Loading...
HomeMy WebLinkAboutApplicationGarfield County Community Development Department 108 8th Street, Suite 401 Glenwood Springs, CO 81601 (970) 945-8212 www.garfield-county.com ONSITE WASTEWATER TREATMENT SYSTEM (OWTS) PERMIT APPLICATION TYPE OF CONSTRUCTION B New Installation ❑ Alteration WASTE TYPE 0 Repair _ _ a O Dwelling ❑ Transient Use 0 Comm/Industrial 0 Non -Domestic El Other Describe Small Temporary Employee Housing Facility INVOLVED PARTIES: LINN Operating, 1999 Broadway, Suite 3700, Denver, CO 802.02 (303) 999-4400 Property Owner: Encana al and Gas (USA) Phone: ( ) Mailing Address: 37017th Street. Suite 1700, Denver, CO 80202 Contractor: United Site Services (A.k.a. Down valley Septic) Mailing Address: 5 E. Rowena lam-, Me. CO 81650 Phone: (gam ) 625-5556 Engineer: David Fox, P.E., Fox Engineering Solutions, Inc. Phone: (070 ) 250-5505 Mailing Address: 870 Canyon Creek Drive, Grand Junction. CO 61507 PROJECT NAME E AND LOCATION: B-21 Man Camp, Section 21, Township 6 South, Range 96 West Job Address: Assessor's Parcel Number: 213527300015 Building or Service Type: Temporary Housing Facility-arnali Sub. Lot Block #Bedrooms: roil Garbage Grinder Distance to Nearest Community Sewer System: Not applicable/None available Was an effort made to connect to the Community Sewer System: None available Type of OWTS Vault and haul O Septic Tank 1 0 Aeration Plant 0 Vault 0 Vault Privy I 0 Composting Toilet 0 Recyding, Potable Use 0 Recycling i 0 Pit Privy 0 Incineration Toilet O Chemical Toilet 0 Other Ground Conditions Depth to 1rt Ground water table Air Percent Ground Slope ox Final Disposal by United Site Services (A.k.a. Down Valley Septic) Water Source & Type . thsd She San,IALs. gown Valley xWkl Effluent O Absorption trench, Bed or Pit { I 0 Underground Dispersal 0 Above Ground Dispersal i O Evapotranspiration 0 Wastewater Pond 0 Sand Filter O I Other O Well _ i 0 Spring O Community Water System Name Will Effluent be discharged directly Into waters of the State? 0 Yes O No 0 Stream or Creek 0 Cistern Town of SO Water CERTIFICATION App icant ac nowle ges that the completeness of the application is con itiona upon suc urther mandatory and additional test and reports as may be required by the local health department to be made and furnished by the applicant or by the local health department for purposed of the evaluation of the application; and the issuance of the permit is subject to such terms and conditions as deemed necessary to insure compliance with rules and regulations made, information and reports submitted herewith and required to be submitted by the applicant are or will be represented to be true and correct to the best of my knowledge and belief and are designed to be relied on by the local department of health in evaluating the same for purposes of issuing the permit applied for herein. 1 further understand that any falsification or misrepresentation may result in the denial of the application or revocation of any permit granted based upon said application and legal action for perjury as provided by law. I hereby acknowledge that I have read and understand the Notice and Certification above as well as have provided the required information which is correct and accurate to the best of my knowledge. Jenna Hirsch ,r r ."ta�art�`` - 3/15/2015 Property Owner Print and Sign Date OFFICIAL USE ONLY Spedal Conditions: Permit Fee: Perk Fee: Total Fee . UL) V Fees Paid: ..1 _... • o Building Permit Septic Permit: Issue ate: 17(I Balance Due: ff L� t 3-17.