HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT
BLCO-10-13-3011
EnCana Middle Fork Water Facility
Manifold Building
Parachute, Colorado
1) ALL WORK MUST COMPLY WITH THE 2009 IBC AND MANUFACTURERS SPECIFICATIONS.
2) ALL WORK MUST COMPLY WITH THE CONDITIONS OF THE CURRENT LAND USE PERMIT.
3) ALL WORK SHALL COMPLY WITH STATE AND FEDERAL REGULATIONS.
4) EXCAVATION OBSERVATION REPORT REQUIRED AT FOOTING INSPECTION, 1700 PSF.
5) ALL HIGH STRENGTH BOLTING AND FIELD WELDING REQUIRES SPECIAL INSPECTOR.
PROVIDE APPROVAL REPORT AT FRAME INSPECTION.
6) LIGHT AND VENTILATION PER 2009 IBC, CHAPTER 12.
7) LOCKS, LATCHES AND LANDINGS PER 2009 IBC, SECTION 1008.
8) ELECTRICAL ROUGH IN APPROVAL IS REQUIRED AT FRAME INSPECTION.
9) ELECTRICAL FINAL APPROVAL IS REQUIRED FOR FINAL INSPECTION.
10) GARFIELD COUNTY ANAL INSPECTION REQUIRED FOR CO/COMPLETION APPROVAL.
c/Z._ cop)/