the subsoils obtained during the field exploration were tested in
the laboratory to determine their classification, compressibility or swell and other
engineering characteristics. The results of the field exploration and laboratory testing
were analyzed to develop recommendations fur foundation types, depths and allowable
pressures for the proposed building foundation. This report summarizes the data obtained
during this study and presents our conclusions, design recommendations and other
geotechnical engineering considerations based on the proposed construction and the
subsurface conditions encountered.
PROPOSED CONSTRUCTION
The proposed residence will consist a 1 V, and 2 story, modular structure (approximately
2,500 square-feet in size) over a crawlspace and small mechanical space with a single
story, wood frame attached garage and slab-on-grade floor located within the building
envelope shown on Figure 1. Grading for the residence is assumed to be relatively minor
with cut depths between about 2 to 6 feet. We assume relatively light foundation
loadings, typical ofthe proposed type of construction.
Job No. l
-2-
If building location, grading or loading information changes from that described above,
we should be notified to re-evaluate the recommendations presented in this report.
SITE CONDITIONS
The lot was vacant at the time of our field exploration. The lot is located on the north
(uphill) side of Sage Meadow Road as shown on Figure I. The ground surface is
relatively flat with a gentle slope down to the south. There is about 2 to 3 feet of
elevation difference across the building envelope. Vegetation consists mainly of sage
brush except near the center of the lot. A small pile ofbasalt cobbles and boulders was
located at the north side of the building envelope.
FIELD EXPLORATION
The field exploration for the project was conducted on April2, 2010. One exploratory
boring was drilled on the lot as shown on Figure I to evaluate the subsurface conditions.
The boring was advanced with 4-inch diameter continuous flight augers powered by a
truck-mounted CME-45B drill rig. The boring was Jogged by a representative of
Hepworth-Pawlak Geotechnica~ Inc.
Samples of the subsoils were taken with a 2 inch J.D. spoon sampler. The sampler was
driven into the subsurface materials at various depths with blows from a 140 pound
hammer falling 30 inches. This test is similar to the standard penetration test described
by ASTM Method D-1586. The penetration resistance values are an indication of the
relative density or consistency of the subsoils and hardness of the bedrock. Depths at
which the samples were taken and the penetration resistance values are shown on the Log
of Exploratory Boring, Figure 2. The samples were returned to our laboratory for review
by the project engineer and testing.
SUBSURFACE CONDITIONS
A graphic log of the subsurface profile encountered in the boring is shown on Figure 2.
The subsoils, below about~ foot of organic topsoil, consist of sandy silt and clay, and
Job No. I
-3-
clayey sand with scattered rock fragments. Siltstone/sandstone bedrock was encountered
in the boring at a depth of30Yz feet down to the maximum explored depth of 41 feet
below the existing ground surface. Nearby borings drilled as part of our previous studies
encountered similar soils.
Laboratory testing perfurmed on samples obtained from the boring included natural
moisture content, density and percent finer than No. 200 sieve (silt and clay fraction)
gradation analysis. Results of swell-consolidation testing performed on relatively
undisturbed drive samples, presented on Figures 4 and 5, generally indicate low
compressibility under existing moisture conditions and light loading. When wetted, the
samples showed a low collapse potential or low heave potential. The laboratory testing is
summarized in Table I.
No free water was encountered in the boring at the time of drilling and the subsoils and
bedrock were slightly moist to moist.
. SUBSIDENCE POTENTIAL
Bedrock ofthe Pennsylvanian age Eagle Valley Evaporite underlies the Pinyon Mesa
subdivision. These rocks are a sequence of gypsiferous shale, fine-grained sandstone and
siltstone with some massive beds of gypsum and limestone. There is a possibility that
massive gypsum deposits associated with the Eagle Valley Evaporite underlie the lot.
