HomeMy WebLinkAboutApplicationGarfield County
Community Development Department
108 8th Street, Suite 401
Glenwood Springs, CO 81601
(970) 945-8212
www.garfield-county.com
ONSITE WASTEWATER
TREATMENT SYSTEM
(OWTS)
PERMIT APPLICATION
TYPE OF CONSTRUCTION
B New Installation ❑ Alteration
WASTE TYPE
0 Repair
_ _ a
O Dwelling ❑ Transient Use 0 Comm/Industrial 0 Non -Domestic
El Other Describe Small Temporary Employee Housing Facility
INVOLVED PARTIES: LINN Operating, 1999 Broadway, Suite 3700, Denver, CO 802.02 (303) 999-4400
Property Owner: Encana al and Gas (USA) Phone: ( )
Mailing Address: 37017th Street. Suite 1700, Denver, CO 80202
Contractor: United Site Services (A.k.a. Down valley Septic)
Mailing Address: 5 E. Rowena lam-, Me. CO 81650
Phone: (gam ) 625-5556
Engineer: David Fox, P.E., Fox Engineering Solutions, Inc.
Phone: (070 ) 250-5505
Mailing Address: 870 Canyon Creek Drive, Grand Junction. CO 61507
PROJECT NAME E AND LOCATION: B-21 Man Camp, Section 21, Township 6 South, Range 96 West
Job Address:
Assessor's Parcel Number: 213527300015
Building or Service Type: Temporary Housing Facility-arnali
Sub. Lot Block
#Bedrooms: roil Garbage Grinder
Distance to Nearest Community Sewer System: Not applicable/None available
Was an effort made to connect to the Community Sewer System: None available
Type of OWTS
Vault and haul
O Septic Tank 1 0 Aeration Plant 0 Vault 0 Vault Privy I 0 Composting Toilet
0 Recyding, Potable Use 0 Recycling i 0 Pit Privy 0 Incineration Toilet
O Chemical Toilet 0 Other
Ground Conditions
Depth to 1rt Ground water table Air Percent Ground Slope ox
Final Disposal by
United Site Services
(A.k.a. Down Valley
Septic)
Water Source & Type
. thsd She San,IALs. gown Valley xWkl
Effluent
O Absorption trench, Bed or Pit {
I 0 Underground Dispersal 0 Above Ground Dispersal
i
O Evapotranspiration 0 Wastewater Pond 0 Sand Filter
O I Other
O Well _ i 0 Spring
O Community Water System Name
Will Effluent be discharged directly Into waters of the State? 0 Yes O No
0 Stream or Creek 0 Cistern
Town of SO Water
CERTIFICATION
App icant ac nowle ges that the completeness of the application is con itiona upon suc urther
mandatory and additional test and reports as may be required by the local health department to be
made and furnished by the applicant or by the local health department for purposed of the evaluation
of the application; and the issuance of the permit is subject to such terms and conditions as deemed
necessary to insure compliance with rules and regulations made, information and reports submitted
herewith and required to be submitted by the applicant are or will be represented to be true and
correct to the best of my knowledge and belief and are designed to be relied on by the local
department of health in evaluating the same for purposes of issuing the permit applied for herein. 1
further understand that any falsification or misrepresentation may result in the denial of the
application or revocation of any permit granted based upon said application and legal action for perjury
as provided by law.
I hereby acknowledge that I have read and understand the Notice and Certification above as well as
have provided the required information which is correct and accurate to the best of my knowledge.
Jenna Hirsch ,r r ."ta�art�`` - 3/15/2015
Property Owner Print and Sign
Date
OFFICIAL USE ONLY
Spedal Conditions:
Permit Fee:
Perk Fee:
Total Fee . UL)
V
Fees Paid: ..1 _...
• o
Building Permit
Septic Permit:
Issue ate:
17(I
Balance Due:
ff
L� t 3-17.-2°)C
BLDG DIV:`... •
APPR • . DATE
•UD) U (s)\ , 3.1(9- S
:LINN{
Energy
NASDAQ LINE
NASOAO LNCO
LINN Operating Inc.
