Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT BLCO-8-11-2160 EnCana Story Gulch Compressor Station Compressor Building Garfield County, Colorado 1) ALL WORK MUST COMPLY WITH THE 2009 IBC AND MANUFACTURERS SPECIFICATIONS. 2) ALL WORK MUST COMPLY WITH THE CONDITIONS OF THE CURRENT LAND USE PERMIT. 3) ALL WORK SHALL COMPLY WITH STATE AND FEDERAL REGULATIONS. 4) EXCAVATION OBSERVATION REPORT REQUIRED AT FOOTING INSPECTION. 5) ALL HIGH STRENGTH BOLTING AND FIELD WELDING REQUIRES SPECIAL INSPECTOR. APPROVAL LETTER REQUIRED FOR FRAME INSPECTION. 6) LIGHT AND VENTILATION PER 2009 IBC, CHAPTER 12. 7) LOCKS, LATCHES AND LANDINGS PER 2009 IBC, SECTION 1008. 8) ELECTRICAL ROUGH -IN APPROVAL IS REQUIRED FOR FRAME INSPECTION. 9) ELECTRICAL FINAL APPROVAL IS REQUIRED FOR FINAL INSPECTION. 10) GARFIELD COUNTY FINAL INSPECTION REQUIRED FOR CO/COMPLETION APPROVAL. c -i0 c asraucnavi, cas,fci1 ,ee.nys/,eld , 'ya/r&h '/1/5