HomeMy WebLinkAboutConditions of PermitCONDITIONS DITIONS OF PERMIT
BLCO-10-11-2260
RIOS DE AQUA VIVA, LLC
Remodel/Conditions
1252 CR 294
Rifle, Colorado
1) ALL WORK MUST COMPLY WITH THE 2009 IBC, IMC, IPC, IFGC, IFC, IECC AND
MANUFACTURERS INSTALLATION SPECIFICATIONS.
2) ALL WORK MUST COMPLY WITH THE CONDITIONS OF THE CURRENT LAND USE
PERMITS.
3) THE A-3 OCCUPANCY USE IS LIMITED TO; LOBBY, (2) OFFICES, CONFERENCE ROOM,
VENDING, CHURCH SEATING, LIBRARY, AND BATHROOMS. SEPARATE PERMITS ARE
REQUIRED FOR ANY ADDITIONAL REMODEL AND/OR USES.
4) THE R-2 OCCUPANCY (SLEEPING UNIT) IS LIMITED TO; THE RESIDENTIAL DESIGNATED
AREA LOCATED AT THE STAIRS. VERIFY A (1) HOUR PARTITION AND 45 MINUTE DOOR
ASSEMBLY FOR OCCUPANCY SEPARATION.
5) PERMIT INCLUDES DEMO/REMODEL OF DINING ROOM WALLS WITH CONDITION THAT
KITCHEN AND DINING ROOM ARE PROHIBITED FROM USE UNTIL FIRE DISTRICT
REQUIREMENTS ARE SATISFIED.
6) ALL ROOMS, AREAS, AND STAIRS PROHIBITED FROM USE SHALL BE SECURED.
7) MAINTAIN EGRESS REQUIREMENTS THROUGHOUT BUILDING PER IBC, CHAPTER 10.
8) ACCESSIBILTY REQUIREMENTS PER 2009 IBC, CH. 11, 34, AND ICC/ANSI A117.1-2003.
PARKING, SIGNAGE, ACCESSIBLE ROUTE, ENTRY AND BATHROOMS.
9) MAXIMUM OCCUPANT LOAD OF 200 SHALL BE POSTED IN BOTH ENGLISH AND SPANISH.
10) LOCAL FIRE DISTRICT SHALL INSPECT FIRE ALARM SYSTEM, EXTINQUISHERS, AND OTHER
PERTINENT IFC REQUIREMENTS. FIRE DISTRICT FINAL APPROVAL LETTER REQUIRED FOR
CERTIFICATE OF OCCUPANCY.
11) VERIFY EXIT DIRECTIONAL SIGNAGE PRIOR TO ELECTRICAL ROUGH -IN INSPECTION.
12) ELECTRICAL ROUGH IN APPROVAL IS REQUIRED PRIOR TO FRAME INSPECTION.
13) ELECTRICAL FINAL APPROVAL IS REQUIRED FOR CERTIFICATE OF OCCUPANCY.
14) LOCKS, LATCHES AND LANDINGS PER 2009 IBC, SECTION 1008.
15) LIGHT AND VENTILATION PER 2009 IBC, CHAPTER 12.
16) CONDITION FOR CERTIFICATE OF OCCUPANCY; A FOLLOW-UP SITE VISIT AND
INSPECTION MUST BE PERFORMED IN SIX (6) MONTHS TO VERIFY COMPLIANCE WITH
ALL CONDITIONS OF PERMIT.