A wholly owned subsidiay gf LINN Energy, LLC
1999 Broadway, Suite 3700
Denver, CO 80202
Phone (303) 999-4400
Fax. (303) 999-4401
Andy Schwaller
Garfield County Building and Planning Department
108 8th Street, Suite 401
Glenwood Springs, CO 81601
Subject: Onsite Wastewater Treatment System (OWTS) Permit Application
B-21 Well Pad
Dear Andy:
March 15, 2015
Enclosed for your review and processing Is a copy of LINN Operating's ("LINN") Application for an Onsite
Wastewater Treatment System Permit, as well as all required supplemental information. The Application requests
approval from Garfield County for operation of the wastewater system for the temporary employee housing
quarters to accommodate drilling personnel working on LINN's B-21 well pad, on lands owned by Encana Oil and
Gas, Inc.
In January, an OWTS permit was approved for a small temporary employee housing facility on ourA-21 well pad.
Now the drilling rig and that same small facility will be moving to the B-21 well pad, approximately 150 feet away.
At your convenience, please have someone from your office call me at the number below so that I may provide
payment by phone to cover the county's permit fee. if you have any questions or comments, please contact me at
303-999-4054 or via email at jhirsch@linnenergy.com
Sincerely,
•
e
?):LIAAAJOL_. 41/02}k)
Jehrida Hirsch
Environmental, Health and Safety Representative
LINN Operating
303.999.4054
www linnenergy.com
www Iinnco.com
Addendum to Onsite Wastewater Treatment System (OWTS) Permit for the B-2lwell pad:
Potable water for the site would be stored in one (1) 3,000 gallon potable water tank, which would be
weather-proof and insulated to prevent freezing. The water would then be piped from this tank to the
internal plumbing systems of the individual mobile home units. The 3,000 gallon tank would serve all four
mobile units. Potable water would be pressurized by a pump that will deliver water at a pressure of 50 to
60 pounds per square inch to all fixtures in the housing quarters. All plumbing meets the 2009
International Plumbing Code and Regulation 43 OWTS as amended by Garfield County. LINN anticipates
5 individuals to be staying at the housing facility at any one lime. Calculations for water usage are for 5
people using 75 gallons of water per day per person, which would be 375 gallons per day. LINN anticipates
and has contracted for twice weekly deliveries of potable water.
Wastewater would be temporarily stored in one (1) 4,000 gallon waste water holding tank at the
employee housing quarters. The tank would be heated to prevent freezing and would be equipped with
overflow alarms that would be triggered when the tank reaches 80% of capacity. The tank and piping
would be made of proper materials, would be water tight, properly sealed or screened to preent entry
and exit of insects and other vermin. All plumbing meets the 2009 International Plumbing code and
Regulation 43 OWTS as amended by Garfield County. The holding tanks would be pumped by vacuum
trucks (United Site Services) two times per week to maintain ample storage capacity. Wastewater haul
trips would typically remove up to 4,000 gallons from each holding tank. The wastewater would then be
hauled and disposed of (as appropriate) at the Garfield County Landfill. Records of all wastewater haul
trips will be maintained on-site to verify the waste was hauled by an approved service and receipts from
the hauler will be kept on record. Letters from the potable water supplier and wastewater hauler certifying
that they will provide service to the temporary employee housing quarters are attached.
lQrr
Aare Stoat Is la
bo locvfed o m&c
of 100' from me
NW Mead
SCALE: 1` _ 50'
DATE: 02-27-12
DRA1* BY: DAB
r
BERRY PETROLEUM COMPANY / IQ ,
TYPICAL RIG LAYOUT FOR
WELL PAD B21 696rZ (risingSCALE
SECTION 21, T6S, R96W, 6tii P.M, Irar pap •tel -696 /
NE 1/4 NE 1/4 /
/
♦
Proposed Acres
Road
17ons Slack
0
•
♦ /• 'Shea! 4 of 12/
♦
•
rfs Z
• }L r . ;
`• r , r •:
1"D3 1-41
fie........
