Loading...
HomeMy WebLinkAboutPlansExisting Parapet Assembly Return Wood Soffit to Channel at New 12" CMU 03 30 00.07 - Non -Compressible Joint Filler Existing Undisturbed Roof Assembly \ l \ , A I \ / \ / / \ / MAE12.01 MAE12.01 = = —=sa New 5/8" Drywall Ceiling Assembly 03 30 00.07 - Non -Compressible Joint Filler New Foundation/Footer Assembly Per Structural Od WALL SECTION 4 1"=1'-0" C> C.O 3\1 NEW EXTERIOR ELEVATION % 1/4"=1'-0" T. 0. CONC. EL. 100'-0' ". T. 0. CONC. idk EL. 100'-0' r DEMOLITION EXTERIOR ELEVATION 2 EXISTING BUILDING BEYOND 0 IA / IMAE12.011 J _1 L Existing CMU Column j' Extent of New Construction This Elevation IJr Install 6" Rigid Insulation in HVAC Units Original R.O. Locations (3). Install Heavy Gauge Metal Panels on Interior and Exterior to Cover ExistinjR.O. J EXTERIOR ELEVATION 1 1/4"=1'-0" T. O. CONC. EL. 100'-0' Revisions BID -PERMIT 09/08/09 CHANGE ORDER #01 11/16/09 HOLY CROSS ENERGY PHASE 2B ELECTRICAL OPERATIONS REMODEL Holy Cross Energy 3799 Highway 82 Glenwood Springs, Colorado 81601 © DPA Architectural Group, 2009 IIII A An Il Architectural Group P.C. 406 South Hyland Park Dr. Suite C Glenwood Springs, CO 81601 Phone: (970) 945-4040 dpadoug©gwest.net • RHM Revisions BID -PERMIT 09/08/09 CHANGE ORDER #01 11/16/09 HOLY CROSS ENERGY PHASE 2B ELECTRICAL OPERATIONS REMODEL Holy Cross Energy 3799 Highway 82 Glenwood Springs, Colorado 81601 © DPA Architectural Group, 2009 J Il 09/08/09 Drawn By RHM Checked By Approved By �OF • —\- /J � •r� RirR - Revisions BID -PERMIT 09/08/09 CHANGE ORDER #01 11/16/09 HOLY CROSS ENERGY PHASE 2B ELECTRICAL OPERATIONS REMODEL Holy Cross Energy 3799 Highway 82 Glenwood Springs, Colorado 81601 © DPA Architectural Group, 2009 J Il Revisions BID -PERMIT 09/08/09 CHANGE ORDER #01 11/16/09 Sheet Number A2.3 Project Number 2009.01 Date 09/08/09 Drawn By RHM Checked By Approved By Sheet Number A2.3 PROJECT: PHASE 2-B ELECTRICAL OPERATIONS REMODEL 3 799 HIGHWAY 82 GLENWOOD SPRINGS, CO 81602 OWNERS: HOLY CROSS ENERGY 3 799 HIGHWAY 82 PO BOX 2150 GLENWOOD SPRINGS, CO 81601 CONTRACTOR: FCI CONSTRUCTORS, INC. 3070 1-70 BUSINESS LOOP, BLDG A GRAND JUNCTION, COLORADO 81504 970-434-9093 ARCHITECT: DPA ARCHITECTURAL GROUP 406 S. HYLAND PARK DR., STE C GLENWOOD SPRINGS, CO 81601 PHONE: 970-945-4040 E-MAIL: dpadoug@qwestoffice.net PHASE 2-B BID -PERMIT DRAWINGS September 8, 2009 STRUCTURAL ENGINEER GLENWOOD STRUCTURAL & CIVIL INC. 2425 SOUTH GRAND AVE GLENWOOD SPRINGS, CO 81601 PHONE: 970-928-0135 E-MAIL: gsc@sopris.net MECHANICAL/ELECTRICAL ENGINEER BIGHORN CONSULTAING ENGINEERS 509 S. WESTGATE DRIVE, SUITE #1 GRAND JUNCTION, CO 81505 PHONE: 970-241-8709 E-MAIL: blaine@bighorneng.com APPROVED SUBJECT TO NOTED LZCEPTIONS & INSPECTIONS GARFIELD COUNTY BI toUILDIVIN ry G DEPARTMENTByRMf FIEL COPY NO INSPECTION WITHOUT THESE PLANS ON SITE page of Revisions BID -PERMIT 09/08/09 Project Number Date Drawn By 2009.01 09/08/09 RHM Checked By Approved By Sheet Number A0.0 II F 3 C!) m C = W a, V3 a) vu y [] © _ v O F = n� lil HOLY CROSS ENERGY PHASE 2B ELECTRICAL OPERATIONS REMODEL Holy Cross Energy 3799 Highway 82 Glenwood Springs, Colorado 81601 © DPA Architectural Group, 2009 ,l i • a Architectural Group P.C. 406 South Hyland Park Dr. Suite C Glenwood Spnngs, CO 81601 Phone: (970) 9454040 dpadouggtgwesl. net ■ Revisions BID -PERMIT 09/08/09 Project Number Date Drawn By 2009.01 09/08/09 RHM Checked By Approved By Sheet Number A0.0 II F 3 C!) m C = W a, V3 a) vu y [] © _ v O F = n� lil HOLY CROSS ENERGY PHASE 2B ELECTRICAL OPERATIONS REMODEL Holy Cross Energy 3799 Highway 82 Glenwood Springs, Colorado 81601 © DPA Architectural Group, 2009 ,l .i 1 of Co .i co 0 Pt. T R 10 % B-tt491 491 , < cc, a1'in . - ..s ii/SeD ARC \ Revisions BID -PERMIT 09/08/09 Project Number Date Drawn By 2009.01 09/08/09 RHM Checked By Approved By Sheet Number A0.0 II F 3 C!) m C = W a, V3 a) vu y [] © _ v O F = n� lil HOLY CROSS ENERGY PHASE 2B ELECTRICAL OPERATIONS REMODEL Holy Cross Energy 3799 Highway 82 Glenwood Springs, Colorado 81601 © DPA Architectural Group, 2009 ,l Revisions BID -PERMIT 09/08/09 Project Number Date Drawn By 2009.01 09/08/09 RHM Checked By Approved By Sheet Number A0.0 II F 3 C!) m C = W a, V3 a) vu y [] © _ v O F = n� Sheet Number A4.1 Revisions BID -PERMIT 09/08/09 CHANGE ORDER #01 11/16/09 Demolition Plan Notes: Remove hollow metal frame and glazing. % Remove hose bib and hose bib supply line and relocate 2'-0" to the North. 4, Remove hose bib and hose bib supply line. Cap supply line per code requirements. 03 Remove small mezzanine structure above to west side concrete support and remove tube steel column support. Remove and replace Concrete as required to fully remove column. O4 Remove CMU exterior walls to 4" min. below adjacent slab, hollow metal door/window frames, glazing, switches, conduit and wiring. ORemove trench drain grating and steel angle grate support. O Remove overhead door, door tracks and hardware, operators, controls and all door conduit and wiring. • Sawcut and remove existing concrete slab on grade. Coordinate sawcut locations and extent of slab removal with new footing sizes per structural. Sawcut and remove existing concrete slab on grade. Og Remove existing hollow metal door and window frame, door leaf, and glazing. Remove CMU curb below hollow metal window sill. Remove portion of foundation wall 4" minimum below adjacent floor slabs directly below removed CMU. Og Remove existing hollow metal window frame and glazing. Saw cut and remove CMU sill/wall directly below window frame to floor. Remove portion of foundation wall 4" min. below adjacent floor slabs directly below removed CMU. 10 Remove existing Thru-Wall HVAC units, power supply, conduit and controls. Sawcut new R.O. for hollow metal door frame. Remove CMU within new sawcut R.O. to 4" below F.F. Coordinate R.O. header requirements with Structural. Remove existing water cooler. Cap existing water supply line. Remove power supply per Code requirements. 13 Remove existing Shelves, supports and brackets. • Remove existing partial height CMU toilet partition and connected I -. d r .