HomeMy WebLinkAboutApplication-PermitGarfield County No. I lCb~-G I
Building & Sanitation Department
108 8th Street, Suite #401 Glenwood Springs, Co. 81601
Office 945-8212 Inspection Line 384-5003
Job Address: 4289 cr 215, Parachute
Locality: 2171-332-00-019
Use of Building: Compressor addition metal bldg #1 (Williams Train 3)
Owner: Williams production RMT company
Contractor: TPI Industrial Inc
Amount of Permit: $2,933.29 Date:
c1erk: -.-.Jl:J~.\ C\J~· ~H:-={O;..:._f __
Trt::d;, 3 -Co'"'f re$sor
GARFIELD COUNTY BUILDING PERMIT APPLICATION Ccw>-fv,cf; SA<t?w"' Wcr ll<e"'e
-108 fJ"" Street, Suite 401, Glenwood Sprlne:•, co 81601 '170 ;;ll.f ?I .• r Gc.{ -;J--
Phonel 970·945·8212 I Fax: 970-384-3470 I Itlapectlon Line! 970-384-5003
Permit No: _\~,.Cf,_,·,_,-<-~-1,;__---
A SEPARATE ELECTRICAL PERMIT IS REQUIRED AND MUST BE
ISSUED BY THE: STATE OF COLORADO.
THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION
AUTHORIZED IS NOT COMMENCED WITHLN 180 DAYS, OR, IF
CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A
PERIOD OF 180 DAYS AT ANY TIME AFrER WORK IS COMMENCED.
! HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS
APPLICATION AND KNOW THE SAME TO BE TRUE AND CORRECT. ALL
PROVISIONS OF LAWS GOVERNING THIS TYPE OF WORK WILL BE
COMPLETED WITHIN WHETHER SPECIFIED HEREIN OR NOT. THE
GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY
TO~~~~~;:x);~~THE PROVISIONS OF ANY OfHER STATE OR ~( CONSTRUCTION OR THE PERFORMANCE
Parcel/Schedule No: :;l.J?/-33;).-00 ·-019
AGREEMENT
PERMISSION IS HEREBY G.RAN'fED TO THE APPLICANT AS OWNER, CONTRACTOR AND/OR THE AGENT OF THE CONTRACTOR OR OWNER TO CONSTRUCT
THE STRUCTURE AS· DETAILED ON PLANS AND SPECIFICATIONS SUBMI'ITED TO AND REVIEWED BY THE BUILDING DEPARTMENT.
IN CONSIDERATION OF THE JSSSUANCE OF THIS PERMIT, THE SIGNER. HEREBY AGREES TO COMPLY WITH ALL BUILDING CODES AND LAND
USE REGULATIONS ADOPTED BY GARFIELD COUNTY PURSUANT TO AUTHORI'IY GIVEN LN 30.28.201 CRS AS AMENDED. THE SIGNER fi'URTHER AGREES
THAT lfi'THE ABOVE SAID ORDINANCES ARE NOT FULLY COMPILED WITH IN THE LCOATJON, ERECTION, CONSTRUCTION, AND USE Ofi' THE
ABOVE DESCRIBED STRUCTURE, THE PERMIT MAY BE REVOKED BY NOTICE FROM THE COUNTY AND THAT THEN AND THERE 1'1' SHALL BECOME
NULL AND VOID. THE ISSUANCE OF A PERMT BASED UPON PLANS, SPECIFICATIONS AND OTHER DATA SHALL NOT PREVENT THE BUILDING OFFICIAL
FROM THEREAFTER REQUIRING THE CORRECTION ·oF ERRORS IN SAID PLANS, SPECIFICATIONS AND OTHER DATA OR FROM PREVENTING
BUILDING OPERATION BEING CARRIED ON THEREUNDER WHEN IN VIOLATION OF THS CODE OR ANY OTHER ORDINANCE OR REGULATION OF
THIS JURISDICTION. THE REVIEW OF SUBMITIED PLANS AND SPECIFICATIONS AND INSPECTIONS CONDUCTED THEREAFTER DOES NOT CONSTITUTE
AN ACCEPTANCE OF ANY RESPONSIBILITIES OR LIABLITIES BY GARFIELD COUN'IY FOR ERRORS, OMISSIONS OR DISCREPENCIES. THE RESPONSI
BILI'IY FOR THESE ITE.MS AND IMPLEMENTATION DURING CONSTRUCTION RESTS SPECIFJCIALLY WITH THE ARTICTECT, DESIGNER, BUILDER,
AND OWNER. COMMENTS ARE INTENDED TO BE CONSERVATIVE AND IN SUPPORT OF THE OWNERS LNTEREST. ·k~-\)to V\ 11 F ~ I HEREBY ACKNOWL\3'()T~y6H~z: .:<~D UNDERSTAND THE AGREEMENT ABOVE (INITIALD ~-··
Q-\3-6\--0: Ql()O i~~~~o $ \"5'3-l :sqOI'tlutt~ $IOF/Svnpptvt0
The following items are required by Garfield County for a final inspection:
1. A final Electrical Inspection from the Colorado State Electrical Inspector;
2. Permanent address assigned by Garfield County Building Departroent posted where readily
