ADDENDUM # 1
Proposed New Building For:
New Creation Pre -School
44761 Hwy 6 & 24
Glenwood Springs, CO 21602
03-24-14
Project 10-171A
This addendum refers to Drawings & Specifications originally dated 03-17-14
AD 1-1 NOTICE:
This Addendum #1 to the drawings and specifications for the above captioned
project supersedes all contrary and/or conflicting information on said drawings
and specifications, which are hereby amended in certain particulars, as follows:
AD 1-2 GENERAL:
A. NA
AD 1-3 DRAWINGS: (Drawings Re -Issued)
A. A-3.6, Detail #7:
1. Remove note for `Truss Bearing El. 118'-4" from drawing.
2. Remove note for "Truss Bearing El. 108'-10" from drawing
3. Detail #8: Overhang dimension to be 12".
B. S-1.2, Detail #5
1. Clarification: There is no reinforcement required in the 24"
diameter Sonotube piers.
C, S-2.3, Trusses "A, B, C, C-1, D, G, H, and J" change bearing elevations
from 8'-1 1/4" to 8'-1 1/8".
D. P-1.0, Detail # 1/P-1.0
1. Added note
1O -171A New Creation Pre -School Page 1 of 2
E. P-2.1, Fixture Schedule # S-5, Scullery Sink
1. Clarification: Specification for this sink is on this legend only- does
not appear in the Plumbing Specifications.
F. P-2.2, Detail # 1/P-2.2:
1. Piping lines are run through the wall, below the ceiling level.
G. P-2.3, Keyed Note 10:
1. Applies to piping shown in Mechanical # 11B. Piping serving
Unisex # 117 is to be run concealed in the walls to the fixtures.
H. M-1 1,
1. Refer to Section run through the Mechanical Mezzanine (1/2"= 1'-
0"): Move the Outside Air Duct to the center space and above the
ceiling. Mount as low as possible and run the building insulation
over the Duct, but 2" clear air space from the insulation to the roof
deck must be maintained for attic air circulation.
2. Refer to Section run through the Mechanical Mezzanine (112"= 1'-
0"): Outside Air and Air Duct sizes are to be as follows: (1) ERU=
18x6, (2) ERU= 24x8, (3) ERU= 26x10, (4) ERU= 32x10, (5) ERU=
40x10. Coordinate relief duct size to insure adequate mounting of
Fan Coils and ERU's. Fan Coils and ERU's may be adjusted east
or west if additional vertical space is required.
3. Extend the Outside Air Intake Duct to the east exterior wall and
then drop down to wall Louver L-OA1.
4. Once the Relief Air Duct is past ERU-115 Transition to 20x20 and t
urn north between trusses. Run up through roof in REL -1.
I. M-2.1:
1. Refer to the piping at the Fan Coil Units: The north most pipe is
the reverse return main, flow direction is toward Mechanical #118,
pipe is 3" entire length. The two pipes to the south are the supply
and return for the Fan Coil Unit, flow in both of these lines is to the
west. The supply line pipe sizing shown is correct. The return line
should be 2" to the connection to FC -115, 2'/Z' from FC -115 to the
connection to FC -122, and 3" after that. Refer to the Hot Water
Schematic: the building side pump at HEX -1 is P-5.
J. E-1.0
1. Refer to Panel "B": add a circuit for P-5, see mechanical portions
of this Addendum, and provide code required disconnecting
means.
K. E-3.1
1. Add soffit light at door #125A, circuit as shown.
AD 1-4 SPECIFICATIONS:
A. NA
END OF ADDENDUM #1