HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT
BLC0-3-15-3548
EnCana Oil & Gas
Pump Bldg.# 3 @ C19 Well Pad
Sec19, T45,R95W
Parachute, Colorado
1) All WORK MUST COMPLY WITH THE 2009 IBC AND MANUFACTURERS SPECIFICATIONS .
2) All WORK MUST COMPLY WITH STATE AND FEDERAL REGULATIONS.
3) All WORK MUST COMPLY WITH THE CONDITIONS OF THE CURRENT LAND USE PERMIT.
4) ENGINEER APPROVAL REPORT REQUIRED FOR CONDITION OF EXISTING FOUNDATION .
5) ELECTRICAL PERMITS & INSPECTIONS THRU THE COLORADO STATE ELECTRICAL BOARD .
6) ELECTRICAL FINAL APPROVAL IS REQUIRED FOR FINAL/COMPLETION INSPECTION .
7) LIGHT AND VENTILATION PER 2009 IBC, CHAPTER 12 .
8) LOCKS, LATCHES AND LANDINGS PER 2009 IBC, SECTION 1008.
9) GARFIELD COUNTY FINAL INSPECTION REQUIRED FOR COMPLETION APPROVAL.