Loading...
HomeMy WebLinkAboutExcavation Observation 07.31.2013Gtech HEPWORTH - PAWLAK GEOTECHNICAL July 31, 2013 Erica Gentry c/o Tom Dyer Construction, Inc. 193 TZ Trail Grand Junction, Colorado 81503 (tldyerl8[;msn.com) Hepworth-Pau•lnk Geotechnical, Inc. 5020 County Road 154 Clermont Springs, Colorado 81601 Phone 970-945-7988 Far: 970-945-8454 email hpgco@hpgeurech.com Job No. 113 256A Subject: Observation of Excavation, Proposed Residence, Lot 8, Sun Meadow Estates, 0530 North Meadow Drive, Garfield County, Colorado Dear Ms Gentry and Mr. Dyer: As requested, a representative of Hepworth-Pawlak Geotechnical, Inc. observed the excavation at the subject site on July 24 and 29, 2013 to evaluate the soils exposed for foundation support, The findings of our observations and recommendations for the foundation design are presented in this report. We previously conducted a subsoil study for design of foundations at the site and presented our findings in a report dated October 19, 2006, Job No. 105 363. At the time of our visit to the site on July 24, the foundation excavation had been cut in one level from 7 to 9 feet below the adjacent ground surface, The soils exposed in the bottom of the excavation consisted of stiff, sandy silty clay and desiccated hard clay. Relatively undisturbed hand driven liner samples were obtained at two locations in the excavation. Results of swell -consolidation testing performed on samples obtained, shown on Figures 1 and 2, indicate the soils are variably compressible under conditions of loading and wetting. No free water was encountered in the excavation and the soils were slightly moist. Due to the swell potential of the desiccated hard clay soils found during our geotechnical exploration, we recommended over -excavation of the hard clay soil to a depth of 2 feet below foundation grade (the northern portion of the excavation). We recommended replacement of the over -excavated soils with'/" aggregate base course or similar granular material compacted to a minimum of 98% of a standard Proctor density for the material at near optimum moisture content. For the southern portion of the excavation, consisting of sandy silty clays, we recommend scarifying, moisture conditioning and compacting the existing soils in the foundation areas. On return visits in the morning and afternoon of July 29, 2013 we observed that the subgrade had been over -excavated to a depth of 2 feet below foundation grade in the northern portion of the excavation, The over -excavated hard clay soils were replaced with compacted i/1" aggregate base course. Compaction tests performed on the base Parker 303-841-7119 • Colorado Springs 719-633-5562 • Silverthorne 970-468-1989 course at foundation grade are attached for reference. The native soil in the southern portion of the excavation had reportedly been scarified, moisture conditioned and compacted. Probing of the soils by hand with a metal rod in the southern portion of the excavation resulted in minor penetration of the probe and the soils were judged to be firm and suitable for placement of footings.. The soil conditions exposed in the excavation and prepared as noted above are suitable for support of spread footings designed for the recommended allowable bearing pressure of 1500 psf. Any loose and disturbed soils should be removed in the footing areas prior to placement of concrete. Other recommendations presented in our previous report which are applicable should also be observed. The recommendations submitted in this letter are based on our observation of the soils exposed within the foundation excavation and the previous subsurface exploration at the site. Variations in the subsurface conditions below the excavation could increase the risk of foundation movement. We should be advised of any variations encountered in the excavation conditions for possible changes to recommendations contained in this letter. Our services do not include determining the presence, prevention or possibility of mold or other biological contaminants (MOBC) developing in the future. If the client is concerned about MOBC, then a professional in this special field of practice should be consulted. If you have any questions or need further assistance, please call our office. Sincerely, HEPWORTH — PAWLAK GEOTECHNICAL, INC. James A. Parker, P.E., P,G. Rev. by: SLP JAP/ljg attachments: Figures 1 & 2 — Swell Consolidation Test Results Earthwork Compaction Test Report Job No. 113256A Compression % D 2 3 4 5 6 7 8 9 Moisture Content = 6.5 percent Dry Density = 92 pcf Sample of: Sandy Silty Clay From: Bottom of Excavation - Southeast Corner • Compression upon wetting r 0.1 1.0 APPLIED PRESSURE - kat 10 100 113 256A Gatech Hepworth—Pawlak Caatachnleal SWELL CONSOLIDATION TEST RESULTS Figure 1 Compression % 0 1 2 3 4 5 6 Moisture Content = 7.6 percent Dry Density = 105 pcf Sample of: Sandy Silty Clay From: Bottom of Excavation- Northwest Corner 4 Compression upon welling 0.1 1.0 APPLIED PRESSURE - ksf 10 100 113 256A %f Hspwo th-Pawldc Gsot.chnrcd SWELL -CONSOLIDATION TEST RESULTS Figure 2 �CG'CI'1 HEPWORTH-PAWLAK GEOTECHNICAL 5024 County Road 154 Glenwood Springs, Colorado 81601 Phone: 970.945-7988 Fax: 970-045.8454 hpsreoehngeotech.com Earthwork Compaction Testing Report Client: Erica Gentry c/o Tom Dyer Construction, Inc. 193 TZ Trail Grand Junction, CO 81503 Job No.: 113256A Day: Monday Date: 7/30/13 Page: 1 of 1 Project: Residence, Lot 8, Sun Meadow Estates, Garfield County, Colorado Weather. Clear, calm, dry Temperature: 84° at 4 pm Earthwork Contractor. Tom Dyer Construction Equipment Used: trackhoe, walk behind pad foot compactor Description of Earthwork Basement level structural fill under slab and footings was tested for Tested: compaction. Compaction tests were judged adequate based on an estimated Proctor value of 135 pcf for the aggregate base course fill. Verbal Communication: The contractor was informed of our compaction test results. Placement and Compaction Procedure: Not Observed by HP Geotech. Lift Thickness: Max. Rock Size: Compactor(s) Used: Moisture Conditioning: Number of Passes: Test No. Location Nuclear Gauge Moisture/Density Test Results Basement Level of Building Area Depth or Elev. Field Dry Density (Pot) Field Moisture Content Feld Comp. (%) Min. Comp. Req. (%) Proctor Lab No. 1 West Side of North Half Foundation grade 141.4 5.3 100 98 Est. 2 North Side of North Half Foundation grade 135.6 4.0 100 98 Est. 3 East Side of North Half Foundation grade 135.3 3.9 100 98 Est. Proctor Sample Reference: Lab No. Method Description Max. Dry Dens. (94) Opt. Moist. (%} Est. ASTM D 698 3/4" aggregate base course 135 7 THIS REPORT PRESENTS OPINIONS AS A RESULT OF OUR OBSERVATIONSOF FILL PLACEMENT, WE HAVE RELIED ON THE CONTRACTOR TO CONTINJE APPLYING THE RECOMMENDED COMPACTTVE EFFORT AND MOISTURE TO FILL DURING THE TIMES WI tEN OUR OBSERVER IS NOT OBSERVING OPERATIONS. THE NUCLEAR DENSOMETER METHOD OF TESTING WAS USED IN SUBSTANTIAL ACCORDANCE WITH ASTM 0 6938. Distribution: Erica Gentry — ericaaentrverifleco.ort Tom Dyer — ildver180msn.c9m James A. Parker, PE, PG Steven L. Pawlak, PE Field Technician Reviewed By