HomeMy WebLinkAboutEngineer Report for ISDSCIVIL ENGINEERINGto LAND SURVEYING
An EmployeaOwned Company
MEMORANDUM
To: Andy Schwaller, Garfield County Community Development Department
From: Matthew Langhorst
Date: December 1$`h, 2014.
Project: Lot 21 Callicotte Ranch, Driggers, Carbondale, CO.
Subject: ISDS Construction Approval Letter.
The proposed ISDS field design at Lot 21, Callicotte Ranch, Driggers property, in Carbondale has been
installed per the approved plans. The beds were trenched down to the tested soil elevation and installed
on an un -compacted level pad of existing soils. The septic tank meets sizing per design and has an inlet
drop and outlet bio -filter installed per design. The tank lids have been raised to the proper elevation
above grade and backfilling of the trench area has been completed. Please see attached as built drawings
of the installation.
Please let me know if you have questions pertaining to this acceptance letter submittal.
Thanks,
'Awl
Matthew Langhorst, P.E.
High Country Engineering, Inc.
1517 BLAKE "ENUE, SUITE 101
GLENWOOD SPRINGS, CO 81601
970.9458676 • PHoNE
970.945-2555 • FAX
W W W.HCENG.COM