visible from access road;
3. A finished roof, a lockable house, complete exterior siding, exterior doors and windows
installed, a complete kitchen with cabinets, a sink with hot & cold running water, non-absorbent
kitchen floor coverings, counter tops and finished walls, ready for stove and refrigerator, all
necessary plumbing;
4. All bathrooms must be complete, with washbowl, tub or shower, toilet stool, hot and cold
running water, non-absorbent floors and walls finished and a privacy door;
5. All steps outside or inside over three (3) steps must have handrails, guard rails on balconies or
decks over 30" high constructed to all IBC and IRC requirements;
6. Outside grading done to where water will detour away from the building;
7. Exceptions to the outside steps, decks and grading may be made upon the demonstration of
extenuating circumstances, i.e. weather, but a Certificate of Occupancy will not be issued until
all the required items are completed and a final inspection made;
8. A final inspection sign off by the Garfield County Road & Bridge Departroent for driveway
installation, where applicable; as well as any final sign off by the Fire District, and/or State
Agencies where applicable.
9. If you will be connecting to a public water and/or sewer system, proof of the tap fees have been
paid and the connections inspected by the service provider prior to issuance of a C.O.
A CERTIFICATE OF OCCUPANCY WILL NOT BE ISSUED UNTIL ALL THE
ABOVE ITEMS HAVE BEEN COMPLETED. --
****A CERTIFICATE OF OCCUPANCY MAY TAKE UP TO 5 BUSINESS DAYS TO BE
PROCESSED AND ISSUED.
****CANNOT OCCUPY OR USE DWELLING UNTIL A CERTIFICATE OF
OCCUPANCY (C.O.) IS ISSUED. OCCUPANCY OR USE OF DWELLING WITHOUT A
C.O. WILL BE CONSIDERED AN ILLEGAL OCCUPANCY AND MAY BE GROUNDS
FOR VACATING PREMISES UNTIL ABOVE CONDITIONS ARE MET.
I understand and agree to abide by the above conditions for occupancy, use and the issuance of a
Certificate of Occupancy for the dwelling under building permit # t~
~IWL
S'gnature
Bpapplicationoctober2006
Date
VALUATION/FEE DETERMINATION
Applicant __ JO.L~,?,'-'\u_\ .\-J' (r;,.!/,d<V)~l.o::..!----::Cc,~""~P
Address._-:-_4,__2"'-"'k"'4"f'---'c'"'_"'/L"'-.._2.J..t_,_i:_
Date __ -!:lq~..,;-;..;.2'-1.~--....::-::::!o~j_,_ ___ _
Subdivision -
Lot/Block
Contractor TP r
Finished (Livable Area):
Main
Upper
Lower
Other
{_oM M W lf(J--F ~
/.:,000 )( 3'1 f) t;
Total Square Feet
Valuation
Basement:
Unfinished
Conversion of Unfinished to Finished
Plan Check Fee for Conversion
Valuation
Garage:
Valuation
Crawl Space:
Valuation
Decks/Patios:
Covered
Valuation
Open
Valuation
Total Valuation
GARFIELD COUNTY BUILDING AND PLANNING
970-945-8212
MINIMUM APPLICATION REQUIREMENTS
FOR
CONSTRUCTION OF
COMMERCIAL OR MULTI-FAMILY RESIDENTIAL BUILDINGS
Including
NEW CONSTRUCTION
ADDITIONS
ALTERATIONS
And
MOVED BUILDINGS
In order to understand the scope of the work intended under a permit application and expedite
the issuance of a permit it is important that complete information be provided. When reviewing
a plan and it's discovered that required information has not been provided by the applicant, this
will result in the delay of the permit issuance and in proceeding with building construction. The
owner or contractor shall be required to provide this information before the plan review can
proceed. Other plans that are in line for review may be given attention before the new
infonnation may be reviewed after it has been provided to the Building Department.