■ - . .. - 4. Remove indicated portion of freestanding interior framed room addition including windows and frames, door and frame. upper level wood railing, ceiling structure, framed walls, conduit, wiring and switches attached to section of removed wall. Retain all panels, conduit etc attached to CMU walls. • Not Used Not Used • Not Used 1•g Not Used C.0 Remove existing wall mounted sink. Cap supply, waste and vent lines per code requirements. eRemove slab on grade at entire new Women's bathroom area. Remove existing hollow metal door frame and leaf. Remove CMU partition to bathroom. Remove portion of foundation wall 4" min. below adjacent floor slabs directly below removed CMU. • Remove existing plywood soffit and light fixtures above. Preserve plywwod for reinstallation as needed at other areas. Remove existing drywall ceiling and light fixtures above. • Remove existing drywall ceiling as required to provide a continuous transition to adjacent new ceiling. Remove and store lockers for later re -installation in this room. 49$, Existing 4" Roof Drain it MEN'S 109 I- J I I I I I I I l LJ WOMEN'S 107 2 r-� IO \'L 2'-8" 3'-4" r.o. 2'-10" r.o. 1'-0' DEMOLITION FLOOR PLAN: RESTROOMS 1/4"=1'-0 EXISTING STOR Hoe I 3'-4" r.o. 2'-3 1/2" UP TO MEZZANINE ii 7 ,,,, ., t{' In DPA Architectural Group P.C. 406 South Hyland Park Dr. Suite C Glenwood Springs, CO 81601 Phone: (970) 945-4040 dpadoug@gwest.net 2009.01 ii HOLY CROSS ENERGY PHASE 2B ELECTRICAL OPERATIONS REMODEL Holy Cross Energy 3799 Highway 82 Glenwood Springs, Colorado 81601 DPA Architectural Group, 2009 • Project Number 2009.01 Date 09/08/09 Drawn By RHM Checked By Approved By _ f�L ii HOLY CROSS ENERGY PHASE 2B ELECTRICAL OPERATIONS REMODEL Holy Cross Energy 3799 Highway 82 Glenwood Springs, Colorado 81601 DPA Architectural Group, 2009 • Project Number Project Number 2009.01 Date 09/08/09 Drawn By RHM Checked By Approved By IL ‚'S AL II Architectural Group P.C. 406 South Hyland Park Or. Suite C Glenwood Springs, CO 81601 Phone: (970) 945.4040 dpadoug©gwest.net 08/28/09 Drawn By ■ Continuous 2x6 Wood Cleat Continuous 1x4 Wood Trim Rim Joist Per Structural 06 10 00.16 - Preservative Treated Sill Per Structural Anchorage Per Structural Approved By NI r T � •• ELD 4, o FLC.02 "eD ARC it MAI8.01 (;\DEC K/WALLTRANSITION L./2 = 1.0. Rebar Welded to Column Per Structural Existing 4x8 Tube Steel Column Rebar Welded to Column Per Structural 45° Sawcut Mitre @ Inside Corner of CMU Av r __ f Masonry Coursing 2• !''°0 +/_ 2. MAI 8.01 I Es No mi um •. • \._ r IllirAlli/ 1 1�1 Co 12.01 MAE r \ 1 1%. ii elTUBE COLUMN/8"/12" CMU TRANSITION 3 =,-0 V f Masonry Coursing f 2' ;'"■� +/- ,,� 7 Rebar Welded to Column Per Structural MAI 8.01 Existing 4x8 Tube Steel Column J Rebar Welded to Column Per Structural K._ 45° Sawcut Mitre @ Inside Corner of CMU 4 I MAE 12.01 COLUMN/8"/12" CMU TRANSITION OTUBE 3' - ' -0' IL ‚'S AL II Architectural Group P.C. 406 South Hyland Park Or. Suite C Glenwood Springs, CO 81601 Phone: (970) 945.4040 dpadoug©gwest.net 08/28/09 Drawn By ■ IL HOLY CROSS ENERGY PHASE 2B ELECTRICAL OPERATIONS REMODEL Holy Cross Energy 3799 Highway 82 Glenwood Springs, Colorado 81601 `J DPA Architectural Group, 2009 II J 08/28/09 Drawn By RHM Checked By Approved By T � •• ELD 4, o "eD ARC it IL HOLY CROSS ENERGY PHASE 2B ELECTRICAL OPERATIONS REMODEL Holy Cross Energy 3799 Highway 82 Glenwood Springs, Colorado 81601 `J DPA Architectural Group, 2009 II J Revisions BID -PERMIT 09/08/09 CHANGE ORDER #01 11/16/09 Sheet Number A6.2 Project Number 2009.01 Date 08/28/09 Drawn By RHM Checked By Approved By Sheet Number A6.2 /1 aIZZZ DENOTES EXISTING WALLS TO REMAIN DENOTES EXISTING WALLS TO BE REMOVED ROOF DEMO & EXISTING 0' 2' 'V 8' SCALE: 1/8" = 1.