Dissolution of the gypsum under certain conditions can cause sinkholes to develop and
can produce areas of localized subsidence. During previous work in the area, several
sinkholes were observed scattered throughout this part of Garfield County. These
sinkholes appear similar to others associated with the Eagle Valley Evaporite in areas of
the Roaring Fork River valley.
Sinkholes were not observed in the immediate area of the subject lot. No evidence of
cavities was encountered in the subsurface materials; however, the exploratory boring
was relatively shallow, fur foundation design only. Based on our present knowledge of
the subsurface conditions at the site, it cannot be said fur certain that sinkholes will not
develop. The risk of future ground subsidence on Lot 9 throughout the service life of the
proposed residence, in our opinion, is low; however, the owner should be made aware of
Job No. I
-4-
the potential for sinkhole development. If further investigation of possible cavities in the
bedrock below the site is desired, we should be contacted.
DESIGN RECOMMENDATIONS
FOUNDATIONS
Considering the subsurface conditionS encountered in the exploratory boring and the
nature of the proposed construction, the proposed residence can be founded with spread
footings bearing on the natural subsoils with some risk of differential foundation
settlement. The soils encountered to a depth on the order of 15 feet generally appear to be
compressible under loading when wetted. There may be relatively shallow, localized
expansive layers but we expect the upper soils overall to be compressible.
The design and construction criteria presented below should be observed for a spread
footing foundation system.
Jo b No . I
1) Footings placed on the undisturbed natural subsoils should be designed for
an allowable bearing pressure of 1,200 psf. Based on experience, we
expect initial settlement of footings designed and constructed as discussed
in this section will be about 1 inch or less. The upper soils are typically
compressible after wetting and there could be some additional post-
construction differential foundation settlement of about 1 to 2 inches if the
bearing soils are wetted. The bearing conditions should be further
evaluated at the time of construction. Precautions should be taken to
prevent post-construction wetting of the bearing soils.
2) Footings should have a minimum width of20 inches for continuous walls
and 2 feet for isolated pads.
3) Exterior footings and footings be neath unheated areas should be provided
with adequate soil cover above their bearing elevation for frost protection.
Placement of foundations at least 36 inches below exterior grade is
typically used in this area .
4) Continuous foundation walls should be reinforced top and bottom to span
local anomaJies such as by assuming an unsupported length of at least 14
-5-
feet. Foundation walls acting as retaining structures should also be
designed to resist lateral earth pressures as discussed in the "Foundation
and Retaining Walls" section ofthis report.
5) Topsoil, loose or disturbed soils and possible expansive clay layers should
be removed and the fuoting bearing level extended down to undisturbed
natural soils . The exposed soils in footing areas should then be moistened
and compacted prior to constructing footings. Footing concrete should
contain sulfate resistant cement and be air entrained.
6) A representative of the geotechnical engineer should observe all footing
exc!lvations prior to concrete placement to evaluate bearing conditions.
FOUNDATION AND RETAINING WALLS
Foundation walls and retaining structures which are laterally supported and can be
expected to undergo only a slight amount of deflection should be designed for a lat eral
earth pressure computed on the basis of an equivalent fluid unit weight of at least 55 pcf
for backfill consisting of the on-site soils. Cantilevered retaining structures which are
separate from the residence and can be expected to deflect sufficiently to mobilize the full
active earth pressure condition should be designed for a lateral earth pressure computed
on the basis of an equivalent fluid unit weight of at least 45 pcf for backfill consisting of
the on-site soils . Backfill should not contain topsoil, vegetation or oversized rock.
All foundation and retaining structures should be designed for appropriate hydrostatic and
surcharge pressures such as adjacent footings, traffic, construction materials and
equipment. The pressures recommended above assume drained conditions behind the
walls and a horizontal backfill surface. The buildup .of water behind a wall or an upward
sloping backfill surface will increase the lateral pressure imposed on a foundation wall or
retaining structure. An underdrain should be provided to prevent hydrostatic pressure
buildup behind walls.
