HomeMy WebLinkAboutCom Check(1;(1COMcheck Software Version 3.9.1
/010f Envelope Compliance Certificate
2009 IECC
Section 1: Project Information
Project Type: New Construction
Project Title : GRHD Battlement Mesa Medical Office Building
Construction Site: Owner/Agent:
Battlement Mesa, CO
Section 2: General Information
Building Location (for weather data):
Climate Zone:
Building Type for Envelope Requirements:
Vertical Glazing f Wall Area Pct.:
Activity Type(*)
Healthcare -Clinic
Grand River Hospital District
501 Airport Road
Rifle, CO 81650
970-625-6458
Rifle, Colorado
5b
Non -Residential
32%
Section 3: Requirements Checklist
Floor Area
39195
Designer/Contractor:
Davis Partnership Architects
2301 Blake Street, Suite 100
Denver, CO 80205
303-861-8555
Envelope PASSES Design 8% better than code.
Climate -Specific Requirements:
Component Name/Description
Level 1 B.O.G.: Slab-On-Grade:Unheated, Horizontal with vertical 3
ft.
Level 2 S.Q.G.: Slab-On-Grade:Unheated, Horizontal with vertical 3
ft.
Roof: Insulation Entirely Above Deck
Basement Wall Level 1: Solid Concrete:12" Thickness, Normal
Density, Furring: Metal, Wall Ht 14.3, Depth B.G. 12.0
Exterior Wall Level 1: Steel -Framed, 16" o.c_
Window 2: Metal Frame Curtain Wall/Storefront:Double Pane,
Tinted, SHGC 0.35
Exterior Wall Level 2: Steel -Framed, 16" o.c.
Window 1: Metal Frame Curtain Wall/Storefront:Double Pane,
Tinted, SHGC 0.35
Gross
Area or
Perimeter
590
277
Cavity Cont. Proposed Budget
R -Value R -Value U -Factor U-Factortaf
23100
3021 0.0
5545 13.0
2029
10.0
10.0
38.0 0.026 0.048
7.5 0.101 0.108
7.5 0.064 0.064
0.320 0.450
9450 13.0 7.5 0.064 0.064
2854 --- — 0.320 0.450
(a) Budget U -factors are used for software baseline calculations ONLY, and are not code requirements.
Air Leakage, Component Certification, and Vapor Retarder Requirements:
X1. All joints and penetrations are caulked, gasketed or covered with a moisture vapor -permeable wrapping material installed in accordance
with the manufacturer's installation instructions.
2. Windows, doors, and skylights certified as meeting leakage requirements.
A3. Component R -values & tJ-factors labeled as certified.
4. No roof insulation is installed on a suspended ceiling with removable ceiling panels.
5. 'Other' components have supporting documentation for proposed U -Factors.
Project Title: GRHD Battlement Mesa Medical Office Building Report date: 12/17/12
Data filename: lldvfsollprojects\Battlement Mesa MOB_DV120821Design\LightingICalculations\Battlement Mesa IECC.cck Page 1 of 2
Id 6. Insulation installed according to manufacturer's instructions, in substantial contact with the surface being insulated, and in a manner that
1— achieves the rated R -value without compressing the insulation.
4 7. Stair, elevator shaft vents, and other outdoor air intake and exhaust openings in the building envelope are equipped with motorized
7 dampers.
8. Cargo doors and loading dock doors are weather sealed.
9. Recessed lighting fixtures installed in the building envelope are Type IC rated as meeting ASTM E283, are sealed with gasket or caulk.
xi 10. Building entrance doors have a vestibule equipped with self-closing devices.
Exceptions:
▪ Building entrances with revolving doors.
4 -Doors not intended to be used as a building entrance.(s%oe ALL -E“ T . ?4=e'rt'��
J Doors that open directly from a space less than 3000 sq. ft. in area.
jg Doors used primarily to facilitate vehicular movement or materials handling and adjacent personnel doors.
D Doors opening directly from a sleeping/dwelling unit.
Section 4: Compliance Statement
Compliance Statement: The proposed envelope design represented
and other calculations submitted with this permit application. The pr
requirements in COMcheck Version 3.9.1 and to comply with the
ame - Title
document is consistent w - . uilding plans, specifications
d envelope system . --..esigned to meet the 2009 IECC
atory requirements ' quirements Checklist.
gnature Date
Project Title: GRHD Battlement Mesa Medical Office Building Report date: 12/17/12
Data filename: 11dvfs011projects\Battlement Mesa MOB_ DV120821Design\Lighting\Calculations\Battlement Mesa IECC.cck Page 2 of 2