Please review this document to determine if you have enough information to design your
project and provide adequate information to facilitate a plan review. Also, please consider
using a design professional for assistance in your design and a construction professional for
construction of your project. Any project with more than ten (10) occupants requires the
plans to be sealed by a Colorado Registered Design Professional.
To provide for a more understandable plan and in order to determine compliance with the
building, plumbing and mechanical codes, applicants are requested to review the following
checklist prior to and during design.
Plans to be included for a Building Permit must be on draft paper at least 18"x 24"" and
drawn to scale.
Plans must include a floor plan, a concrete footing and foundation plan, elevations all sides with
decks, balcony steps, hand rails and guard rails, windows and doors, including the finish grade
and original grade line. A section showing in detail, from the bottom of the footing to the top of
the roof, including re-bar, anchor bolts, pressure treated plates, floor joists, wall studs and
spacing, insulation, sheeting, house-rap, (which is required), siding or any approved building
material. Engineered foundations may be required. Check with the Building Department.
A window schedule. A door schedule. A floor framing plan, a roofing framing plan, roof must
be designed to withstand a 40 pound per square foot up to 7,000 feet in elevation, a 90 M.P.H.
windspeed, wind exposure B or C, and a 36 inch frost depth.
All sheets need to be identified by number and indexed. All of the above requirements must be
met or your plans will be returned.
All plans submitted must be incompliance with the 2003 IBC, IPC, IMC and IFGC.
Applicants are required to indicate appropriately and to submit completed checklist at
time of application for a permit:
I. Is a site plan included that identifies the location of the proposed structure, additions or
other buildings, setback easements, and utility easements showing distances to the
property lines from each comer of the proposed structure prepared by a licensed surveyor
and has the surveyors signature and professional stamp on the drawing? Slopes of 30%
or more on properties must be show on site plan. (NOTE: Section 1 06.2) Any site plan
for the placement of any portion of a structure within 50 ft. of a property line and not
within a previously surveyed building envelope on a subdivision final plat shall be
prepared by a licensed surveyor and have the surveyors signature and professional stamp
on the drawing. Any structure to be built within a building envelope of a lot shown 011 a
recorded subdivision plat, shall include a copy of the building envelope as it is shown on
the finLiat with the proposed structure located within the envelope.
Yes
2. Does the site plan when applicable include the location of the I.S.D.S. (Individual
Sewage Disposal System) and distances to the property Jines, wells (on subject property
and adjacent properties), streams or water courses? This information must be certified by
a licensed surveyor with their signature and professional stamp 91'1 the design.
Yes No Not necessary for this project _:_V_
3. Does the site plan indicate the location and direction of the State, County or private road
acces~ the property?
Yes
4. Is the I.S.D.S. (Individual Sewage Disposal System) designed, stamped and signed by a
Colorado Registered Engineer?
2
Yes. __ _ No __ Not necessary for this project /
5. Are the plans submitted for application review construction drawings and not drawings
that are stamped or marked identifying them as "Not for construction, for permit issuance
only", "~roval drawings only", "For permit issuance only" or similar language?
Yes_L No__ Not necessary for this project. __ _
6. Do the plans include a foundation plan indicating the size, location and spacing of all
reinforcing steel in accordance with the uniform building code or per stamped engineered
design~
Yes No__ Not necessary for this project __
7. If the building is a pre-engineered structure, is there a stamped, signed engineered
found/" plan for this building?
Yes No__ Not necessary for this project __
8. Do the plans indicate the location and size of ventilation openings for under floor crawl
spaces and the clearances required between wood and earth?
Yes__ No__ Not necessary for project_L'
9. Do the plans indicate the size and location of the ventilation openings for the attic, roof
joist spaces and soffits?
Yes__ No__ Not necessary for this project_L
I 0. Do the plans include design loads as required under the IBC or IRC for roof
snowl;r, (a minimum of 40 pounds per square foot in Garfield County)?
