Loading...
HomeMy WebLinkAboutCom Check(1;(1COMcheck Software Version 3.9.1 /010f Envelope Compliance Certificate 2009 IECC Section 1: Project Information Project Type: New Construction Project Title : GRHD Battlement Mesa Medical Office Building Construction Site: Owner/Agent: Battlement Mesa, CO Section 2: General Information Building Location (for weather data): Climate Zone: Building Type for Envelope Requirements: Vertical Glazing f Wall Area Pct.: Activity Type(*) Healthcare -Clinic Grand River Hospital District 501 Airport Road Rifle, CO 81650 970-625-6458 Rifle, Colorado 5b Non -Residential 32% Section 3: Requirements Checklist Floor Area 39195 Designer/Contractor: Davis Partnership Architects 2301 Blake Street, Suite 100 Denver, CO 80205 303-861-8555 Envelope PASSES Design 8% better than code. Climate -Specific Requirements: Component Name/Description Level 1 B.O.G.: Slab-On-Grade:Unheated, Horizontal with vertical 3 ft. Level 2 S.Q.G.: Slab-On-Grade:Unheated, Horizontal with vertical 3 ft. Roof: Insulation Entirely Above Deck Basement Wall Level 1: Solid Concrete:12" Thickness, Normal Density, Furring: Metal, Wall Ht 14.3, Depth B.G. 12.0 Exterior Wall Level 1: Steel -Framed, 16" o.c_ Window 2: Metal Frame Curtain Wall/Storefront:Double Pane, Tinted, SHGC 0.35 Exterior Wall Level 2: Steel -Framed, 16" o.c. Window 1: Metal Frame Curtain Wall/Storefront:Double Pane, Tinted, SHGC 0.35 Gross Area or Perimeter 590 277 Cavity Cont. Proposed Budget R -Value R -Value U -Factor U-Factortaf 23100 3021 0.0 5545 13.0 2029 10.0 10.0 38.0 0.026 0.048 7.5 0.101 0.108 7.5 0.064 0.064 0.320 0.450 9450 13.0 7.5 0.064 0.064 2854 --- — 0.320 0.450 (a) Budget U -factors are used for software baseline calculations ONLY, and are not code requirements. Air Leakage, Component Certification, and Vapor Retarder Requirements: X1. All joints and penetrations are caulked, gasketed or covered with a moisture vapor -permeable wrapping material installed in accordance with the manufacturer's installation instructions. 2. Windows, doors, and skylights certified as meeting leakage requirements. A3. Component R -values & tJ-factors labeled as certified. 4. No roof insulation is installed on a suspended ceiling with removable ceiling panels. 5. 'Other' components have supporting documentation for proposed U -Factors. Project Title: GRHD Battlement Mesa Medical Office Building Report date: 12/17/12 Data filename: lldvfsollprojects\Battlement Mesa MOB_DV120821Design\LightingICalculations\Battlement Mesa IECC.cck Page 1 of 2 Id 6. Insulation installed according to manufacturer's instructions, in substantial contact with the surface being insulated, and in a manner that 1— achieves the rated R -value without compressing the insulation. 4 7. Stair, elevator shaft vents, and other outdoor air intake and exhaust openings in the building envelope are equipped with motorized 7 dampers. 8. Cargo doors and loading dock doors are weather sealed. 9. Recessed lighting fixtures installed in the building envelope are Type IC rated as meeting ASTM E283, are sealed with gasket or caulk. xi 10. Building entrance doors have a vestibule equipped with self-closing devices. Exceptions: ▪ Building entrances with revolving doors. 4 -Doors not intended to be used as a building entrance.(s%oe ALL -E“ T . ?4=e'rt'�� J Doors that open directly from a space less than 3000 sq. ft. in area. jg Doors used primarily to facilitate vehicular movement or materials handling and adjacent personnel doors. D Doors opening directly from a sleeping/dwelling unit. Section 4: Compliance Statement Compliance Statement: The proposed envelope design represented and other calculations submitted with this permit application. The pr requirements in COMcheck Version 3.9.1 and to comply with the ame - Title document is consistent w - . uilding plans, specifications d envelope system . --..esigned to meet the 2009 IECC atory requirements ' quirements Checklist. gnature Date Project Title: GRHD Battlement Mesa Medical Office Building Report date: 12/17/12 Data filename: 11dvfs011projects\Battlement Mesa MOB_ DV120821Design\Lighting\Calculations\Battlement Mesa IECC.cck Page 2 of 2