Loading...
HomeMy WebLinkAboutCO-66531 4,1A4,41, el. • otr.r • ei;,-* • • 4•A•lhAt• "." PI; • 1141,;.• „„,4'.‘,* :.; • Pre :1' :4. Ilt,VAI 1pp. n, %,1,44,4.441T ".' • • 1 . 0.4 •• Certificate of Occupancy Building & Planning Department Garfield County, Colorado No change in the character of occupancy of a building shall be made without a Certificate of Occupancy- {Chapter 1 IRC, IBC) This certificate is issued pursuant to the requirements of Chapterl of the 1RC or Chapter 1 of the lBC certifying that at the time of Issuance, this structure was in compliance with the various codes adopted by the County regulating building construction or use for the fokowing. CO Number: CO -6653 Permit No. BLCO-10-10-11312 Group U f Owner Building Address Contractor George & Leslie Strong 'Type of Construction 70 CR 300 PARACHUTE, CO OWNER NDY SCHWALLER, Chief Building Official Owner Address Locality: VB Contractor Address Date of Final Inspection 0070 CR 300 Parachute, CO 81635 240927300002 Strong Subdivision SAME AS OWNER 05/02/2011 Work Description: Pump house for Water and Chlorination system. Issuance of a Certificate of Occupancy shall not be construed as an approval of a violation of the provisions of this code or of other resolutions or zoning codes of the jurisdiction. Certificates presuming to give authority to violate or cancel the provisions of this code or of this code or of other resolutions of the jurisdiction shall not be valid. {Chapter 1 IRC, IBC). eril--,..,•4104,. , iN*z., .6;(4.,:•, ,, LKTR, -.... • 7 "., -.,.:.?. ,,„•,:w,to... k e.,.,A....t..,..,21. . 0,, ft Avio-41i, r Iti1/414,1 • rii}littOIT:itevz,., Acz.,A...At .4444.4.11q so t,,‘, SAN r . '%M.:''r's..,^4.1reof1.11!'• „4.itl's -0,0 • !id , .h: A „VciPkiii0t1,7J4 g . „ f, .t1 0 is • •• '