Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT BLCO-3-12-2398 EnCana Injection Facility F26 Injection Building SE, NW 1/4 of Section 26, T4S, R96W Parachute, Colorado 1) ALL WORK MUST COMPLY WITH THE 2009 IBC AND MANUFACTURERS SPECIFICATIONS. 2) ALL WORK MUST COMPLY WITH THE CONDITIONS OF THE CURRENT LAND USE PERMIT. 3) ALL WORK SHALL COMPLY WITH STATE AND FEDERAL REGULATIONS. 4) LIGHT AND VENTILATION PER 2009 IBC, CHAPTER 12. 5) LOCKS, LATCHES AND LANDINGS PER 2009 IBC, SECTION 1008. 6) FIELD VERIFY C.D.O.H. INSIGNIA I5 AFFIXED AT FINAL INSPECTION. 7) ELECTRICAL FINAL APPROVAL IS REQUIRED FOR FINAL/COMPLETION INSPECTION. 8) GARFIELD COUNTY FINAL INSPECTION REQUIRED FOR COMPLETION APPROVAL.