Yes No__ Not necessary for this project __
11. Do the plans include design loads as required for floor loads under the IBC or IRC?
Yes____L No__ Not necessary for this project __
12. Does the plan include a building section drawing indicating foundation, wall, floor, and
roof construction?
Yes_£ No__ Not necessary for this project __
13. Is the wind speed and exposure design included in the plan?
Yes_£ No __ . Not necessary for this project __
14. Does the building section drawing include size and spacing of floor joists, wall studs,
ceilingysts, roof rafters or joists or trusses?
Yes__ No__ Not necessary for this project __
15. Does the building section drawing or other detail include the method of positive
connection of all columns and beams?
Yes_£ No__ Not necessary for this project __
3
16.
17.
18.
19.
Does the elevation plan indicate the height ofthe building or proposed addition from the
undisturbed grade to the midpoint between the ridge and eave of a gable or shed roof or
the top of a flat roof? (Check applicable zone district for building height maximum)
Yes _L No__ Not necessary for this project __
Does the plan include any stove or zero clearance fireplace planned for installation
including make and model and Colorado Phase II certifications or Phase II EPA
certification?
Yes __ No __ Not necessary for this project V
Does the plan include a masomy fireplace including a fireplace section indicating design
to comply with the IBC or IRC?
Yes__ No__ Not necessary for this project_L
Does the plan include a window schedule or other verification that egress/rescue
windows from sleeping rooms and/or basements comply with the requirements of the
IBC oriRC?
Yes __ No __ Not necessary for this project~
20. Does the plan include a window schedule or other verification that windows provide
natural light and ventilation for all habitable rooms?
Yes__ No__ Not necessary for this project V
21. Do the plans indicate the location of glazing subject to human impact such as glass doors,
glazing immediately adjacent to such doors; glazing adjacent to any surface normally
used as a walking surface; sliding glass doors; fixed glass panels; shower doors and tub
enclosures and specifY safety glazing for these areas?
Yes_L No__ Not necessary for this project __
22. Do the plans include a complete design for all mechanical systems planned for
installation in this building?
Yes__ No Not necessary for this project /
23. Have all areas in the building been accurately identified for the intended use?
(Occupancy as identified in the IBC Chapter 3)
Yes~ No__ Not necessary for this project __ _
24. Does the plan indicate the quantity, form, use and. storage of any hazardous materials that
may be in use in this building?
Yes__ No__ Not necessary for this project V
25. Is the location of all natural and liquid petroleum gas furnaces, boilers and water heaters
indicated on the plan?
Yes__ No__ Not necessary for this project /
4
26. Do the plans indicate the location and dimension of restroom facilities and if more than
four employees and both sexes are employed, facilities for both sexes?
Yes__ No__ Notnecessary forthisproject_L_
27. Do the plans indicate that restrooms and access to the building are handicapped
accessible?
Yes __ No __ Not necessary for this project~
28. Have two (2) complete sets of construction drawings been submitted with the
applica,.?
Yes No __
29. Have you designed or had this plan designed while considering building and other
construction code requirements?
Yes-----J.L No__ Not necessary for this project __
30. Does the plan accurately indicate what you intend to construct and what will receive a
final inspection by the Garfield County Building Department?
Yes_L No __
31. Do your plans comply with all zoning rules and regulations in the County related to your
zone district? For corner lots see supplemental section 5.05.03 in the Garfield County
Zoning Resolution for setbacks.
Yes .V No __ _
32. Do you understand that approval for design and/or construction changes are required
prior to the implementation of these changes?
Yes_£ No __
33. Do you understand that the Building Department will collect a "Plan Review" fee from
you at the time of application and that you will be required to pay the "Permit" fee as
well as any "Septic System" or "Road Impact" fees required, at the time you pick up your
building permit?
Yes~ No __
34. Are you aware that you are required to call for all inspections required under the IBC
including approval on a final inspection prior to receiving a Certificate of Occupancy
and occup;ncy of the building?
Yes __ v_ No __
35. Are you aware that the Permit Application must be signed by the Owner or a written
authority be given for an Agent and that the party responsible for the project must
comply with the Uniform Codes?
Yes~ No __
5
36. Are you aware that you must call in for an Inspection by 3:30 the business day
before the requested inspection in order to receive it the following business day?
Inspections will be made between 7:30a.m; and 3:30p.m. Monday through Friday.
Inspections are to be called in to 384-5003. '! e S
3 7. Are you aware that requesting inspections on work that is not ready or not accessible
will result in a $50.00 re-inspection fee?