-2°)C BLDG DIV:`... • APPR • . DATE •UD) U (s)\ , 3.1(9- S :LINN{ Energy NASDAQ LINE NASOAO LNCO LINN Operating Inc. A wholly owned subsidiay gf LINN Energy, LLC 1999 Broadway, Suite 3700 Denver, CO 80202 Phone (303) 999-4400 Fax. (303) 999-4401 Andy Schwaller Garfield County Building and Planning Department 108 8th Street, Suite 401 Glenwood Springs, CO 81601 Subject: Onsite Wastewater Treatment System (OWTS) Permit Application B-21 Well Pad Dear Andy: March 15, 2015 Enclosed for your review and processing Is a copy of LINN Operating's ("LINN") Application for an Onsite Wastewater Treatment System Permit, as well as all required supplemental information. The Application requests approval from Garfield County for operation of the wastewater system for the temporary employee housing quarters to accommodate drilling personnel working on LINN's B-21 well pad, on lands owned by Encana Oil and Gas, Inc. In January, an OWTS permit was approved for a small temporary employee housing facility on ourA-21 well pad. Now the drilling rig and that same small facility will be moving to the B-21 well pad, approximately 150 feet away. At your convenience, please have someone from your office call me at the number below so that I may provide payment by phone to cover the county's permit fee. if you have any questions or comments, please contact me at 303-999-4054 or via email at jhirsch@linnenergy.com Sincerely, • e ?):LIAAAJOL_. 41/02}k) Jehrida Hirsch Environmental, Health and Safety Representative LINN Operating 303.999.4054 www linnenergy.com www Iinnco.com Addendum to Onsite Wastewater Treatment System (OWTS) Permit for the B-2lwell pad: Potable water for the site would be stored in one (1) 3,000 gallon potable water tank, which would be weather-proof and insulated to prevent freezing. The water would then be piped from this tank to the internal plumbing systems of the individual mobile home units. The 3,000 gallon tank would serve all four mobile units. Potable water would be pressurized by a pump that will deliver water at a pressure of 50 to 60 pounds per square inch to all fixtures in the housing quarters. All plumbing meets the 2009 International Plumbing Code and Regulation 43 OWTS as amended by Garfield County. LINN anticipates 5 individuals to be staying at the housing facility at any one lime. Calculations for water usage are for 5 people using 75 gallons of water per day per person, which would be 375 gallons per day. LINN anticipates and has contracted for twice weekly deliveries of potable water. Wastewater would be temporarily stored in one (1) 4,000 gallon waste water holding tank at the employee housing quarters. The tank would be heated to prevent freezing and would be equipped with overflow alarms that would be triggered when the tank reaches 80% of capacity. The tank and piping would be made of proper materials, would be water tight, properly sealed or screened to preent entry and exit of insects and other vermin. All plumbing meets the 2009 International Plumbing code and Regulation 43 OWTS as amended by Garfield County. The holding tanks would be pumped by vacuum trucks (United Site Services) two times per week to maintain ample storage capacity. Wastewater haul trips would typically remove up to 4,000 gallons from each holding tank. The wastewater would then be hauled and disposed of (as appropriate) at the Garfield County Landfill. Records of all wastewater haul trips will be maintained on-site to verify the waste was hauled by an approved service and receipts from the hauler will be kept on record. Letters from the potable water supplier and wastewater hauler certifying that they will provide service to the temporary employee housing quarters are attached. lQrr Aare Stoat Is la bo locvfed o m&c of 100' from me NW Mead SCALE: 1` _ 50' DATE: 02-27-12 DRA1* BY: DAB r BERRY PETROLEUM COMPANY / IQ , TYPICAL RIG LAYOUT FOR WELL PAD B21 696rZ (risingSCALE SECTION 21, T6S, R96W, 6tii P.M, Irar pap •tel -696 / NE 1/4 NE 1/4 / / ♦ Proposed Acres Road 17ons Slack 0 • ♦ /• 'Shea! 4 of 12/ ♦ • rfs Z • }L r . ; `• r , r •: 1"D3 1-41 fie........ PmotistVon Eqv rnip! Arno 025x759 146' • 146' 54110'2B"E pin I ®� . rwr ®®®1MIME] E AY we. 1 t46' 0" b" 01WTeak 154' •..tr Uqrt -Proposed Pjo kir UfNTAN ENGINEERING & LAND S'URvrrnc 07 n no nee • r..,,.+. 11.A 1407 • 14tsr rn- AM United 5 TE SERVICES PORTABLE RESTRCOMS SINKS RESTROOM TRAILERS and MORE November 10, 2014 Senna Hirsch EH&S Representative Linn Energy, LLC 1999 Broadway Suite 3700 Denver, CO 80202 Dear Janna, Here is the CDPHE number (C00223351) that you requested for the purpose of providing sanitar} sewage hauling and disposal services for the proposed Linn Energy L- 15 Well pad north of Parachute Colorado. Sincerely, ve W. Tanis Operations Manager United Site Services of Colorado, Inc.. Steve W Tanis 5 Powerline Rd , Rifle Co 81650 970-625-5556 (Office) 970-309-5911 (Cel ) DRINKING WATER ANNUAL FEE INVOICE Water Quality Control Division waccicomplienco.com CDPHE 4300 Cherry Creek Drive Mail Code ASD -AR -B1 Denver, Colorado 80246-1530 UNITED SITE SERVICES CIO WADE LOGAN PO BOX 1929 RIFLE, CO 81650 Colorado Department of Public Health and Environment Date: 8/22/2014 PWS ID: C00223351 Invoice fl: 900022210 Drinking Water Fee for Transient Non -Community, SWP System with a Population of 25 Amount: Payments or Credits: Balance Due: Payment Due Date: $75.00 $0.00 675.00 9/21/2014 See reverse side of this invoice for more information. PAYMENT DUE WITHIN 30 DAYS PLEASE RETURN HOT TOM PORTION OF INVOICE WITH PAYMENT UNITED SITE SERVICES C10 WADE LOGAN PO BOX 1929 RIFLE. CO 81650 BILLING INQUIRIES: 303-692-3502 CHANGE OF ADDRESS: The current billing address Is located on your Monitoring Schcdu'a, available at we cdcompliance.ccmisahedules. If your bll Ing address is incorrect. please submit a change of address on Contacts Change form available at wacdcompliance.com. Call 303-692.3556 for assistance with submitting a change of address. MAKE CHECKS PAYABLE TO CDPHE REMIT PAYMENTS TO. CDPHE 4300 Cherry Creek Drive South Mall Code ASD'AR-B1 Denver. Colorado 60246 1530 PWS ID: 6882233) Balance #,2840 Balance D e: 575.00 CREDIT CARD PAYMENT -Complete the information below or Name on card: Viss!MC #: Security Codo(3 digit code located on beck of card): Expires: 1 Phone #: ( } To receive a receipt provide your Fax # or Email address: Fax #: ( ) - Email address: rci / 0417r( ih?e d SITE SERVICES.; �M .:4.1.ur.tladsll:rxi,vicas cam t±-ftp:as�:A=c.a -a"-=7 N,..�_-. PORTABLE REST ROOMS, SINKS, RESTROOM TRAILERS and MORE January 06, 2015 Jenna Hirsch EI -t&5 Representative Linn Energy, LLC 1999 Broadway Suite 3700 Denver, CO 80202 Dear Janna, Please consider this letter confirmation that United Site Services of Colorado, Inc. will provide potable water, septic, trash hauling services for the proposed Linn Energy L-15 Well pad north of Parachute Colorado United Site Services of Colorado, Inc. will piovide trip logsh•eports, landfill receipts, and water test results to Linn Energy as required by Garfield County. o Estimated potable water hauling is 5000 gallons per week. We anticipate approximately 2 truck trips per week to service the facility. o Estimated sanitary sewage production is 5000 gallons per week. We anticipate approximately 2 truck trips per week to service the facility. Y Estimated trash hauling is 10 tons per week. We anticipate approximately 2 truck trips per week to service the facility. Sincerely,/ teve W. Tanis Operations Manager United Site Services of Colorado, Inc. Steve W. Tanis 5 Powerline Rd., Rifle, Co 81650 970-625-5558 (Office) 970-309-5911 (Cell)