HomeMy WebLinkAboutConditions of permitCONDITIONS OF PERMIT
BLCO-12-13-3078
Watermark LLC, Tenant Finish
Nutritional Supplements, LLC - OPCO
38150 River Frontage Rd. Units 1B, 2A,2B,2C,2D, 3C
New Castle, Colorado
1) ALL WORK MUST COMPLY WITH THE 2009 IBC, IMC, IPC, IFGC, IFC, IECC AND MANUFACTURERS
INSTALLATION SPECIFICATIONS.
2) ALL WORK MUST COMPLY WITH STATE AND LOCAL REGULATIONS.
3) ALL ACTIVITY MUST COMPLY WITH THE COMMUNITY DEVELOPMENT DIRECTOR'S DETERMINATION
LETTER DATED FEBRUARY 20, 2013.
4) STRUCTURE IS APPROVED AS TYPE VB CONSTRUCTION, F-1 OCCUPANCY.
5) CONTACT THE LOCAL FIRE PROTECTION DISTRICT FOR PERTINENT IFC REQUIREMENTS. FIRE DISTRICT
FINAL APPROVAL LETTER IS REQUIRED FOR CO/FINAL INSPECTION.
6) THE REQUIRED SECOND EXIT DOOR MUST COMPLY WITH IBC, SECTION 1015.2.1.
7) MAXIMUM ALLOWABLE QUANTITY OF FLAMMABLE OR COMBUSTIBLE MATERIALS PER 2009 IBC,
SECTION 414 AND 2009 IFC, CHAPTER 27.
8) ENVIRONMENTAL MONITORS WITH CO2 SENSORS/ALARMS MUST BE INSTALLED IN ALL PLANT
GROWING AREAS TO INSURE HUMIDITY LEVELS, AIR QUALITY, SAFE, AND SANITARY CLIMATIC
CONDITIONS ARE MAINTAINED.
9) MECHANICAL EQUIPMENT AND SENSORS MUST BE INTERCONNECTED FOR AUTOMATIC OPERATION. A
MECHANICAL FINAL APPROVAL REPORT SEALED BY A COLORADO LICENSED DESIGN PROFESSIONAL
FOR EXISTING SYSTEM IS REQUIRED FOR CO/FINAL INSPECTION.
10) EXISTING TOILET ROOM MUST BE ACCESSIBLE. BASED ON OCCUOPANT LOAD, A UNISEX ACCESSIBLE
TOILET ROOM WILL BE PERMITTED. ACCESSIBILITY PER 2009 IBC, CHAPTER 11 & ICC/ANSI A117.1-2003.
11) PROVIDE NONABSOBANT FLOORS AND 4" BASE BOARDS IN ALL WET AREAS. A PLUMBING FINAL
APPROVAL REPORT SEALED BY A COLORADO LICENSED DESIGN PROFESSIONAL FOR EXISTING SYSTEMS
IS REQUIRED FOR CO/FINAL INSPECTION.
12) PROVIDE EXIT SIGNS EQUIPPED WITH EMERGENCY LIGHTING (W/BATTERY BACK UP) AT ALL EXIT
DOORS, SPECIFICALLY IN "DARK AREA" PLANT GROWING ROOMS. (GREEN LETTERING OKAY) AN
ELECTRICAL PERMIT IS REQUIRED.
13) STAE ELECTRICAL FINAL APPROVAL IS REQUIRED FOR CO/FINAL INSPECTION.
14) STATE OF COLORADO MEDICAL MARIJUANA ENFORCEMENT DIVISION (MMED) COMPLIANCE REPORT
IS REQUIRED FOR CO/FINAL INSPECTION.
15) ONE (1) ACCESSIBLE VAN PARKING SPACE, SIGNAGE, ACCESSIBLE ROUTE, AND ENTRY IS REQUIRED PER
2009 IBC, CHAPTER 11 AND ICC/ANSI A117.1-2003.
16) LOCKS, LATCHES AND LANDINGS PER 2009 IBC, SECTION 1008.
17) LIGHT AND VENTILATION PER 2009 IBC, CHAPTER 12.
18) AS THE BUILDING IS CURRENTLY OCCUPIED AND IN VIOLATION OF THE BUILDING CODE ALL WORK
MUST BE COMPLETED AND FINAL APPROVALS RECEIVED WITHIN THIRTY
PERMIT ISSUANCE. A GARFIELD COUNTY FINAL INSPECTION 15 REQUIRED AT THIS TIME.
30
DAYS FROM TIME OF