Yes~ No __ _
38. Are you aware that prior to issuance of a building permit you are required to show proof
of a driveway access permit or obtain a statement from the Garfield County Road &
Bridge Department stating one is not necessary? You can contact the Road & Bridge
Departmen_> at 625-860 I.
Yes !L_ No. ___ _
39. Do you understand that you will be required to hire a State of Colorado Licensed
Electrician and Plumber to perform installations and hookups? The license number will
be required at time of inspection.
Yes 1/ No. ___ _
40. Are you aware, that on the front of the building permit application you will need to fill in
the Parcel/ Schedule Number for the lot you are applying for this permit on prior to
submittal of the building permit application? Your attention in this is appreciated.
Yes ~/ No ___ _
41. Do you know that the local fire district may require you to submit plans for their review
of fire safety issues? Yes No (Please check with the
building department about this requirement)
42. Do you understand that if you are planning on doing any excavating or grading to the
property prior to issuance of a building permit that you will be required to obtain a
grading permit?
Yes_JL_ __ _
43. Did an Architect seal the plans for your commercial project? State Law requires any
commercial project with occupancy of more than I 0 persons as per Section I 004 of the
IBC to prepare the plans and specifications for the project.
Yes 1/ No Not Necessary for this project -----
I hereby acknowledge that I have read, understand, and answered these questions to
the best of my ability.
tlh)~ {
6
(evenings)
Project Address: 1/J. ll '7 C R f) IS", Pa {',:;; cJr,.,de"' CD
Note:
If you answered "No" on any of these questions you may be required to provide this information
at the request of the Building Official prior to beginning the plan review process. Delays in
issuing the permit are to be expected. Work may not proceed without the issuance of the permit.
*If you have answered "Not necessary for this project" on any of the questions and it is
determined by the Building Official that the information is necessary to review the application
and plans to determine minimum compliance with the adopted codes, please expect the
following:
A. The application may be placed behind more recent applications for building permits in
the review process and not reviewed until required information has been provided and the
application rotates again to first position for review.
B. Delay in issuance of the permit.
C. Delay in proceeding with construction.
*If you answered "No" to this question the circumstances described in the question could result
in a "Stop Work Order" being issued or a "Certificate of Occupancy" not being issued.
Bpcomm
October 2006
7
PLAN REVIEW CHECKLIST
Applicant_---'\"'A""-liL\'-'1'-'1-"AMA"""""*.!'<----
Building
~ngineered Foundation
4Driveway Permit
Date. __ qJ_· _-=:...:J-L.7_~=-o+1-
Planning/Zoning
Lrroperty Line Setbacks yt..uu_ ':)d
/ ot :J¢ If<-ttt~
___!.L__c_Surveyed Site Plan l 1
~30ft Stream Setbacks
--t.L_Flood Plain
~ ":}0
u4t-septic Permit and Setbacks
ft'¥l._ Grade/Topography 30%
14b-Attach Residential Plan Review List
~Minimum Application Questionnaire
4-.-Subdivision Plat Notes
J4L_Fire Department Review
LV aluation Determination/Fees
-V~:~:Red Line Plans/Stamps/Sticker
~Attach Conditions
~plication Signed
V_?an Reviewer To Sign Application
-~_pP,arcel!Schedule No.
J4t-40# Snow load Letter-Manf. Hms.
_/soils Report
GENERAL NOTES:
/ p /lp(J~ + s l{_Q _\/ __ Building Height VI-
~Zoning Sign-off
*-Road Impact Fees
..t0z,_.HONDRC Approval
_LGrade/Topography 40%
/. . . Oen--f,u..J q -z ~-o ?
~Planmng Issues S u.f 6 't
4subdivision Plat Notes
Shawn Wallace
From:
To:
Cc:
Sent:
Subject:
Shawn:
"Fiore, Tom (E&P)" <Tom.Fiore@Williams.com>
"Shawn Wallace" <tpishawn@earthlink.net>
"Miller, Eric (E&P)" <Eric.Miller@Williams.com>
Monday, September 10, 2007 11 :05 AM
Authorization
Page 1 of 1
This e-mail will act as authorization for TPI to represent Williams Production RMT and Bargath Inc., in securing
building permits for the buildings associated with the Expansion of Parachute Ill Gas Plant.