Backfill should be placed in uniform lifts and compacted to at least 90% of the maximum
standard Proctor density at near optimum moisture content. Backfill in pavement and
walkway areas should be compacted to at least 95% of the maximum standard Proctor
Job No.1
-6-
density. Care should be taken not to overcompact the backfill or use large equipment
near the wall, since this could cause excessive lateral pressure on the wall. Some
settlement of deep foundation wall backfill should be expected, even ifthe material is
placed correctly, and could result in distress to facilities constructed on the backfill.
The lateral resistance offoundation or retaining wall fOotings will be a combination of the
sliding resistance of the footing on the foundation materials and passive earth pressure
against the side of the fuoting. Resistance to sliding at the bottoms ofthe footings can be
calculated based on a coefficient of friction of0.30. Passive pressure of compacted
backfill against the sides ofthe fOotings can be calculated using an equivalent fluid unit
weight of300 pcf The coefficient of friction and passive pressure values recommended
above assume ultimate soil strength. Suitable factors of safety should be included in the
design to limit the strain which will occur at the ultimate strength, particularly in the case
of passive resistance. Fill placed against the sides ofthe fOotings to resist lateral loads
should be compacted to at least 95% of the maximum standard Proctor density at near
optimum moisture content.
FLOOR SLABS
The natural on-site soils, exclusive of topsoil, are suitable to support lightly loaded slab-
on-grade construction. The upper soils are compressible when wetted and there is a risk
of slab settlement and distress mainly if the subgrade soils are wetted. To reduce the
effects of some differential movement, floor slabs should be separated from all bearing
walls and columns with expansion joints which allow unrestrained vertical movement.
Floor slab control joints should be used to reduce damage due to shrinkage cracking. The
requirements for joint spacing and slab reinforcement should be established by the
designer based on experience and the intended slab use. A minimum 4 inch layer of free-
draining gravel should be placed beneath basement level slabs to facilitate drainage. This
material should consist of minus 2 inch aggregate with at least 50% retained on the No. 4
sieve and less than 2% passing the No. 200 sieve.
All fill materials for support of floor slabs should be compacted to at least 95% of
maximum standard Proctor density at near optimum moisture content. Required fill can
Job No. I
-7-
consist of the on-site soils or imported granular soils (such as road base) devoid of
vegetation, topsoil and oversized rock.
UNDERDRAIN SYSTEM
Although free water was not encountered during our exploration, it has been our
experience in the area that local perched groundwater can develop during times of heavy
precipitation or seasonal runoff. Frozen ground during spring runoff can create a perched
condition. We recommend below-grade construction, such as retaining walls and
basement areas, be protected from wetting and hydrostatic pressure buildup by a
perimeter underdrain system The drain system should not be constructed around garage
areas or crawlspaces 4 feet deep. Backfill should be adequately compacted and the
surfuce sloped to drain away from the residence.
Where provided, the drains should consist of drainpipe surrounded above the invert level
with free-draining granular material The drain should be placed at each level of
excavation and at least I foot below lowest adjacent finish grade and sloped at a
minimum 1% to a suitable gravity outlet or sump and pump. Free-draining granular
material used in the underdrain system should contain less than 2% passing the No. 200
sieve, less than 50% passing the No.4 sieve and have a maximum size of2 inches. The
drain gravel backfill should be at least 1 Y. feet deep. An impervious membrane, such as
20 or 30 mil PVC, should be placed beneath the drain gravel in a trough shape and
attached to the foundation wall with mastic to prevent wetting of the bearing soils.
SURFACE DRAINAGE
The following drainage precautions should be observed during construction and
maintained at all times after the residence has been completed:
Job No. I
I) Inundation of the fOundation excavations and underslab areas should be
avoided during construction.
2) Exterior backfill should be adjusted to near optimum moisture and
compacted to at least 95% of the maximum standard Proctor density in
-8-
pavement and slab areas and to at least 90% of the maximum standard
Proctor density in landscape areas.
