Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT BLC0-3-15-3543 EnCana Oil & Gas Injection Pump Bldg. @ F26 Well Pad Sect26, T4S,R95\N Parachute, Colorado 1) ALL WORK MUST COMPLY WITH THE 2009 IBC ANO MANUFACTURERS SPECIFICATIONS . 2) ALL WORK MUST COMPLY WITH STATE ANO FEDERAL REGULATIONS. 3) ALL WORK MUST COMPLY WITH THE CONDITIONS OF THE CURRENT LANO USE PERMIT. 4) ENGINEER APPROVAL REPORT REQUIRED FOR CONDITION OF EXISTING FOUNDATION . S) ELECTRICAL PERMITS & INSPECTIONS THRU THE COLORADO STATE ELECTRICAL BOARD . 6) ELECTRICAL FINAL APPROVAL IS REQUIRED FOR FINAL/COMPLETION INSPECTION. 7) LIGHT AND VENTILATION PER 2009 IBC, CHAPTER 12. 8) LOCKS, LATCHES AND LANDINGS PER 2009 IBC, SECTION 1008. 9) GARFIELD COUNTY FINAL INSPECTION REQUIRED FOR COMPLETION APPROVAL.