HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT
BLCO-3-12-2399
EnCana Injection Facility F26
Generator Building
SE, NW % of Section 26, T4S, R96W
Parachute, Colorado
1) ALL WORK MUST COMPLY WITH THE 2009 IBC AND MANUFACTURERS SPECIFICATIONS.
2) ALL WORK MUST COMPLY WITH THE CONDITIONS OF THE CURRENT LAND USE PERMIT.
3) ALL WORK SHALL COMPLY WITH STATE AND FEDERAL REGULATIONS.
4) LIGHT AND VENTILATION PER 2009 IBC, CHAPTER 12.
5) LOCKS, LATCHES AND LANDINGS PER 2009 IBC, SECTION 1008.
6) FIELD VERIFY C.D.O.H. INSIGNIA IS AFFIXED AT FINAL INSPECTION.
7) ELECTRICAL FINAL APPROVAL IS REQUIRED FOR FINAL/COMPLETION INSPECTION.
8) GARFIELD COUNTY FINAL INSPECTION REQUIRED FOR COMPLETION APPROVAL.
c/G-&-- Cop,