3) The ground surface surrounding the exterior of the building should be
sloped to drain away from the foundation in all directions. We
recommend a minimum slope ofl2 inches in the first 10 feet in unpaved
areas and a minimum slope of3 inches in the first 10 feet in paved areas.
Free-draining wall backfill should be capped with at least 2 feet of the on-
site soils to reduce surface water infiltration.
4) Roof downspouts and drains should discharge well beyond the limits of all
backfill.
5) Sprinkler heads and landscaping which requires regular heavy irrigation,
such as sod, should be located at least I 0 feet from foundation walls.
Consideration should be given to use ofxeriscape to reduce the potential
for wetting of soils below the building caused by irrigation.
LIMITATIONS
This study has been conducted in accordance with generally accepted geotechnical
engineering principles and practices in this area at this time. We make no warranty either
express or implied. The conclusions and recommendations submitted in this report are
based upon the data obtained from the exploratory boring drilled at the location indicated
on Figure I, the proposed type of construction and our experience in the area. Our
services do not include determining the. presence, prevention or possibility of mold or
other biological contaminants (MOBC) developing in the future. If the client is
concerned about MOBC, then a professional in this special field of practice should be
consulted. Our findings include extrapolation ofthe subsurface conditions identified at
the exploratory boring and variations in the subsurface conditions may not become
evident until excavation is performed. If conditions encountered during construction
appear different from those described in this report, we should be notified so that re-
evaluation of the recommendations may be made.
This report has been prepared for the exclusive use by our client for design purposes. We
are not responsible for technical interpretations by others of our information. As the
Job No. I
)
-9 -
project evolves, we should provide continued consultation a nd field services during
construction to rev iew and monitor the implementation of our r ecommendations, and to
verify th a t the recommendations have been appropriately int e rpre t ed . Significa nt d esign
c hanges may require additional analysis or modifi cations to the recommendations
presen ted here in . We recommend on-site observation of excavation s and foundation
bearing s trata a nd t est ing o f structural fill by a representative of the geot echnical
engm eer.
Resp ectfull y Submitted,
HEPWORTH -PAWLAK GEOTE CHNI CA L, IN C.
~~eke€
Trevor L. Knell , P.E.
Reviewed by:
TLK/kac
Joh No. I ~tech
r------------l
I I I I I I I
I
... I . -·-~
LOT9 I LOTlO
LOTS
I I
I
•BORING 1
I
-~
I I
~ I I I
~ I
~ I
@UILDING ENVELOPE _____ J
I I
I I
APPROXIMATE SCALE: L_ __ __ _j 1~ = 20'
SAGE MEADOW ROAD
110069A LOCATION OF EXPLORATORY BORING FIGURE 1
0
5
10
15
Iii
If
' ~ 20
w c
25
30
35
40
110 069A ~
GEOIECH
BORING1
9/12
WC=6.3
00=98
12/12
15/12
WC=10.9
00=118
15112
WC•14.3
00=109
-200·85
21/12
WC=11.4
OD-117
42/12
70/6
Bottom of Boring at 41 Feet
0
5
10
15
m
20
J:
li: w c
25
30
35
40
Note: EJ<planation of symbols is shown on Figure 3.
LOG OF EXPLORATORY BORING FIGURE 2
LEGEND:
TOPSOIL; sand and clay, soft, moist, black, organics. ~
D
~
I
p
CLAY AND SILT (CL-ML); sandy, with ocoasional sittstone/sandstone fragments up to cobble size, stiff to very
stiff, slightly moist to moist. brown, slightly calcareous.
SAND AND CLAY (SC-Cl.); silty, with scattered siltstone/sandstone fragments up to cobble size, medium
dense/very stiff, slightly moist to moist, reddish brown and grey-brown, gypsllerous . . "': ~ .. •, . -
SILTSTONE/SANDSTONE; medium hard to very hard with depth, fractured, slightly moist to moist, mixed grey
and tan, gypsiferous. Eagle Valley EvaporHe
Relatively undisturbed drive sample; 2-inch I. D. California liner sample.
