HomeMy WebLinkAboutApplicationVALUATION/FEE DETERMINATION
Applican~ '?1:>~-M'
Address _sfef lt14j e g;& ..
Date g .. (i) .. 05
Finished (Livable Area):
Main
Upper
Lower
Other
17Subdivision 20
~Lot/Block ~ ci;-_._ -·
Contractor0 6~
Ct.') (\Q.J{"-
2 ., 7 .... J "! Total Square Feet ~z ~ ; -1 1~ </81 ,4
Valuation
Basement:
Unfinished
Conversion of Unfinished to Finished
Plan Check Fee for Conversion
Valuation
Garage:
Valuation /4Jl y ( 5
Crawl Space:
Valuation
Decks/Patios:
Covered
Valuation ~ .) '1' J.. ~
Open
Valuation ?? ...,. (]..,
Total Valuation
:: 15 J?_
FEEEn'IMATE
FINISHED LIVING S'PACE: (;?'5;)~ X 74.61 = I 42 4<;</.
UNFINISHED BASEMENT: !M£1tfr X 41.00 = -
. CRAWL SPACE: -=-X 9.00 =
GARAGE: f 4:)7 X 11.00 = g?v." 5b b
UNCOVERED 'ATIO/DECK: b\2 X 12.00 = 7::J:f>
COVERED 'ATIO/DECK: X 24.00 =
MISC. ---------MISC. ---------
TOTAL VALUATION: / 9~ 77) 7
PIAN REVIEW FEE: dfJDC/. Cj(f
PERNllT FEE: l 5" ~d. 7. ~
TOTAL: a. e)~J . {QC(
'
MANUFACTURED HOME SET UP FEE:--------
SEl'TIC -'ERMIT: "5:4?
PERK: /rOO
\
GARFIELD COUNTY BUILDING AND PLANNING
970-945-8212
MINIMUM APPLICATION REQUIREMENTS
For
SINGLE FAMILY DWELLING CONSTRUCTION
Including
NEW CONSTRUCTION
ADDITIONS
ALTERATIONS
And
MOVED BUILDINGS
In order to understand the scope of the work intended under a pennit application and expedite the
issuance of a permit it is important that complete infonnation be provided. When reviewing a plan
and it's discovered that required infonnation has not been provided by the applicant, this will result
in the delay of the pennit issuance and in proceeding with building construction. The owner or
contractor shall be required to provide this infonnation before the plan review can proceed. Other
plans that are in line for review may be given attention before the new infonnation may be reviewed
after it has been provided to the Building Department.
Please review this document to determine if you have enough information to design your
project and provide adequate information to facilitate a plan review. Also, please consider
using a design professional for assistance in your design and a construction professional for
construction of your project. Any project with more than ten (10) occupants requires the plans
to be sealed by a Colorado Registered Design Professional.
To provide for a more understandable plan in order to detennine compliance with the building,
plumbing and mechanical codes, applicants are requested to review the following checklist prior to
and during design. Applicants are required to indicate appropriately and to submit the
completed check.list at time of application for a permit.
Plans to be included for a Building Permit, must be on drafting paper at least 18"x24" and
drawn to scale.
1
\
Plans must include a floor plan, a concrete footing and foundation plan, elevations all sides with
decks, bal~ony, steps, hand rails and guard rails, windows and doors, including the finish grade line
and original grade. A section showing in detail, from the bottom of the footing to the top of the roof,
including re-bar, anchor bolts, pressure treated plates, floor joists, wall studs and spacing, insulation,
sheeting, house-rap, (which is required), siding or any approved building material. Engineered
foundations may be required.
A window schedule. A door schedule. A floor framing plan, a roof framing plan, roof must be
designed to withstand a 40 pound per square foot up to 7,000 feet in elevation, a 90 M.P.H. wind
speed, wind exposure B or C, and a 36 inch frost depth.
All sheets to be identified by number and indexed. All of the above requirements must be met or
your plans will be returned.
All plans submitted must be incompliance with the 2003 IRC.
I. Is a site plan included that identifies the location of the proposed structure or addition and
distances to the property lines from each comer of the proposed structure(s) prepared by a
licensed surveyor and has the surveyors signature and professional stamp on the drawing?
