Loading...
HomeMy WebLinkAboutPlansis MAIN LEVEL. F ;AMEN& FLAN ,i■ PROVIDE TEMPORARY SHORING UNDER STEEL BEAM AT THESE LOCATIONS SCALE: J' =I --o NOTES, !. INFORMATION TAKEN FROM SHEET 52.1G OF IRONBRIDGE 50PR15 SERIES LOT 13&, 3203 GI R BY 5.K. PEIGHTAL EN&INEERS DATED NOVEMBER 10, 2004 2. CONCRETE SCREW ANCHORS (GSA) SHALL BE MANUFACTURED BY SIMPSON STRONG --TIE COMPANY, INC. TITEN HD STRENGTH FASTENERS OR EQUIVALENT (E) I'YI&X7! (19f=15/e, _ OR WI&X65 (bf=7%", tf=%/.�") 2° PX4" C5A (4 RE&V) _ - 6X6 OF #I SHORING POST 8" MIN /4" MAX DO NOT DISTURB FAILED BEARING POCKET L6X4) 1&' X O-3---. N45 SIDES FABRICATED Ye fe GUIDE SHOE (TOTAL Y4" GLR EA. DIRECTION) APPROVED SUBJECT TO NOTED EXCEPTIONS & INSPECTIONS GAR"IELD COUNTY BUILD G + EPAR Date ? Z / ' By LD COPY NO INSPECTION WITHOUT THESE PLANS ON SITE MT!. S fOR N& DETAILS PROVIDE OPPOSING HARDWOOD TAPERED SHIMS FULL COL END AREA, RIP CUT AT I:I2 (5°) ANGLE; DRIVE SNUG, TRIM ENDS FLUSH AND CONTAIN WITH LOOSE CHANNEL OR BAR CLAMP. (CLAMP RODS NOT SHOWN, FOR CLARITY) Alexander, Judy remodeIC 67 River Bend Way, GWS Ironbridge PUD, Lot 166 (417-)0', ' S ,o71- /gore/71 ,r -2) .751,//a/i4 , 49- Ped'/ie "men BLRE-7-13-2B15 PATTILLO ASSOCIATES ENGINEERS i! 3 e al El '1 9 z w0< <‘11pAo > IL DRAM BY: EGN PROJECT ENG: RHP CHECKED BY: RMP SCh: A5 5410114 PROJECT q,tinCeeles 159JE DATES: 07/12/2013 155WD TITLE SHOWN& PLAN AND DETAILS SHEET S 1