9112 Drive sample blow count; Indicates that 9 blows of 140 pound hammer falling 30 inches were required to drive the
California sampler 12 inches.
NOTES:
1. The exploratory boring was drilled on April 2, 2010 with 4-inch diameter continuous flight power auger.
2. The location of the exploratory boring was measured approximately by pacing from features shown on Figure 1.
3. The elevation of the exploratory boring was not measured and the log of the exploratory boring is drawn to depth.
4. The exploratory boring location should be considered accurate only to the degree implied by the method used.
5. The lines between materials shown on the exploratory boring log represent the approximate boundaries between
material types and transitions may be gradual.
6. No free water was encountered in the boring at the time of drilling. Fluctuation in wat~r level may occur with time.
7. Laboratory Testing Results:
WC = Water Content ( % )
DD = Dry Density ( pel )
-200 = Percent passing No. 200 sieve
110 069A
·--. ,-,~ ; -·:~--
LEGEND AND NOTES FIGURE 3
..
Moisture Content = 6.3 perce nt
Dry Density = 98 pel
Sample of: Clayey Sandy Silt with Gravel
From: Boring 1 at 2 Feet
0
I
.-·
I I
--·
1 I I -~----r---'* ~ i--, z 2
0 \ I
__ Cornpressron
iii I ffi upon
a: 3 welling
a. \ ::0
0 u 4 1\
\ I 5 \.
6 l '
0.1 , -·-·" 1.0 10 .. """-100
APPLIED PRESSURE ( ksf)
I Moisture Content = .1(/.9 percent
Dry Density = 118 pel
Sample of: Silty Sandy Clay with Gravel
From: Boring 1 at 10 Feet -'#.
~ .
~ -
iii 1
§ --r-J I 0 ~
' I ~ ''}_ ~ I I ~ I I I I iii 1 fB I:Xpanslon
I
I
a: I' upon I D..
::0 wetting 0 u
I
.
I
0.1 ... 1.0 10 100
APPLIED PRESSURE ( ksf)
~ ·-
110 069A SWELL-CONSOLIDATION TEST RESULTS FIGURE 4
H 1'/LAK GEOil:CHN"',;,
. -..
Moisture Content = 11.4 perce nt
Dry Density = 117 pel
Sample of: Sandy Clay with Gravel
From: Boring 1 at 20 Feet
I
' ..
I ~
* ~
z ~ 1
z
I ~ ... ~ 0
' I ,~ z
I I :..:> 0
(jj
8l 1
f.. Expansion
I
I
I g: --upon I ::;; wetting 0
(.) l ... .
r I ' I
I
I r ·-
n 1
·-··~ ..
.. . ...
I
I
0.1 1.0 .. :: __ :· 10. 100
APPUED PRESSURE ( ksf)
~ ..
110 069A SWELL-CONSOLIDATION TEST RESULTS FIGURE 5
H WIAK GEDTECHNm
HEPWORTH-PAWLAK GEOTECHNICAL, INC.