Properties with slopes of 30 % or greater must be shown on the site plan. (NOTE
Section: 106.2) Any site plan for the placement of any portion of a structure within 50 ft.
of a property line and not within a previously surveyed building envelope on a
subdivision final plat shall be prepared by a licensed surveyor and have the surveyor's
signature and professional stamp on the drawing. Any structure to be built within a
building envelope of a lot shown on a recorded subdivision plat shall include a copy of
the building envelope as it is shown on the final plat with the proposed structure located
within the envelope.
Yes X
2. Does the site plan also include any other buildings on the property, setback easements and
utility easements? Please refer to Section 5.05.03 in the Garfield County Zoning Resolution
if the property you are applying for a building permit on is located on a corner lot. Special
setbacks do apply.
Yes ")(
3. Does the site plan include when applicable the location of the I.S.D.S. (Individual Sewage
Disposal System) and the distances to the property lines, wells (on subject property and
adjacent properties), streams or water courses?
Yes X •
2
I .
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
DQes the plan include a masonry fireplace including a fireplace section indicating design to
comply with the IRC?
Yes No_--;)<,___ ___ _
Does the plan include a window schedule or other verification that egress/rescue windows
from sleeping rooms and/or basements comply with the requirements of the IRC?
Yes "X No _____ _
Does the plan include a window schedule or other verification that windows provide natural
light and ventilation for all habitable rooms?
Yes 1' No _____ _
Do the plans indicate the location of glazing subject to human impact such as glass doors,
glazing immediately adjacent to such doors; glazing adjacent to any surface nonnally used as
a walking surface; sliding glass doors; fixed glass panels; shower doors and tub enclosures
and specify safety glazing for these areas?
Yes 'f No ______ _
Is the location of all natural and liquid petroleum gas furnaces, boilers and water heaters
indicated on the plan?
Yes ~ No ______ _
Do you understand that if you are building on a parcel of land created by the exemption
process or the subdivision process, are building plans in compliance with all plat notes and/or
covenants?
Yes ___ 'f.ft--No -------
Do you understand that if you belong to a homeowners association, it is your responsibility
to obtain written permission from the association, if required by that association, prior to
submitting an application for a building permit? The building permit application will not
be accepted without it.
Yes f No ______ _
Will this be the only residential structure on the parcel?
Yes f., No If no-Explain: ______ _
Have two (2) complete sets of construction drawings been submitted with the application?
Yes 'j
Do you understand that the minimum dimension a home can be on a lot is 20ft.wide and 20ft.
long?
Yes ~ No ____ _
4
4. . Does the site plan indicate the location and direction of the County or private road accessing
the property?
Yes ¥
5. Do the plans include a foundation plan indicating the size, location and spacing of all
reinforcing steel in accordance with the IRC or per stamped engineered design?
Yes i
6. Do the plans indicate the location and size of ventilation openings for under floor crawl
spaces and the clearances required between wood and earth?
Yes 'f.
7. Do the plans indicate the size and location of ventilation openings for the attic, roof joist
spaces and soflits?
Yes /..
i
8. Do the plans include design loads as required by Garfield County for roof snow loads, (a
minimwn of 40 pounds per square foot up to & including 7 ,000 feet above sea level), floor
loads and ~-loads?
Yes ]t __ ....__ __ _
9. Does the plan include a building section drawing indicating foundation, wall, floor, and roof
constructi.on?
Yes 'f.
10. Does the building section drawing include size and spacing of floor joists, wall studs, ceiling
joists, roof rafters or joists or trusses?
Yes 'f.
11. Does the building section drawing or other detail include the method of positive connection of
all colwnns and beams?
Yes 'f,
12. Does the elevation plan indicate the height of the building or proposed addition from the
undisturbed grade to the midpoint between the ridge and eave of a gable or shed roof or the
top of a flat roof? (Building height measurement usually not to exceed 25 feet)
Yes 'ft
13. Does the plan include any stove or zero clearance fireplace planned for installation including
make and model and Colorado Phase II certifications or phase II EPA certification?