This will include, but not be limited to the New Amine Building, MCC and the Expansion of the existing
Compressor Building.
Shawn; let me know if you need anything else.
Thanks.
Tom Fiore
Williams Production RMT
Office 970 263-27 43
Cell 970 210-1641
9/10/2007
No. --1\...=()-""-E) "16~---Assessor's Parcel No. 9SH ""])~d-,-c:D-0\9
Date \()-a'a. -c:?j-
BUILDING PERMIT CARD
Job Address L\dlsQ (f~ \:)t p\(\f\vLe -Owner U)\;\\,\.O,)M':> \:>'f0:'1 IJC.\ \(!)Ill
Contractor Wt wwmS\ HetL
Address \CYS'8 Cf~\~~~'cV\.uW
Address ~l\1\ t1oer fd G · S" ·
Phone # nS~C\31-"::\-
Phone # ~ 43-Y~ltl )
Setbacks: Front Rear-:-;----RH ____ LH ____ Zoning --~-
C(!)W\pre~'Sal <?ttltl· 'Meffil. btctt.\_ 't'F-\ INSPECTioNs
Soils Test ~I /L \
Footing II-q-Ql FJ'Vip ~--l(-r;S/&lr1~V
Foundation _________ _
Grout ___________ _
Underground Plumbing _____ _
Rough Plumbing _______ _
Framing __________ _
Insulation----------
Roofing-----------
Drywall -----------
Gas Piping----------
Weatherproofing __________ _
Mechanical ___________ _
Electrical Rough (State) _______ _
Electrical Final (State) ________ _
A~~inaiJ. ~CJ-!d /Checklist Completed? __ _
,.....,!'" Certificate Occupancy # __,(.Y"'---'i.f._,&~7-,--___ _
Date . 2-" z..z..... f U
Septic System# __________ _
Date __________ _
Final __________ _
Other--------------
NOTES
(contii"f® on back)
COUNTY OF GARFIELD m BUILDING DEPARTMENT
CORRECTION NOTICE
108 8th St., Suite 401 . Glenwood Springs, Colorado
Phone (970) 945-8212
Job located at _Lf;-~-=-1-_....~L-Cf+-----=U~_z_::./s=_..------
Permit No. ----Jfr....t.t2~~~1--"!fe"'--____ _:__ ____ _
I have this day inspected this structure and these
premises and found the following corrections needed:
50.00 Re-lnspection Fee must be paid prior to Re-lnspection
You are hereby notified that the above correction must be inspected
before covering.
When correction(s) have been made, cali for inspection at 970-384-5003.
Date ~-/3 20 /)_i _ (}
Build-in-g-ln_s_p_e_,ct::__o_r ~-~--~-~_ .._ ___ -_ --~~:~-",~-):all-l·~ii-C)L:::;-jLf-¥---JN+-+~~=-.!<:._----
Phone (970) 945-8212
Division of Registrations
View Permit 638531
Requestor
Site
ra Division of Registrations
Electrical and Plumbing Permits Online
Company Name: PYRAMID CORPORATION
First Name: LAWRENCE
Last Name: GOODMAN
Address: 2375 LELAND AVE
City: GRAND JUNCTION
State: CO
Zipcode: 815050000
Phone: (970) 257-0800
Fax: ()-
Email Address: kelly.nicholes@pyramidcorporation.com
License Number: 6700
Property Type: PRIVATE
Property Owner: WILLIAMS PARACHUTE 3.5
Job Site Address:-4828 eR 215
City: PARACHUTE
State: CO
Zipcode:
County: GARFIELD
Power: •NONE
Building Type: OTHER
Construction Type: NEW
Mise Construction:
'/7-'6']
Cost of Materials I Labor$: 2073000
Inspections
Inspected Date Type Status
05/15/2009 FINAL ACCEPTED
02/20/2009 FINAL REJECTED
11/10/2008 FINAL REJECTED
10/03/2008 ROUGH IN ACCEPTED PARTIAL
https://www.dora.state.co.us/pls/real/ep _ web_permit_gui.show _page?p _user_ type=ELEC... 5/18/2009
Division of Registrations Page 2 of2
oat24t2oo8 ROUGH IN ACCEPTED
oat2212oo8 ROUGH IN ACCEPTED PARTIAL
oatost2oo8 FINAL ACCEPTED PARTIAL
oato5t2oo8 FINAL ACCEPTED PARTIAL
Q§/29/2008 FINAL ACCEPTED PARTIAL
Q§/20/2008 FINAL ACCEPTED PARTIAL
QZ/22/2008 ROUGH IN ACCEPTED PARTIAL
Q§/12/2008 ROUGH IN ACCEPTED PARTIAL
Q§/1 0/2008 ROUGH IN ACCEPTED PARTIAL
Qg/27/2008 ROUGH IN REJECTED PARTIAL
Q4/17/2008 ROUGH IN ACCEPTED PARTIAL
Q1/07/2008 ROUGH IN ACCEPTED
Q~/28/2Q08 ROUGH IN ACCEPTED PARTIAL
Status/Actions
Permit Number. 638531
Type: ELECTRICAL
Status: CLOSED
Opened: 01/29/2008
Expiration Date: 08/01/2009
Closed: 05/16/2009
Replaces: NONE
Replaced By: NONE
• Questions? Check out the Definitions Page or Frequently Asked Questions IFAQ).