-0" N r 0 r-- sl° o‘S -V Ate L _J 1 , ., ..„ D Ak alk Architectural Group P.C. 406SouthHyland Park Dr Suite C Glenwood Spnngs. CO 81601 Phone: (970) 945-4040 dpadoug@qwestnet • • 100% Set 9/8/09 Drawn By Add 1 9/29/09 (E) W12X16.6 CD/VT. Approved By AG F724 „S rb s (2 ,j \ •S CS i i z; • 1114.) lc • • 29 5 5;• •te., 32LH09 6'-0 0.C. ( @ C.O. k72727/ a/Zra Wr-ZWZI,ilr n I I I I (E) W12X22 CONTINUOUS NOTE: GENERAL SHORING SEQUENCING CONTRACTOR AND BY 247/ die 1/2741.77flazz/ ., FaZW22. . 'm 4 sC Q'Sv 1‘4 C.O. (E) Wl2X2 I I I _J /1 aIZZZ DENOTES EXISTING WALLS TO REMAIN DENOTES EXISTING WALLS TO BE REMOVED ROOF DEMO & EXISTING 0' 2' 'V 8' SCALE: 1/8" = 1.-0" N r 0 r-- sl° o‘S -V Ate L _J t 1 , ., ..„ D Ak alk Architectural Group P.C. 406SouthHyland Park Dr Suite C Glenwood Spnngs. CO 81601 Phone: (970) 945-4040 dpadoug@qwestnet • t • HOLY CROSS ENERGY PHASE 2B ELECTRICAL OPERATIONS REMODEL Holy Cross Energy 3799 Highway 82 Glenwood Springs, Colorado 81601 DPA Architectural Group, 2009 t • 100% Set 9/8/09 Drawn By Add 1 9/29/09 Checked By Change Order #01 11/6/09 Approved By AG i i z; • 1114.) lc • • 29 5 5;• •te., t • HOLY CROSS ENERGY PHASE 2B ELECTRICAL OPERATIONS REMODEL Holy Cross Energy 3799 Highway 82 Glenwood Springs, Colorado 81601 DPA Architectural Group, 2009 t • Sheet Number S2.5 1... Revisions 09266 98% Set 8/28/09 100% Set 9/8/09 Drawn By Add 1 9/29/09 Checked By Change Order #01 11/6/09 Approved By AG Sheet Number S2.5 Project Number 09266 Date 11/16/09 Drawn By KJK/MCJ Checked By MCJ Approved By AG Sheet Number S2.5 Apply Plywood Siding Saved from Demolition of Mezzanine Structure 16" x 16" x 8" CMU Stacked Column Refer to Structural Remove Mezzanine Structure. Preserve Plywood Siding for Later Re -use. 1— FLC.02 A6.2 IN I•1 ■ ■ ■ Grout Open CMU Cells at Demolished Wall. Flush with Adjacent CMU. MAE8.01 +I•CtNrE5:1Gi ■ T.O. GUARDRAILS EL 112'-7' ■ ■ ■ T. O. CMU 1 EL. 1101-8' ■ \ B. O. CEILING EL. 110'-0' um .e 04 20 00.16 - 8" Concrete Block Infill at Existing Window R.O. T.O. CONC. S EL. 100'-0' SECTION THROUGH CREW FOREMAN J 1/4"=1'-0" T.O. GUARDRAIL EL. 112'-7' T.O. MEZZ N N EL. 109'-1' T.O. CONC. kik EL. 100'-0' THROUGH CREW FOREMAN CaziSECTION j 1/4"=1'-0" SB. 0. HEAD EL. 110'-0' Al T. 0. CMU. EL. 108'-0' 1 A1.4 MEG 02 I v 118 A N IMAE12.01 B. 0. HEAD ai EL. 110'-0' T. 0. CMU. EL. 108'-0' T. 0. CONC. EL. 100'-0' 2 NEW EXTERIOR ELEVATION 1/41=11-0' i, /, / // / - 1, . ' z _/ r11 L `, DEMOLITION EXTERIOR ELEVATION 1/4'=1'-0" T. 0. CONC. s EL. i00' -O' t yrs:; :r< Architectural Group P.C. 406 South Hyland Park Dr. Suite C Glenwood Springs. CO 81601 Phone: (970)945-4040 dpadoug®gwest.net 2009.01 t HOLY CROSS ENERGY PHASE 2B ELECTRICAL OPERATIONS REMODEL Holy Cross Energy 3799 Highway 82 Glenwood Springs, Colorado 81601 © DPA Architectural Group, 2009 s 2009.01 Date 09/08/09 Drawn By RHM Checked By Approved By Co epf 0 'az., ‘'FD ARCkk\ t HOLY CROSS ENERGY PHASE 2B ELECTRICAL OPERATIONS REMODEL Holy Cross Energy 3799 Highway 82 Glenwood Springs, Colorado 81601 © DPA Architectural Group, 2009 s Revisions BID -PERMIT 09/08/09 CHANGE ORDER #01 11/16/09 Sheet Number A1 .3 Project Number 2009.01 Date 09/08/09 Drawn By RHM Checked By Approved By Sheet Number A1 .3