Yes ~ No _____ _
3
24. Have you designed or had this plan designed while considering building and other
construction code requirements?
Yes 1. No _____ _
25 . Do your plans comply with all zoning rules and regulations in the County related to your
properties zone district?
Yes '(. No ______ _
26 . Does the plan accurately indicate what you intend to construct and what will receive a final
inspection by the Garfield County Building Department?
Yes X No ____ _
27. Do you understand that approval for design and/or construction changes are required prior to
the application of these changes?
Yes '/' No _____ _
28. Do you understand that the Building Department will collect a "Plan Review11 fee from you
at the time of application submittal and that you will be required to pay the "Pennit Fee" as
well as any "Road Impact" or "Septic System" fees required, at the time you pick up your
building pennit?
Yes } No ____ _
29. Are you aware that you must call in for an inspection by 3:30 the business day before
the requested inspection in order to receive it the following business day? Inspections
will be made from 7:30 a.m. to 3:30 p.m. Monday through Friday. Inspections are to be
called in to 384-5003.
Yes j No ____ _
30. Are you aware that requesting inspections on work that is not ready or not accessible will
result in a $50.00 re~inspection fee?
Yes ~ No ____ _
31. Are you aware that you are required to call for all inspections required under the IRC
including approval on a final inspection prior to receiving a Certificate of Occupancy and
occupancy of the building?
Yes '1' No ______ _
32. Are you aware that the Pennit Application must be signed by the Owner or a written
authority being given for an Agent and that the party responsible for the project must comply
with the IRC?
Yes ]\ No _____ _
5
33. Are you aware that prior to submittal of a building permit application you are required to
show proof of a driveway access permit or obtain a statement from the Garfield County Road
& Bridge Department stating one is not necessary? You can contact the Road & Bridge
Department at 625-8601 .
Yes ')l No_~-----
34. Do you understand that you will be required to hire a State of Colorado Licensed Electrician
and Plumber to perform installations and hookups, unless you as the homeowner are
performing the work? The license number of the person performing the work will be
required at time of applicable inspection.
Yes J No ______ _
35. Are you aware, that on the front of the Building Permit Application you will need to fill in
the Parcel/Schedule Number for the lot you are applying for this permit on prior to submittal
of a building{ermit application? Your attention in this is appreciated.
Yes No
----------~
36. Do you know that the local fire district may require you to submit plans for their review of
fire safety issues? Yes ~ No (please check with the
building department about this requirement)
37. Do you understand that if you are planning on doing any excavating or grading to the
property prior to issuance of a building permit that you will be required to obtain a grading
permit?
Ye s_,~,....___ __
I hereby acknowledge that I have read, understand and answered these questions to the
best of my ability. Jn
-.. j-6----IZP~~ 1-1 5-Db
Signature of Owner Date
Phone: z1cr -9 B 5 4 (days); __ SA _____ H_e.,..,-=------<evenings)
Project Name: Jg..uE,.-e, bCOD ~E-~rOU)GE,
Project Address: fo $ +~ R 1 c\fie 1<o A D
Notes: If you have answered "No" on any of the questions , you may be required to provide this
information at the request of the Building Official prior to beginning the plan review process. Delays
in issuing the permit are to be expected. Work may not proceed without the issuance of a permit. If
it is determined by the Building Official that additional information i s necessary to review the
application and plans to determine minimum compliance with the adopted codes, the application
6
ma)l be placed behind more recent applications for building permits in the review process and not
reviewed until required information has been provided and the application rotates again to first
position for review, delay in issuance of the permit or delay in proceeding with construction.
BpminreqFeb2005
7
Homestead Ranch Homeowners Association
PO Box302
Glenwood Springs CO 81602
July 12, 2005
Joel and Kathy Trueblood
4577 County Road 137
Glenwood Springs CO 81601
Re: New residence for parcel 20
In consideration of the plans and materials submitted June 10, discussion at the annual
meeting, several on-site visits, and comments expressed by your neighbors; it has been
determined that with the exception of the barn setback you are in compliance with the
Covenants, and therefore the Architectural Committee (Board of Directors) approves
your proposed development by a vote of three affirmative and one abstention.