TABLE1
SUMMARY OF LABORATORY TEST RESULTS
Job No. 110 069A
SAMPLE LOCATION NATURAL NATURAL GRADATION PERCENT ATTERBERG LIMITS UNCONFINED
MOISTURE DRY PASSING LIQUID PLASTIC COMPRESSIVE SOIL
BORING DEPTH CONTENT DENSITY GRAVEL SAND N0.200 LIMIT INDEX STRENGTH TYPE
NO. (ft) (%) (pcf) (%) (%) SIEVE (%) (%) (psf)
1 2 6.3 98 Clayey sandy silt with
l_g_rave1
10 10.9 118 Silty sandy clay with
L.s!!_vel
15 14.3 109 85 Silty sandy clay
20 11.4 117 Sandy clay with gravel
Account
Account: R044394
Location
Parcel Number 2393-082-05-009
Situs Address
City Glenwood S prin gs
ZipCode 81601
Tax Area 011-IR-MF-011
Legal Summary Section: 7 Township: 7
Range: 88 Subdivis ion: PINYON MESA
PUD, FLG I Lot: 9
Transfers
Sale Price
$120,000
Tax Hi sto r y
Tax Year
• Estimated
*2010
2009
Taxes
Owner Information
Owner Name GORDON , DENlSE G &
ROBERT D
Owner Address 12037 ASCENCION DRIVE
TIGARD, OR 97223
Sale Date Doc Type
04/19/20 10 432
09/24/2007 DCL
10/01 /2007 AGR
09/25/2007 POA
Images
Page 1 of 1
Assess me nt History
Actual (2010) $148,290
Primary Taxable $43,000
Tax Area: Oil Mill Levy: 57.0750
Type Actual Assessed SQFf
Land $148,290 $43,000 10900.000
Book Page
https ://act.garfield -county.com/assessor/taxweb/acco unt.jsp?accountNwn=R044394 7/26/20 10
COUNTY OF GARFIELD -BUILDING DEPARTM ENT
CORRECTION NOTICE
108 8th St., Suite 401 Glenwood Springs, Colorado
Phone (970) 945-8212
Job located at CJ1P ~s--5~ £ /!1£A Pc;w}
Permit No. / Z 2:-7
I have this day inspected this structure and these
premises and found the following corrections needed:
A/£~p (27!2/() /f&~tk= .//1752
~ (_ Al/&6 f).s: /?}
50.00 Re-lnspection Fee must be paid prior to Re-lnspection
You are hereby notified that the above correction must be inspected
before covering.
When correction(s ) have been made, call for inspection at 970-384 -5003.
Date 9 -Z-f 20 /P
Building Inspector --------------------------------
Phone (970) 945 -8212
~:l errn i t Card POST ON SITE
G arfie ld Co unly
Building and Pl anning Departmen t
108 8t h Street , Suite 40 1
Glenwood Spring s, CO 8 1601
Phon e: (9 70)9 45-82 12
,f · 1, l Permit ryp~: Manufactured ~uilding
"·f -'. •
t---''-'--'-
·.•; ··:· -~ t' ~ J-:·., ·<~ ;. , \W?rtf.~l~~sif!_cat(on: N~w-Multi-Lev_el
Fa x: (9 70)384 -3 470
AGREEMENT
In consideration of the iss uance of the permit, the applicant here by agrees to comply with all laws and regulatio ns related to
the zoning, loca·don; co nstruction a nd erecti on of the proposed structured for which this permit is granted, and further
agrees that if the above said r eg ulations a rc not fully complied with in the zoning, location, erection and cons truction of the
above describ ed s tructu r e, the permit may then b e r evo ked by notice from the County Building department and
IMMEDIATELY BECOME NULL AND VOID.
Manufactured Building Parcel#:239308205009
Owner's Name: Robert & Denise Gordon Own er's Phone: 50;~-;.:-~J
Job Address: 0055 Sage Meadow RD
-~~~~~-----------------------G LENWOO D SPR INGS, CO Total Square Feet: --~01 _
''Uo!S!'~niJm:L:t_,-._~~~~-ll:lm~~Sif:i«~~m\'JI
~ontractq_r~. __ Phone Prima ry Contractor Work Description:
1
fllgh M"k Con,tructlon Comp•ny (970)947-9092 Ye'
L
-----------------·-------------------------------------------------------------Ins pection Scheduling Code
Fi na l
Rough Plumbing
G as
ADDITIONAL INSPECTIONS MAY BE REQUI RE D
POST THIS IN CONSPICUOUS PLACE WHEN CONSTRUCTION IS STARTED
For In spections Ca ll : 1 -88~-868-5 306
"