HomeMy WebLinkAboutDaybreak engineeringKAUP ENGINEERING INC. 1129 Grand Avenue Glenwood Springs, CO 81601 (970)945-9613, fax (970)945-9633 August 23, 2009 Jerry Rush Rocky Mountain Steel Structures 0353 E Vista Drive Silt, CO 81652 RE: High Mesa Foundation Dear Jerry: Per our discussion, the horizontal reinforcing bars shall have hook bars added to the top & bottom bars only in the wall reinforcing. The center bar may remain without hooks. The hooks shall be the same diameter as the horizontal bar. The top bars shall have a 24" x 24" hook bar lapped to each of the top bars. The bottom bars shall have either a 24" x 24" hook bar, or if access is limited, a 6" x 24" hook may be installed from each direction with the 6" dimension overlapping in the comers. These hooks again shall be placed on each horizontal bar. Please call with any other questions or comments. Orel ���Uu118111REG% �v�Q y4. S KAUP ENGINEERING INC. 1129 Grand Avenue Glenwood Springs, CO 81601 (970)945-9613, fax (970)945-9633 November 16, 2009 Rocky Mountain Steel Structures 353 E. Vista Drive Silt, CO 81652 RE: High Mesa Foundation, Garfield County, CO Attention: Jerry Dear Jerry: Per your request, I have reviewed the following items from the Building Department's field report. The continuous concrete strip & pad footings on the interior of the building may be formed 9'/" thick in lieu of the 10" thickness shown in details 1/S3.1 & 2/53.1. The exterior continuous footings may be formed with 2x10's with a 2x2 sistered on top for a total depth of approximately 10 %". This would allow the exterior walls to be formed with 2 courses of 16" tall ICF blocks for a total wall height of 32". The wall reinforcing should remain unchanged. The foundation was designed for an allowable bearing pressure of 1000 PSF as specified by the Soils Report by HP Geotech # 107 0639 dated December 4, 2007. The soils report recommends that a follow up site inspection be performed to observe actual conditions but this is at the Owner's discretion. Please call with any questions or comments. Since 011111IREG� rir, ee rri Dale C7aJ Mt' esP.t .g�tc ...., ROCKY MOUNTAIN STEEL STRUCTURES, INC. 353 EAST VISTA DR. SILT, CO 81652 / PHONE 970-876-5878 FAX 970-876-5877 / rmssna,sopris.net "LEARN MORE ABOUT US AT WWW. RMSTEELSTRUCTURES.COM To whom it may concern, This letter is to state that 1, Bob Graham, owner of Daybreak Realty, hereby wave the recommendation by the soils engineer to obtain an additional soils report and take full responsibility thereof. I also hereby state that 1 have installed the plumbing, heating and gas pipe not supplied by Magnolia Homes excluding exterior septic and water systems. Please call Jerry Rusch with Rocky Mountain Steel Structures with any further questions. Thanks you, B i • Graha Cer of Daybreak Realty ROCKY MOrt'".AIN STEEL STRUCTURES, INC. /a-` 3/`0? RUSCH , PRESIDENT KAUP ENGINEERING INC. 1129 Grand Avenue Glenwood Springs, CO 81601 (970)945-9613, fax (970)945-9633 Jerry Rush Rocky Mountain Steel Structures 0353 E Vista Drive Silt, CO 81652 RE: High Mesa Foundation February 19, 2010 Dear Jerry: Per your request, I am writing to respond to the building department's question regarding the assumed soils bearing pressures for this project. You provided us with soils report # 107 0639, by HP Geotech dated 12/14/07 that was provided for the High Mesa Development. The report gave 2 different soils bearing pressures depending on which type of bearing soils the building was founded on. We were not provided with a site specific location for the building so we assumed the lower bearing pressure option of 1000 PSF. There were a few borings which indicated high compression when wetted. The soils report recommends that site specific bearing pressures be reviewed by a soils engineer after excavation and before foundation placement, to verify the design pressures given in the report. The Owner has the option to proceed without this verification as long as the Owner is willing to accept the associated risk. PleasIt\ PAY my other questions or comments. v.p�...V7... ST 4' i rel r__�! 2 esi!S • NM- � Dale fit/ on1/40. SIMPSON LTP4 PLATE ® 45" O.G. AROUND OUTSIDE OF BLDG 4 NAIL. COVER IV FIELD INSTALLED TRIM BAND BOARD. FACTORY INSTALLED 2x10 PL x CANT BY BLDG SUPPLIER otki T WALL= SEE PLAN +c4- Nay \rov t•--to(� t`.1 t° PREFAB BLDG BY OTHERS. ADD 2x BEARING SHIM ® EACH FLOOR JOIST. 4) ad NAILS 616" 0.G. IN EACH JOIST BAY T PLY —SEE PLAN 2x6 TREATED SILL PLATE VW "4+ EPDXY BOLTS ® 45" 0.G. • Il lillll��ll�il���l FOUNDAT WE SOILS REPORT ?€V tsar SEE PLAN (2) *5 x CANT TOP 4 BOT HORIZ ® 16"0G VERT 0 16"OG 05 X fV DIAL ®52"00 ALTERNATE 6" LEGS XGO 1 111 111=III=11 T FTG= parik SEE PLAN SCHMUESER I GORDON !MEYER GLENWOOD SPRINGS E N G 1 N EER 5 }SURVEYORS April 12, 2010 Jerry Rusch / RMSS 353 East Vista Drive Silt, CO 81652 Subject: OWTS Installation Observation RMSS Inc Battlement Mesa, Colorado 81652 118 WEST SIXTH STREET, SURE 200 GLENWOOD SPRINGS. CO 81601 970.945. 1004 970.945.5948 PM Jerry, As requested, Schmueser Gordon Meyer reviewed your installation at the subject site. The system was designed as a three bedroom dwelling, under Job No. 2009-368.001. The installation included a new 1,250 two compartment septic tank with a Model 312 dosing siphon installed in the second compartment of the tank. At the time of installation, the risers had not been sealed allowing for groundwater infiltration and has now been corrected. The effluent discharges to a five outlet distribution box equipped with speed levelers and at the time of installation did not have a baffle. The original installation specified had a larger six outlet distribution box to allow for additional settling prior to discharge. Upon a subsequent site visit it was noted that a baffle had been installed in the original box. It was also noted that the speed levelers were installed incorrectly and it was agreed that this would be corrected. The absorption field is comprised of five trenches each with 17 units. There was a clean out adjacent to the house septic for maintenance purposes. The observed components of the OWTS were installed in general conformance with our design and as per the attached as built drawing. The installation observations do not imply a guarantee or warranty of materials or workmanship. If there are questions, please call. Sincerely, SCHMUESER GORDON MEYER, INC. Brian Edwards, ROWP BJE/jrc ASPEN GUNNISON 101 FOUNDERS PLACE, UNIT 102 103 WEST TDMICH1 AVE. PO Box 2155 SURm A ASPEN, CO 81611 GUNNISON. CO 970,925.6727 970.641.5355 970.925.4157 PAX 970.641 .5358 PAX Dan Cokley P.E. GRAND JUNCTION MEEKER 573 WEST Caere CIRCLE 32o LARD STREET SUILDINO 1, SUITE 205 MEEKER, CO 81641 GRAND JUNCTION, CO 81505 970.878.5 180 970.245.2571 970.878.4181 FAx 970.245.2871 FAx