PmotistVon
Eqv rnip! Arno
025x759
146' • 146'
54110'2B"E
pin I ®�
. rwr
®®®1MIME]
E AY we. 1
t46'
0" b"
01WTeak
154'
•..tr
Uqrt
-Proposed Pjo kir
UfNTAN ENGINEERING & LAND S'URvrrnc
07 n no nee • r..,,.+. 11.A 1407 • 14tsr rn- AM
United
5 TE SERVICES
PORTABLE RESTRCOMS SINKS RESTROOM TRAILERS and MORE
November 10, 2014
Senna Hirsch
EH&S Representative
Linn Energy, LLC
1999 Broadway Suite 3700
Denver, CO 80202
Dear Janna,
Here is the CDPHE number (C00223351) that you requested for the purpose of
providing sanitar} sewage hauling and disposal services for the proposed Linn Energy L-
15 Well pad north of Parachute Colorado.
Sincerely,
ve W. Tanis
Operations Manager
United Site Services of Colorado, Inc..
Steve W Tanis
5 Powerline Rd , Rifle Co 81650
970-625-5556 (Office) 970-309-5911 (Cel )
DRINKING WATER ANNUAL FEE INVOICE
Water Quality Control Division
waccicomplienco.com
CDPHE
4300 Cherry Creek Drive
Mail Code ASD -AR -B1
Denver, Colorado 80246-1530
UNITED SITE SERVICES
CIO WADE LOGAN
PO BOX 1929
RIFLE, CO 81650
Colorado Department
of Public Health
and Environment
Date: 8/22/2014
PWS ID: C00223351
Invoice fl: 900022210
Drinking Water Fee for Transient Non -Community, SWP System with a Population of 25
Amount:
Payments or Credits:
Balance Due:
Payment Due Date:
$75.00
$0.00
675.00
9/21/2014
See reverse side of this invoice for more information.
PAYMENT DUE WITHIN 30 DAYS
PLEASE RETURN HOT TOM PORTION OF INVOICE WITH PAYMENT
UNITED SITE SERVICES
C10 WADE LOGAN
PO BOX 1929
RIFLE. CO 81650
BILLING INQUIRIES:
303-692-3502
CHANGE OF ADDRESS:
The current billing address Is located on your Monitoring Schcdu'a,
available at we cdcompliance.ccmisahedules.
If your bll Ing address is incorrect. please submit a change of address on
Contacts Change form available at wacdcompliance.com.
Call 303-692.3556 for assistance with submitting a change of address.
MAKE CHECKS PAYABLE TO CDPHE
REMIT PAYMENTS TO.
CDPHE
4300 Cherry Creek Drive South
Mall Code ASD'AR-B1
Denver. Colorado 60246 1530
PWS ID: 6882233)
Balance #,2840
Balance D e: 575.00
CREDIT CARD PAYMENT -Complete the information below or
Name on card:
Viss!MC #:
Security Codo(3 digit code located on beck of card):
Expires: 1 Phone #: ( }
To receive a receipt provide your Fax # or Email address:
Fax #: ( ) -
Email address:
rci / 0417r(
ih?e d
SITE SERVICES.; �M
.:4.1.ur.tladsll:rxi,vicas cam t±-ftp:as�:A=c.a -a"-=7 N,..�_-.
PORTABLE REST ROOMS, SINKS, RESTROOM TRAILERS and MORE
January 06, 2015
Jenna Hirsch
EI -t&5 Representative
Linn Energy, LLC
1999 Broadway Suite 3700
Denver, CO 80202
Dear Janna,
Please consider this letter confirmation that United Site Services of Colorado, Inc. will
provide potable water, septic, trash hauling services for the proposed Linn Energy L-15
Well pad north of Parachute Colorado
United Site Services of Colorado, Inc. will piovide trip logsh•eports, landfill receipts, and
water test results to Linn Energy as required by Garfield County.
o Estimated potable water hauling is 5000 gallons per week. We anticipate
approximately 2 truck trips per week to service the facility.
o Estimated sanitary sewage production is 5000 gallons per week. We anticipate
approximately 2 truck trips per week to service the facility.
Y Estimated trash hauling is 10 tons per week. We anticipate approximately 2 truck
trips per week to service the facility.
Sincerely,/
teve W. Tanis
Operations Manager
United Site Services of Colorado, Inc.
Steve W. Tanis
5 Powerline Rd., Rifle, Co 81650
970-625-5558 (Office) 970-309-5911 (Cell)