HomeMy WebLinkAboutFirst Addendum 03.24.2014111/7/4-$ ASSOCIATES W.L. PERRY ASSOCIATES, LTD 226 Quimby NE Grand Rapids, MI 49505 (616) 454-1740 * 454-1746 fax ADDENDUM # 1 Proposed New Building For: New Creation Pre -School 44761 Hwy 6 & 24 Glenwood Springs, CO 21602 03-24-14 Project 10-171A This addendum refers to Drawings & Specifications originally dated 03-17-14 AD 1-1 NOTICE: This Addendum #1 to the drawings and specifications for the above captioned project supersedes all contrary and/or conflicting information on said drawings and specifications, which are hereby amended in certain particulars, as follows: AD 1-2 GENERAL: A. NA AD 1-3 DRAWINGS: (Drawings Re -Issued) A. A-3.6, Detail #7: 1. Remove note for `Truss Bearing El. 118'-4" from drawing. 2. Remove note for "Truss Bearing El. 108'-10" from drawing 3. Detail #8: Overhang dimension to be 12". B. S-1.2, Detail #5 1. Clarification: There is no reinforcement required in the 24" diameter Sonotube piers. C, S-2.3, Trusses "A, B, C, C-1, D, G, H, and J" change bearing elevations from 8'-1 1/4" to 8'-1 1/8". D. P-1.0, Detail # 1/P-1.0 1. Added note 1O -171A New Creation Pre -School Page 1 of 2 E. P-2.1, Fixture Schedule # S-5, Scullery Sink 1. Clarification: Specification for this sink is on this legend only- does not appear in the Plumbing Specifications. F. P-2.2, Detail # 1/P-2.2: 1. Piping lines are run through the wall, below the ceiling level. G. P-2.3, Keyed Note 10: 1. Applies to piping shown in Mechanical # 11B. Piping serving Unisex # 117 is to be run concealed in the walls to the fixtures. H. M-1 1, 1. Refer to Section run through the Mechanical Mezzanine (1/2"= 1'- 0"): Move the Outside Air Duct to the center space and above the ceiling. Mount as low as possible and run the building insulation over the Duct, but 2" clear air space from the insulation to the roof deck must be maintained for attic air circulation. 2. Refer to Section run through the Mechanical Mezzanine (112"= 1'- 0"): Outside Air and Air Duct sizes are to be as follows: (1) ERU= 18x6, (2) ERU= 24x8, (3) ERU= 26x10, (4) ERU= 32x10, (5) ERU= 40x10. Coordinate relief duct size to insure adequate mounting of Fan Coils and ERU's. Fan Coils and ERU's may be adjusted east or west if additional vertical space is required. 3. Extend the Outside Air Intake Duct to the east exterior wall and then drop down to wall Louver L-OA1. 4. Once the Relief Air Duct is past ERU-115 Transition to 20x20 and t urn north between trusses. Run up through roof in REL -1. I. M-2.1: 1. Refer to the piping at the Fan Coil Units: The north most pipe is the reverse return main, flow direction is toward Mechanical #118, pipe is 3" entire length. The two pipes to the south are the supply and return for the Fan Coil Unit, flow in both of these lines is to the west. The supply line pipe sizing shown is correct. The return line should be 2" to the connection to FC -115, 2'/Z' from FC -115 to the connection to FC -122, and 3" after that. Refer to the Hot Water Schematic: the building side pump at HEX -1 is P-5. J. E-1.0 1. Refer to Panel "B": add a circuit for P-5, see mechanical portions of this Addendum, and provide code required disconnecting means. K. E-3.1 1. Add soffit light at door #125A, circuit as shown. AD 1-4 SPECIFICATIONS: A. NA END OF ADDENDUM #1 10-171A New Creation Pre -School Addendum #1