Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS DITIONS OF PERMIT BLCO-10-11-2260 RIOS DE AQUA VIVA, LLC Remodel/Conditions 1252 CR 294 Rifle, Colorado 1) ALL WORK MUST COMPLY WITH THE 2009 IBC, IMC, IPC, IFGC, IFC, IECC AND MANUFACTURERS INSTALLATION SPECIFICATIONS. 2) ALL WORK MUST COMPLY WITH THE CONDITIONS OF THE CURRENT LAND USE PERMITS. 3) THE A-3 OCCUPANCY USE IS LIMITED TO; LOBBY, (2) OFFICES, CONFERENCE ROOM, VENDING, CHURCH SEATING, LIBRARY, AND BATHROOMS. SEPARATE PERMITS ARE REQUIRED FOR ANY ADDITIONAL REMODEL AND/OR USES. 4) THE R-2 OCCUPANCY (SLEEPING UNIT) IS LIMITED TO; THE RESIDENTIAL DESIGNATED AREA LOCATED AT THE STAIRS. VERIFY A (1) HOUR PARTITION AND 45 MINUTE DOOR ASSEMBLY FOR OCCUPANCY SEPARATION. 5) PERMIT INCLUDES DEMO/REMODEL OF DINING ROOM WALLS WITH CONDITION THAT KITCHEN AND DINING ROOM ARE PROHIBITED FROM USE UNTIL FIRE DISTRICT REQUIREMENTS ARE SATISFIED. 6) ALL ROOMS, AREAS, AND STAIRS PROHIBITED FROM USE SHALL BE SECURED. 7) MAINTAIN EGRESS REQUIREMENTS THROUGHOUT BUILDING PER IBC, CHAPTER 10. 8) ACCESSIBILTY REQUIREMENTS PER 2009 IBC, CH. 11, 34, AND ICC/ANSI A117.1-2003. PARKING, SIGNAGE, ACCESSIBLE ROUTE, ENTRY AND BATHROOMS. 9) MAXIMUM OCCUPANT LOAD OF 200 SHALL BE POSTED IN BOTH ENGLISH AND SPANISH. 10) LOCAL FIRE DISTRICT SHALL INSPECT FIRE ALARM SYSTEM, EXTINQUISHERS, AND OTHER PERTINENT IFC REQUIREMENTS. FIRE DISTRICT FINAL APPROVAL LETTER REQUIRED FOR CERTIFICATE OF OCCUPANCY. 11) VERIFY EXIT DIRECTIONAL SIGNAGE PRIOR TO ELECTRICAL ROUGH -IN INSPECTION. 12) ELECTRICAL ROUGH IN APPROVAL IS REQUIRED PRIOR TO FRAME INSPECTION. 13) ELECTRICAL FINAL APPROVAL IS REQUIRED FOR CERTIFICATE OF OCCUPANCY. 14) LOCKS, LATCHES AND LANDINGS PER 2009 IBC, SECTION 1008. 15) LIGHT AND VENTILATION PER 2009 IBC, CHAPTER 12. 16) CONDITION FOR CERTIFICATE OF OCCUPANCY; A FOLLOW-UP SITE VISIT AND INSPECTION MUST BE PERFORMED IN SIX (6) MONTHS TO VERIFY COMPLIANCE WITH ALL CONDITIONS OF PERMIT.