• Please take our Survey to tell us about your experience with the online permits site.
Generated: 0511812009 08:31 a.m. Federal Home Page II State Home Page II Department Home Page
Top of Page
Privacy Statement 1 Disclaimer
Technical Assistance:
EHmail Information Technology Section E-Mail the Division of Registrations
1560 Broadway, Suite 1500
Denver, CO 80202
(303) 894~2985 ~Phone
(303) 894-23'!0-Fax
Relay Colorado
(TTY (English & Spanish), Voice, VCO. ASCII, STS Assistance Numbers)
https://www.dora.state.co.us/pls/real!ep _web _permit_gui.show _page?p _user_ type=ELEC... 5/18/2009
THUNDER MOUNTAIN TESTING
~+~
2973 F. JRoad ~ Grand Junction, CO 81504
(970) 256-9965/ Cell (970) 210·7008/ FAX (970) 314-7067
Exterran
20602 East 81" Street
Broken Arrow, OK 74115
ATTN: Mr. Jim Akins
RE: PCGP #3 Compressor Expansion # 1
4289 CR 215
Parachute, CO
Dear Mr. Akins,
March 4, 2008
Pennit #10676
As requested, structural steel special inspection was conducted per the IBC 2000 Edition ~Chapter
17: Structural Tests and Specia1Jnspection and Garfield County requirements. 1 arrived on site at 12:00
PM. I met with Mr. David Pena with Exterran to review project requirements and specifications. The
project steel erector is TPI Commercial Construction in Grand Junction, Colorado. 1 met with the Crew
Leader, Mr. Bruce Mosher, to review High Strength bolt tensioning requirements. Project drawings indicate
"Tum-of-nuf' method for bolt tensioning as defined in the AJSC 91
h Edition: Manual of Steel Construction.
Approved drawings on site utilized for inspection were provided by B & C Steel in Scottsbluff, NE.: Job
#4644 dated 7/30/07.
Visual inspection was conducted at the Roof Framing Plan 1evel on the%" & 7/8" ASTM A325
High Strength beam to beam) beam to column, and column runway support to crane rail bolted connections.
As a minimum~ 10% of all connections, but not less than 2 bolts per connection were inspected for proper
tensioning and bolt match marking techniques as stated in IBC requirements for periodic inspection.
Inspection was conducted at grid line A-D & 0 -4. Bolts inspected were observed to be acceptable with
project bolt tension requirements.
