HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT
BLCO-9-12-2629
WPX Energy Rocky Mtn., LLC
Meter Building
Section 33, T6, R96
Parachute, Colorado
1) ALL WORK MUST COMPLY WITH THE 2009 IBC AND MANUFACTURERS SPECIFICATIONS.
2) ALL WORK MUST COMPLY WITH THE CONDITIONS OF THE CURRENT LAND USE PERMIT.
3) ALL WORK SHALL COMPLY WITH STATE AND FEDERAL REGULATIONS.
4) EXCAVATION OBSERVATION REPORT REQUIRED AT FOOTING INSPECTION.
5) LIGHT AND VENTILATION PER 2009 IBC, CHAPTER 12.
6) LOCKS, LATCHES AND LANDINGS PER 2009 IBC, SECTION 1008.
7) VERIFY CDOH INSIGNIA I5 AFFIXED PRIOR TO FINAL/COMPLETION INSPECTION.
8) ELECTRICAL FINAL APPROVAL 15 REQUIRED FOR FINAL/COMPLETION INSPECTION.
9) GARFIELD COUNTY FINAL INSPECTION REQUIRED FOR COMPLETION APPROVAL.
r� CP/