HomeMy WebLinkAboutPlans0
N
N
0
twos /
de
/ /
/ GROUND /
EXISTING
FENCE
I
ALUMINUM CAP BENCHMARK
N: 614188.45
E: 1262741.20
ELE: 5441.82
PLANT GRID COORDINATES:
N: -90.47
E: -1233.86
CONDITIONS OF PERMIT
BLCO-10-12-2680
WPX Energy Rocky MountainLLC
Parachute Creek Gas Plant Expansion
Mobile Office/JOB Trailer
Parachute, Colorado
Z
0
7
0
Z
O
3
APPROVED
suBJECT TO NOTED
EXCEPTIONS & INSPECTIONS
GARFIELD COUNTY
BUWL I EP
49ij -By
u o
LDC
NO INSPECTION WITHOUT
THESE PLANS ON SITE
Irpr of
INTERSTATE
ELECTRICAL CONTRACTORS, INC.
10
m
0
WING NUMBER
:B—SUB—CV10-001
PROPOSED LOCATION
FOR XCEL ACCESS GATE
LAYDOWN AREA
T-7 MATERIAL STORAGE TRAILER, SEMI V
T-10 MATERIAL STORAGE TRAILER, SEMI (AN
OFFICE FIELD OFFICE, MOBILE CONNE RAILER
PREPARED BY:
electric power engineering
EXISTING H -FRAME
MODIFIED FOR NEW
SWITCH
(GOABSW-PCS1-01)
1) ALL WORK MUST COMPLY WITH THE 2009 IBC AND MANUFACTURERS SPECIFICATIONS.
2) ALL WORK MUST COMPLY WITH THE CONDITIONS OF THE CURRENT LAND USE PERMIT.
3) MOBILE OFFICE TRAILER APPROVED FOR CONTRACTOR'S USE ONLY.
4) MOBILE OFFICE TRAILER USE IS TEMPORARY AND LIMITED TO 180 DAYS FROM THE
DATE OF PERMIT ISSUANCE. REQUEST FOR EXTENSION IS REQUIRED.
5) LOCKS, LATCHES, AND LANDINGS PER 2009 IBC, SECTION 1008.
6) LIGHT AND VENTILATION PER 2009 IBC, CHAPTER 12.
7) IF APPLICABLE, ELECTRICAL FINAL APPROVAL I5 REQUIRED FOR FINAL INSPECTION.
8) GARFIELD COUNTY FINAL INSPECTION REQUIRED FOR FINAL/COMPLETION APPROVAL.
1
APPROX. LOCATION FOR
TURNING STRUCTURE.
PHASE TO PHASE AND
STATIC HEIGHT ARE
HOLD.
I
L
Set Gond/ %1.5 towiil/C t'ie-.
444 9 S9iti/ces4 /4 .
TRUCTION
A_ / ONL'
!—BOLLARDS
SCALE
40' 30' 20' 10' 0' 40'
Y
TOLERANCES
B
UPDATED GA PER WILLIAMS COMMENTS
9/28/2012
HAL
ET
P.O. Box 1265 Arvada, CO 80001
(303) 431-7895 FAX (303) 431-1836
OLD DRAWING NUMBER
ORIGINAL DRAWINGS BY
XXX
3
A
ISSUED FOR REVIEW
9/6/2012
ET
REFERENCE DRAWINGS AND INFORMATION
4
REV.
DESCRIPTION
DATE
BY
CK
CUTS:
ANGLES:
WELD ASS'Y: ±1/4'
±1/3"
±1/2"
THIS DRAWING IS THE
PROPERTY OF WILLIAMS
AND IS NOT TO BE USED FOR
ANY PURPOSE OTHER THAN
THAT FOR WHICH IT IS
SPECIFICALLY FURNISHED.
Edited By: nnowmon
Oct 23, 2012 - 7:13am
File Name: SITE PIAN
PCB-SUB-CV10-001
WiII:ams
WILLIAMS FIELD SERVICES
-PICEANCE BASIN-
LC0-10-12-2680
J
0
Y
C.1
c
_
C
W
X
3
[9
d
COMPANY/FACILITY:
WILLIAMS FIELD SERVICES — PICEANCE BASIN
230kV SUBSTATION PCS2
TITLE:
SITE PLAN
DRAWN BY:
HAL
SCALE:
NTS
DATE CREATED:
09/07/12
UNIT NO:
REVISION:
B
SHEET NUMBER: APPROVED BY: NO REQ'D:
1 OF 1
DRAWING NUMBER:
PCB—SUB—CV10-001
10
REVISIONS
8