Further, in consideration of the grade and curvature of the proposed driveway and
concerns about winter maintainability, you are hereby authorized to .construct an alternate
driveway in the general vicinity of your proposed power line right-of-way. Additionally,
it is understood and acceptable that you intend to schedule the project across two
construction seasons in order to avoid winter construction.
Sincerely,
HOMESTEAD RANCH HOMEOWNERS ASSOCIATION
Kevin Milner, Secretary Treasurer
cc: Board members
.
' ,'. • -r
Tereasa Baker
From:
Sent:
To:
Mike Vander Pol
Thursday, July 14, 2005 10:27 AM
Tereasa Baker
Subiect: Exemption for Driveway
Tereasa;
Page 1of1
Joel T uebloOd who is building a home on Lot 20 of Homestead Ranch Estate does not need a driveway permit.
This property is in a private subdivision and therefore exempt from the requlation.
Mike
"7 /1 A V'lf\f\C
PLAN REVIEW CHECKLIST
Building ~gineered Foundation
Jll/:...oriveway Permit
~rveyed Site Plan
~ic Permit and Setbacks
~!Topography 30%
~ach Residential Plan Review List
~M .. A 1· . Q .. __ m1mum pp icatmn uestmnnaire
Msubdivision Plat Notes
fLL.Fire Department Review
~uation Determination/Fees
A.d Line Plans/Stamps/Sticker
~ach Conditions
~ication Signed
~~ewer To Sign Application
-~--arceell//SSclchedule No .
__ 40# Snowload Letter-Manf. Hms.
GENERAL NOTES :
Date 8' Cu ·OS-
Planning/Zoning
~roperty Line Setbacks
___&rt Stream Setbacks
~oodPlain
~ding Height
.. ~ing Sign-off
~Impact Fees
-~RC Approval
~!Topography 40%
~inglssues
.. ~division Plat Notes
9
I
JUH-30-2009 09:39 AM LINDAUER DUHN, INC • 970 243 2430
..la\ Lindauer·Dunn,Inc. .1·~ STRUCTURAL ENG INEERS
~ ~.
Phone:
Re:
P tlK C OVBI' S"best
From1 Sf,.. .. )
P•aes: 3
CCI
802 ROOD A VENUE
GRANO Jl,INcnON, CO 81501
(910) 241a0900
FAX (970) 243-2'130
0 Urgent CJ For Review 0 Please Comment 0 Please Reply
If all pages are not received or are not l1gible , please contact our office at the numbtr above
• Commenta1
P .Bt
JUN-30-2009 09:40 AM LINDAUER DUNN.INC.
TYP.
4 SIDES
970 243 2430
HSS 4x4 COLUMN
RE: PLAN
P.0:5
STEEL COLUMN SPLICE DETAIL 1°=1'-o
REVISION
Trueblood Residence
Lot 20, Homestead Estates
Glenwood Springs, CO
FOR: Joel Trueblood
JOB# 05.073
6/17/09 Sheet:
e: SEE PLAN S 2A
t-----t
sws
A Undaucr·Dunn, Im
~ .. , ..
802 Rood A"tenUe
Grand Junction, CD 81501
PHONE: 970-l41-<1900
FAX: .970-MJ.:-2430 www.lt1cllUtrCIUnn.mm
JUH-30-2009 09:40 AM ~IHDAUER DUHH,JHC. 970 243 2430
3/16" 3 MIN.
L4x3x5/16 EA. SIDE
'---HSS COLUMN W/
STEEL COLUMN CAP
P.02
·I .. ~ ',.
ROOF BEAM CONN. DETAIL 3/4.=1'-o
REVISION
Trueblood Residence
Lot 20, Homestead Estates
Glenwood Springs, CO
FOR: Joel Trueblood
JOB# 05.073
Date: 6/17/09
SEE PLAN
sws
Sheet:
528 JI& Undauer· Dunn, Inc. .w 11U:ftmM.•1•1•b
802 Rcod Avenut _
Grand Junction, w 81501
PHONE: 970-241-Q900
FAX: 970-.~'_lj2430 www.llnelaw.uunn.mm