HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT BLCO-12-12-2719 Grand River Hospital District Healthcare Facility TBD Sipprelle Dr. Parachute, Colorado 1) PRIOR TO CONSTRUCTION, PROVIDE A COPY OF THE STORMWATER DISCHARGE PERMIT. 2) PRIOR TO CONSTRUCTION, PROVIDE A COPY OF THE ROAD CUT PERMIT FROM THE GARFIELD COUNTY ROAD & BRIDGE DEPARTMENT. 3) ALL WORK MUST COMPLY WITH THE 2009 IBC, IMC, IPC, IFGC, IFC, IECC AND MANUFACTURERS INSTALLATION SPECIFICATIONS. 4) ALL WORK MUST COMPLY WITH THE CONDITIONS OF THE BATTLEMENT MESA PUD. 5) ALL WORK MUST COMPLY WITH STATE AND FEDERAL REGULATIONS. 6) OPEN -HOLE SOILS REPORT IS REQUIRED AT FOOTING INSPECTION, 4000 PSF. 7) ALL HIGH STRENGTH BOLTING AND FIELD WELDING REQUIRES SPECIAL INSPECTOR. APPROVAL REPORT IS REQUIRED AT FRAMING INSPECTION. 8) LOCAL FIRE DISTRICT SHALL INSPECT FIRE SUPRESSION SYSTEM, EXTINQUISHERS, ALARMS, AND OTHER PERTINENT IFC REQUIREMENTS. FIRE DISTRICT FINAL APPROVAL LETTER REQUIRED FOR CERTIFICATE OF OCCUPANCY. 9) STORAGE OF HAZARDOUS MATERIALS PER 2009 IBC AND IFC REQUIREMENTS. 10) PENETRATIONS OF FIRE RATED ASSEMBLIES PER IBC SECTION 713. 11) ACCESSIBILTY REQUIREMENTS PER 2009 IBC, CHAPTER 11 AND ICC/ANSI A117.1-2003. 12) ELEVATOR PERMITTING AND INSPECTIONS THROUGH THE NORTHWEST COLORADO COUNCIL OF GOVERNMENTS. (NWCOG 970-468-0295 EXT 108) 13) ELECTRICAL PERMITTING AND INSPECTIONS THROUGH THE COLORADO STATE ELECTRICAL BOARD. (303-869-3458) 14) VERIFY EXIT DIRECTIONAL SIGNAGE PRIOR TO ELECTRICAL ROUGH -IN INSPECTIN. 15) ELECTRICAL ROUGH IN APPROVAL IS REQUIRED PRIOR TO FRAME INSPECTION. 16) ELECTRICAL FINAL APPROVAL IS REQUIRED FOR CERTIFICATE OF OCCUPANCY. 17) IECC, CH. 5 COMPLIANCE REPORT REQUIRED PRIOR TO FINAL MECHANICAL INSPECTION. 18) A REVEGITATION PLAN IS REQUIRED PRIOR TO CO/FINAL INSPECTION. 19) LOCKS, LATCHES AND LANDINGS PER 2009 IBC, SECTION 1008. 20) LIGHT AND VENTILATION PER 2009 IBC, CHAPTER 12.