Loading...
HomeMy WebLinkAboutApplicationCommunity Development Department 108 8th Street, Suite 401 Glenwood Springs, CO 81601 (970) 945-8212 www.earfield-county.com TYPE OF CONSTRUCTION BUILDING PERMIT APPLICATION ❑ Commercial/Multi-Family 0 Demolition Residential (SF, Duplex, orTownhome ❑ Reroof Q Manufactured Home (SF or Duplex) O Grading (locate all utilities prior to grading) INVOLVED PARTIES Property Owner: L/3 JIL) M E5 , J C Phone: (t 7 )9L�j �,j S5—C) Mailing Address: per, O .,QX t q / e ti)91 ( & / (Q e 2 Contractor: I25 , y'( M F 5, tom( C Phone: FI ?() g6 ----5-53—e) e% Mailing Address: T,,_(±),__130)( (c, 6 t,_,25 / G C] l d Z Architect: Phone: ( Mailing Address: Engineer: ,44- , Mailing Address: Phone: (`I 7[) )'1'fs' 55r) Manufactured Home Installer: Phone: ( Mailing Address: PROJECT NAME AND LOCATION Describe Work: ,+C.(X 442 ,i'CAL 57t (JG T I 0,4 Job Address: I.T 77 I v Assessor's Parcel Number: 71z33€-/ 3 Dc7?ub. K1 Lie i2 , x1% Lot 7 Block Owner's Valuation of Work: $ ( ZO / 60 Property Size (Sq.Ft or Acres): w 3,i8 Sq.Ft of Building: 2. Z Height: !1 # of Floors: 3 Class of Work: TA -New l ❑ Alteration 0 Addition Garage: ,ttached Septic: 0 ISDS Type of Heat: O Repair 0 Move/Relocation O Detached Community 0 Natural Gas 0 Propane Electric Driveway Permit: $-Exempt 0 Other O Permit #: Grading Square Feet of Earthwork 30 Cubic Yards of Earthwork NOTICE Authority. This application for a Building Permit must be signed by the Owner of the property, described above, or an authorized agent. If the signature below is not that of the Owner, a separate letter of authority, signed by the Owner, must be provided with this Application. Legal Access. A Building Permit cannot be issued without proof of legal and adequate access to the property for purposes of inspections by the Building Division. Other Permits. Multiple separate permits may be required: (1) State Electrical Permit, (2) County ISDS Permit, (3) another permit required for use on the property identified above, e.g. State or County Highway/ Road Access or a State Wastewater Discharge Permit. Void Permit. A Building Permit becomes null and void if the work authorized is not commenced within 180 days of the date of issuance and if work is suspended or abandoned for a period of 180 days after commencement. CERTIFICATION hereby certify that I have read this Application and that the information contained above is true and correct. I understand that the Building Division accepts the Application, along with the plans and specifications and other data submitted by me or on my behalf (submittals), based upon my certification as to accuracy. Assuming completeness of the submittals and approval of this Application, a Building Permit will be issued granting permission to me, as Owner, to construct the structure(s) and facilities detailed on the submittals reviewed by the Building Division. In consideration of the issuance of the Building Permit, I agree that 1 and my agents will comply with provisions of any federal, state or local law regulating the work and the Garfield County Building Code, ISDS regulations and applicable land use regulations (County Regulation(s)). I acknowledge that the Building Permit may be suspended or revoked, upon notice from the County, if the location, construction or use of the structure(s) and facility(ies), described above, are not in compliance with County Regulation(s) or any other applicable law. I hereby grant permission to the Building Division to enter the property, described above, to inspect the work. I further acknowledge that the issuance of the Building Permit does not prevent the Building Official from: (1) requiring the correction of errors in the submittals, if any, discovered after issuance; or (2) stopping construction or use of the structure(s) or facility(ies) if such is in violation