~~
ICC Certified-#0863569-85
Thunder Mountain Testing
Cc: Davin Pena ~ Exterran
Parcel Detail Page 1 of 4
Garfield County Assessor/Treasurer
Parcel Detail Information
Ass~SSQr/Iref\gJI~rProP~JJYS~CJrch I As~ss_or Subset Ou~x)C I AssessoLS~al~s __ Search
Ckrk &R~coxr:!~rRec~ptionSean:;b
Parcel Detail I Value Detail Sales Detail I Residential/Commercial _ _Improvement Detail
Land Detail I Photographs
j Tax Area II Account Number II Parcel Number II Mill Levy I
I 026 II R008109 II 2nm2ooo19 II 36.682 I
Owner Name and Mailing Address
!WilLIAMS PRODUCTION RMT COMPANY I
lc/0 LOGAN & FIRMINE I
13615 S HURON ST, STE 200 I
!ENGLEWOOD, CO 80110 I
Legal Description
lsECT,TWN,RNG:33-6-96 DESC: A TR IN I
/SEC 4 7-96 SECS 27, 28, 29, 32, 33, I
134. PRE:R260381 PRE:R005786 BK:714 I
lPG: 1 BK:702 PG:411 BK:682 PG:294
jBK:658 PG:762 BK:657 PG:419 BK:641
IPG:759 BK:640 PG: 131 BK:630 PG:883
IBK:377 PG: 106 BK:355 PG:266 BK:326
IPG:220 BK:275 PG:l BK:268 PG:l19
IBK:134 PG:98 BK:125 PG:41 BK:1129 I
IPG:l16 BK:1795 PG:96 RECPT:697033 I
IBK: 1793 PG:599 RECPT:696730 BK: 1780 I
jPG:407 RECPT:694080 BK:1731 PG:127 I
jRECPT:683317 BK:1668 PG:426 I
IRECPT:66984 BK: 1655 PG:230 I
IRECPT:666856 BK: 1621 PG:903 I
http://www .garcoact.com/assessor/parcel.asp ?Parce1Number=2171332000 19 9/13/2007
Parcel Detail Page 2 of 4
IRECPT:659636 BK:1617 PG:263 I
IRECPT:658768 BK:1587 PG:440 I
IRECPT:652080 BK:1582 PG:31
IRECPT:651031 BK:1300 PG:448
IRECPT:591324 BK:1300 PG:439
IRECPT:591323 BK:l300 PG:431
\RECPT:591322 BK:1300 PG:421
IRECPT:591321 BK:l300 PG:414 I
IRECPT:591320 BK:1300 PG:410 I
\RECPT:591319 BK:1300 PG:392 I
IRECPT:591318 BK:l300 PG:389 I
IRECPT:591317 BK:1204 PG:993 I
\RECPT:568682 BK:1263 PG:299 I
IRECPT:583146 BK:1205 PG:9 I
IRECPT:568684 BK:1205 PG:1 I
\RECPT:568683 BK:1187 PG:176 I
IRECPT:563403 I
Location
I Physical Address: I
I Subdivision: I
I Land Acres: 111333.01 I
I Land Sq Ft: llo
I Section II Township II Range I
I 33 II 6 II 96 I
Property Tax Valuation Information
II Actual Value II Assessed Value I
I Land: II 7,48oll 2,1701
I Improvements: II Oil 0
I Total: II 7,48011 2,1701
Sale Date: 1110/31/2001
Sale Price: 1/1,536,000
Basic Building Characteristics
http://www .garcoact.com/assessor/parcel.asp ?Parce!N umber=2171332000 19 9113/2007
Parcel Detail
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Number of Residentiallo
Buildings:
Number of Commllnd lo
Buildings:
No Building Records Found
Tax Information
Tax Year Transaction Type
2006 Tax Payment: Second Half
2006 Tax Payment: First Half
2006 Tax Amount
2005 II Tax Payment: Second Half
2005 II Tax Payment: First Half
2005 II Tax Amount
2004 II Tax Payment: Second Half
2004 II Tax Payment: First Half
2004 II Tax Amount
2003 II Tax Payment: Second Half
2003 II Tax Payment: First Half
2003 II Tax Amount
2002 II Tax Payment: Second Half
2002 II Tax Payment: First Half
2002 II Tax Amount
2001 II Tax Payment: Second Half
2001 II Tax Payment: First Half
2001 II Tax Amount
Amount
($40.36)
II ($40.36)1
II $80.721
II ($40.43)1
II ($40.43)1
II $80.861
II ($46.50)1
II ($46.50)1
$93.ool
($49.86)1
($49.86)1
$99.721
I ($47.74)1
II ($47.74)1
II $95.481
II ($50.93)1
II ($50.93)1
II $101.861
Top of Pt;~
AssessoLDi!tabaseSearchQptions I Txeasu.rer Dilti!lti!~t;_S~arch_O_ptiom
Clerl\&Recon:l.erDatabi!seSearchOptions
Garfield CountyJ:-Iome Pa~
Page 3 of 4
The Garfield County Assessor and Treasurer's Offices make every effort to collect and maintain
accurate data. However, Good Tums Software and the Garfield County Assessor and Treasurer's Offices
are unable to warrant any of the information herein contained.
http://www .garcoact.com/assessor/parcel.asp ?Parce1Number=2171332000 19 9/13/2007