HomeMy WebLinkAboutLand Use Change PermitLAND USE CHANGE PERMIT
for
A Parcel of Land Owned by the Richard and Mary Jolley Family LLLP located
approximately 4 miles east of the Town of Slit, In Section 8, Township 6 South,
Range 91 West of the el' P.M. and Leg~l/y Described in a Correction Deed
found at Reception Number 645993 in the records of the Garfield County Clerk
and Recorder.
(Assessor's Parcel No. 2181-172-00-086)
In accordance with and pursuant to provisions of the Garfield County Land Use and
Development Code. as amended, and Resolution No. 2015-07 of the Board of County
Commissioners of Garfield County, State of Colorado, the following activity is hereby
authorized by Land Use Change Permit:
A Booster Compressor located on a 1.48 acre site within a 1,400 acre parcel
known as the WPX KP24-8 Booster Compressor (operated by WPX Energy
Rocky Mountain UC) as shown on the Site Plan Attached as Exhibit "A"
(GAPA-8028)
This Administrative Land Use Change Permit Is Issued subject to the condttlons
contained In Resolution No. 2015-07 and set forth in Exhibit "811 and shall be valid only
during compliance with such conditions and other applicable provisions of the Garfield
County Land Use and Development Code, as amended, Building Code, and other
regulations of the Board of County Commissioners of Garfield County, Colorado.
Date
ATTEST:
1111 rN'J'-"A~f .rll' ,!Htf NCr~JU~l~.~t~Yllt11I, h!l'riYJ, 11111
Recept..l cinlt : 859337
02119/2015 09 :39121 Al'! Je;in Alberico
2 of 4 Rco Fee:SO 00 Doc Fee :O 00 GARFIEtD COUNTY CO
Exhibit A
(Project Area -Site Plan)
--------.. llR w,ir.rJ,'lif.• Dll't,IW.I ,~J." M4PM.~,1'Nlil1i•~1.\IYA 1111
-RecepUontt : 859337
02/18/2016 011:39:21 Al'I Jean Albarloo 3 or 4 Reo Fee:S0,0Q Doo Fee:0 .00 GARFIELD COUNTY CO
ExhibitB
(page 1 of2)
1. That all representations made by the Applicant in the application shall be
conditions of approva1 unless specifically altered by the conditions of approval.
2. That the WPX Energy KP24-8 .Booster .Compressor shall be operated in
accordance with all applicable Federal, State, and local -regulations governing
the operation of this type of facility .
1 3. Prior to issuance of the Land Use Change Permit, the Applicant shall provide a
copy of the Road Use and Maintenance Agreement demonstrating ongoing
maintenance commitments for the acc;ess road consl~tent wlth the Application
submittals and roadway assessment by the Fox Engineering Solutions Inc.
including but not limited to dust control, snow removal, and upkeep of the
driving surface and drainage improvements. Waivers from Section 7-107
Roadway Standards regarding right of way width, lane width, cross section
details, and curve radius are approved pursuant to · the Fox Engineering
SoJutlons Inc. report.
4. Prior to Issuance of the Land Use Change Permit, the Applicant shall provide a
copy of the Emergency Response Plan applicable to the site including current
contact Information for the Colorado River Fire and Rescue District and
provisions regarding field or wildland fire prevention and emergency shutdown -
·of the facility.
5. Prior to issuance of the Land Use Change Permit, the Applicant shall provide
confirmation that the site ls covered under an. existing COGCC reclamation plan
aod bond.
6. The facility shall maintain compliance with the Light lndustria1 COGCC Noise
Standards/Regulations. Prior to issuance of the Land Use Change Pennft the
Applicant shall provide written corroboration of the COGCC extrapolation
fonnula finding the site will be in compliance with the Light Industrial standards.
If future compliance 'Issues are identifled, the Appllcant shall provide noise.
mitigation In order to achieve compliance along with a technical evaluation by a
qualified professional to conflnn compliance.
7. The facility shall maintain compliance with CDPHE Storm Water Management
Permits. Drainage and Grading Plans, SPCC Plans and Reclamation Plans for
the site.
ExhibitB
(page2of2)
8. The Applicant shall maintain all required COGCC and BLM permits and forms
for the facility and shall comply with all best management practices, conditions
of approval and requirements of said permits and forms.
9. The Applicant shall maintain all required CDPHE air quality permits for the
facility.
1 o. The Applicant shall comply with the referral comments from Colorado Parks
and Wiidiife (CPW) Including recommendations regarding scheduling of daily
maintenance operations during winter months.
11. That upon completion of the installation of the compressor the Applicant shall
contact the Colorado River Fire and Rescue District to schedule a final
Inspection and site visit with the fire crew for pre--planning purposes.
12. The Applii;:ant shall apply for and obtain any building permits as required for the
proposed compressor building.
13. The Applicant shall continue weed management on the site in compliance with
existing plans and shall monitor and treat any Jointed Goatgrass that may be
identified on the site .