of County Regulation(s) or any other applicable law. Review of this Application, including submittals, and inspections of the work by the Building Division do not constitute an acceptance of responsibility or liability by the County of errors, omissions or discrepancies. As the Owner, I acknowledge that responsibility for compliance with federal, state and local laws and County Regulations rest with me and my authorized agents, including without limitation my architect designer, engineer and/ or builder. I hereby acknowledge that I have read and understand the Notice and Certification above as well as have provided the required information whi 57 -X1/1" ---f ',47 Property Owner Print and Sign is correct an curate to the best of my knowledge. /3 Da OFFICIAL USE ONLY Special Conditions: `1 g61 Adjusted Valuation: 13 7, 7Z4.32 Plan Check Fee: Zoo . eb Permit Fee: /3/S.5 -f Manu home Fee: ,. Misc Fees: 1 Total Fees: 15/8.SC Fees Paid: 1 359 . 39- Balance Due: //51/67 BP No: 15DS No: C - A Setbacks: /` z /ZZ3 .5/�l' OCC Group:_ � C Const Type: �c Zoning: Pd BUILDING / PLANNING DIVISION :(�C.r. c..•'''" -1"S01;5/9 Signed Approval Date c.arn t51 Applicant Address Date VALUATION FEE DETERMINATION RB Homes, Inc 97 River Boat Dr. New Castle 5/I5/2013 Subdivision Lot/Block Contractor Finished (Livable Area): Main 572 sq.ft Upper 676 sq.ft Lower 676 sq.ft Other sq.ft X $74.68 Total Square Feet 1924 sq.ft Total Valuation Basement: Unfinished Conversion of Unfinished to Finished Other Total Valuation Garage/Storage (wood framed) Conversion of garage to finished living Carport Other Total Valuation Crawl Space Total Valuation Decks/ Patios/Porches Covered Open Other Total Valuation "Type of Construction: Occupancy: Total Valuation 780 sq.ft X $41.00 sq.ft X $33.68 sq.ft X sq.ft X $18.00 sq.ft X $56.68 sq.ft X $12.00 sq.ft X sq.ft X $9.00 sq.ft X $24.00 sq.ftX $12.00 sq.ft x Commercial sf X sf X sf X sf X sf X sf X Riverbend Lot # 7 Steve Boat 143,684.32 0.00 14,040.00 0.00 0.00 0.00 Total Valuation 157,724.32 Building Plan Review Description of Work: new construction of multi family duplex Bin #: Location Address: 97 Riverboat DR NEW CASTLE, CO General information Contacts Case Manager: David Bartholomew Plan Case Number: BLDG -5-I3-7556 Parcel: 212334330007 Application Date: 05/06/2013 Owner: RB Ilomes, Inc. Applicant: RB Homes, Inc. Applicant Phone: 970-945-5550 Email: Building Planninq(Zoninq Engineered Foundation Property Line Setbacks PP Driveway Permit / 30ft Stream Setbacks / Surveyed Site Plan / Flood Plain irl Septic Permit and Setbacks 7. Building height / Grade/Topography 30% / Zoning Sign -off Attach Residential Plan Review List Ai/e4 Road Impact Fees / ,vj4 Minimum Application Questionnare HOA/DRC Approval Subdivision Plat Notes / Grade/Topography 40% N/ /f Fire Department Review Planning Issues Valuation Determination/Fees Red Line Plans/Stamps/Sticker Attach Conditions Application Signed Plan Reviewer To Sign Application ParcellSchedule No. /114 40# Snowload Letter - Manu. Homes j` Soils Report Subdivision Plat General Comments: Wednesday, May 15, 2013 The Building Division will collect a Plan Review fee at time of application submittal. The permit fee, as well as any Septic or Road Impact fees will be collected when the permit is issued. The permit application must be signed by the owner or by person having written authority from the owner to act as their representative. Building cannot be occupied until a Certificate of Occupancy (CO) is issued. Using the building without a CO will be considered an illegal occupancy and may be grounds for vacating the premises. (Final/CO inspection requirements will be attached to your approved field set of plans.) I hereby acknowledge I have read, understand, and will abide by the requirements of this checklist. Property Owner Print and Sign - 13 Date